Copy of Responses - RFIs - ECP Awnings_Utilities.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Entry Point Awnings & Utilities
Solicitation number
W50S6N-21-B-0004
Issued by

About this file

This document contains a request for information and responses related to a federal contract opportunity for entry point awnings and utilities at an Air National Guard base in Alabama. The contract will be for construction services on a firm-fixed-price basis to provide all labor, materials, equipment, and supervision necessary to construct two free-standing awning structures over vehicle lanes and a truck inspection area at the base entry control point. Additionally, the contract will include providing electric and water utility services to the adjacent area. The responses address questions on as-built drawings, structural design requirements, engineering drawings, and surface drainage. A pre-bid site visit is scheduled for July 15, 2021, and construction is anticipated to take 120 days with completion by late 2021. The North American Industry Classification System code is 236220 and it is set aside for small businesses with average annual revenue under $39.5 million for the previous three years.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI's

Comment NumberDrawing/ Spec. NumberAdditional Data(RFI) Request for Information.Design Team: Architect's / Engineer's CommentsResponse ByDate:187th CES Response / CommentsResponse ByComment Date:Open / Close
1Please provide as-builts of the new entry point and surrounding areas along with a utilities map of the entire area where work is scheduled to be performed.Conformance Drawings attached.WS8/3/21Close
2Will a structural design of the awning column footings and wind load calculations be requirements for this project?Structural drawings will not be required. However, certification by the manufacturer will be required for wind loads. Column footings will be installed per manufacturer recommendation.WS8/3/21Close
3Is there a basis of design for these awnings?No.WS8/3/21Close
4Will we be required to provide engineered awning shop drawings?Engineered shop drawings will not be required. See response to RFI #2.WS8/3/21Close
5Will it be acceptable for the downspouts to surface drain onto the concrete and/or grass?Downspouts will surface drain on to the grass or concrete, in the direction away from the roadway.WS8/3/21Close