This solicitation is for construction services to provide two free-standing awning structures and utility service upgrades at the entry control point to the 187th Fighter Wing in Montgomery, Alabama. The scope of work includes constructing awnings over the incoming traffic lanes and truck inspection area, and installing electric and water utility lines adjacent to the traffic lanes. The contract is a firm-fixed-price, between $100,000 and $250,000, with a 120 calendar day completion period after notice to proceed. A pre-bid site visit is scheduled for July 15, 2021. The NAICS code is 236220 and it is a 100% small business set-aside. The solicitation is issued by the Department of the Army Alabama Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ABSTRACT ECP AWNING.pdf | ||
| Base Utility Map (for information only).pdf | ||
| Copy of Responses - RFIs - ECP Awnings_Utilities.xlsx | XLSX spreadsheet | |
| SF30 SOLICITATION AMENDMENT 0001.pdf | ||
| WD AL20210093 7_23_2021.pdf | ||
| Pre-Bid slides ECP Awning.ppt | PPT presentation | |
| Site Visit Attendance_Redacted.pdf | ||
| W50S6N21B004 SOL..pdf | ||
| STATEMENT OF WORK for ECP awning and utilities.pdf | ||
| WD AL20210093.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
T1.0
TITLE SHEET
AND INDEX
TO
DRAWINGS
CO
N
ST
RU
CT
N
E W
E N
TR
Y
CO
N
TR
O
L
PO
IN
T
D A
N N
E
LL
Y F
IE
LD
, M O
N
TG
O M
E
RY
, A L
12171.00
AUGUST 2019
DCD
INDEX TO DRAWINGS
Sheet No. Sheet Name
A0.9 OMITTED
A0.10 FENCE DETAILS
A0.11 FENCE DETAILS
A0.12 FENCE DETAILS
A0.13 FENCE DETAILS
04 Electrical
E1.0 SITE PLAN LIGHTING
E1.1 SITE PLAN LIGHTING CALCULATIONS
E1.2 LUMINAIRE SCHEDULE
E2.0 SECURITY GATES ELECTRICAL
E2.1 SECURITY GATES ELECTRICAL
E3.0 SINGLE LINE DIAGRAM, PANELBOARD, DETAILS,
& NOTES
05 CONSTRUCTION PHASING
P1.1 CONSTRUCT. PHASING PLAN - PHASE I
P1.2 CONSTRUCT. PHASING PLAN - PHASE II
P1.3 CONSTRUCT. PHASING PLAN - PHASE III
INDEX TO DRAWINGS
Sheet No. Sheet Name
00 Title
T1.0 TITLE SHEET AND INDEX TO DRAWINGS
02 Civil
C1.1 EXISTING SITE & DEMOLITION PLAN
C1.2 CONSTRUCTION SAFETY PLAN
C2.1 PROPOSED SITE PLAN
C3.1 GEOMETRIC CONTROL PLAN
C4.1 PROPOSED UTILITY PLAN
C4.2 PROPOSED STORM PROFILES
C5.1 PROPOSED GRADING PLAN
C5.2 PROPOSED GRADING PLAN
C5.3 FENCE DETAIL
C6.1 PRE DEVELOPMENT DRAINAGE PLAN
C6.2 POST DEVELOPMENT DRAINAGE PLAN
C7.1 EROSION CONTROL PLAN PHASE I
C7.2 EROSION CONTROL PLAN PHASE II
C8.1 DETAILS
C8.2 DETAILS
C8.3 DETAILS
C8.4 DETAILS
C8.5 TRAFFIC CONTROL DETAILS
C8.6 TRAFFIC CONTROL DETAILS
C8.7 TRAFFIC CONTROL DETAILS
C8.8 SIGNAGE DETAILS
03 Architectural
A0.1 FENCING AND CONTAINMENT PLAN
A0.2 ENLARGED ENTRY CONTROL POINT PLAN
A0.3 ENLARGED FENCING PLAN
A0.4 ENLARGED FENCING PLAN
A0.5 ENLARGED FENCING PLAN
A0.6 ENLARGED FENCING PLAN
A0.7 DECORATIVE FENCING DETAILS
A0.8 OMITTED
Approvals:
Title: Signature: Date:
Base Commander
Base Civil Engineer
Base Project Engineer
Bio Environmental Eng.
Safety
Security Police
Base Communications
Fire Chief
Using Agent
Schedule of Bid Options:
Civil:
CONSTRUCT NEW ENTRY CONTROL POINT
PHASE I
Dannelly Field (ANG), Montgomery, AL
Architect:
Design Team: Consulting Engineers:
Electrical:
No. Revision Date 3 Addendum
No. 4 10/18/201
DDonovan Text Box
CONFORMANCE DOCUMENTS
DDonovan Typewritten Text
DDonovan Typewritten Text
DDonovan Text Box
JANUARY 2020
0 100' 200'
Scale: 1" = 100'
1. The Contractor is responsible for having all existing utilities located prior to construction. All existing utilities to be uncovered and verified as to size, location, elevation and condition prior to commencement of construction. All cost associated with having the utilities marked and uncovered are the responsibility of the Contractor, regardless of the utilities being shown in the plans.
2. The Contractor shall dispose of all demolition debris in accordance with federal, state and local regulations.
3. This plan is not intended to show each and every item to be removed or demolished by the Contractor. There are other items not shown that the Contractor must remove and/or replace to construct the improvements shown in these plans.
The Contractor shall thoroughly investigate the plans and investigate the site prior to submitting a bid. He/she shall include in his/her bid whatever means he/she feels it will take to construct the improvements. The Contractor shall not receive additional compensation for removing items not noted as such on the this plan.
4. The Contractor shall saw cut the existing concrete at the nearest joint to the locations where the concrete is to be removed.
5. The Contractor shall remove the concrete back to a clean cut and uniform construction joint to minimize the "patch" look in all sidewalk and curb and gutter to be removed.
6. It is the Contractor's responsibility to satisfy himself of the accuracy of the topographic information shown in this drawing prior to commencing construction.
C1.1
Existing Site &
Demolition Plan
Sheet Number
Sheet Title
Project Title
M o n tg o m er y
D o th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
DDonovan Text Box
CONFORMANCE DOCUMENTS
DDonovan
JANUARY 2020
I I I I
&\\Vi
121/A
LEGEND
RUNWAY SAFETY AREA
WORK AREA - PHASE 1
WORK AREA - PHASE 2
STAGING AREA
LIGHTED 11X
SIGNAL
PROPERTY LINE
STAGING AREA
Point # Lat Long
1 N5
53' 25" E4
16' 44"
2 N5
53' 24" E4
16' 59"
3 N5
53" 17" E4
16' 58"
4 N5
53" 18" E4
16' 45"
-: \ \fon:gorrP.ry\C MGf/ -:•wg\t..NG · 27\C 1-AG1:l17009L A.NG rT P\ +plo::.-.s\C · .O? ':ArTTY Pl A'Lc1wg lRANSITIONAL
SURFACE (TYP)
RUNWAY lHRESHOLD
ELEV - B
RUNWA'I'
£ RUNWAY
SECTION
PROFILE
PAVEMENT SAFETY AREA WIDTH •
RW J-21 400'
RW 10-28 500'
J/21 TAXIWAYS 49'/118'
10/28 TAXIWAYS 214"
•All. DISTANCES ARE CENTERED A80UT THE
CENTERLINE OF" THE AREA LISTED.
SAFETY AREA DIMENSIONS
RUNWAY END A B C
3 500' 219.7' 34 21 500' 185.9' 20
10 1000' 218.2' 50
28 1000' 192.5' 50
FAR PART 77 SURFACES
N.T.S.
1HE PART n SECTION VIEW IS CENTERED ON lHE RUNWAY CENTERLINE AT lHE CENTERLINE ELEVATION, AND ON 1HE EXTENDED RUNWAY CENTERLINE AT lHE RUNWAY
1HRESHOLD ELEVATION TO A POINT 200 FEET BEYOND
EACH lHRESHOLD. lHE SECTION lHEN RISES ALONG 1HE SLOPE INDICATED ON lHE PROFILE VIEW.
SAFETY NOTES
1. ALL CONSTRUCTION VEHICLES AND EQUIPMENT OPERATING ON THE AIRPORT PROPERTY SHALL BE MARKED WITH A FLASHING CIRCULAR AMBER EMERGENCY WARNING UGHT, ACCORDING TO FM ADVISORY CIRCULAR 150/5370-2E.
2. ALL FOREMEN'S AND SUPERINTENDENT'S VEHICLES SHALL CONTAIN RADIOS CAPABLE OF TRANSMITTING AND RECEIVING THE FM GROUND CONTROL FREQUENCY OF 121.7 MHZ AND TOWER/CTAF FREQUENCY OF 119.7 MHZ NORMAL RADIO COMMUNICATIONS BETWEEN CONTRACTOR PERSONNEL WILL NOT BE ALLOWED ON ANY FM FREQUENCY.
3. ALL FLAGMEN CONTROLLING CONSTRUCTION TRAFFIC ACROSS AIRPORT OPERATIONAL SHALL ALSO BE EQUIPPED WITH A
RADIO WHICH WILL OPERATE ON A FREQUENCY 121.7 MHZ AND 119.7 MHZ.
4. THERE SHALL BE A MINIMUM OF 1 RADIO CAPABLE OF OPERATING ON THE FM GROUND CONTROL FREQUENCY OF 121.7 MHZ AND TOWER FREQUENCY 119.7 MHZ ON THE PROJECT SITE AT ALL TIMES DURING EACH CONSTRUCTION WORK PERIOD.
5. SUFFICIENT VACUUM TYPE SWEEPERS AND CLEAN UP EQUIPMENT SHALL BE PROVIDED IN ORDER THAT ALL WASTE, LOOSE
MATERIAL, AND DEBRIS CAN BE REMOVED FROM ALL AIRPORT OPERATION AREAS.
6. ALL BARRICADES, RADIOS, TEMPORARY MARKINGS, ETC., AS INCLUDED IN THESE SAFETY NOTES, SHALL BE FURNISHED AT NO ADDITIONAL COST TO THE OWNER. AIRFIELD BARRICADES SHALL CONFORM TO THE REQUIREMENTS OF AC 150/5370-2E. NO SEPARATE MEASUREMENT AND PAYMENT WILL BE MADE FOR THESE REQUIRED SAFETY ITEMS. ALL COSTS ASSOCIATED WITH THESE ITEMS MUST BE INCLUDED IN THE CONTRACT BID PRICES LISTED IN THE PROPOSAL FOR THE ITEMS WHICH WOULD MOST
LOGICALLY INCLUDE THEM.
7. THE CONTRACTOR SHALL NOT AT ANY TIME BE ON THE RUNWAY UNLESS THE AIR TRAFFIC CONTROL TOWER GIVES PRIOR
APPROVAL.
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION, MAINTENANCE, REMOVAL AND CLEANUP OF ALL HAUL ROlJTES
(ON AND OFF AIRPORT PROPERTY).
9. THE CONTRACTOR SHALL FURNISH ALL LIGHTING NECESSARY FOR NIGHT OPERATIONS. LIGHTING WILL BE DIRECTED OR SHADED TO PREVENT INTERFERENCE WITH AIRCRAFT, THE AIR TRAFFIC CONTROL TOWER, AND OTHER AIRPORT OPERATIONS.
THE CONTRACTOR SHALL BE CAPABLE OF REMOVING ALL LIGHTING EQUIPMENT FROM THE RUNWAY WITHIN 15 MINUTES OF NOTIFICATION OF AN EMERGENCY. A TRAILER MOUNTED LIGHTED 'X' SHALL BE PROVIDED FOR EACH RUNWAY END FOR NIGHT TIME CLOSURE OF RUNWAY 3/21 AND RUNWAY 10/28. THESE MAY BE RENTED FROM THE AIRPORT FOR THE PROJECT DURATION.
10. THE CONTRACTOR SHALL BE REQUIRED TO HAVE ON HAND AT ALL TIMES DURING CONSTRUCTION ACTIVITIES ONE AIRPORT
POLICE RADIO CAPABLE OF A FREQUENCY OF 156.21 MHZ.
SEQUENCING/PHASING NOTES
I
,,I'1 \
II
N
500' 1000'
Scale: 1" = 500'
1. CONTRACTOR SHALL PREPARE STAGING AREAS AND HAUL ROUTES. CONTRACTOR SHALL BE ALLOWED ACCESS TO THE AIRPORT DURING APPROVED DAYTIME HOURS FOR THIS WORK. CONTRACTOR SHALL
REQUEST ACCESS 2 WEEKS PRIOR TO WORKING.
2. CONTRACTOR SHALL BEGIN WORK. THERE ARE NO TIME RESTRICTIONS FOR WORK IN PHASE 1. ALL WORK FOR PHASE 2 SHALL BE COMPLETED WITHIN THE HOURS OF 11:59 PM AND 5:00 AM LOCAL TIME.
ALL RUNWAY 10/28 LIGHTING AND NAVIGATION AIDS SHALL BE TURNED OFF DURING THIS PHASE. NO
RUNWAY CLOSURE WILL BE REQUIRED FOR WORK IN PHASE 1.
3. A FINAL INSPECTION OF ALL WORK SHALL OCCUR TO CLOSE OUT JOB.
No. Rev1s1on Date ob Number
12171.00
Date
SEPTEMBER 04, 20 I 9
Drawn By
Checked By
Project Title
� C) z z z� B �o � u p., � H
� �o
rf) � z zz
� 00 uu Q
Sheet Title
Construction
Safety Plan
Sheet Number
Cl.2
CONFORMANCE DOCUMENTS JANUARY 2020
REQ'D PAVEMENT
MARKING, (TYP.)
VEHICLE REJECTION\ \
ROUTE \ \ ' ' '
REQ'D BOLLARD HOLDER
\ ', \ I 1. \
REQ'D GATE (SEE'
ARCHITECTURAL PLANS) \
REQ'D (3) REMOVABLE ', ,
BOLLARDS \ \·, \ \ \
\ \ R29.0"',' . ' ' .' '
REQ'D (1) 24" STOP BAR
(1) R1-1
STOP SIGN
R23.0'
R13.0'
RB.O'
R78.0'
EXISTING AIRPORT FENCE TO BE MODIFIED
(REFER TO SPECIFICATIONS)
REQ'D (1) R5-1A
WRONG WAY SIGN
(1) R5-1 DO NOT
ENTER SIGN
REQ'D (3)
REMOVABLE
BOLLARDS
REQ'D BOLLARD HOLDER
R96.0'
REQ'D (2) 24" STOP
BARS
(2) R1-1
STOP SIGNS
, REQ'D
\.BOLLARD
,HOLDER
TRUCK
INSPECTION
"'�. N en
' I j I I ' I f I I I-I iI II j
' I I
'III
' III' III' IIII' III' III
1', I ,I
THROUGH LANE
AREA 12.24 SQ FT
OPTIONAL TURN LANE
AREA 21.51 SO FT
f i
ft) i ,I 1/ I I I I !
I i I
REQ'D
DIRECTIONAL
ARROW, (TYP.) ! ' I
: I /\ ,' i
/1'::°! ' ' -------------- '1 l i i ----------. '� \ i I ----------- I \ , i' ---------- I 'y' I ------------ ·1i i ------- I / I I -••r------- , I I
1 ·)/" r'. •.,,:�-------.. r §, :' i , ,I' --•-••- I (r� 1' /,-/ I L=L.5.5.L'.,( ··-•·-j 'f 1// • I I II ' '
I I I I ' � i I
TRUCK RE.ECTION
ROUTE
I i' ,' n,i ' I I I
REQ'D 3-3c/ SIGN .........._,/ • i R166.0'
15.0'
18.0'
REQ'D (1) R5-1A WRONG WAY SIGN
(1) R5-1 DO NOT ENTER SIGN
REQ'D WHITE
ISLAND STRIPING
I �' a I ,-1
: JIii' � I I I i ' ' I ' I l ' , 1 I / I i t I ; I ,I I I I : 1 I I I I : I • J I I I I i' I I ' I' ' ' I II I ' • I I j t i i ' f i i' I ' I I I i i
'III I
' \, I
'III' III I
IIII
' II I
' III' II' '
r \ ___ ,,-i' /"S /,' 1 S" I/ J _,.,..____
11 -_ V c.:.___....._ I ,r ·---"-�--"-----o._ I I I I
' III' II I
' IIII
' II I
R123.0'
REQ'D DROP ARM (SEE
ARCHITECTURAL PLANS)
REQ'D 24" CURB
& GUTTER, (TYP.) I I t ' JI I
REQ'D (1) W3-3D SIGN
(1)W16-2 SIGN i
& ALTERNATING FLASHING
'III
'III I
REO'D (1) 24" STOP BAR
(1) R1-1
STOP SIGN
REQ'D PAVEMENT
MARKING, (TYP.)
REQ'D ASPHALT
PAVING
YELLOW WARNING LIGHTS I I ii / - ,l, { ·'.L_L,L,SI_ i ,I 1\ \/t.L\1L f-' I _JI i' \/
I Y\ i 1 /··1 /i \ , I , ,I / _I '""'"-• , UJ J i / / i: I I "·"� I r i'/ I f!i , __
/ : •.,;r, -- ' J. ' I / I ' I
--:___1--_-::._- --r-
ACTIVE BARRIER/FINAL DENIAL : : /
(PHASE I) 'c ' t i I' I
R128.0'
' ,· J '1 I ,'
REQ'D (1) R10-6A �IGN N7 .'
,I I i · • ' ' I .' -' ' I ! i'
- /--/,� r--l_J/ I/ I
' ,;,, ---J �-'
'4' .. -,'&31� I I -~ I I I I
C I
' Ii I,' j I
REQ'D R/Y /G TRAFFIC
LIGHT (SEE ELECTRICAL}
Y:-:-'L. - : '(\._ REQ'D R/Y' �G
' " - -• 'I I / ; • -- ' 1 ; TRAFFIC LIGHT {SEE
' ,....-,, • i / ELECTRICAL)
- --u::.,1 __
'\ REQ'D (1) R10-6A SIGNf I I
REQ'D STOP BAR
N
50' 100'
Scale: 1" = 50'
LEGEND
- - -UIV- - -
---Ct,S---
,/C,'•·
CJ
=-\. lv11\JCR COi\ -ClJ�
__ X CA,S LI\JL
:=::x. STO�lv' INL:=::T
SHRUB
REQ'D BARBED WIRE FENCE
MODIFICATION
REQ'D CONCRETE SIDEWALK
REQ'D ASPHALT PAVING
REVISED CONCRETE PAVING
TO ASPHALT PAVING
PROJECT NOTES
1. The Contractor is expected to carefully examine the plans, proposal and site of the work.
Therefore, it will be assumed that the Bidder has satisfied himself as to the conditions to be encountered in regards to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of the Plans, Specifications and Contract.
The submission of a proposal by a Bidder will be considered prima facie evidence that the Bidder has made such an examination.
2. The work on this project shall adhere to the following Specifications, Standards and/or Regulations:
Environmental Protection Agency (EPA) - "Best Management Practices Manual" and the requirements of the site specific NPDES Discharge Permit issued for this project Alabama Department of Transportation Standard Specifications for Highway Construction - Latest Edition. Any and all references to unit prices are not applicable to this project Montgomery County Standards and Specifications.
City of Montgomery Standards and Specifications.
The drawings and specifications.
If conflicts arise between these requirements, the more stringent shall apply.
3. The Contractor is responsible for all costs associated with all permits for this project
4. Construction access and security control plan shall be coordinated and submitted with the owner prior to any construction activities.
5. The Contractor will be responsible for temporary diversion of runoff water, as required to facilitate construction or as directed on-site by the Engineer. This temporary drainage of runoff is considered incidental to the bid.
6. Electronic data that may be given to the Contractor either as an aid in the preparation of his bid or in the construction of the improvements will be done so strictly as a courtesy to the Contractor. The Engineer does not warrant the accuracy of the electronic information so transferred. In all cases, the printed plans as issued by the Engineer shall govern. A Letter releasing the Engineer from liability will be required of the Contractor prior to the release of said information.
7. The Contractor is responsible for notifying the applicable governmental agencies and departments of the beginning of construction.
8. The Contractor is responsible for having all existing utilities located prior to construction, including stubouts. Existing utilities shown have been drawn using the best available information and have not been field verified. All existing utilities to be uncovered and verified as to size, location, elevation and condition prior to commencement of construction.
9. The Contractor is responsible for all cost associated with removing and/or relocating existing utilities and structures to construct the improvements shown in these plans. The contractor shall not receive additional compensation for removing and/or relocating any existing items.
10. No deviation from the plans is allowed without prior approval from the engineer. Said approval shall be given in writing.
11. The Contractor must adjust all valve boxes, covers, meters, manhole rims, and other water, storm, power, telecommunications and sanitary sewer service appurtenances to final grade.
The cost of these adjustments shall be included in the bid
12. The cost of all work shown in the plans is the responsibility of the Contractor unless stated otherwise.
13. The Contractor will be responsible for repair to public and private roads caused by his activities throughout construction. Periodic cleaning of public and private roads may be necessary during construction. It is the contractor"s responsibility to meet with private entities, state, city and county officials to agree upon and record the conditions of the roads before construction commences.
14. All surveying and staking during construction is the responsibility of the Contractor.
No. Rev1s1on Date 2 Addendum 09/25/20 I 9
No. 2
3 3 Addendum I 0/1B/2019
No.4 ob Number
12171.00 Date
AUGUST 2019
Drawn By
Checked By
Project Title
� C) z � � z z� B �o � up..
� H
� �o ifJ � z zz
� 00 uu Q
Sheet Title
Proposed Site Plan
Sheet Number
C2.1
Reserved
Security
Police
Parking
Only
Reserved
Security
Police
Parking Only
Reserved
Security
Police
Parking
Only
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
0 50' 100'
Scale: 1" = 50'
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C3.1
Geometric
Control Plan
UTILITY NOTES 'i', i,
1. This project is based on a Lump Sump contract All work described, shown, referenced, or
2.
3.
otherwise indicated in or on the drawings, proposal, advertisement and specifications are to be completed in-place and serviceable according to the plans, instructions, specifications, lines and grades indicated on the plans and all applicable state, federal, and municipal codes and standards, Individual items of work that are necessary to complete the project to the lines and grades, whether shown or described in the plans and specifications, are to be considered incidental and are the responsibility of the Contractor,
4. The Contractor is responsible for OBTAINING THE STORMWATER PERMIT AND all costs associated with all permits for this project.
5. Site security will be the responsibility of the Contractor.
6. All fuel storage tanks used on the site by the Contractor must meet all local, state and federal codes and regulations.
7. The Contractor will be responsible for temporary diversion of runoff water, as required to facilitate construction or as directed on-site by the Engineer. This temporary drainage of runoff is considered incidental to the bid.
8. Electronic data that may be given to the Contractor either as an aid in the preparation of his bid or in the construction of the improvements will be done so strictly as a courtesy to the Contractor.
The Engineer does not warrant the accuracy of the electronic information so transferred. In all cases, the printed plans as issued by the Engineer shall govern. A Letter releasing the Engineer from liability will be required of the Contractor prior to the release of said information, 9, The Contractor is responsible for notifying the applicable governmental agencies and departments of the beginning of construction.
10, The Contractor is responsible for having all existing utilifies located prior to construction, including stubouts. Existing utilities shown have been drawn using the best available information and have not been field verified, All existing util�ies to be uncovered and verified as to size, location, elevation and condifion prior to commencement of construction.
11. The Contractor is responsible for all cost associated with removing and/or relocating existing utilities and structures to construct the improvements shown in these plans. The Contractor shall not receive additional compensation for removing and/or relocating any existing items, 12, No deviation from the plans is allowed without prior approval from the Engineer, Said approval shall be given in writing.
13, The Contractor is responsible for coordinating with the various utility companies on the placement of their services, 14, It is the Contractor's responsibility to obtain final approval of work done on or adjacent to existing streets/roads and Right of Way, Written approval from the applicable agency is required prior to release of the Contractor's Retainage, 15, The Contractor must adjust all valve boxes, covers, meters, manhole rims, and other water, storm, power, teleccmmunications and sanitary sewer service appurtenances to final grade, The cost of these adIustments shall be included in the bid.
16, All storm sewer concrete pipe joints shall be wrapped with filter cloth.
17, All storm sewer shall be laid from the lowest point following the rising grade.
18, Backfill and compaction of all trenches will conform to the recommendation of the Geotechnical Engineer. Testing of the fill and compaction must be performed by the testing laboratory according to the specifications with the test reports forwarded to the Engineer, Any backfill failing to meet compaction requirements will be removed and reworked until compaclion is achieved, this work shall be done at the contractor's expense.
19, Any work on public right of way will require a traffic control plan in accordance with the M.UT.C,D.
Preparation and submittal of said plan to the appropriate authority is the responsibility of the Contracfor,
20. The cost of all work shown in the plans is the responsibility of the contractor unless stated otherwise.
21, All utility bores shall be a minimum of 4 ft deep, Any damage to existing streets or drives resulting from a utility bore shall be repaired by the Contractor at no additional cost to the owner, 22, The Contractor will be responsible for repair to public and private roads caused by his activities, It is the Contractor's responsibility to meet with private entities, state, city and county officials to agree upon and record the conditions of the roads before construction ccmmences, 23, All paving work shall be done in accordance with the latest edition of ALDOT's Standards and Specifications.
24, The Contractor shall include in his bid all costs associated with shoring/stabilizing existing utilities during construction of the proposed improvements.
25, All pipe labeled as RCP shall be Class 3 Reinforced Concrete Pipe or ADS HP Storm unless stated otherwise, 26, All pipes shall be installed per manufacturers specifications.
27, 3M MARKERS SHALL BE INSTALLED ON ALL STEEL CASING FOR FUTURE UTILITIES. DO NOT
INSTALL MORE THAN 48" DEEP, WARNING TAPE IS REQUIRED,
28, Grate inlets shall be constructed per the Flat Grate Inlet detail on the Details Sheets, Grate used in hard surfaces shall be rated for H-20 loading Mod 5390 by East Jordan Iron Works Inc.
-:\\fon:gorrP.ry\CMGf/ -:•wg\t..NG '27\CI-AG1:l17009L A.NG rTP\+plo::.-.s\C4.01 .,Tl ITY "IA�.dwg
REQ'D (1) 12" STEEL CASING W/ SPACERS
EVERY 5' &: A MINIMUM OF 36" OF COVER
REQ'D (1) 14" STEEL CASING W/ SPACERS
EVERY 5' &: A MINIMUM OF 36" OF COVER
3-DWSI
RIM: 229.77
FL Out=227.50 18"
18' RCP 1fli.aor.·-----------ffi
REVISED CONCRETE PAVING
TO ASPHALT PAVING
0 50' 100'
Scale: 1" = 50'
LEGEND
--------2..:T--------
----------------------- 11111111111111111111111111111111111 c:I
\_ JTI_ -y
=::JX
[/. WAT[� _ \[
EX. 31�RIED CAB_E
lX _IC_'.H f--'O_l
U< - �'.=-- HYLHA\ I
REQ'D UTILITY SLEEVE
REQ'D STORM SEWER LINE
REQ'D SLOPE PAVED
HEADWALL
REQ'D SINGLE WING STORM
INLET
REQ'D DOUBLE WING STORM
INLET
REQ'D JUNCTION BOX
REQ'D HEADWALL
r -j I i j I i I
REQ'D (2) 12" STEEL CASINGS W/
--,- SPACERS EVERY 5' &: A MINIMUM
L OF 36" OF COVER.
No. Rev1s1on Date
2 Addendum 09/25/20 I 9
No. 2
3 3 Addendum I 0/1B/2019 No.4 ob Number
12171.00 Date
AUGUST 2019
Drawn By
Checkedlly
Project Title
� C) z z z� B �o � up..
� H
� �o ifJ � z zz
� 00 uu Q
Sheet Title
Proposed
Utility Plan
Sheet Number
C4.1
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C4.2
Proposed
Storm Profiles
0 50' 100'
Scale: 1" = 50'
1. The Contractor shall grade the site in accordance with the Plans and Specifications.
2. All grading operations may be monitored by a qualified GEOTECHNICAL consultant as chosen and paid for by the owner. It is the Contractor's responsibility of have the GEOTECHNICAL Consultant onsite at all times during grading operations.
3. All work required to compact, moisten, dry, condition, modify, or improve any portion of the subgrade, and/or building pads, as directed by the plans and specifications or the Engineer, is part of the Contractor's bid.
4. The Contractor shall stabilize all disturbed areas immediately after the completion of the grading operation.
5. All excess material generated from grading operations to be removed from the site and properly disposed of off-site at the Contractor's expense.
6. The Contractor shall be required to replace any items damaged during the construction of the improvements shown in these plans. This includes curb & gutter and pavement. All pavement repairs shall be backfilled entirely with stone. These cost shall be included in the contractor's bid price.
7. Spot elevations along curb lines are edge of pavement elevations unless otherwise indicated.
8. The Contractor shall coordinate location of condensate drains supporting mechanical equipment prior to construction.
9. Pipe labeled "perforated" shall be ADS N-12.
10. Pipe labeled "storm" shall be RCP CLASS III.
12. All work associated with topsoil stripping, including, but not limited to: stripping to spread, stripping to stockpile, spreading from stockpile, topsoil haul-off, seedbed preparation, etc. as directed by the plans and specifications or the Engineer is part of the Contractor's Bid.
13. The Contractor is responsible for reviewing the preliminary geotechnical investigation report attached to the bid documents. Said report is provided for the contractor's convenience.
Neither the Engineer nor the report preparer warrants the complete and total accuracy of the report. It is the contractor's responsibility to satisfy himself as to the existing soil conditions.
14. Fill material used on-site shall be clean, non-saturated, non-organic soil as approved by the Geotechnical Consultant.
15. All disturbed areas outside of the building and pavement to reveive a 4-inch layer of topsoil.
16. If the pavement, stone or slab is not constructed immediately after the initial subgrade preparation, the contractor shall be required to restore the subgrade prior to the placement of the pavement, stone or slab. The cost of the subgrade restoration shall be included in the Contractor's bid.
17. The Contractor shall clean and repair the adjacent public and private roads and ROW throughout the construction activities as necessary.
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C5.1
Proposed
Grading Plan
CONFORMANCE DOCUMENTS JANUARY 2020CONFORMANCE DOCUMENTS JANUARY 2020
0 30' 60'
Scale: 1" = 30'
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C5.2
Proposed
Grading Plan
LOW FLYING AIRCRAFT
NO STOPPING
CAUTION
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C5.3
Fence Detail
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C6.1
Pre Development
Drainage Plan
®-9' '
,,,, 7A-JB
I j,-:\ \ I
1 18" RCP
b
---------•• __;__,___ I
___ - - "l:'.co-
2A-JB
2-S
18"
REVISED CONCRETE PAVING
TO ASPHALT PAVING
-1
I
..i N j I
I I I I
I I I I
I ' I ' I i I '
I j I
N
50' 100'
Scale: 1" = 50'
LEGEND
Area No.
STR-STR
1-SWSI TO 2-SWSI
2-SWSI TO 2A-JB
2A-JB TO 4-SWSI
3-DWSI TO 4-SWSI
4-SWSI TO 6-DWSI
5-DWSI TO 6-DWSI
6-DWSI TO 6A-SPHW
8-SPHW TO 8A-SPHW
----0-
11111111111111111111111111111111111
11111111111111111111111111111111111
Ii:::,,, Cl
Drainage Calculations -
Area (ac) L (ft) CN
0.28 295,00 98
0.27 231,93 98
0.27 188,85 98
0.51 253-59 98
0.12 198,77 98
0.86 197,88 98
1.96 265,24 98
3.64 300,00 80
4.23 187,83 80 lX.. _/CH I f'.Cll lX. -l/,Cl
REQ'D SANITARY SEWER
REQ'D STORM SEWER
REQ'D SANITARY MANHOLE
REQ'D SWSI STORM INLET
REQ'D DWSI STORM INLET
REQ'D SPHW
REQ'D JUNCTION BOX
REQ'D OPEN THROAT INLET
25 Year Storm Event s tc i Q (cfs)
1.30 5.00 8.56 1.85
1.30 5.00 8.56 1.77
1.30 5.00 8.56 l,77
1.30 5.00 8.56 3-37
1.30 5.00 8.56 0.80
1.30 5.00 8.56 5.64
1.30 5.00 8.56 12.87
1.73 36,14 4.29 13.08
2.95 30-76 4_03 15.16
Pipe Sizes - 25 Year Storm Event
Added Q Total Q Pipe Des Slope Min. Slope,%
1.85 1.85 18 1.00 0.03
1.77 3.62 24 1.00 0,03
0.00 3.62 24 1.00 0,03
1.77 1.77 18 1.00 0.03
3.37 8.76 24 1.00 0.15
0.80 0.80 18 1.00 0.01
5.64 15.20 30 0.50 0.14
13.08 13.08 30 1.21 0,10
No. Rev1s1on Date
2 Addendum
No. 2
09/25/20 I 9
3 Addendum
No.4 ob Number
I 0/1B/2019
12171.00
Date
AUGUST 2019
Drawn By
Checkedlly
Project Title
Sheet Title
Post
Development
Drainage Plan
Sheet Number
C6.2
1. These standard details shall be applicable to all land disturbing activities and attached to the relevant site plan.
2. The Contractor is responsible for implementing and maintaining Erosion/Sedimentation Control measures in accordance with ADEM/EPA "Best Management Practices". Measures shown on the plans should be considered minimums. Structures / Measures shown along the perimeter of disturbed areas to be installed prior to disturbance activity. Other measures to be installed as soon as construction sequences allow.
3. Maintenance of said structures and /or measures is the responsibility of the Contractor.
All erosion control structures/measures are to be inspected immediately after all rainfall events. Corrective action, if required, must be taken immediately.
4. All BMPs shall be designed and installed in accordance with the conditions outlined in the Alabama Handbook for Erosion Control, Sediment Control and Storm Water Management on Construction Sites.
5. The Contractor is responsible for whatever measures are necessary to produce and maintain an acceptable stand of grass. Said measures to include (but not limited to) watering, re-seeding, regrading eroded areas, re-fertilizing, etc.
6. The Contractor is responsible for keeping mud and debris off private streets, City/State Streets and ROW at all times. Cleanup is required DAILY of the site and roadways.
7. The Contractor shall keep a copy of the "Best Management Practices" on site at all times for the life of the project.
8. Any area that has been cleared of its vegetative cover and will remain so for twelve (12) days or longer without appreciable construction activity must be seeded and mulched within twelve (12) days of being disturbed. Those areas shall be seeded and mulched in accordance with the latest edition of the AL.D.O.T. Construction Specifications, utilizing ALDOT seed mixes.
9. Additional BMPs may be required by the Engineer, QCP, ADEM and City of Montgomery over the course of the project to prevent sediment release from the site. The cost associated with these additional BMP's shall be included in the contractor's bid, no additional compensation will be given to the contractor for this work.
10. The Contractor shall stabilize all disturbed areas immediately after the completion of the grading operation.
11. Maintenance of all earth surfaces, including slopes, is the responsibility of the Contractor. Said maintenance to include regrading, temporary grassing, mowing, etc. as may be required.
12. The Engineer or the QCP may require the Contractor to clean up silt/sediment, replace erosion control or add additional erosion control measures at any time, if the measures in place do not appear to be adequate and/or functioning properly. The cost associated with any of these corrective measures shall be included in the contractor's bid, no additional compensation will be given to the contractor for this work.
13. The Contractor shall be responsible for removing the silt fence and any other erosion/sediment control items once an acceptable stand of grass is grown. The Owner and Engineer shall determine if the grass is acceptable.
14. The Contractor shall maintain the Construction Entrance as required to prevent silt/sedimentaion from leaving the site. This includes but is not limited to washing down of the construction entrance, installing and utilizing a vehicle wash down area, installing additional stone, etc.
15. The Contractor shall utilize new filters on the Silt Savers at the beginning of the project.
The Contractor shall be required to replace the filters whenever the Engineer, QCP or City of Montgomery states they are not adequate. The cost of the replacement filters shall be included in the Contractors bid. The Contractor shall not receive additional compensation for the cost of replacing the filters.
16. All disturbed areas to be sodded with hybrid bermuda.
17. All areas outside of the building and pavement area to receive a 4-inch layer of topsoil.
Topsoil shall be as follows:
a. Fertile, friable, naturally occurring. Free of stones, clay, lumps, hardpan, roots, stumps, brances, sticks and other debris larger than one (1) inch in any dimension; free of noxious weeds, grasses, seeds, plants,extraneous matter and any substance harmful to plant growth. Topsoil from open fields will not be accepted.
b. Ph: 5.0 to 7.0
c. Organic Matter: 5% to 10%
d. Sand: 50% to 70%
e. Silt: less than 30%
f. Clay: 10% to 25%
g. Permeability Rate of 5 x 10 <-3> centimeters or greater at 85% compaction.
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C7.1
Erosion
Control Plan
Phase I
Reserved
Security
Police
Parking
Only
Reserved
Security
Police
Parking
Only
Reserved
Security
Police
Parking
Only
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
0 50' 100'
Scale: 1" = 50'
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C7.2
Erosion
Control Plan
Phase II
Ô
Ô
Ô
Ô
Ô
Sheet Number
Sheet Title
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.1
Details
'lRACKING' WllH MACHINERY ON
SANDY SOIL PROIIIDES ROUGHENING
WllHOUT UNDUE COMPACTION.
STRAW ANCHORING
NOlES:
1. ROUGHEN SLOPE WllH BULLDOZER.
2. BROADCAST SEED AND FERTILIZER.
3. SPREAD STRAW MULCH 3" (76mm) lHICK. (1-1/2 to 2 TONS PER ACRE)
4. PUNCH SlRAW MULCH INTO SLOPE BY RUNNING BULLDOZER UP AND
DOl'IN SLOPE.
2 COATS WHITE
TRAFFIC PAINT
4"
STRAW
ANCHORING
I
NOTE: SEE SITE PLAN FOR PARKING
DIMENSIONS & LAYOUT
PAVEMENT STRIPING DETAIL
PLACE CHECK DAM
EELS (MIXlURE 1.0)
UPSLOPE OF EELS
WITH MIXlURES 1.1
OR 1 .2. EELS WITH
MIXlURE 1.1 SHOULD
ALWAYS BE PLACED
UPSLOPE OF EELS
WITH FINE PARTICLE
MIXlURE 1.2.
N. T.S
CONCENTRATED FILOW
IN DITCH
l
STAGE 1
CHECK DAM
MIXlURE SPECIFICATION 1.0
SPREAD CONCENTRATED FLOW
TO WIDE AREA BEFORE
DISCHARGING
srAGE 2,,Ck;:f<,;><>
GROSS PARTICLE FILTER EROSION
(MIXlURE SPECIFICATION 1. 1 l l
STAGE 3
LIMITS OF DITCH
• • FINE PARTICLE FILTER EROSION EEL'" (MIXlURE SPECIFICATION . 1 ,2)
SCALE: NOT TO SCALE EROSION EEL DITCH OUTLET DETAIL
TREATMENT TIER APPROACH FOR
CONCENTRATED FLOW FOR 9 s• AND 20•@ EELS
1 4
Heavy Duty Paving Section N. T.S.
(J) 1.50" Al.DOT Section 424A .J41, Bituminous Wearing Surface @ Al.DOT Section 405 Bituminous Tack Coat @ 4.50" Al.DOT Section 4248 6.J6, Bituminous Binder @) Al.DOT Section 401 Bituminous Prime Coat @ 12" ALOOT Section 2.J2 Lime Stab,7ized Roadbed (98% Standard o.,,,sity)
NOllE: PA \IING SECTION TO BE VERIFIED BY GEOTECHNICHAL ENGINEER.
i--------- 24" or 30"--------i
Saw Cut
Actual Pavement Replacement
1·-0·
Min.
4'-0" Min.
Trench Width (See Table
T T I
1·-0·
Min.
SEE MEDIUM
DUTY ASPHALT
PAVING SECTION
BACKFILLED
WITH
"ENGINEERED
FILL"
Saw Cut
PAVEMENT PATCH
N. T.S.
I
REMOVED CONCRETE
PAVING SECTION
N. T.S.
Q) 4.0" 3000 psi Compressive Strength Concrete
Concrete Sidewalk
T
Where Pavement Slopes Away From Curb & Gutter, Use Tilt-Out Curb & Gutter
GENERAL NOTES:
1. USE MNIIIUII 12 NCH lllMEIIR FIIER WATllE.
2. USE 2 FT. WOOllEN SIMES W1IH A 2 IN. X 2 N. NOMIW. alOSS SECl1llN J. ONLY INSIAU. wtmll(S) 10 A HEIGHT IN lll1tH SO FUM Will 111T WASH AROUNO WAT11£ NID SOOUR lll1tH
SI.OPES NID IS IHCIEll.
4. INSTAil A MNIIJM Of 2 ll'SLOPE STAKES NID 4 DOWIISUl'E SIMES AT NI ANGI.E 10 llEDGE WAT1IE 10
BOJ10II Of antH.
with 6"x6" - 10/10 W. W.F. (Minimum 525 psi Flexural Strength) Maximum 4 • Slump
® 4" ALDOT Section 825, Class 8 Aggregate Base Layer (Compacted to 100% Modified Proctor (AASHTO T-180) Maximum Dry Density)
(j) 6"x6" - 10/10 W. W.F. Placed at 1/3 Slab Thickness From Top
NOlE: PAVING SECTION TO BE VERIFIED BY GEOllECHNICHAL ENGINEER.
NOTE:
SLIGHTLY ANGLE STAKES WITH
TOP FACING TOWARDS DIRECTION
OF FLOW.
NOTE:
TIE FILOC LOGS SECURELY AT
CENTERLINE OF FLOW ON
DOWNSTREAM SIDE.
LIMITS OF DITCH
INSTAUL EELS• OVER FILOCMAT
-CRADLE" (SEE DETAIL E1-G
ON SHEET E-1).
� t 12" MIN. OVERLAP
EXTEND EELS•AT SIDES OF
DITCH TO PREVENT BYPASSING.
USE ONE OR MORE EELS• AS NEEDED TO SPAN
WIDTH OF DITCH. NOTE: TO MAXIMIZE FLOW,
ARRANGE EELS• IN A CURVED, ANGLED PATTERN
TO MAXIMIZE EXPOSED SURFACE AA£A TO FLOW.
NOlE:
APPLICABLE TO LARGE WIDlH DITCHES WHERE ONE EEL• ls
NOT SUFFICIENT TO SPAN
LENGTH.
SCALE: NOT TO SCALE
PLAN VIEW
CENTERLINE OF DITCH
AND CENTER OF 10'
EEL!'
USE EROSION EEL• MIXlURE
SPECIFICATION 1.0 FOR CHECK
DAM APPLICATIONS.
MINIMIZE OVERLAP LENGTH IN
CHECK DAM APPLICATIONS TO
MAXIMIZE FLOW-THROUGH
CAPACITY.
IN LIEU OF OVERLAPS, EEL•
JOINT WRAPS CAN BE USED
PER DETAILS.
EROSION EEL DETAIL:
CHECK DAM ARRANGEMENT FOR
LARGER WIMM PITCHES fOR g,5• AND 20•1 EEi S
·4 ... 4
4i
4.:i T co
··_l_ ,--
I
I ,--
Standard Curb & Gutter Detail
NT.S.
NOTE:
NOTE:
TIE FILOC LOGS SECURELY
AT CENTERLINE OF FLOW ON
DOWNSTREAM SIDE.
APPLICABLE TO SMAIL WIDTH
DITCHES WITH TOTAL WIDTH
THAT REQUIRES ONLY ONE
10' EEL• TO SPAN.
DITCH WIJT1l
EROSION EEL•
SECURE END OF
A
EEL· TO T-POST
I iiiAS DIRECTED. •
A
EXTEND EELS" AT SIDES OF
DITCH TO PREVENT
BYPASSING.
NOTE:
EROSION EELS'" USED FOR
CHECK DAMS SHAU. USE
MIXlURE SPECIFICAllON 1.0.
PRO\IIDE SCOUR
PROTECllON 0
DOWNSLOPE SIDE OF
AUL EEL• CHECK DAMS.
SCALE: NOT TO SCALE
PLAN VIEW
1·
STABILIZE EROSION EELS• VIA METAL T-POSTS ON
DOWNHILL SIDE AT lHE CENTER, AT EACH END, AND
AT ADDITIONAL POINTS AS NEEDED (2' MAX.
SPACING), OR AS DIRECTED BY THE ENGINEER.
CONTRACTOR SHAU.
PLACE INl11AL STAKE
AT CENTERLINE OF
DITCH.
NOTE:
SLIGHTLY ANGLE STAKES
WITH TOP FACING TOWAADS
DIRECTION OF FILOW.
EROSION EEL DETAIL:
SMALL DITCH CHECKS SINGLE EEL
(NO STACKING) FOR 9 5• ANP 20•• EEi S
RN!:JRIC YID'
CBOS5 SFCJl)N YEE Jmli
CROSS SfliJ]QN JBMfZOIQAL DITCH
APPROVED DATE, 0112010
6. PROVIIE STAPlfS MADE Of 0.125 N. IIIAIIE1ER srm WIRE FllRMED NIO A U SHIPE 111T llSS 1H!N 12" IN 1£Nll1H.
6. INSTAil � N'PROXIMlB.Y e.tRI' 1 LJ£/R FOOT ON IIOIH SIDES Of WAT11£ NID /iJ 6ICH END 10 SEl:URE IT 10 1HE SOL
7. INSTAil IIIT1Nl N M:CORDINCE MIH SEC110N 1631 Of 11£ NCOOI STAIIWII SPEaF1CA110NS .
6. PRIOR 10 POLY/CRYIAIIIDE (AW) N'PIJCA1ION, OBrAN A SOIL SMl'LE FROII PROJECT LOCATION, AND FROII
OFF5ITE MATIRIIL AND IIW.VZE RJR N'PROPRIAII PAM FLOCCUIANT 10 BE APPlE 10 6ICH WATllE.
9. llflW.I.Y APPLY 2 OUNCES Of ANIONIC OR NEll11WJ.Y CHARGED PAM !MR 111111.E 'MERE WA1ER WU FUM
NII 1 OUNCE ON MATINll ON 6ICH SllE Of WATllE. -_y PAM AITTR e.tRI' RAINFAil E\'ENT 1HAT IS
EIIU!L 10 OR EXCEEDS O.SO N .
�. ·, '•�OZl•
NOT TO SCALE
TEMPORARY WATTLE CHECK DAM
WITH MATTING AND OPTIONAL PAM
NOTE:
SLIGHTLY ANGLE STAKES
WITH TOP FACING TOWARDS
DIRECTION OF FLOW.
STABILIZE EROSION EELS• VIA METAL T-POSTS
ON DOl\NHILL SIDE A T THE CENTER, AT EACH
END, AND AT ADDITIONAL POINTS AS NEEDED
(2' MAX. SPACING), OR AS DIRECTED BY THE
ENGINEER.
NOTE:
APPLICABLE TO SMALL WIDTH
DITCHES WITH TOTAL WIDTH
THAT REQUIRES ONLY ONE
10' EEL• TO SPAN.
NOTE:
TIE FILOC LOGS SECURELY
AT CENTERLINE OF FLOW ON
DOWNSTREAM SIDE.
EROSION EEL•
PLACED ON TOP OF
GROUND SURFACE.
IF SOIL BENEAlH EEL• IS
SOFT OR LOOSE, COMPACT
BY HAND TAMPING OR OTHER
APPROVED MEANS.
SCALE: NOT TO SCALE EROSION EEL DETAIL:
SECTION VIEW
SMALL DITCH CHECKS
EQR g,5• AND 20•, EELS
HOT-POURED SEALER
PRE MOLDED EPANSION
JOINT FILLER (FULL DE PTH)
NOTE, DO NOT RUN MESH
REINFORCEMENT
THRU EXPANSION JOINT,
EXPANSION JOINT
1/B'R CTYP>
l/�� ·,11�
CONTRACTION JOINT
SIDE\,/ALK
NOTE, PAVEMENT JOINTS MAY BE TOOLED DR SA\J
CUT, SIDE\JALK JOINTS MUST BE TOOLED,
CONCRETE JOINT
NOT TD SCALE
1. EXPANSION JOINTS IN THE SIDE\JALK SHALL
BE A MAXIMUM \JIDTH OF 20 FEET, CONTRACTION
JOINTS SHALL BE EVERY SFT.
No. Rev1s1on Date
2 Addendum 09/25/2019
No. 2
& 3 Addendum I 0/18/2019
No.4 ob Number
12171.00 Date
AUGUST 2019
Drawn By
Checked By
Project Title
� 0 z � p::i z z� B �o � u �� H � �o rJJ � z zz
� 00 uu Q
Sheet Title
Details
Sheet Number
C8.2
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.3
Details
Section A-A Type "A" Section B-B Type "A"
Section D-D Type "A" Section C-C Type "A"
N.T.S. N.T.S.
N.T.S.
N.T.S.
"S" Inlet Detail (Double Wing) N.T.S.
1-#4 Bar ECenter Bars In SlabManhole
8" Concrete or Brick
#4 Bar @ 9" O.C.
#4 Bars @ 12" O.C.
#4 @ 6" O.C. Bars C #4 Bars @ 6" O.C. Bars D
C
L
(Min. 4')
6"6" of Pipe + 6" Outside Span
8" 8"
.5
V a ri e s
NOTE
.75" Chamfer
Rounded
Inlets on This Sheet.
Cylinder Molds To Form Throats of of 6" Concrete Pipe or Concrete Test Contractor May Use Short Section
.5
.5
V a ri e s
V a ri e s of Pipe + 6"
6" Outside Span 6" 2'-10" 2'-0"
1/2" Ft. Slope
Bars A Bars D
Bar B
Varies
8"
#6 Bars A Area.
SLope of Sidewalk or Adjacent Surface Finish Surface To Conform To Cross
Concrete or Brick 8"
8" of Pipe +6"
8"Outside Span
.5
.5
.5
V a ri e s
.5
.5
.5
2" Weep Holes
1'-6"6"1'-6"
2" Weep Holes
.5
.5
.5
V A
R
IE
S .5
"7 .5
"4 .5
Flow
O p e n in g M a rk
M
D ia g o n a l B a rs
A ro u n d
Round Corner
Bars B #4 @ 6" O.C.
Bars D #4 @ 6" O.C.
Bars C #4 @ 6" O.C.
2-#6 Bars A
Concrete Gutter
1-#4 Bar E
C
D
B
BA
8"
6"
14'-0" No Curb and Gutter Will Be Paid For Within Limits of Spillway
(Min. 4'-4") 4'-10"Outside Span of Pipe + 6"
#6 Bars A
Finish Surface To Conform To Cross SLope of Sidewalk or Adjacent Surface Area.
Min.
#3 Bars
Joint Material 1/2" Expansion
4'-10"
D
C
2'-10"2'-0"
Rounded
1-#4 Bar E
#4 Bars @ 6" O.C. Bars D
#4 @ 6" O.C. Bars C
Bars D #4 @ 6" O.C.
Round Corner 6"
1-#4 Bar E
8"
Joint Material 1/2" Expansion
8"
8"
Section A-A Type "A" Section B-B Type "A"
Section D-D Type "A" Section C-C Type "A"
N.T.S. N.T.S.
N.T.S.
N.T.S.
"S" Inlet Detail (Single Wing) N.T.S.
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.4
Details
O.C. Each Way #5 Bars @ 12"
8" Thick Walls Typical
O.C. Each Way #5 Bars @ 12"
Concrete Slope Paved Headwall Not to Scale
End Elevation Not to Scale
6"x6" W.W.M. (2" CLR.)
Not to Scale
Longitudinal Section
Concrete Class I
Beveled End Pipe
6"x6" W.W.M. (2" CLR.)
DETAIL OF STANDARD JUNCTION BOX 12-36" PIPE
NOT TO SCALE
Not to Scale
EMERGENCY SPILLWAY
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.5
Traffic Control
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.6
Traffic Control
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.7
Traffic Control
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
SEPTEMBER 04, 2019
No. Revision Date
C8.8
Signage Details
Project Title
M o n tg o m er th an
W W W .S S L A R C H .C O M
(M
D
Job Number
Date
Drawn By
Checked By
A R
C H
IT
E
C T
U R
E
I N
T E
R
IO
R D
E S
IG
N
NOT FOR
CONSTRUCTION
USE
C O
N S T
R U
C T
N E
W E
N T
R Y
C O
N T
R O
L P
O
IN
T
D A
N N
E L
L Y
F
IE
L D
M
O N
T G
O M
E R
Y A
L
12171.00
AUGUST 2019
No. Revision Date
C8.9
Temporary Fence Details
CONFORMANCE DOCUMENTS JANUARY 2020
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text
%%UCHAIN LINK FENCE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CORNER POST
AutoCAD SHX Text
PULL POST
AutoCAD SHX Text
LINE POST
AutoCAD SHX Text
NOTES: 1. ALL DIMENSIONS SHALL CONFORM TO SECTION F-162 OF THE SPECIFICATIONS
AutoCAD SHX Text
EXTENSION ARM
AutoCAD SHX Text
3 STRAND BARBED WIRE
AutoCAD SHX Text
BRACE
AutoCAD SHX Text
NO. 7 COIL 7 COIL SPRING TENSION WIRE
AutoCAD SHX Text
3/8" ROD AND TURNBUCKLE
AutoCAD SHX Text
WIRE TO BE KNUCKLED ON TOP AND BOTTOM EDGES
AutoCAD SHX Text
3-1/2" GALVANIZED STEEL POST (TYP.)
AutoCAD SHX Text 3"
AutoCAD SHX Text
GROUND RODS @ 400' O.C. 400' O.C. TIE TO FENCE AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text 9/19/2019
AutoCAD SHX Text Addendum No. 1
AutoCAD SHX Text
DDonovan
This detail is intended to depict construction requirements for temporary fencing to meet FAA requirements and section off the work site from the active airfield areas - refer to phasing plan. All new permanent fencing shall meet the requirements of the United Facilities Criteria and be as depicted on sheets A0.1 through A0.13.
EXISTING CHAIN LINK SWINGING GATE TO BE REMOVED. MODIFY EXISTING
FENCE LINE AS REQUIRED TO TIE INTO NEW FENCE LINE
FINAL DENIAL BARRIER
FELD
ER RO
AD
TOWER ROAD
EXISTING MUNITIONS ROAD
EXISTING CHAIN LINK FENCING WITH CABLE BARRIER TO REMAIN
EXISTING CHAIN LINK FENCING TO REMAIN
(NO VEHICLE BARRIER CABLING)
US HIGHWAY 80
US HIGHWAY 80
BASE
CE
A0.2 1 Sim
A0.3 1 Sim
A0.4 1 Sim
A0.5 1 Sim
A0.5 2 Sim
A0.6 1 Sim2
EXISTING FENCE LINE TO REMAIN
EXISTING FENCE LINE TO BE RETROFITTED TO RECEIVE NEW
DOUBLE " Y" OUTRIGGER AND 6 NEW STRANDS OF BARBED WIRE
NEW 8'-0" HIGH CHAIN LINK FENCING WITH DOUBLE "Y"
OUTRIGGERS AND 6 STRANDS OF BARBED WIRE
NEW ASPHALT PAVING (SEE CIVIL)
LEGEND:
NEW K-RATED POST AND RAIL CONTAINMENT SYSTEM (SEE
DETAILS)
DECORATIVE FENCE (NON K- RATED)
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.1
FENCING
AND
CONTAINMENT
PLAN
CO
N
ST
RU
CT
N
E W
E N
TR
Y
CO
N
TR
O
L
PO
IN
T
D A
N N
E
LL
Y F
IE
LD
, M O
N
TG
O M
E
RY
, A L
12171.00
AUGUST 2019
DCD
1" = 160'-0"A0.1
Fencing Plan @ Entry Control Point
No. Revision Date 2 Addendum
No. 2 9/25/2019
3 Addendum No. 4
10/18/201
FELD
ER RO
AD
NON-RATED CANTILEVER SLIDING GATE
DECORATIVE METAL FENCING (SEE DETAILS)
DECORATIVE METAL
FENCING (SEE DETAILS)
REMOVABLE BOLLARDS
AND BOLLARD HOLDER
NON RATED DROP ARM
Reserved
Security
Police
Parking
Only
Reserved
Security
Police
Parking
Only
Reserved
Security
Police
Parking
Only
Visitor
Parking Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
Visitor
Parking
SEE CIVIL
OUTLINE OF FUTURE GUARDHOUSE
(NOT IN SCOPE)
NON-RATED CANTILEVER SLIDING GATE
NON-RATED DROP ARM
5' - 8"
5' - 8"
5' - 8"
0' - 9"
REMOVABLE BOLLARDS
AND BOLLARD HOLDER
A0.7 1
Typical
A0.7
Typical
A0.7
Typical
(9) NELLIE R. STEVENS HOLLY
(6) NELLIE R. STEVENS HOLLY
DECORATIVE METAL
FENCING (SEE DETAILS)
NEW CHAIN LINK FENCING
WITH DOUBLE "Y" OUTRIGGERS
AND BARBED WIRE
PLC
2' - 0"
REMOVABLE BOLLARDS
AND BOLLARD HOLDER
NON-RATED CANTILEVER
SLIDING GATE
2' - 0"
24' - 0"
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ EQ EQ EQ
EQ EQ EQ EQ
EQ
EQ
EQ
EQ
FIELD VERIFY
32' - 0"
FIELD
VER
IFY
20' - 9 1/2"
EQ
EQ
EQ
EQ
EQ
FIELD VERIFY
135' - 8"
EQ EQ EQ EQ EQ EQ EQ EQ
FIELD VERIFY
36' - 2"
EQ
EQ
EQ
EQ
FIELD VERIFY
27' - 2 1/2"
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
EQ
FIELD
VER
IFY
176' - 11"
EXISTING CHAIN LINK
FENCING TO REMAIN
DECORATIVE BRICK PIER
DECORATIVE BRICK PIER
DECORATIVE BRICK PIER
NON-RATED CANTILEVER SLIDING GATE
EXISTING FENCING TO BE MODIFIED. CONTRACTOR
TO REMOVE EXISTING SINGLE OUTRIGGER AND 3
STRANDS OF BARBED WIRE. INSTALL NEW DOUBLE
"Y" OUTRIGGER WITH 6 STRANDS OF BARBED WIRE.
NEW CONCRETE PAVING (SEE CIVIL)
LEGEND:
NEW ASPHALT PAVING (SEE CIVIL)
DECORATIVE FENCE (NON K- RATED)
NEW SOD (ALL OTHER AREAS TO RECEIVE SEED)
NELLIE R. STEVENS HOLLY - SEE
PLANTING SCHEDULE AND DETAILS
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.2
ENLARGED
ENTRY
CONTROL
POINT PLAN
CO
N
ST
RU
CT
N
E W
E N
TR
Y
CO
N
TR
O
L
PO
IN
T
D A
N N
E
LL
Y F
IE
LD
, M O
N
TG
O M
E
RY
, A L
12171.00
AUGUST 2019
DCD
1/16" = 1'-0"A0.2 1 Enlarged Entry Control Point Plan
No. Revision Date 3 Addendum
No. 4 10/18/201
TOWER ROAD
FELD
ER RO
AD
FINAL DENIAL BARRIER (SEE SPECS
AND ELECTRICAL)
NEW 8'-0" HIGH CHAIN LINK FENCING
EXISTING FENCE AND SWING GATE TO
REMAIN
EXISTING 8'-0" HIGH CHAIN LINK FENCING TO REMAIN.
CONTRACTOR TO REMOVE EXISTING SINGLE BARBED WIRE
OUTRIGGER AND REPLACE WITH NEW DOUBLE "Y" OUTRIGGER AND
6 STRANDS OF BARBED WIRE.
NEW DECORATIVE METAL FENCING
NEW K RATED POST & RAIL BARRIER
A0.10 2 Sim
NEW K RATED POST AND RAIL BARRIER
A0.7 3
Ty pi ca l
A0.7 3
Ty pi ca l
Typical
A0.7 3
Ty pi ca l
NEW 8'-0" HIGH CHAIN LINK FENCING
WITH DOUBLE "Y" OUTRIGGER, 6
STRANDS OF BARBED WIRE \
(9) NELLIE R. STEVENS HOLLY
(6) NELLIE R. STEVENS HOLLY
EPU - SEE ELECTRICAL
BATTERY CABINET
ACTIVE BARRIER SIGNAGE APRROX.
300' FROM BARRIER - SEE CIVIL
ACTIVE BARRIER SIGNAGE APPROX. 300'
FROM BARRIER - SEE CIVIL
STOP AHEAD SIGNAL 100' FROM
STOP BAR - SEE ELECTRICAL
PLC
EXISTING MUNITIONS ROAD TO
REMAIN
NEW K RATED POST AND RAIL
BARRIER (BASE BID)
NEW 8'-0" HIGH CHAIN LINK FENCE WITH DOUBLE "Y"
OUTRIGGER AND 6 STRANDS OF BARBED WIRE
LEGEND:
EXISTING FENCE LINE TO REMAIN
A101
SIM
DETAIL TAG
EXISTING FENCING TO BE MODIFIED. CONTRACTOR TO REMOVE
EXISTING SINGLE OUTRIGGER AND 3 STRANDS OF BARBED WIRE.
INSTALL NEW DOUBLE "Y" OUTRIGGER WITH 6 STRANDS OF
BARBED WIRE.
NEW K RATED POST AND RAIL BARRIER
NEW SOD (ALL OTHER AREAS TO RECEIVE SEED)
Sheet Number
Sheet Title
Project Title
Job Number
Date
Drawn By
Checked By
A
RC
H
IT
E
CT
U
RE
IN
TE
RI
O R
D E
SI
G
N
A0.3
ENLARGED
FENCING
PLAN
CO
N
ST
RU
CT
N
E W
E N
TR
Y
CO
N
TR
O
L
PO
IN
T
D A
N N
E
LL
Y F
IE
LD
, M O
N
TG
O M
E
RY
, A L
12171.00
AUGUST 2019
DCD
1" = 40'-0"A0.3
1 FENCING PLAN 1
No. Revision Date 3 Addendum
No. 4 10/18/201
PROVIDE NEW CHAIN LINK SWING GATE.