New Combo Synopsis dated 17July2020.docx

DOCX document 66 KB Posted

Attached to
Medium Caliber Armament - Barrel Manufacturing Capability Federal contract opportunity
Solicitation number
W15QKN-20-R-0B2X
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This is a combined synopsis and solicitation issued by the Department of the Army Materiel Command Contracting Command Picatinny Arsenal seeking proposals for a firm-fixed-price purchase order to provide medium caliber armament barrel manufacturing capability. Offerors are requested to provide one UNISIG Model UNI-50BTA-3000-CR Series Deep Hole Drilling Machine, one UNISIG Model R100 Series Rifling Machine, and optionally one Ohio Tool Works PowerHone-4M Horizontal Honing Machine along with installation, training, and support. Proposals are due no later than July 22, 2020 with award intended within 24 months of award. Offerors must meet delivery, testing, and technical requirements and the contract will be awarded using the lowest price technically acceptable process.

View the file

Other files for this federal contract opportunity

Other files attached to Medium Caliber Armament - Barrel Manufacturing Capability, newest first.
File Type Posted
QA AMD 0007 - MED CAL ARMNT SYS BARREL MANUF EQP.docx DOCX document
QA AMD 0006 - MED CAL ARMNT SYS BARREL MANUF EQP 07162020.docx DOCX document
New Combo Synopsis dated 10July2020.docx DOCX document
Question_Answer_July082020.docx DOCX document
New Combo Synopsis dated 06July2020.docx DOCX document
QA AMD 02 - MED CAL ARMNT SYS BARREL MANUF EQP.DOCX DOCX document
New Combo Synopsis.docx DOCX document
US_Government_NDA_Medium Caliber Armament.DOC DOC document
DD_2345_FORM.pdf PDF
CERTIFICATE_OF_DESTRUCTION_Medium Caliber Armament.DOC DOC document
CDRL A004 Security Training.pdf PDF
CDRL A003 Operation and maintenance manuals.pdf PDF
CDRL A001 Certificate of Compliance.pdf PDF
CDRL A005 Certification_Data Report.pdf PDF
CDRL A002 Accident_Incident Report.pdf PDF
Combo Synopsis.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This is a combined synopsis/solicitation for a commercial item prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation. Proposals are being requested; a written solicitation will not be issued.

Solicitation No. W15QKN-20-R-0B2X is issued as a request for proposal (RFP) and incorporated provisions and clauses are those in effect through the Federal Acquisition Circular 2005-61. This requirement shall be competed on full and open basis under NAICS code 333517 with a size standard of 500 employees.

The U.S. Army Contracting Command (ACC-NJ), Picatinny Arsenal, NJ intends to award one (1) firm-fixed-price (FFP) purchase order, on a competitive basis, for Medium Caliber Armament Systems – Barrel Manufacturing Capability fabricated in the Manufacturing and Prototyping Technology Division (MM&PT) in accordance with the following Statement of Work (SOW) requirements:

1. Background:

The Combat Capabilities Development Command (CCDC) Armaments Center (AC) Armaments Engineering Analysis & Manufacturing Directorate (AEA&MD) has been, and continues to be responsible for advanced manufacturing technologies of armaments components. The new equipment specified will provide state of the art technology to support the engineering and development of novel manufactured components for the Warfighter. Medium Caliber Armament Systems - Barrel Manufacturing is an enabling technology that allows for rapid prototyping of new medium caliber gun barrel designs.

2. Scope:

This Statement of Work (SOW) sets forth the work efforts required for the supply, delivery, installation, training, and support for Medium Caliber Armaments System Barrel Manufacturing Equipment that will be used to further technology development at the U.S. Army Combat Capabilities Development Command Armaments Center (CCDC AC). The technology required from the Contractor under this effort to provide a base capability is Deep Hole Drilling, Honing and Barrel Rifling. The Contractor shall provide a standard manufacturer’s warranty for a period of 2 years from the date of installation for the equipment for parts and labor. The contractor shall also be responsible for installation and training. This machinery and its ancillary components shall fit within 2500 square feet. The machinery shall have the capability to manufacture a finished gun barrel when starting with a forging or hardened blank. This effort will include the purchase, delivery, final installation and training of the following:

2.1. One (1) UNISIG Model UNI-50BTA-3000-CR Series Deep Hole Drilling Machine, brand name or equal.

2.2. One (1) UNISIG Model R100 Series Rifling Machine, brand name or equal.

2.3. Option - One (1) Ohio Tool Works (OTW) PowerHone-4M Horizontal Honing Machine, brand name or equal. This piece of equipment is optional within the period of performance.

3. Applicable Documents:

3.1. Drawing 50MM BARREL

3.2. MIL-HDBK-29612-2A

4. Requirements:

4.1. General Requirements:

· Total capability must be installed in a 50’ x 50’ area and on an existing 8” thick reinforced concrete floor.

· Deep Hole Drilling machine shall be capable of drilling and rifling from 32" to 130" in depth.

· Deep Hole Drilling internal diameter capability of up to 50MM (1.969”).

· Variable twist rate barrel rifling capability. Must be capable of both constant and variable twist rate.

· Variable depth of cut in bore.

· Rifling capability must be compatible with hook and crown tooling.

· Equipment referenced in Section 2.1-2.2 must be capable of machining materials up to 50 Rockwell C.

· Equipment referenced in Section 2.1-2.2 must be capable of holding blank material up to 6” max diameter.

· Equipment referenced in Section 2.1-2.2 must include Ethernet communication to allow upload, backup and restore of program data files to network location.

· Equipment referenced in Section 2.1-2.2 to include a minimum 2 year warranty.

· Equipment referenced in Section 2.1-2.2 to include a minimum of 2 years technical support.

· Equipment referenced in Section 2.1-2.2 to include a minimum of 5 years maintenance.

· Equipment referenced in Section 2.1-2.2 shall be Nationally Recognized Testing Laboratory (NRTL) approved.

4.2. Technical Requirements:

4.2.1. UNISIG Model UNI-50BTA-3000-CR Series Deep Hole Drilling Machine, brand name or equal with the following options.

· One (1) UNISIG Model UNI-50BTA-3000-CR Series Deep Hole Drilling Machine, brand name or equal.

· Three (3) Vibration dampener carriage, 135 mm (5.3 in) bore, single spindle

· Two (2) Clamping cones for workpiece.

· SMW steady rest, 22 - 150 mm (0.88 - 6.0 in) diameter workpiece capacity, Removable carriage, Hydraulic actuation, Hydraulic valve stack, local plumbing.

· One (1) Adjustable height vee support for workpiece, single spindle.

· One (1) Ethernet communication for PLC machines. Allows backup and restore of program data file to network location.

· One (1) Operation status stack light: Red / Green / Yellow

· One (1) Refrigerant chiller, 19 kW (66,000 Btu/hour) coolant capacity. Programmable oil temperature, interlocked with control.

· One (1) BTA drill tube clamp, A2-5, direct mount, 68 mm ID. Tube size range 794 - 816 (11 - 68 mm)

· One (1) Gundrill driver, 19.05 mm (0.75 in), 3.18 - 12.7 mm (0.13 - 0.50 in) dia. Gundrills.

· One (1) Gundrill driver, 25.4 mm (1.00 in), 12.7 - 19.05 mm (0.50 - 0.75 in) dia. Gundrills.

· One (1) Gundrill driver, 31.8 mm (1.25 in), 19.05 - 25.4 mm (0.75 - 1.00 in) dia. Gundrills.

· One (1) Gundrill driver, 38.1 mm (1.50 in), 25.4 - 38.1 mm (1.00 - 1.50 in) dia. Gundrills.

· One (1) Gundrill driver, 50.8 mm (2.00 in), 38.1 - 50.8 mm (1.50 - 2.00 in) dia. Gundrills.

4.2.2. UNISIG Model R100 Series Rifling Machine, brand name or equal with the following options.

· One (1) UNISIG model R100-3000 Servo Rifling Machine, brand name or equal.

· One (1) Ethernet communication for PLC machines. Allows backup and restore of program data file to network location.

· One (1) Hinged belt chip conveyor, length to capture chips from L.H. and R.H. chip collection.

· Refrigerant chiller, 11 kW (30,000 Btu/hour) coolant capacity.

4.2.3. The following equipment is optional for purchase within the period of performance.

4.2.3.1. Option – Horizontal Honing Machine. The contractor shall deliver one (1) OTW PowerHone-4M horizontal honing machine, brand name or equal with the following options.

· Maximum Stroke Capacity4M
· Minimum Diametric Capacity.500” ID
· Maximum Diametric Capacity22.00” ID
· Spindle Drive PowerFull Servo-Drive System
· Reciprocation Drive Power11 kW Servo
· Spindle Speeds-Infinitely VariableTBD
· Reciprocation Speeds-Infinitely Variable1-100 FPM
· Tool Expansion – Servo-ElectricLinear
· Power Center480V/3PH/60Hz

· Two (2) universal part holding fixtures.

· One (1) traveling driveshaft support assembly.

· Front stationary driveshaft support assembly.

· Data collection system.

· Remote machine diagnostics capability.

· Programmable stroke positioning.

· Touch screen operator’s controls.

· Driveshaft storage racks.

· Two (2) year, new machine warranty.

· Operator and maintenance manuals (Electronic).

· Allen-Bradley control system.

· Operator’s tool kit.

· DCO-100 Magnetic separator and paper filter with 79-Gallon tank.

· OTW-MB-300-55 Pre-Mixed honing oil 55-gallon drums.

· Model OTW-.500-3182.5-XXXX-4M Integral Driveshaft.

· Model OTW-.750-3184-XXXX-4M Integral Driveshaft.

· Model OTW-1.0-3184-XXXX-4M Integral Driveshaft.

· Model OTW-1.25-3146-1992 1.25” tool with .750 drive shank.

· Model OTW-1.5-35166-1301 1.5” tool with .750 drive shank.

· Model OTW-1.75-45166-1314 1.75” 1.75” tool with 1.125 drive shank.

· Model OTW-2.0PH-1.12-.750-XXXX push feed driveshaft assembly for use with the 1.25” and 1.5” tool assemblies.

· Model OTW-2.0PH-1.56-1.12-XXXX push feed driveshaft assembly for use with the 1.75” tool assemblies.

· Driveshaft support bushings and driveshaft wiper assemblies.

· One (1) #18149 universal spindle drive adaptor complete with reversing keys. This adaptor will connect the machine spindle to the driveshaft assemblies.

5. Acceptance Testing:

5.1. Origin Testing/Inspection:

5.1.1. Contractor shall demonstrate the system’s ability by fabricating 2 barrels that meet the technical requirements per Drawing #302-1021-1, BARREL, 50MM BLANK at the Contractor facility prior to shipping. The contractor shall provide a Certification/Data Report (DI-MISC-80678), CDRL A005 prior to acceptance.

5.2. Destination Testing/Inspection:

5.2.1. The contractor shall demonstrate machine function in all operational modes and demonstrate accessory functions.

5.2.2. Contractor shall demonstrate the system’s ability by fabricating 2 barrels that meet the technical requirements per Drawing #302-1021-1, BARREL, 50MM BLANK at the destination facility after installation. The contractor shall provide a Certification/Data Report (DI-MISC-80678), CDRL A005 prior to acceptance.

6. Installation:

6.1. The Contractor shall provide the site installation plan within 90 days after contract award. Plan shall outline all the infrastructure and utility requirements to commission the machinery.

6.2. The Contractor shall provide all labor, material and supplies necessary to deliver, unload, install, connect and power-up each machine.

6.3. The Contractor shall provide all disconnects, transformers, wiring, conduit, pipe and other materials necessary to connect the machines to main power and shop air. Connection points for main power and shop air are within fifty (50) feet.

6.4. The Contractor shall install the equipment in accordance with applicable Occupational Safety and Health Administration (OSHA) and National Institute for Occupational Safety and Health (NIOSH) regulations.

6.5. The Government will provide access to 480V, 3-Phase, 60 Hz power and shop air at the required Standard Cubic Feet per Minute and Pressure. The equipment shall be installed at the following location.

6.6. Installation Location:

US Army CCDC-AC

FCDD-ACM-AM

3150 Gately Rd., Picatinny Arsenal, NJ 07806-5000

6.7. US Army CCDC-AC Industrial Hygiene Office may observe the installation and conduct a Workplace Ergonomics Evaluation assess work envelope acceptability, musculoskeletal risks, noise levels, fumes/vapors, lighting, etc.

7. Training:

7.1. The contractor shall provide training of the equipment for two (2) Government Armaments Center personnel. This training is to include operation, programing of equipment and preventative maintenance.

7.2. Training Location: The training will be performed at the following location:

US Army CCDC-AC

FCDD-ACM-AM

3150 Gately Rd

7.3. The contractor shall employ training instruction (e.g., manuals), training criteria (e.g., desired learning outcomes and performance goals), and evaluation methods and metrics to verify training effectiveness in accordance with criteria (e.g., performance measurements such as number of tasks correctly completed within a prescribed time). The contractor may use MIL-HDBK-29612-2A - Department of Defense Handbook, Instructional Systems Development/Systems Approach to Training and Education (Part 2 of 5 Parts), 31 August 2001 as guidance.

8. Deliverables: The contractor shall provide the following equipment and documentation:

8.1. One (1) UNISIG Model UNI-50BTA-3000-CR Series Deep Hole Drilling Machine, brand name or equal.

8.2. One (1) UNISIG Model R100 Series Rifling Machine, brand name or equal.

8.3. The contractor shall provide a Certificate of Compliance (DI-MISC-81356A), CDRL A001, with the delivery of each piece of equipment.

8.4. Accident/Incident. The contractor shall report immediately any major accident/incident (including fire). The contractor shall prepare an Accident/Incident report (DI-SAFT-81563), CDRL A002, for each incident.

8.5. The contractor shall supply one set of operation and maintenance manuals (DI-TMSS-80384), CDRL A003, with each piece of equipment and a complete duplicate set on CD with the rights to print more copies as needed.

8.6. Mandatory Security Training. The contractor shall submit certificates of completion in accordance with CDRL A004 (DI-MISC-80678).

8.7. Data Report. The contractor shall provide a Certification/Data Report (DI-MISC-80678) CDRL A005 prior to origin and destination acceptance by demonstrating the system’s ability by fabricating 2 barrels that meet the technical requirements per Drawing #302-1021-1, BARREL, 50MM BLANK

8.8. Option - One (1) OTW PowerHone-4M Horizontal Honing Machine, brand name or equal.

9. General Information:

9.1. Delivery Location:

Attn: TBD US Army CCDC-AC

FCDD-ACM-AM

3150 Gately Rd., Picatinny Arsenal, NJ 07806-5000

9.2. Government POC’s:

Engineering POC: TBD COR: TBD

9.3. Classification: Highest Overall Classification: Unclassified

9.4. Contract Information: This is a Firm Fixed Price Contract.

9.5. Period of Performance: Period of performance shall be no more than 24 months from date of contract award.

9.6. Place of Performance:

· Equipment will be built at vendor’s facility. TBD at contract award.

· Equipment will be delivered and installed at: US Army CCDC-AC, 3150 Gately Rd, Picatinny, NJ 07806-5000.

· Due to COVID-19 and the uncertainty when Picatinny Arsenal will reopen, contractor shall not deliver any item(s) or begin performance at Picatinny until official authorization is provided by the PCO that work can commence. The date would be subject to further delay via contract modification depending upon the COVID-19 situation.

10. General Requirements:

10.1. Non-Personal Services: The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Such contractor employees shall be accountable solely to the Contractor who, in turn is responsible to the Government. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

10.2. Government - Contractor Relationships: The Government and the contractor understand and agree that the services to be delivered under this task order by the contractor to the Government are non-personal services and the parties recognize and agree that no employer-employee or master-servant relationships exist or will exist under the task order between the Government and the contractor and/or between the Government and the contractor's employees. It is therefore in the best interest of the Government to afford the parties a full and complete understanding of their respective obligations.

10.3. Contractor personnel under this task order shall not:

10.3.1. Be placed in a position where they are appointed or employed by a Federal Officer, or are under the supervision, direction, or evaluation of a Federal Officer, Military or Civilian.

10.3.2. Be placed in a staff or policy making position.

10.3.3. Be placed in a position of command, supervision, administration or control over DA Military or Civilian personnel, or personnel of other contractors, or become a part of the Government organization.

10.3.4. Be used for the purpose of avoiding manpower ceilings or other personnel rules and regulations of DA or the Civil Service Commission.

10.3.5. Be used in administration or supervision of military procurement activities.

10.4. Employee Relationships:

10.4.1. The services to be performed under this task order do not require the contractor or its employees to exercise personal judgment and discretion on behalf of the Government, but rather the contractor's employees will act and exercise personal judgment and discretion on behalf of the contractor.

10.4.2. Rules, regulations, directions, and requirements which are issued by command authorities under their responsibility for good order, administration, and security are applicable to all personnel who enter any Government installation, or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control which is inconsistent with a non-personal services task order.

10.5. Identification of Contractor Employees:

10.5.1. All contractor employees shall be identified as such by wearing badges at all times while performing work at Government facilities and when performing work for the Government under the scope of specific contract at other installations or nongovernment sites to include attendance at meetings, seminars, etc. The badges may be either affixed to clothing or be displayed from a chain or other mechanism worn around the neck. Badges must include contractor's company name and employee's name. No other items may be placed on the badge.

10.5.2. Contractor workspace shall ensure that Federal employees and the public know that they are not Federal employees.

10.5.3. Contractor employees shall initially identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings/seminars or any other situations where their contractor status is not obvious.

10.5.4. Official contractor correspondence (written, facsimile, and email display) shall include their company name and any other documents or reports produced by contractors are identified as contractor products or contractor participation is disclosed.

10.6. Inherently Governmental Functions: The Contractor shall not provide inherently governmental functions as defined in FAR 2.101.

11. Security:

11.1. AT Level I Training: “All contractor employees, including subcontractor employees, requiring access to Department of Defense installations, facilities, or controlled access areas shall complete AT Level I awareness training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies and within 12 months prior to travel outside of the US, then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jkodirect.jten.mil/.”

11.2. Access and General Protection/Security Policy and Procedures: “All contractor employees, including subcontractor employees, shall comply with all installation and facility access and local security policies and procedures (provided by the Government representative), and security/emergency management exercises. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. During FPCONs Charlie and Delta, services/installation access may be discontinued/postponed due to higher threat. Services will resume when FPCON level and or threat is reduced to an acceptable level as determined by the Installation Commander. Contractor personnel working on an installation are required to participate in the Installation Random Antiterrorism Measures Program as directed. Contractors may be subject to and must comply with vehicle searches, wearing of ID badges, etc. Failure to comply with policies and procedures could result in barred access onto the installation.”

11.3. iWATCH (See Something, Say Something) Training: “All contractor employees, including subcontractor employees, shall receive training and participate in the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, and then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel.” Slides available to COR at https://www.milsuite.mil/book/docs/DOC-284984

11.4. For contractors that do not require CAC, but require access to a DoD facility or installation: “Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.”

11.5. Export Control Laws/International Traffic in Arms Regulation: “DFARS Clause 252.225-7048, Export-Controlled Items applies to this effort. All documents determined to contain export controlled technical data will be marked with the following notice: WARNING: - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

11.6. For Contracts That Require a Government Provided OPSEC Standing Operating Procedure/Plan. Requires the addition of: “The contractor is subject to compliance with the CCDC Armaments Center Operations Security Plan, per AR 530-1 (or DoDM 5205.02-M). This SOP/Plan will specify the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.”

11.7. For Contracts That Require OPSEC Training: “Per AR 530-1 (or DoDM 5205.02-M), new contractor employees, including subcontractor employees, must complete initial (Level I) OPSEC training within 30 calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC level II trained OPSEC Officer/Coordinator. The Contracting Officer Representative (COR) or Agreements Officer Representative (AOR) can request CCDC Armaments Center OPSEC training from CCDC Armaments Center OPSEC POC e-mail: usarmy.pica.rdecomardec.mbx.ardec-opsec@mail.mil.”

11.8. For Contracts that Involve the Public Release of Information: “Per AR 530-1 (or DoDM 5205.02-M), an OPSEC review is required prior to all public releases. All government information intended for public release by a contractor will undergo a government OPSEC review prior to release.”

12. Environmental:

12.1. The contractor shall adhere to all local, county, state, Army and federal policies, directives, executive orders and regulations required including the following: 32 Code of Federal Regulations (CFR) Part 651, AR 200-1 (Environmental Protection and Enhancement), 40 CFR , and Picatinny Arsenal local policies/regulations in order to maintain environmental compliance for the duration of the contract. Local policies that must be adhered to include the Picatinny Environmental Bulletin and the Installation Environmental Policy. These documents can be found on the Picatinny Environmental Management System (PEMS) website (https://picac2w5.pica.army.mil/pems) or can be obtained from the COR.

12.2. The contractor shall comply with all Affirmative and Green Procurement policies and procedures when ordering materials. Picatinny’s Green Procurement Plan is located at https://picac2w5.pica.army.mil/pems/docs/GPProcedures.pdf or can be obtained from the COR.

12.3. The contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.

12.4. The contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

12.5. The contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.

12.6. The contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility. 11.1. Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy. 11.2. Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream. 11. 3. Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight. 11. 4. The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials. 11. 5. The Contractor shall make maximum effort to reduce and prevent waste.

12.7. The contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils-lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources; and immediately contact the installation Fire and Emergency Services (Fire Department).

12.8. The contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

The following Federal Acquisition Regulation (FAR) and Defense FAR Supplement (DFARS) provisions/clauses are applicable and are incorporated by reference: FAR: 52.203-3, 52.203-5, 52.203-7, 52.203-7, 52.203-10, 52.203-12, 52.203-13, 52.204-4, 52.204-7, 52.204-8, 52.204-13, 52.204-18, 52.204-23, 52.204-25, 52.209-9, 52.209-10, 52.210-1, 52.211-5, 52.211-15, 52.212-1 & 52.212-2 (addenda below), 52.212-3, 52.212-4, 52.212-5; 52.215-8, 52.215-10, 52.222-3, 52.222-4, 52.225-2, 52.233-4, 52.246-2, 52.247-34 and 52.217-5,52.217-7. FAR 52.212-5 applies along with the following additional clauses under FAR 52.212-5: 52.219-1, 52.219-6, 52.219-8, 52.219-9, 52.219-28, 52.222-3, 52.222-4, 52.222-19, 52.222-21, 52.222-22, 52.222-23, 52.222-24, 52.222-25, 52.222-26, 52,222-35,52,222-36,52.222-37, 52.222-40, 52.222-50, 52.222-54, 52.223-5, 52.223-6, 52.223-10, 52.223-18, 52.225-13, 52.227-1, 52.227-2, 52.229-3; 52.225-19, 52.232-1, 52.232-33, 52.233-1, 52.233-3, 52.233-4, 52.243-1, 52.249-2, 52.249-8, and DFARS: 252.203-7002, 252.204-7002, 252.209-7004,252.222-7006, 252.216-7000, 252.216-7007, 252.225-7002, 252.225-7004, 252.225-7008, 252.225-7009, 252.225-7013, 252.232-7006 and 252.232-7010. 252.203-7000, 252.203-7005; 252.204-7012, 252.204-7015, 252.211-7003, 252.225-7000, 252.225-7001, 252.225-7012, 252.225-7036, 252.225-7048, 252.225-7036, 252.232-7003; 252.234-7004; 252.244-7000, 252.244-7005; 252.246-7003; 252.249-7002; 252.247-7023 Alt II.

The following local information also applies:

1. Responses must set forth full, accurate and complete information as required by this solicitation (including attachments). Responses shall include the contractor’s Cage Code and DUNS number. Examine the entire solicitation carefully. The penalty for making false statements is prescribed in 18 U.S.C. 1001.

2. Responses must be plainly marked with the Solicitation Number and the date and local time set forth for bid opening or receipt of proposals in the solicitation document.

3. Information regarding the timeliness of response is addressed in the provision of the solicitation entitled either “Late Submission, Modification and Withdrawal of Bid” or “Instructions to Offerors – Competitive Acquisitions”.

4. Procurement Information:

This Procurement is unrestricted.

The applicable NAICS code is: 333517.

5. Issuing Office

U.S. Army Contracting Command – New Jersey ATTN: Yubaraj Rasaily Office Symbol: ACC-NJ-JA Picatinny Arsenal, NJ 07806-5000 Email: yubaraj.rasaily.civ@mail.mil

6. Point of Contact for Information:

Name: Yubaraj Rasaily Title: Contract Specialist Email: Yubaraj.rasaily.civ@mail.mil

DISCLOSURE OF UNIT PRICE INFORMATION

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

Packaging and Marking Commercial Packaging shall apply to this procurement (see below).

2D Bar Codes are not required.

The estimated weight of the item in its shipping container is greater than 30,000 Pounds.

The Security Classification of the material to be shipped is Unclassified.

The item being shipped is not hazardous and not Arms, Ammunition or Explosives.

No Government Furnished Equipment will be provided for this contract.

Items will be shipped to:

US ARMY CCDC AC

FCDD-ACM-AM

3150 Gately Road

ATTN: TBD

COMMERCIAL PACKAGING REQUIREMENTS

1. Packaging - Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.

1.1 Cleanliness - Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants.

1.2 Preservation - Items susceptible to corrosion or deterioration shall be provided protection such as preservative coatings, volatile corrosion inhibitors, desiccants, and water-proof and/or water-vapor-proof barriers.

1.3 Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration and prevent damage during handling and shipment.

2. Unit package

2.1 Unit Package - A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of the unit package shall be a container such as a sealed bag, carton or box.

2.2 Unit Package Quantity - Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.

3. Intermediate Package

3.1 Intermediate Packaging - The use of intermediate packaging is required whenever one or more of the following conditions exist:

a. The quantity is over one (1) gross of the same national stock number.

b. Use enhances handling and inventorying.

c. The exterior surface of the unit pack is a barrier bag.

d. The unit pack is less than 64 cubic inches.

e. The weight of the unit pack is less than five (5) pounds and no dimension is over twelve (12) inches.

Intermediate container shall be limited to a maximum of 100 unit packs, a net load of 40 pounds, or a maximum volume of 1.5 cubic feet, whichever occurs first.

4. Packing

4.1 Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed in shipping containers. All shipping containers shall be the most cost effective and shall be of the minimum cube to contain and protect the items.

4.2 Shipping Containers - The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.

5. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

6. Marking

All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, Date 18 February 2014 including bar coding. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. NOTE: Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/rfid/index.htm for the current DoD Suppliers’ Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the unit load.

7. Hazardous Materials

7.1 A hazardous material is defined as a substance which has been determined by the Department of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Title 49 CFR and other applicable modal regulations effective at the time of shipment.) Ammunition and explosives (Hazard Class 1) are special cases and must be properly hazard classified and registered with the competent authority of the United States (Department of Transportation).

7.2 Packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

a. International Air Transport: International Civil Aviation Organization (ICAO) Technical Instructions for the Safe Transport of Dangerous Goods by Air

b. International Vessel Transport: International Maritime Dangerous Goods Code (IMDG)

c. Domestic Transport: Code of Federal Regulations (CFR) Title 49

d. Military Air Transport: Joint Service Regulation AFMAN24-204/TM38-250/NAVSUP PUB 505/MCO P4030.19/DLAM 4145.3.

7.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the regulations of the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

7.4 A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside a waterproof sealed pouch attached to the outside of the package.

8. Wood Packaging Materials - Heat Treatment and Marking of Wood Packaging Materials: In accordance with the requirements of International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 continuous minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). All materials must include certification markings in accordance with ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

9. Quality Assurance -The contractor is responsible for establishing a quality system. Full consideration to examinations, inspections, and tests will be given to ensure the acceptability of the commercial package.

GOVERNMENT PROCUREMENT QA ACTIONS: INSPECTION

Government Procurement Quality Assurance (PQA) actions will be accomplished by the Government Quality Assurance Representative (QAR) at: Destination

GOVERNMENT PROCUREMENT QA ACTIONS: ACCEPTANCE

Acceptance of supplies will be at: Destination

HQ AMC-LEVEL PROTEST PROGRAM

If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103.

Send protests (other than protests to the contracting officer) to:

Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 Email: usarmy.redstone.usamc.mbx.protests@mail.mil

The AMC-level protest procedures are found at:

Web Address: http://www.amc.army.mil/amc/commandcounsel.html If Internet access is not available contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR - http://farsite.hill.af.mil/vffara.htm 52.212-1 Addenda - Proposal SUBMISSION This section contains proposal submission instructions as well as specific proposal requirements for the solicitation.

The offeror’s proposal shall be labeled in a consistent manner with this document. All references to the Statement of Work (SOW) shall be clearly labeled with the appropriate SOW paragraph. Offerors are expected to submit a proposal in sufficient detail to allow the Government evaluation without the need for further clarifications. The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of proving acceptability remains with the offerors.

General: The proposal shall be presented in sufficient detail to allow Government evaluation of the response to the requirements of the request for Proposal (RFP). The Government will not assume offerors possess any capability, understanding, or commitment not specified in the proposal.

All inquiries/questions concerning this procurement, either technical or contractual, must be submitted via email to the Contracting Office, phone call inquiries will NOT be accepted. No direct discussion between the technical representative and a prospective offeror will be conducted.

US Army Contracting Command-New Jersey
ACC-NJ-JA, Yubaraj Rasaily
Picatinny Arsenal, NJ 07806-5000
E- mail: yubaraj.rasaily.civ@mail.mil

52.212-2 Addenda:

1.0 Basis for Award

The Government’s selection for an awardee will be made on the basis of the lowest priced quote meeting or exceeding the acceptability standards for the non-cost factors in accordance with FAR 13.106-2(b) and FAR 15.101-2, lowest price technically acceptable source selection process. The call order will be awarded to the offeror who is deemed responsible by the Contracting Officer, in accordance with the General Standards for contractor responsibility at FAR 9.104-1, and whose proposal conforms to all of the solicitation’s requirements (including stated terms, conditions, representations, certifications, and all other information) and is assessed, based on the evaluation factors below, to represent the lowest price technically acceptable.

2.0 Evaluation Factors & Evaluation Approach

All proposals will be evaluated in a fair and consistent manner. All proposals will be subject to evaluation by a team of Government personnel. The offeror whose proposal is determined to provide the lowest priced proposal that meets the acceptability standards for non-cost factors will be awarded the call order.

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low priced when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

The Government reserves the right to award based on initial proposals. The Government intends to evaluate proposals and award the call order without discussions with the offerors (except clarifications as described in FAR 15.306). However, the Government reserves the right to conduct discussions and request proposal revisions if it is determined to be in the best interest of the Government.

Factor 1 – Technical

The proposals will be evaluated based on the criteria established in this solicitation as follows.

In order to achieve an Acceptable rating in the Technical factor, the offeror’s proposal must clearly demonstrate its understanding and capability to meet the following minimum requirements:

a. Technical Approach: The contractor shall meet the following minimum requirements in accordance with the Statement of Work (SOW):

i. The contractor shall deliver the following equipment with all options as described in section 4 of the SOW.

· One (1) UNISIG Model UNI-50BTA-3000-CR Series Deep Hole Drilling Machine, brand name or equal.

· One (1) UNISIG Model R100 Series Rifling Machine, brand name or equal.

· Option - One (1) Ohio Tool Works (OTW) PowerHone-4M Horizontal Honing Machine, brand name or equal. This piece of equipment is optional within the period of performance.

ii. The contractor shall perform origin and destination testing/inspection prior to acceptance as described in section 5 of the SOW.

iii. The Contractor shall deliver all parts/materials within the delivery schedule specified in the SOW.

Proposals will be evaluated to determine an offeror's Understanding of the Requirements and Feasibility of Approach.

(1) Understanding the Requirements - The proposal will be evaluated to determine the extent to which it demonstrates a clear and complete understanding of all requirements involved including offeror's existing capabilities, knowledge and expertise in providing the requested items and meeting the requirements presented by the SOW.

(2) Feasibility of Approach - The proposal will be evaluated to determine whether the offeror's methods and approach to meeting the SOW requirements provide the Government with a high level of confidence of successful completion within the required schedule.

ADJECTIVAL RATING
DEFINITION
ACCEPTABLE
Proposal clearly meets the minimum requirements of the solicitation.
UNACCEPTABLE
Proposal does not clearly meet the minimum requirements of the solicitation.

Factor 2 - Price

1. The Total Evaluated Price will be determined by summing the price proposed on each Line Item. This Total Evaluated Price will then be evaluated for reasonableness in accordance with price analysis techniques at FAR 15.404-1(b). Price will not be scored.

2. An offeror must propose on all Line Items to be considered for award. Unit pricing shall be listed with extended costs for each item.

3. Adequate competition is anticipated for this call order. However, in the event that only one offer is received, the Government reserves the right to perform a cost analysis IAW FAR 15.404-1(c). Therefore, in instances when only one offer is received and the quote is $2,000,000 or more, the Contracting Officer shall obtain Certified Cost or Pricing Data. Offers under $2,000,000 require cost or pricing data, but such cost or pricing data is not required to be certified by the offeror. Cost or Pricing Data or Other than certified cost or pricing data shall be provided upon request IAW FAR 15.403. This information will be evaluated for magnitude and reasonableness and may be adjusted from a technical and cost perspective using cost analysis to determine the most probable cost to the Government. Offerors shall utilize a Microsoft Excel file format with formulas intact when submitting their Price/Cost quote (FAR 15.403-5(b)(1)).

4. Price/Cost Inconsistencies: A proposal is presumed to represent an offeror’s best effort to respond to the solicitation. Each initial proposal should contain the offeror’s best terms for award for this call order. Any inconsistencies in performance or price should be explained in the proposal. Any significant inconsistencies, if unexplained, raise a fundamental issue of the offeror’s understanding of the nature and scope of work required and its financial ability to perform the contract, and may be grounds for rejection of the proposal.

Please complete provision 52.212-3, Offeror Representations and Certifications- Commercial Items; OR indicate that your company’s representation’s and certifications…

This is the start of the file's text. The full file is on GovTribe.