W15QKN20R0104-0001.pdf

PDF 47 KB Posted

Attached to
MEDIUM CALIBER NON-RECURRING ENGINEERING (NRE) - AMENDMENT NO. 0001 Federal contract opportunity
Solicitation number
W15QKN20R0104
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document provides details for a federal solicitation seeking non-recurring engineering support for medium caliber ammunition systems. The solicitation requests proposals for development, manufacturing, design, and testing support for 20mm, 25mm, 30mm x 113mm, 30mm x 173mm, and 50mm weapon systems to assess enhanced lethality and accuracy technologies for legacy and future medium caliber ammunition components and improved production and manufacturing of standard cannon legacy ammunition and components in the 20mm to 50mm range. Proposals are due from contractors capable of manufacturing and testing prototype and production samples of mechanical and electronic components on an individual, subsystem, or system basis. The Army Contracting Command - New Jersey will award the contract on behalf of the Project Manager for Maneuver Ammunition Systems using other than full and open competition in accordance with Federal Acquisition Regulation 6.302-3 for industrial mobilization, engineering, development, or research capabilities.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2020OCT28

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

REAGAN WELTNER

EMAIL: REAGAN.W.WELTNER.CIV@MAIL.MIL

W15QKN-20-R-0104

2020OCT09

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 16

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: REAGAN WELTNER

Buyer Office Symbol/Telephone Number: CCNJ-MC/(973)724-5664

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost Plus Fixed Fee

Kind of Contract: Research and Development Contracts

*** End of Narrative A0000 ***

The purpose of Amendment 0001 to Solicitation # W15QKN-20-R-0104 as follows:

1. Remove Labor Category Description "L. Clerical/Administrative" from Section B0001 Narrative. This labor category is not required and was included in the original solicitation in error.

2. Revise Section L0002 Narrative (Volume III, Paragraph 3.3, Section 3 - Subcontracts) to clarify the Government's requirement.

3. Revise an error found in the first paragraph of Attachment 0003 - Non-Disclosure and Non-Use Agreement NRE.

4. Document the following questions received from potential offerors and provide USG responses:

Question 1: There is only one tab for FFP pricing which is a summary of the five years (FFP OP1-5). Does the USG want only a summary page with all five years or do they also require separate tabs for each year of FFP pricing?

USG Response 1: The FFP price proposal does not require all of the subcontracting data that CPFF does, therefore only one FFP pricing tab is needed.

Question 2: There are five tabs for CPFF, but not summary tab similar to the FFP one referenced above. Does the USG require a summary tab of all five years of CPFF pricing?

USG Response 2: The overall summary tab shows the summary for FFP and CPFF. No further summary for CCFF is needed.

Question 3: The labor hours and material and travel dollar amounts in the FFP summary tab are 1/3 of the amount shown in the CPFF individual yearly tabs. Are these correct or would you like us to have the same amounts in FFP summary as the CPFF tabs?

USG Response 3: The labor hours and material and travel dollar amounts should not be adjusted and should not be the same for FFP and

CPFF. These amounts are for evaluation purposes only. Specific FFP/CPFF Labor Hours/Material/Subcontracts/Travel/ODCs will be proposed, evaluated and negotiated under each order.

Question 4: Will the Government clarify what information is required in Section 3 of the Past Performance volume?

USG Response 4: Section L0002 Narrative, Volume III, Paragraph 3.3, Section 3 - Subcontracts, language has been updated to clarify required information.

5. All other terms and conditions of this solicitation remain unchanged and in full force and effect.

*** END OF NARRATIVE A0002 ***

2 16

W15QKN-20-R-0104

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

LABOR CATEGORY DESCRIPTIONS___________________________

A. SCIENTIST/PROGRAM MANAGER:

Organizes, directs, and coordinates planning and implementation of all contract support activities. Interface with government personnel.

Formulate and review project feasibility studies, determine costs, ensure conformance to work standards. Interpret policies, purposes, and goals of the organizations for subordinates. Manage logistics support analysis for military systems. Manage systems safety studies.

Identify, acquire and utilize company resources to achieve project technical objectives.

B. SENIOR ENGINEER:

Performs a variety of engineering tasks, either independently or under supervision, which are broad in nature and are concerned with the design and implementation, including personnel, hardware, software and support facilities and/or equipment. Performs with latitude for un-reviewed actions and decisions. Must be capable of system conceptualization, system level requirements definition and system test and evaluation. Must be familiar with probability, reliability, statistical analysis methods, sampling and test and evaluation techniques, data collection and applicable regulations and standards.

C. GENERAL ENGINEER:

Under supervision performs a variety of engineering tasks, which are broad in nature and are concerned with the design and implementation, including personnel, hardware, software and support facilities and/or equipment. Performs with some latitude for unreviewed actions and decisions. Must be capable of system conceptualization, system level requirements definition and system test and evaluation. Must be familiar with probability, reliability, statistical analysis methods, sampling and test and evaluation techniques, data collection and applicable regulations and standards.

D. QUALITY CONTROL ENGINEER:

Has experience in probability, reliability, maintainability, statistical analysis methods, sampling and test and evaluation techniques, data collection and familiarity with applicable regulations and standards. Experience in the areas of development and operational testing at both component and system level; preparation, review and analysis of failure reports, verification of corrective actions;

requirement validation and their translation and trace to technical requirements and test specifications; and preparation and review of detailed test plans/procedures/reports.

E. ENGINEERING TECHNICIAN:

Provides highly technical expertise and skills in development and repair of prototype hardware, use of numerical control machines, and knowledge of shop practices, etc. Performs in all phases of hardware manufacturing process. Develop standards, procedures, and guidelines for tasks being performed. Perform in all phases of hardware testing, recording of test data, pointing out deviations resulting from equipment malfunction or observational errors. Participate in hardware evaluations. Develop test procedures and report test results.

F. DRAFTSMAN:

Prepares mechanical and electronic drawings, as well as, technical illustrations, assembly drawings, schematics, facility layouts, wiring diagrams and wire lists. Develops documentation of design from concept to completion.

G. MANUFACTURING:

Experience should include basic manufacturing planning, understanding of military specifications and certifications, raw material selection, engineering change process, design modification, use of CAD/CAM systems and manufacturing process development. Must be able to set-up and operate the full range of machine tools found in a well-equipped prototype development shop. Must be able to work from engineering design drawings and technical specifications. Must be able to maintain dimensional accuracy, to + or - 0.0001", during machining processes, through the use of measuring instruments (e.g. vernier calipers, inside/outside & depth micrometers, gage blocks, surface and height gages, and dial indicators).

H. INSPECTION & TESTING:

Must have experience and skills in outlining, setting up, and operating test equipment that will meet specification requirements.

Perform in all phases of hardware testing, recording of test data, pointing out deviations resulting from equipment malfunction or observational errors. Participate in hardware evaluations. Develop test procedures and report test results.

I. QUALITY CONTROL TECHNICIAN:

Knowledge should include a basic understanding of and familiarity with Military and DoD quality standards. Specific experience may include: Destructive and/or non destructive testing; Collection of quality metrics; Execution of quality plans; prepare and execute quality related tests, collect data, repair appropriate reports; Assist in the conduct of subcontractor Source Inspections.

J. PRODUCTION CONTROL:

Plan, direct, or coordinate the work activities and resources necessary for manufacturing products for prototypes and low rate production in accordance with cost, quality, and quantity specifications.

K. TOOL/DIE/MODEL MAKER:

3 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Must be able to fabricate and construct mechanisms, models and instruments that fulfill engineering requirements for equipment involving mechanical, electro-mechanical, hydraulic, optical and pneumatic principles. Determine necessity for special tools, dies and fixtures required to accomplish intricate machining and assembly operations and set-up and operate CNC machines (Machining Center, Lathe and Milling Machine).

*** END OF NARRATIVE B0001 ***

4 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0003 NON-DISCLOSURE AND NON-USE AGREEMENT NRE 28-OCT-2020 003 EMAIL

5 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

PROPOSAL SUBMISSION INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS

I. PROPOSAL SUBMISSION______________________

1. Introduction: This section contains general proposal submissions instructions as well as specific proposal requirements for the

Medium Caliber Ammunition Engineering Design and Manufacturing Technology to Support Medium Caliber Programs.

2. General. The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the

Request for Proposal (RFP). The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

II. PROPOSAL INSTRUCTIONS_________________________

1. General:

1.1. Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding or commitment not specified in the proposal.

1.2. The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.

1.3. The Government intends to award without discussions (see FAR 52.215-1). Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

1.4. Alternate Proposals: Alternate proposals will not be accepted.

1.5. Proposals shall be valid through 26 February 2021.

2. All questions concerning this procurement, either technical or contractual must be submitted in writing to the Contracting Officer.

No direct discussion between the technical representative and a prospective Offeror shall be conducted. Questions and proposals shall be submitted to the following points of contact:

Army Contracting Command - New Jersey

ATTN: Katherine N. Conklin, Contracting Officer

Bldg 10 Phipps Road

Picatinny Arsenal, NJ 07806-5000

Email: katherine.n.conklin.civ@mail.mil

Army Contracting Command - New Jersey

ATTN: Reagan Weltner, Contract Specialist

Bldg 10 Phipps Road

Picatinny Arsenal, NJ 07806-5000

Email: reagan.w.weltner.civ@mail.mil

Please note that electronic e-mail proposal submissions will not be accepted.

3. The proposal shall consist of the following:

3.1. Each proposal shall be submitted in the English language and consist of and include all of the following:

NOTE: Offeror shall request DoD Secure Access File Exchange (SAFE) Site Drop-Off Link (via https://safe.apps.mil ) from

Contracting Officer and/or Contract Specialist no later than 7 calendar days prior to proposal submission deadline.

a. All proposal submissions shall be submitted via DoD SAFE Site Drop-Off Link provided by the Contracting Officer

6 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

and/or Contract Specialist. One signed and completed copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices/costs in the Price/Cost Matrix, any fill-ins required, such as Contract Data

Requirements List: DD Form 1423 with Blocks 17 and 18 completed if required, and Certifications and Representations in

Section K. Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating

N/A. The proposal must also include computation for the use of Government Property, if applicable.

b. Electronic Copies shall be submitted; no paper copies will be accepted unless otherwise noted by the Contracting

Officer. All electronic copies of the proposal volumes, as reflected in D.3., shall be compiled using the Microsoft

Office for Windows suite of applications, and formatted for an MS Windows compatible computer. The Price/Cost Factor shall be contained in a separate file from non-price/cost factors. Price/Cost breakdown, when applicable, will include

MS Excel spreadsheets with formulae intact. Process flows may be delivered in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with the Offerors Name and the Solicitation Number. Alternatively, files may be provided in Portable Document Format (.pdf).

c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under this solicitation, all Offerors must submit Reps/Certs data into the System for Award Management

(SAM) at https://www.sam.gov and provide one (1) electronic copy submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.

4. Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR 52.219-

9, alternate II. This plan shall be incorporated into any resultant contract in reference to the RFP.

5. Submit the proposal to the following addresses:

Army Contracting Command - New Jersey

ATTN: Katherine N. Conklin, Contracting Officer

Bldg 10 Phipps Road

Picatinny Arsenal, NJ 07806-5000

Email: katherine.n.conklin.civ@mail.mil

Army Contracting Command - New Jersey

ATTN: Reagan Weltner, Contract Specialist

Bldg 10 Phipps Road

Picatinny Arsenal, NJ 07806-5000

Email: reagan.w.weltner.civ@mail.mil

III. FORMAT FOR PROPOSALS_________________________

1. The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor.

2. Page limitation for each Volume is as follows:

Volume I: Technical Factor (Maximum of 50 pages)

Volume II: Price/Cost Factor (No Maximum)

Volume III: Past Performance Factor (Maximum of 10 pages)

Volume IV: Small Business Participation (Maximum of 10 pages)

Volume V: Solicitation, Offer and Award Documents and Certfications/Representations (No Maximum)

*Pages submitted beyond the maximum number of pages allowed will not be evaluated. It is in the offerors best interest to adhere to the maximum page limit.

3. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:.

7 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Margins: Top, Bottom, Left, Right - 1 inch

Gutter: 0 inches

From Edge: Header, Footer 0.5 inch

Page Size: Width 8.5 inches

Page Size: Height 11 inches

4. Length:

4.1. Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc. may be used, with each fold counted as one additional page. The font used shall not be less than 10 point.

4.2. Price/Cost Volume. The Offerors Price Matrix and any documentation that is based on or includes mathematical calculations

(e.g., calculations where there is the appearance of unbalanced pricing, etc.) shall be submitted in electronic, executable format utilizing Microsoft Excel. Any additional information necessary to explain the proposed pricing that does not contain mathematical calculations may be submitted in Adobe, Microsoft Word or Microsoft Excel format.

4.3. Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring

Contracting Officer (PCO) no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.

4.4. The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal.

Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Section M of the RFP.

4.5. File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Please note Self extracting .exe files will not be accepted.

IV. SPECIFIC PROPOSAL INSTRUCTIONS__________________________________

Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross- referenced to both the applicable Statement of Work (SOW) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable SOW paragraph by placing the appropriate SOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the SOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to this effort, components and assemblies, except for the area of Past Performance. In the response to the Request for Proposal, the

Offeror must address the following Factors and Subfactors:

VOLUME I FACTOR 1 - TECHNICAL FACTOR_____________________________________

1. The offeror shall provide a summary of how their responses to the following Technical Subfactors meets the objective of the Technical factor by demonstrating an understanding of the technical requirements of the program stated in the solicitation. The offerors response shall adequately and completely consider, define and satisfy the requirements specified in the solicitation.

SUBFACTOR 1 - MEDIUM CALIBER EXPERIENCE_______________________________________

The offeror shall define and describe their Medium Caliber experience, discussing in detail their capabilities for conducting and supporting all contract tasks, based on the requirements listed below:

a) Knowledge of and prior experience in 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm cannon ammunition and ammunition component design and development. Knowledge of and prior experience of 20mm through 50mm cannon ammunition not in the families listed above.

8 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b) Knowledge of and prior experience in 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm ammunition and ammunition component small developmental quantity (less than 500) fabrication and inspection.

c) Knowledge of and prior experience in 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm ammunition and ammunition component manufacturing and inspection. Knowledge and experience in bringing newly developed items from development through low rate initial production and to full-scale production.

d) Knowledge of and prior experience in 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm ammunition and ammunition component non-destructive and destructive testing including ballistic testing.

e) Knowledge of and prior experience in interior and exterior aero-ballistic analyses of Medium caliber projectiles.

f) Knowledge of and prior experience in the areas of handling, storing, designing, developing, manufacturing, assembling and testing of items and assemblies that contain electrical/electronic components.

g) Knowledge of and prior experience in the areas of handling, storing, designing, developing, manufacturing, assembling and testing of items and assemblies containing energetic materials (e.g., explosives, pyrotechnics and propellants). NOTE: This shall include the containers of raw energetics as well as the items and assemblies that contain them.

SUBFACTOR 2 - FACILITIES, EQUIPMENT, AND SUPPLIERS__________________________________________________

The offeror shall define and describe their Facilities, equipment, and suppliers for Medium Caliber requirements, discussing in detail their capabilities for conducting and supporting all contract tasks, based on the requirements listed below:

a) Availability of facilities, equipment, and suppliers/sub-contractors necessary to perform design and development work on 20mm x 102mm, 25mm x 137mm, 30mm x 113mm 30mm x 173mm and 50mm x 228mm, and other 20-50mm ammunition and ammunition components.

b) Availability of facilities, equipment, and suppliers/sub-contractors necessary to fabricate and inspect small developmental quantities (less than 500) of 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm, and other 20- 50mm ammunition and ammunition components.

c) Availability of facilities, equipment, and suppliers/sub-contractors necessary to fabricate and inspect small production quantities, up to 10,000 cartridges, of 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x

228mmammunition and ammunition components.

d) Availability of facilities, equipment, and suppliers/sub-contractors necessary to perform 20mm x 102mm, 25mm x

137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm ammunition component non-destructive and destructive testing including ballistic testing.

e) Availability of facilities, equipment, and suppliers/sub-contractors necessary to perform interior and exterior aeroballistics analysis of Medium caliber projectiles.

f) Availability of facilities, equipment, controls and licenses required to handle, store, design, develop, manufacture, assemble and test items and assemblies containing energetic materials (e.g., explosives, pyrotechnics and propellants). NOTE: This shall include the containers of raw energetics as well as the items and assemblies that contain them.

SUBFACTOR 3 - PERSONNEL_______________________

Offerors shall define and discuss their personnel proposed for Medium Caliber efforts, describing in detail their capabilities for conducting and supporting all contract tasks, based on the requirements listed below:

a) Availability and qualifications of personnel necessary to perform ammunition and ammunition component design and development work who have experience in 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm, 50mm x 228mm and other

20-50mm items.

b) Availability and qualifications of personnel necessary to fabricate and inspect small developmental quantities

(less than 500) of ammunition and ammunition components who have experience in 20mm x 102mm, 25mm x 137mm, 30mm x

113mm, 30mm x 173mm and 50mm x 228mm.

c) Availability and qualifications of personnel necessary to manufacture and inspect small production quantities, up to 10,000 cartridges, who have experience in 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, 30mm x 173mm and 50mm x 228mm.

9 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

d) Availability and qualifications of personnel necessary to perform of 20mm x 102mm, 25mm x 137mm, 30mm x 113mm, and

30mm x 173mm and 50mm x 228mm, ammunition and ammunition component non-destructive and destructive testing including ballistic testing. These personnel should have experience in Medium caliber ballistic testing and non-destructive testing.

e) Availability and qualifications of personnel necessary to perform interior and exterior aeroballistics analysis of

Medium caliber projectiles. These personnel should have experience in Medium caliber interior and exterior aeroballistics analysis.

f) Availability and qualifications of personnel trained and experienced in the handling, storage, design, development, manufacturing, assembly and testing of items and assemblies containing energetic materials (e.g., explosives, pyrotechnics and propellants). NOTE: This shall include the containers of raw energetics as well as the items and assemblies that contain them.

VOLUME II FACTOR 2 - PRICE/COST FACTOR_______________________________________

1. Offerors shall not propose pricing on the CLINs in Section B. These contract line items are established to enable to placement of future orders. All offerors must be able to perform FFP and CPFF requirements to be considered for award.

2. FFP Requirements. Offerors shall complete Attachment 0009, including FFP Labor, FFP Material/Subcontracts and FFP Travel.

2.1. FFP Labor: Offerors shall submit only one FFP fully loaded labor rate for each labor category for each ordering period in

Attachment 0009. The fully loaded labor rates shall be inclusive of direct labor, indirect costs and profit. Offerors shall propose a fully loaded labor rate for all labor categories and ordering periods. An Offerors fully loaded labor rates will be incorporated into any contract that is awarded as a result of this solicitation. Offerors will have the opportunity to propose lower fully loaded FFP labor rates for orders, but may not exceed what is incorporated in the basic contract. The Offeror shall not deviate from the labor categories and Government-provided hours listed by labor category and ordering period. These

Government-provided hours are for evaluation purposes only.

2.2. FFP Material/Subcontracts: Offerors may propose indirect cost and profit applicable to Government-provided FFP

Material/Subcontracts and shall be detailed in Attachment 0009.

2.3. FFP Travel: Offerors may propose indirect rates and profit applicable to FFP Travel and shall be detailed in Attachment

0009.

3. CPFF Requirements. Offerors shall complete Attachment 0009, including CPFF Labor, CPFF Material/Subcontracts and CPFF Travel.

3.1. CPFF Labor: Offerors shall submit a minimum of one fully loaded labor rate per labor category, indicating whether it is for the prime contractor, subcontractor, interdivisional transfers and affiliates under common control (hereafter referred to as subcontractors) for each of the five ordering periods, in Attachment 0009. However, the Offeror and each subcontractor may only propose one fully loaded labor rate for each labor category. If the Offerors/subcontractor(s) rates are blended, weighted or composite rates, the Offeror/subcontractor(s) shall provide a detailed schedule and breakout by element of cost which demonstrates how the blended, weighted or composite rates were calculated Offerors shall submit separate rates for effort performed by the prime contractor and subcontractors for each labor category. The fully loaded labor rates shall be inclusive of wages, applicable indirect costs and fee. The prime contractor cannot utilize their fully loaded labor rates for their subcontractors. The CPFF fully loaded labor rates will be incorporated into any contract that may be awarded as a result of this solicitation. Offerors will have the opportunity to propose lower fully loaded CPFF labor rates for orders, but may not exceed what is incorporated in the basic contract.

3.1.2. Offerors may not deviate from the labor categories and hours listed by labor category and ordering period in

Attachment 0009. The Government-provided labor hours are used for evaluation purposes only. The number of Government labor hours per labor category in Attachment 0009 shall be allocated among the Offeror and subcontractor(s). The total proposed hours per labor category shall be equal to the total Government-provided hours listed for each labor category for each ordering period. Offerors shall not change the total Government-provided labor hours per labor category listed.

3.1.3. The Offeror, as well as any subcontractor with a total proposed effort for all ordering periods of $1,000,000 or more as allocated by the prime contractor must provide a breakdown of the cost elements for each proposed fully loaded CPFF labor rate and the supporting documentation detailed below. The prime contractor shall submit a quotation from all subcontractors regardless of dollar value which includes the subcontractors proposed fully loaded labor rates in order to verify the subcontractors proposed rates. The Offeror must provide a matrix of all subcontracts including their name, address, contract type and total proposed value.

3.1.4. Fully Loaded Labor Rate Schedules: The Offeror and each subcontractor estimated over $1,000,000 shall provide a

10 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

schedule in Microsoft Excel with formulas intact and functioning which details the proposed hourly wages, applicable indirect rates and costs, fee percentage and fee dollar for each fully loaded CPFF labor rate. For subcontracted labor, the Offeror shall provide a breakout which shows the subcontractors labor rates broken out by element of cost and application of any adders proposed by the prime contractor broken out by element of cost. If the

Offerors/subcontractor(s) rates are blended, weighted or composite rates, the Offeror/subcontractor(s) shall provide a detailed schedule and breakout by element of cost which demonstrates how the blended, weighted or composite rates were calculated.

3.1.5. Direct Labor Rates: The Offeror/subcontractor(s) shall provide the basis of the proposed direct labor rates and documentation supporting their proposed direct labor rates, such as current payroll records from the actual payroll system, copies of their current DCAA Forward Pricing Rate Agreement or current (within the last twelve months) DCAA

Forward Pricing Rate Proposal submission, salary survey, etc. If any of the proposed rates are based on a salary survey, the Offeror/subcontractor shall provide the complete salary survey data used to formulate the proposed rates, a detailed explanation and calculations in Microsoft Excel with formulas intact and functioning detailing how the proposed rates were calculated from the salary survey, and rationale for the percentile used in the salary survey. The source and rationale for proposed escalation factors shall be identified and supporting documentation shall be provided for the proposed escalation. If the offeror/subcontractors labor categories differ from those contained in the solicitation, the offeror/subcontractor shall provide a matrix which cross-walks their labor categories to the

Governments and shall provide their labor category descriptions, including years of experience and education level.

3.1.6. Indirect Rates: The Offeror/subcontractor(s) shall identify the basis for their proposed indirect rates. For the current year indirect rates, the Offeror/subcontractor(s) shall provide copies of their current DCAA Forward

Pricing Rate Agreement or current (within the last twelve months) DCAA Forward Pricing Rate Proposal submission, and/or Provisional Billing Rates approval letter for the current year, if available. For current year or out-year indirect rates based on budgetary data or if none of the listed DCAA/DCMA documents are available, the

Offeror/subcontractor(s) shall provide a detailed breakout of their indirect rates showing pool of expenses and allocation base with associated dollars used in formulation of the rates. Offerors shall provide their actual indirect rates, and detailed breakout, for their last three completed financial years.

3.1.7. If a subcontractor will not provide a detailed breakout of their proprietary cost data (i.e. rates, etc.) to the prime contractor, the primes proposal shall include fully loaded hourly labor rates for the subcontractor which correlates to the detailed proposed rates provided by the subcontractor directly to the Government. As a prime contractor submitting a proposal, also provide the following subcontractor information: point of contact, (name, mailing address, phone number, e-mail address). Instruct the subcontractor that their detailed proposal must be submitted to the PCO by the proposal due date and time. The subcontractors proposal, submitted directly to the

Government, shall also reference the prime contractor they are working with. The same level of detail required for the

Offerors proposal shall be submitted for all subcontracts over $1,000,000. An explanation shall be provided by the

Offeror if the Offeror proposed a different amount than that quoted by the subcontractor, including a detailed breakout of any prime markups.

3.1.8. If the Offeror does not provide supporting rate detail and/or escalation data required by the solicitation, the probable cost computed for the Offeror/subcontractors will be derived utilizing the higher of the proposed rates and readily available rate data for the same or similar labor categories and escalation rates from sources the Government deems appropriate.

3.2. CPFF Material/Subcontracts: Offerors may propose indirect cost and profit applicable to Government-provided CPFF

Material/Subcontracts and shall be detailed in Attachment 0009. See paragraph D.4.2.3.1.6 for indirect rate submission requirements.

3.3. CPFF Travel: Offerors may propose indirect cost and profit applicable to Government-provided CPFF Travel and shall be detailed in Attachment 0010. Offerors. See paragraph D.4.2.3.1.6 for indirect rate submission requirements.

4. The CDRLs shall be not separately priced (NSP), but the Offeror is required to complete blocks 17 and 18 on each DD 1423 form. The DD

1423 forms shall be included in the proposal submission.

5. Contractor Manpower Reporting (CMR) shall not be separately priced (NSP).

6. Each Ordering Period Year of the contract shall be from the date of award until one year later. For example, with an estimated award date in January 2021, the ordering periods would be as follows:

Ordering Period 1: 31 January 2021 to 30 January 2022

Ordering Period 2: 31 January 2022 to 30 January 2023

Ordering Period 3: 31 January 2023 to 30 January 2024

Ordering Period 4: 31 January 2024 to 30 January 2025

11 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Ordering Period 5: 31 January 2025 to 30 January 2026

7. FAR 52.215-22, Limitation on Pass-Through Charges-Identification of Subcontract Effort and FAR 52.215-23 are applicable. The offeror shall, as required, identify the information set forth in paragraph (c) of FAR 52.215-22.

8. Any HUBZone Small Business Concern shall provide proof of HUBZone certification with its proposal submission.

9. Accounting System: In order to receive a cost reimbursement contract, pursuant to FAR 16.301-3(a)(3), the contractors accounting system must be deemed adequate for determining costs applicable to the contract. Provide documentation from DCMA/DCAA supporting the determination that the offerors accounting system has been deemed adequate. If the offerors accounting system has not been determined adequate, the offeror shall complete Attachment 0010 - Preaward Survey of Prospective Contractor Accounting System and include this checklist with its proposal. An offeror will not be awarded a cost reimbursable order until such time as their accounting system has been deemed adequate.

10. Unbalanced Pricing. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The greatest risks associated with unbalanced pricing occur when (a) Startup work, mobilization, first articles, or first article testing are separate line items; (b)

Base quantities and option quantities are separate line items; or (c) The evaluated price is the aggregate of estimated quantities to be ordered under separate line items of an indefinite-delivery contract. Offerors shall provide documentation, including data, calculations and supporting rationale, for any apparent unbalanced pricing which will be used to determine if the proposed prices are balanced.

VOLUME III FACTOR 3 - PAST PERFORMANCE FACTOR______________________________________________

1. Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offerors existing plant capability and demonstrate satisfaction of customer requirements.

2. Offerors shall submit a list of all recent Federal Government contracts (prime and major subcontracts) in performance or awarded to the Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the effort required by the solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. The Government plans to rely on existing documentation from Federal databases to the maximum extent practicable. Sources of existing information available to the Government include, but are not limited to, Past Performance

Information and Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), and Electronic

Subcontract Reporting System (eSRS). The Government may use past performance information obtained from sources other than those identified by the Offeror. The burden of providing thorough and complete past performance information remains with the Offerors.

Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the Government.

3. This volume shall be organized into the following sections:

3.1. Section 1 Contract Descriptions. This section shall include the following information in the following format:

(a) Contractor/Subcontractor place of performance, Commercial and Government Entity (CAGE) Code and Data Universal

Numbering System (DUNS) Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

PLEASE NOTE: While an Offeror may submit past performance information on relevant efforts where they performed as a major subcontractor, the Government does not have privity with subcontracts and therefore, may not be able to obtain qualitative information.

(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, telephone and fax numbers.

(c) Governments technical representative/COR, and current e-mail address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.

(e) Government contract administration activity's Pre-Award Monitor's name and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase

12 16

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Agreements, also include Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc.) In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite

Quantity) and secondary contract type (FP, CR, T&M, etc.)).

(h) Awarded price/cost.

(i) Final or projected final price/cost.

(j) Original delivery schedule, including dates of start and completion of work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

3.2. Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 describing the objectives achieved and detailing how the effort is relevant to the requirements of the solicitation.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The

Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors delivered product.

3.3. Section 3 Subcontracts. Offerors shall provide an outline of how the effort required by past performance on Government contracts was assigned within the Offeror's corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work performed and how it is relevant to the current RFP's SOW. This includes all major subcontractors who provided critical hardware/services or whose subcontract was for more than 25% of the total proposed price/cost.

3.4. Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees. However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

3.5. Section 5 - Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be completed and submitted (APPENDIX D). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer and Contract Specialist within thirty (30) calendar days of the release of the

RFP, to katherine.n.conklin.civ@mail.mil and reagan.w.weltner.civ@mail.mil. The Offeror shall also e-mail to the Contracting

Officer and Contract Specialist a list of all the POCs who were sent a questionnaire. The Government must receive this list within thirty (30) calendar days after release ofthe RFP. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name;

POC Title; POC Telephone Number; POC E-Mail Address; Date E-Mailed to POC (month/day).

VOLUME IV FACTOR 4 - SMALL BUSINESS PARTICIPATION FACTOR_________________________________________________________

1. The Small Business Participation Factor Volume is comprised of a single chapter. Offerors are responsible for including sufficient detail to permit a complete evaluation. Any information provided as part of the Small Business Participation Factor Volume may be used to correlate the evaluation of the other proposal volumes.

2. This provision applies to every Offeror (U.S. and non-U.S.), regardless of size status or locations of working facilities or headquarters.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .