Attachment 0016- Order of Precedence for USG Technical Specifications

View the file

Other files

File Type Posted
W15QKN18R0080-0002.pdf PDF
W15QKN18R0080-0001.pdf PDF
Attachment_0011_-_SPI-AM13058839_(Cylinder).pdf PDF
Attachment_0006-_M240_ADJUSTABLE_BIPOD_(LW)_SPECIAL_PACKAGING_INSTRUCTIONS.pdf PDF
Attachment_0009_-_SPI-AM13058834_(Leg_Assy,_Upper).pdf PDF
W15QKN18R0080-M240_LW_Adjustable_Bipod_Assy.pdf PDF
Attachment_0002_-_AMSTA-AR_Form_1350_Technical_Data_Request_Questionnaire.pdf PDF
Attachment_0012_-_SPI-AM13061383_(Adjustable_Bipod).pdf PDF
Attachment_0005_-_M240_Adjustable_Bipod_TDP_Shipping_Request_Form.pdf PDF
Attachment_0007_-_SPI-AM13058832_(Bipod_Assy).pdf PDF
Attachment_0017-_Standard_Form_LLL_(SF_LLL),_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0010_-_SPI-AM13058838_(Head,_Hinge).pdf PDF
Attachment_0013_-_Past_Performance_Questionaire.docx DOCX document
EXHIBIT_A_-_Contract_Data_Requiremens_List_(A001-A015).PDF PDF
Attachment_0018_-_Contractor_Occupied_Admin_Space_Report.docx DOCX document
Attachment_0003_-_M240_Bipod__Certificate_of_Destruction.pdf PDF
Attachment_0015_-_First_Article_Testing_(Contractor_Testing).docx DOCX document
Attachment_0014_-_Non_Disclosure_Agreement_(M240_LT_Bipod).doc DOC document
Attachment_0008_-_SPI-AM13058833_(Leg_Assy).pdf PDF
Attachment_0004_-_DD2345_Military_Critical_Technical_Data_Agreement.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORDER OF PRECEDENCE – SPECIFICATIONS

The following order of precedence shall apply in the event of an inconsistency within the specifications:

(a) Technical Data Package List (TDPL) cited in Section C.

(b) Tests required by drawings and/or Detail Item Specification (see NOTE).

(c) Drawings.

(d) Detail specification (including gage designs for item(s) being procured).

(e) Detail specification for material or operations.

(f) General specification for class of items.

(g) General specification for class of materials.

NOTE: Compliance with tests (proving ground ballistics, performance and shop) required by the specifications and drawing are mandatory. The Contractor will not assume nor does the Government guarantee that all possible combinations permitted by the tolerance limits of the specifications and drawings, will consistently satisfy the test requirements, therefore, the manufacturer is obligated to choose those combinations of tolerances and fits within the limits of the specifications and drawings, that best suit his process needs and still satisfy the testing requirements.