W15QKN-16-R-0070-0002.pdf
PDF 38 KB Posted
- Attached to
- Picatinny/ARDEC IT Support Services Federal contract opportunity
- Solicitation number
- W15QKN16R0070
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W15QKN16R0070-0004.pdf | ||
| W15QKN16R0070-0003.pdf | ||
| ATTCH_1_Picatinny_ARDEC_IT_Support_Services_PWS-Task_1-20Jun16.doc | DOC document | |
| Attachment_6_Labor_Category_Description.docx | DOCX document | |
| W15QKN-16-R-0070-0001.pdf | ||
| ATTCH_4_QASP_Basic.docx | DOCX document | |
| ATTCH_1_Picatinny_ARDEC_IT_Support_Services_PWS-Task_1-2May16.doc | DOC document | |
| ATTCH_3_LABOR_CATEGORIES_AND_RATES_TABLE.docx | DOCX document | |
| ATTCH_6_Labor_Category_Descriptions.docx | DOCX document | |
| W15KQN-16-R-0070.pdf | ||
| Exhibit_A_Base_CDRLs_-_DD1423.pdf | ||
| ATTCH_5_CDRLS_DD1423-2_Task_1.pdf | ||
| ATTCH_2_Past_Perf_Cover_Letter_ _Questionaire.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
W15QKN
ARMY CONTRACTING COMMAND - NJ
PICATINNY ARSENAL, NJ 07806-5000
AUSTIN ALPAUGH
EMAIL: AUSTIN.M.ALPAUGH.CIV@MAIL.MIL
W15QKN-16-R-0070
2016MAY19
X
X
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 14
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: AUSTIN ALPAUGH
Buyer Office Symbol/Telephone Number: ACC-NJ-MA/(973)724-4166
Type of Contract 1: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
The purpose of this amendment to:
A. Add 52.219-14 01-NOV-2011 LIMITATIONS ON SUBCONTRACTING. See Section I - Contract Clauses.
B. Replace Attachment 0001 PICATINNY ARDEC IT SUPPORT SERVICES PWS with updated version dated 20-JUN-2016. See Section J - List of
Attachments.
C. Answer questions from potential offerors as follows:
1) Is there an incumbent for the contract?
ANSWER:
This is a new requirement for ARDEC.
2) In what locations do you anticipate most of the work?
ANSWER:
As stated in Section 2.5 of the Basic Solicitation Performance Work Statement (PWS) for Picatinny/ARDEC IT Support Services, the location and hours of work will be determined on an individual task order basis.
3) Is there established funding behind this contract? Or is it a vehicle set up for not yet identified tasking?
ANSWER:
Task Order 0001 is identified as set forth in the Solicitation W15QKN-16-R-0070 and its amendments. Any additional requirements will be solicited as they arise.
4) Pg 10 Section 3.10. Please provide details on ARDEC legacy systems to provide support on.
ANSWER:
ARDEC supports the following systems beyond SAP, Sharepoint and Oracle:
Windchill PACE3
Webtrends
Adobe LiveCycle
ARFILES Shared Disk Space File Server
5) Pg 57 Section A.3.1.c In which volume do we submit a copy of our SAM records in .XPS format
ANSWER:
SAM records are submitted as part of Volume IV in accordance with SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, PROPOSAL INSTRUCTIONS, Paragraph A.6.
6) Pg 58 A.4.3.1 What is the minimum font size to be used in Table and Graphic
ANSWER:
Per SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, PROPOSAL INSTRUCTIONS, Para. A.4.3.1, The font used shall not be less than 10 point.
7) Pg 58 A.5.1.1 RFP A.5.1.1 Subfactor 1 - The Offeror shall provide evidence of knowledge and experience of the prime contractor, major subcontractors and affiliates under common control with ARDECs Integrated Data Environment (IDE) its planning, analysis, design, implementation, and system integration.
Question: Does the word Offeror mean the prime contractor or subcontractor/team member? Could the subcontractors/team members knowledge/experience be considered as Offerors experience and knowledge in ARDEC IDE?
ANSWER:
As stated in SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS, PROPOSAL INSTRUCTIONS, Para. A.5.1.1, the offeror shall
2 14
W15QKN-16-R-0070 0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
provide evidence of knowledge and experience of the prime contractor, major subcontractors and affiliates under common control with
ARDECs Integrated Data Environment (IDE) its planning, analysis, design, implementation, and system integration. Therefore the term offeror here means the prime contractor, subcontractors or affiliates under common control. All evidence of knowledge and experience for prime contractor, subcontractors or affiliates under common control can be provided. The proposal should state whether it is the prime or major subcontractors and affiliates under common control who have the knowledge and experience.
8) Pg 58 A.5.1.2 Key Personnel: The three Key Personnel identified, are all of them at IDIQ level or Task Order 0001 level?
ANSWER:
The three Key Personnel are identified for the Basic IDIQ Contracts that are planned for award. These Key Personnel are also planned for ask Order 0001. If there are any differences in future task orders, this will be identified in the future task order.
9) Task 0001-PWS How many end-users are there for the eNOVA systems?
ANSWER:
There are approximately 3,000 licenses for the eNova system.
10) What is the average monthly transaction volume for the eNOVA systems?
ANSWER:
There are approximately 209,717 Enterprise Central Component (ECC) and 209,153 Product Lifecycle Management (PLM) eNOVA transactions monthly.
11) How many Level I, II and II support tickets are processed annually?
ANSWER:
Level 1 (currently all Level I tickets are handled through Acquisition Logistics and Technology Enterprise System and Services (ALTESS)
Level 2 (7600 tickets from May 2015 to May 2016)
Level 3 About 200 tickets (includes most of BASIS and eNOVA ABAP CRs)
12) Are there Webl reports or Crystal reports in BOBJ, and if so, how many?
ANSWER:
There are 3 WEBI Reports and 0 Crystal reports in BOBJ.
13) Are there any BO dashboards, if so how many?
ANSWER:
There are no dashboards.
14) What is the contract value of the current contract?
ANSWER:
This is a new requirement for ARDEC.
15) Do we need to submit a Cover letter? If so, which volume does it go in?
ANSWER:
Submittal of a cover letter is at the offerors prerogative. The offeror is cautioned to keep in mind the page limitation for each
Volume as stated in the PROPOSAL INSTRUCTIONS.
16) Can Commercial SAP quals be used? The RFP says Government contracts.
ANSWER:
If quals means "qualifications" then this is described in the Labor Categories Descriptions, Attachment 006 to the Solicitation.
17) How many quals are required for Prime and Subcontractor? The RFP did not clearly specify.
ANSWER:
If quals means "qualifications" then this is described in the Labor Categories Descriptions, Attachment 006 to the Solicitation.
18) Government contracts is mentioned on page 59/66 section A.5.2.2 - To further clarify the question, can we only submit experience and past performances for the ERP work done on Government/Federal contracts, or can we use past performances of the SAP work done on commercial projects?
3 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ANSWER:
Per Solicitation W15QKN-16-R-0070-0001, PROPOSAL INSTRUCTIONS, Paragraph No. A.5.2.2 Offerors shall submit a list of all recent
Government contracts (prime and major subcontracts) in performance or awarded to the Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the effort required by the solicitation.
19) Additionally, on the same page and same paragraph, it states that the - Offerors shall submit a list of all recent Government contracts within the past 3 years. Is there a maximum limit to how many the prime and the sub can submit?
ANSWER:
There is no maximum limit to how many past performance contracts the prime and subcontractors can submit, but the Offeror is cautioned to follow the PROPOSAL INSTRUCTIONS, A.5.2 Volume II FACTOR 2: PAST PERFORMANCE.
20) In an effort to increase competition would the government consider increasing the 3 year window on past performance to work performed in the past 5 years?
ANSWER:
The Offeror shall follow the PROPOSAL INSTRUCTIONS, A.5.2 Volume II FACTOR 2: PAST PERFORMANCE.
21) Would you mind confirming whether or not there is an incumbent contract for the IT Support acquisition, RFP # W15QKN16R0070?
ANSWER: The current eNova contract is through a larger PEO contract. This is a new requirement for ARDEC.
22) Section 3.1.2 states The contractor shall provide support services for the High Performance Computer Cluster, which provides scientists and engineers in the modeling and simulation community with the ability to draw on local resources to run complex programs and use resulting data to improve weapon systems research and development. Can the Government give the details of the hardware specifications of the lab?
ANSWER:
The High Performance Computing Systems (HPCC) are self-contained networked nodes comprised of a head-node and many slave nodes (117 in one case and 64 in another). All nodes are Intel Xeon processors with multi-core usage. The standard slave nodes have either 16 or 12 core respectively and 4G RAM/core. The large memory nodes have 256+ RAM total and 32-48 cores.
Each node runs the Redhat Linux operating system. One HPC runs Bright Computing/SLURM for HPC-Management/scheduler; the other runs
Platform PCM/LSF.
23) In the eNOVA PWS of Page 2, Section 4.1 mentions that we will be supporting the integration of Enterprise applications. Is there a current set schedule for the integration and sustainment of said applications? If so, will the Government provide the schedule?
ANSWER:
The Government manages the schedule and that information is not available.
24) In Amendment 0001, Page 6 of 11, A.2.1 Section A.2.1 mentions a Point of Contact for delivery of the proposal and includes a building number; however there was no physical address provided. Will the Government please provide a physical address? Also, if we deliver our proposal in person, will we need to set up an appointment to do so?
ANSWER:
The physical address for delivery is as follows:
Army Contracting Command - New Jersey (ACC-New Jersey)
Maneuver Ammunition Center
ATTN: Mr. Frank Corradi, Contract Specialist
Bldg. 10, ACC-NJ-MA Mail Stop: 10B
Picatinny Arsenal, NJ 07806-5000
For hand delivery please contact any of the points of contact below as follows:
Mr. Frank Corradi, Contract Specialist, Phone: 973-724-5421 or Mr. Austin Alpaugh, Phone: (973)724-5166, or Ms. Katherine N. Conklin, Phone: 973-724-7674
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS PROPOSAL INSTRUCTIONS has been updated in this amendment to reflect this change.
25) Page 62 of 66, A.4 Section A.4 outlines via text the methodology and ranking system the government will use to evaluate our proposal. Is there a percentage (numerical) ranking that will be assigned to elements the evaluation criteria mention equal importance for some factors and we would like to understand the numbers behind the rankings?
4 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ANSWER:
As stated in the Army Federal Acquisition Regulation 5115.304 Evaluation factors and significant subfactors:
(b)(2)(B) As stated in the AS3 [Army Source Selection Supplement], evaluation factors and subfactors must be definable in readily understood qualitative terms (i.e., adjectival, colors, or other indicators, but not numbers) and represent the key areas of importance for consideration. Numerical weighting (i.e., assigning points or percentages to evaluation factors and subfactors) is not an authorized method of expressing the relative importance of the factors and subfactors.
As stated in the Federal Acquisition Regulation 15.304 -- Evaluation Factors and Significant Subfactors, (c) The evaluation factors and significant subfactors that apply to an acquisition and their relative importance are within the broad discretion of agency acquisition officials, subject to the following requirements:
26) Will the Government extend the three (3) year recency criteria to four (4) years to allow for additional pertinent past performance?
ANSWER:
Per Solicitation W15QKN-16-R-0070-0001, PROPOSAL INSTRUCTIONS, Paragraph No. A.5.2.2 Offerors shall submit a list of all recent
Government contracts (prime and major subcontracts) in performance or awarded to the Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the effort required by the solicitation.
27) Amendment 0001, page 9 of 11 A.5.2.2(5) The Government has requested a list of past performance citations and the past performance questionnaires within thirty (30) days of release of the RFP. With the extension of the due date for the overall proposal, will the
Government extend the Past Performance due date as well?
ANSWER:
PROPOSAL INSTRUCTIONS, Paragraph No. A.5.2.2(5) has not been changed by any Solicitation Amendments. If, however, the Past Performance respondent has not returned the completed questionnaire within the thirty days of release of the solicitation, the respondent is encouraged to return the completed questionnaire as soon as possible.
28) For the Past Performance questionnaires, the Government provides instructions for the questionnaires to be submitted by the POCs NLT
30 days after release of the RFP. In the instructions to the POC (Attachment 2), the Government states the questionnaires are to be returned within 15 days of receipt. Can the Government please clarify when Past Performance questionnaires are due back to the
Government?
ANSWER: PROPOSAL INSTRUCTIONS Paragraph No. A.5.2.2(5) does state The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer within thirty (30) calendar days of the release of the
RFP, to Katherine N. Conklin, Katherine.N.Conklin.civ@mail.mil. Attachment 2, Past Performance Letter and Questionnaire does state
Please complete and submit the Questionnaire within 15 days of receipt via e-mail to the undersigned Contracting Officer at katherine.n.conklin.civ@mail.mil. Please also copy by E-mail frank.j.corradi.civ@mail.mil and austin.m.alpaugh.civ@mail.mil. The
Offeror is responsible, therefore, to forward the Attachment 2, Past Performance Letter and Questionnaire to the POCs in sufficient time to allow the POC enough time to complete and submit the completed questionnaire to katherine.n.conklin.civ@mail.mil, frank.j.corradi.civ@mail.mil and austin.m.alpaugh.civ@mail.mil within thirty (30) calendar days of the release of the RFP. Completed
Past Performance Questionnaires should be received by the points of contact shown above no later than the proposal due date.
29) Will the Government please identify the current Help Desk software deployed? Is it the Governments intent to change the currently deployed software?
ANSWER:
Currently the Government is using Remedy. The Government used SAP SOLMAN Service Desk in the past prior Remedy. No change currently planned.
30) What SAP Modules are currently implemented and will need support?
ANSWER:
The following SAP Modules are currently implemented and will need support:
PLM, MM, SD, PS, CO, FI, FM, SRM, HR, ESS/MSS
31) Does eNOVA use ChARM?
ANSWER:
No, eNOVA uses CTS+.
32) Does eNOVA use an N+1 landscape for its environments?
ANSWER:
Yes, however it is only used when working on a project.
33) Can we get the degree of complexity for RICEFW objects?
ANSWER:
5 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Complexity of RICEFW objects include Web dynpro applications, Sap Scripts, Dialog programming, Adobe Interactive forms, Reports, BADIs, LSMW, BAPIs, Linux scripts for interfaces, Workflow, and Enhancement points.
34) How many development objects (RICEFW) are in scope for new development?
ANSWER:
All of the remaining Personnel Information Portal (PIP) are scheduled to be redeveloped in eNOVA. The Functional areas that will be developed in ENOVA are for the Telework Agreement, Training and PAF requests
35) What tools are used to manage sustainment (e.g. ticketing, configuration/ change management/ performance testing/ regression testing/ etc)
ANSWER:
The Remedy tool is used to create help desk tickets. The Government uses Solution Manager for System configuration and change management.
Change management, regression testing: Manual
Tools like Certify is available to conduct performance and regression testing but have not been employed recently because of lack of resources who can maintain the scripts.
36) What are the current versions of the SAP applications listed in Section 2 Background of the Task Order, column 6 Description?
ANSWER:
See Attached Revised PWS (Attch 1 Picatinny ARDEC IT Support Services PWS-Task 1) as the systems counts and status have changed. The version #s are noted where applicable.
37) What is the current capacity of the existing eNOVA sustainment team and their ability to manage tickets on a monthly, quarterly and annual basis?
ANSWER:
Please refer to annual ticket information in ANSWER 11
38) What is the average time to close Level I, II and II tickets?
ANSWER:
The Government manages the schedule and tickets through a Configuration Control Board (CCB).
39) How many development objects (RICEFW) are in scope for sustainment?
ANSWER:
750 RICEFW Objects (includes currently used financial)
50 Objects in BW
40) What BO Products are currently being used? (Dashboards/Design Studio, WebIntelligence, Crystal Reports, BODS (Data Services), Analysis for Office, Analysis for OLAP, etc.)
ANSWER:
Dashboards, Design Studio, Web Intelligence, Crystal Reports, and Information Design Tool are currently being used.
41) Does ARDEC use the AESIP SDLC methodology, and if not could you provide an overview of ARDEC SDLC? We currently use the SAP best practices SDLC processes.
ANSWER:
Basic Solicitation Performance Work Statement states the following on Para. 3.1.2 The contractor shall provide support services for the
High Performance Computer Cluster, which provides scientists and engineers in the modeling and simulation community with the ability to draw on local resources to run complex programs and use resulting data to improve weapon systems research and development.
*** END OF NARRATIVE A0003 ***
6 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 ADDED 52.219-14 LIMITATIONS ON SUBCONTRACTING NOV/2011
7 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0001 PICATINNY ARDEC IT SUPPORT SERVICES PWS 20-JUN-2016 008 EMAIL
8 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
PROPOSAL INSTRUCTIONS:
A.1 General:
A.1.1 Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
A.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.
A.1.3 The Government intends to award without discussions (see FAR 52.215-1). Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
A.1.4 Alternate Proposals: Alternate proposals will not be accepted.
A.1.5 Proposals shall be valid through 180 days after the closing of the RFP.
A.2 All questions concerning this procurement, either technical or contractual, must be submitted in writing to the Contracting
Officer. No direct discussion between the technical representative and a prospective Offeror shall be conducted. Questions shall be submitted to the following point of contact:
A.2.1 The physical address for delivery is as follows:
Army Contracting Command - New Jersey (ACC-New Jersey)
Maneuver Ammunition Center
ATTN: Mr. Frank Corradi, Contract Specialist
Bldg. 10, ACC-NJ-MA Mail Stop: 10B
Picatinny Arsenal, NJ 07806-5000
For hand delivery please contact any of the points of contact below as follows:
Mr. Frank Corradi, Contract Specialist, Phone: 973-724-5421 or Mr. Austin Alpaugh, Phone: (973)724-5166, or Ms. Katherine N.
Conklin, Phone: 973-724-7674
Proposals shall be submitted to the following point of contact:
A.2.2 Army Contracting Command New Jersey
ACC-NJ-MA, Bldg. 10
Mr. Frank Corradi Telephone: (973)724-5421 or Mr. Austin Alpaugh, Telephone: (973)724-5166
Picatinny Arsenal, NJ 07806-5000
Please note that electronic e-mail proposal submissions shall not be accepted.
A.3 The proposal shall consist of the following:
A.3.1 Each proposal shall be submitted in the English language and consist of and include all of the following:
a. One (1) signed and completed paper copy of the attached Standard Form 33 (SF 33) and continuation sheets (all sections of the
RFP) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the Contract Line Item
Numbers (CLINs)/Pricing Matrices in Supplies or Services and Prices, any fill-ins required, such as Contract Data Requirements List:
DD Form 1423 with Blocks 17 and 18 completed if required, and Certifications and Representations in Representations, Certifications, and Other Statements of Offerors. Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A.
b. Original and five (5) paper copies and five (5) electronic CD copies of the proposal volumes, as reflected in A.4., shall be compiled using the Microsoft Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, and formatted for a Microsoft (MS) Windows compatible computer. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. The Price Factor shall be contained on a separate CD from non-price
Factors. Price breakdown, when applicable, will include MS Excel spreadsheets with formulae intact. Process flows may be delivered
9 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with the Offerors Name and the Solicitation Number. Alternatively, files may be provided in Portable Document Format (.pdf).
c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide ___________________________________________________ all Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the IT Support Services for ARDEC solicitation, all Offerors must submit Reps/Certs data into the System for Award Management (SAM) at https://www.sam.gov/ and provide one (1) hard copy and one (1) electronic copy (on CD) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.
A.4 FORMAT FOR PROPOSALS
A.4.1 The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor.
Page limitation for each Volume is as follows:
Volume I: Technical/Management Factor (Maximum of 50 pages), exclusive of resumes.________
Volume II: Past Performance Factor (Maximum of 25 pages plus up to 5 pages for each major subcontractor, excluding Past_________
Performance Questionnaire Forms)
Volume III: Price Factor (No Maximum)__________
A.4.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A
Table of Contents should be created using the Table of Contents feature in Microsoft (MS) Word. MS Word (.doc) files shall use the following page setup parameters:
Margins Top, Bottom, Left, Right - 1
Gutter 0
From Edge Header, Footer 0.5
Page Size, Width 8.5
Page Size, Height 11
A.4.3 Length:
A.4.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc.
may be used, with each fold counted as one additional page. The font used shall not be less than 10 point.
A.4.3.2 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring _______________________________
Contracting Officer (PCO) no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.
A.4.3.3 The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal.
Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in the Evaluation
Factors for Award section of the RFP.
A.4.3.4 File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Please note Self extracting .exe files will not be accepted.
A.5 SPECIFIC PROPOSAL INSTRUCTIONS
Offerors are responsible for including sufficient details (without reference to cost) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross-referenced to both the applicable Performance Work Statement (PWS) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable PWS
10 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
paragraph by placing the appropriate PWS number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the PWS and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to the IT Support Services for ARDEC, except for the area of Past Performance. In the response to the RFP, the Offeror shall address the following Factors and Subfactors:
A.5.1 Volume I FACTOR 1: TECHNICAL/MANAGEMENT
A.5.1.1 Subfactor 1 Corporate Knowledge and Experience______________________________________________________
The Offeror shall provide evidence of knowledge and experience of the prime contractor, major subcontractors and affiliates under common control with ARDECs Integrated Data Environment (IDE) its planning, analysis, design, implementation, and system integration.
a. The Offeror shall provide demonstrable evidence of the necessary knowledge, capability and personnel to address and support ARDECs IDE, DoD/Army Information Assurance policies, standards and procedures, Army/DoD software development programs, Armys
Enterprise Resource Planning (ERP) initiative, Enterprise Integration, multiple software development languages and development environments to include but not limited to: SAP applications including Process Integration (SAP PI), SAP Business
Warehouse/Intelligence (SAP BW/BI), SAP Business Objects (SAP BOBJ), SAP Master Data Management, (SAP MDM), SAP Governance, Risk, &
Compliance (SAP GRC), and SAP Enterprise Portal (SAP EP). Additional tools and technology include SharePoint, Oracle 10g, Oracle
WebCenter, ARIS, Windchill, Linux and Windows Servers.
b. The Offeror shall provide evidence of prime contractor experience in the design, development, implementation, and maintenance of robust software solutions that facilitate enterprise knowledge sharing and streamline business processes.
A.5.1.2 Subfactor 2 - Key Personnel and Management Knowledge and Experience_____________________________________________________________________________
The Offeror shall provide demonstrable evidence that it possesses the knowledge, capability, and key personnel to accomplish the stated requirements of this effort. Resumes of proposed key personnel/management shall be provided in regard to key personnel work experience, knowledge, expertise and qualifications as described in Attachment 0003 as they pertain to the Offerors overall technical knowledge and capability to perform the stated requirements of this effort.
A.5.1.3 Subfactor 3 Task Order 0001, eNOVA Support Services_____________________________________________________________
a. The Offeror shall provide evidence of a clear understanding of all features involved in meeting the requirements presented by Task Order 0001.
b. The Offeror shall provide its methods, approach and strategy to meeting Task Order 0001 requirements.
c. The Offerors shall provide the labor categories that would be used in the performance of Task Order 0001, rationale for the use of each labor category, and an explanation as to how each labor category would be used in the performance of Task Order
0001.
A.5.2 Volume II FACTOR 2: PAST PERFORMANCE
A.5.2.1 Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offerors existing plant capability and demonstrate satisfaction of customer requirements.
A.5.2.2 Offerors shall submit a list of all recent Government contracts (prime and major subcontracts) in performance or awarded to the Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the effort required by the solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. The Government plans to rely on existing documentation from
Federal databases to the maximum extent practicable. Sources of existing information available to the Government include, but are not limited to, Past Performance Information and Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information
System (FAPIIS), and Electronic Subcontract Reporting System (eSRS). The Government may use past performance information obtained from sources other than those identified by the Offeror. The Government reserves the right to use or not use past performance information submitted by the Offeror based on whether or not adequate recorded past performance information is available in its
Federal databases. Since the Government may not necessarily interview any or all of the sources provided by the Offerors, it is incumbent upon the Offeror to explain the relevance of the data provided. The burden of providing thorough and complete past performance information remains with the Offerors. Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the Government. This volume shall be organized into the following sections:
(1) Section 1 Contract Descriptions. This section shall include the following information in the following format: ________________________________
11 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) Contractor/Subcontractor place of performance, Commercial and Government Entity (CAGE) Code and Data Universal Numbering System
(DUNS) Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact
(POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers). PLEASE
NOTE: While an Offeror may submit past performance information on relevant efforts where they performed as a major subcontractor, the Government does not have privity with subcontracts and therefore, may not be able to obtain qualitative information.
(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, telephone and fax numbers.
(c) Governments technical representative/Contracting Officer Representative (COR), and current e-mail address, telephone and fax numbers.
(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.
(e) Government contract administration activity's Pre-Award Monitor's name and current e-mail address, telephone and fax numbers.
(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, also include Delivery Order Numbers.
(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc.) In the case of
Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc)).
(h) Awarded price/cost.
(i) Final or projected final price/cost.
(j) Original delivery schedule, including dates of start and completion of work.
(k) Final or projected final, delivery schedule, including dates of start and completion of work.
(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 _______________________ describing the objectives achieved and detailing how the effort is relevant to the requirements of the solicitation.
(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure
Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors delivered product.
(3) Section 3 Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be assigned for _______________________ performance within the Offerors corporate entity and among the proposed subcontractors. The information provided for the prime
Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government PWS subparagraph number. This includes all major subcontractors who will be providing critical hardware/services or whose subcontract is for more than 25% of the total proposed price.
(4) Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and _________________________________ employees. However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.
(5) Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be completed ______________________________ and submitted (Attachment 0002). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract.
The POCs shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the
Contracting Officer within thirty (30) calendar days of the release of the RFP, to Katherine N. Conklin, Katherine.N.Conklin.civ@mail.mil. The Offeror shall also e-mail to the Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list within thirty (30) calendar days after release of the RFP. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation Number; Company Name; Contract Number;
Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail Address; Date E-Mailed to POC (month/day).
A.5.3 Volume III FACTOR 3: PRICE
A.5.3.1 The Offeror shall complete and submit RFP Attachment 0003 titled Labor Category and Rate Table. Offerors shall complete this table which shall contain the Offeror's Firm Fixed Price (FFP) fully loaded labor rates (inclusive of direct labor, indirect expenses and profit, etc.) for each labor category and ordering period. Offerors may not deviate from labor categories listed.
Note: The Government provided estimated labor hours included in the solicitation are for evaluation purposes only and do not
12 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
obligate the Government to award such labor hours amounts.
A.5.3.2 Other Direct: Travel will be funded on appropriate CLINs and will be evaluated prior to award of individual Task Orders.
A.5.3.3 As a result of market research, it is expected that, after the solicitation is issued, there will be more than adequate competition that will result in more than one basic contract. Assuming multiple awards, task orders shall be competed among
Offerors awarded a contract. Offerors shall propose labor categories in accordance with the resultant contract. The Offeror shall propose FFP rates for task orders at or below the rates contained in their contract.
A.5.3.4 CLIN 0001 IT Services for ARDEC: The Offeror shall provide a completed Attachment 0003 of the RFP, Labor Categories & Rate
Table, which shall contain the Offeror's FFP fully loaded labor rates (inclusive of direct labor, indirect rates and profit) for each labor category. Offerors may not deviate from the labor categories listed in the Labor Categories & Rate Table attachment and defined in the Labor Category Descriptions attachment. Offerors will have the opportunity to propose lower fully loaded FFP labor rates for task orders but may not exceed what is set forth in the basic contract award. Note: The Government provided estimated labor hours per ordering period contained in Attachment 0003, Labor Categories & Rate Table, are for evaluation purposes only and do not obligate the Government to award such labor hours.
CLIN 0002- Travel: Travel, including applicable indirect rates, will be funded on appropriate task orders and will be evaluated prior to award of individual task orders.
CLIN 0003 - Contract Data Requirements List (CDRLs): CDRLs will be negotiated separately prior to award of individual task orders.
The CDRLs (DD1423) shall be not separately priced (NSP), but the Offeror shall be required to complete blocks 17 & 18 on each DD
1423 Form.
CLIN 0004 Contractors may include the cost for Contractor Manpower Reporting in CLIN 0004 as appropriate for each Ordering Period.
CLIN 0004 Contractor Manpower Reporting (CMR) will be determined on an order by order basis and will be included on the individual task orders.
Labor Hours, Travel, CDRLs and CMR shall be evaluated/negotiated on a task order by task order basis.
A.5.3.5 TASK ORDER 0001
A.5.3.5.1 The Offeror shall provide a proposal for Task Order 0001 which includes the labor categories, FFP fully loaded labor rates, hours, extended amounts for each labor category and a total price for the task order in order for the Government to verify the fully loaded labor rates proposed. Travel is not anticipated for the Task Order 0001. An offer may be rejected if the Offerors proposed labor rates are higher than the rates proposed under CLIN 0001 for Ordering Period 1 (Labor Categories and Rate Table, Attachment 0003). Labor categories cannot deviate from the labor categories provided by the Government in Attachments 0003 (Labor
Categories and Rate Table) and 0004 (Labor Category Descriptions) of the RFP. Offerors may propose fully loaded labor rates lower than the rates proposed under CLIN 0001.
A.5.3.5.2 Task Order 0001: The Government will perform a price analysis in accordance with FAR 15.404-1(b) utilizing the Offeror's proposed price for Task 0001 Base Year and Option Year. The Offeror shall provide a total proposed price for Task Order 0001 Base
Year and Task Order 0001 Option Year. The proposed prices will be evaluated separately from CLIN 0001.
A.5.3.6 Price Inconsistencies: A proposal is presumed to represent an Offeror's best effort to respond to the solicitation. Any inconsistencies, whether real or apparent between promised performance and price should be explained in the proposal. Any significant inconsistencies, if unexplained, raise a fundamental issue of the Offeror's understanding of the nature and scope of work required and his/her financial ability to perform the contract, and may be grounds for rejection of the proposal.
A.5.3.7 Unbalanced Pricing: Offerors are cautioned against submitting an offer that contains unbalanced pricing. Unbalanced pricing exist when, despite an acceptable total evaluated price, one or more of the proposed FFP fully loaded labor rates are significantly over or understated as indicated by the application of cost or price analysis techniques. In accordance with FAR 15.404-1(g), a proposal may be rejected if the PCO determines that the lack of balance poses an unacceptable risk to the Government. If the
Offeror's proposed FFP fully loaded labor rates appear unbalanced when comparing them from ordering period to ordering period, the
Offeror shall provide documentation, including calculations and supporting rationale, explaining the apparent unbalanced pricing.
LABOR CATEGORY AND RATE TABLE (is found at Attachment 0003 to the RFP)
TASK ORDER 0001
Offerors shall submit a price proposal for Task Order 0001. It is the intent of the Government to award this task immediately following the basic award, however the price of Task Order 0001 will be evaluated separately after the basic awardees are determined.
13 14
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The proposed pricing for Task Order 0001 shall use the same or lower labor rates submitted by the contractor in the Labor
Category and Rates Table for Ordering Period 1 only. Offerors may not deviate from categories listed in the Labor Category and
Rates Table. The proposal for Task Order 0001 shall include travel and any other costs deemed appropriate by the offeror in addition to the proposed hours. The labor hours and rates need to be broken out separately in order for the Government to verify the labor rates used.
A.6. VOLUME IV SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS
A.6.1 Each Offeror shall complete (fill-ins, signatures and any attachments or amendments to the RFP) the solicitation sections as indicated in the Standard Form 1449 (SF 1449) Solicitation/Contract/Order for Commercial Items. An authorized official of the firm shall sign the SF 1449 and all certifications requiring original signature. An Acrobat .PDF file shall be created to capture the signatures for submission.
*** END OF NARRATIVE L0001 ***
14 14
| SECTION A |
| SECTION I |
| SECTION J |
| SECTION L |
File details come from the government source that posted it. Updated .