Attachment 0002 - Quality Assurance Surveillance Plan

View the file

Other files for this federal contract opportunity

Other files attached to Business Operation Support Services (BOSS), newest first.
File Type Posted
OPMG_Boss_Question_2.docx DOCX document
W15QKN16R0050_Amendment_0001.pdf PDF
OPMG_BOSS_Questions.docx DOCX document
Attachment_001_PWS.docx DOCX document
Attachment_003_DD254_ADDENDUM.pdf PDF
Attachment_0003_DD254.pdf PDF
W15QKN16R0050.pdf PDF
Attachment_0004_-_Labor_Category_Matrix.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

OPMG Business Operations Support Services

1.0 INTRODUCTION

1.1. Purpose. The purpose of the Quality Assurance Surveillance Plan (QASP) is to identify the methods and procedures the Government will use to evaluate contractor performance while concurrently determining the contractor is meeting the mission essential elements of the Performance Work Statement (PWS). The QASP is designed to provide an effective surveillance method by monitoring contractor performance for each listed performance objective in the Performance Requirements Summary (See Section 7).

1.1.1. The QASP provides a systematic method to evaluate the services the contractor is required to perform as specified in the PWS and the contract proposal.

1.1.2. The QASP is developed by the requiring activity. It is designed to provide direction to personnel performing contractor surveillance activities. Personnel surveying the contract terms and conditions and PWS requirements will periodically review the QASP throughout the life of the contract.

2.0. ROLES AND RESPONSIBILITIES.

2.1. Government. The role of the Government in quality assurance is to ensure the contractor is performing in accordance with the contract requirements and contract standards are achieved.

2.2. Contracting Officer. The Contracting Officer is responsible for safeguarding the interests of the United States Government in contractual relationships. Only the Contracting Officer is authorized to bind the Government and then, only to the extent of the authority entrusted to them through the issuance of a warrant.

2.2.1. The Contracting Officer designates authority for inspection and/or acceptance responsibilities to the COR – or delegates authority to another certified acquisition professional - in accordance with the FAR/DFARS. This documented authority allows the COR or other certified acquisition professionals to act on the Contracting Officer’s behalf.

2.2.2. The Contracting Officer informs the contractor of the names, duties, and limitations of authority for all quality assurance personnel assigned to the contract.

2.3. Contracting Officer Representative. The Contracting Officer Representative (COR) when designated:

i. develops and creates the QASP

ii. serves as the eyes and ears for the Contracting Officer at the contractor’s site

iii. monitors contractor performance to ensure contract requirements are met for: Performance, Cost, and Schedule

iv. ensures that contract quality requirements, provisions, standards, and thresholds are defined, practical, enforceable, necessary, and verifiable.

v. evaluates and documents contractor performance in accordance with this QASP and the PWS.

vi. notifies the Contracting Officer of any significant performance deficiencies using a Contractor Discrepancy Report with supporting documentation.

vii. maintains surveillance documentation.

viii. recommends improvements to the QASP and PWS throughout the life of the contract.

3.0. DESCRIPTION OF SERVICES

3.1. Scope of Work. The scope of this contract is to provide support to include coordination’s and operations in the areas of administration, operations, facility access control, budget, programming and procurement to the Office of the Provost Marshal General (OPMG), The Defense Forensics and Biometrics Agency (DFBA), and Army Corrections Command (ACC).

4.0. QUALITY REQUIREMENTS

4.1. Quality Control Program. The contractor, not the Government, is responsible for management and quality control actions to meet the terms of the contract. Details of these controls will be document (when required) in the contractor’s Quality Control Program document.

5.0 SURVEILLANCE. The COR will perform monthly surveillance based on the quality and effectiveness of the contractor’s data deliverables as well as the services provided. Regardless of the surveillance method, the COR shall always contact the contractor's quality manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, when designated, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

5.1 Unacceptable Performance. If the number of complaints/defects exceeds the performance threshold for any objective, the COR will determine the possible cause of this unacceptable performance. Government-caused complaints/defects will not be counted against the contractor. The same applies to any other requirement of the contract when Government-caused complaints/defects are the cause of unacceptable contractor performance. If the contractor’s performance is judged unacceptable for any requirement by the COR, the COR will document the discrepancy as a non-conformance and inform the contracting officer (if needed) for resolution. Significant (major non-conformance) performance deficiencies must be submitted to the Contracting Officer using a Contractor Discrepancy Report and include supporting documentation.

6.0 DOCUMENTATION REQUIREMENTS.

6.1Monthly Reports in VCE COR Tool
6.2Progress Reports as required
6.3Final Report as required
6.4Discrepancy Reports as required

7.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS)

7.1 Overview. The PRS details and identifies the contractor requirements by performance objectives that relate directly to mission essential elements from the PWS. The performance threshold describes the minimum acceptable levels of service required for each contractor requirement. These thresholds define minimum acceptance standards critical to mission success. Various methods of surveillance exist to monitor performance; see note 2 below.

7.2 Performance Evaluation. Performance of a service will be evaluated to determine whether or not it meets the performance threshold. Revising and resubmitting the documentation at no cost to the Government is the preferred method for correcting unacceptable performance. The contractor shall provide the Government a written response as to why the performance threshold was not met, how performance will be returned to acceptable levels, and how recurrence of the cause will be prevented in the future.

7.3 Performance Objectives, Indicators, Thresholds, and Surveillance Methods. The services required by the contractor are summarized into performance objectives and indicators, along with the minimum standards that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of quality or service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE REQUIREMENTS SUMMARY

Performance Indicator
Standard
Performance Threshold (Acceptable Quality Level)
Method of Surveillance

PRS # 1. Technical Accuracy and Competency. The contractor shall provide expertise in generation of reports and work products.

PWS Part 5

All products shall be technically sound, sufficiently detailed and accurate.
Reports and work products should not require significant rework.
95%
Validate via reviewing deliverables.

100% INSPECTION

PRS # 2 Customer Satisfaction.

The contractor shall facilitate timely resolution of any customer issues.

PWS Part 5

All customer issues shall be addressed in a timely and efficient manner that provides the appropriate level of responsiveness and support IAW with organization business practices
No complaints from agencies on the resolution of issues that may include accuracy or timeliness.
95%
Validate via monthly reviews and customer feedback.

USER SURVEY

PRS # 3 Documentation. The contractor shall provide accurate and timely documentation to the government.

PWS Part 5

All documentation shall be provided in the form of trip reports, meeting minutes, monthly reports, white papers, technical reports, memos, information papers and evaluation reports, as required.
All documentation will be accurate and delivered in the prescribed timeframe as agreed upon by the government.
95%
Validate at the time of documentation delivery and via monthly reviews

100% INSPECTION

PRS # 4 Project Schedule. The contractor shall provide realistic schedules for assigned projects.

PWS Part 5

All project schedules shall be realistic and have achievable milestones.
All project schedules shall have defined start and completion dates with identified milestones.
Projects shall be completed no more than 15 days from specified completion date.

Validate at each project completion and also at monthly reviews.

PERIODIC INSPECTION

Note 1. The evaluation ratings are as follows:

a. Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

b. Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

c. Marginal - Performance does not meet some contractual requirements. The contractual performance of the task and sub-task being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

d. Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Note 2. Surveillance methods

The COR must use at least 1 of the surveillance methods listed above in the administration of this QASP.

a. PLANNED - DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

b. PERIODIC INSPECTION. (Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a deficiency is suspected. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)

d. RANDOM SAMPLING. (Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.)

e. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.)

f. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)

g. 100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)