This is a Geotechnical Engineering Report prepared by Parikh Consultants, Inc. for the MLK Streetscape Improvements Project in Oakland, California, conducted on behalf of Wood Rodgers, Inc. The report presents findings from a comprehensive subsurface investigation along Martin Luther King Jr. Way between 2nd and 12th Street, including proposed roadway paving and rehabilitation, sidewalk widening, buffered bike lanes, turn lanes, and lighting improvements. The investigation consisted of six exploratory borings (B-1 through B-6) advanced to depths of 10 to 15 feet using a truck-mounted drill rig, with soil samples collected at various depths using Modified California samplers and Standard Penetration Test samplers. Laboratory testing included moisture content, density, particle-size analysis, and R-Value tests on bulk samples recovered from borings B-1, B-3, and B-5, with results indicating R-values of 71 to 74.
The report identifies subsurface conditions consisting predominantly of very loose to medium dense silty sand, classified as Holocene and Latest Pleistocene Dune Sand based on geological literature. Groundwater was encountered in Boring B-2 at 10.9 feet below ground surface. Structural pavement design recommendations vary by traffic index (TI) values ranging from 8.5 to 12.0, with flexible pavement sections utilizing Hot Mix Asphalt (Type A) and Aggregate Base (Class 2) conforming to Caltrans 2023 Standard Specifications. The report recommends an R-value of 40 for pavement design and specifies that subgrade be scarified to at least 6 inches depth and moisture conditioned prior to recompaction to 95% relative compaction. Baseline Environmental's concurrent Phase 2 testing identified elevated lead concentrations (570 mg/kg) in the soil sample from boring B3 that exceeded construction worker Environmental Screening Levels and California hazardous waste criteria, requiring non-RCRA California hazardous waste disposal classification for soils excavated between borings B2 to B4.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GEOTECHNICAL ENGINEERING REPORT
MLK STREETSCAPE IMPROVEMENTS PROJECT
MARTIN LUTHER KING JR. WAY
OAKLAND, CALIFORNIA
For
Wood Rodgers, Inc.
3301 C-Street, Building 100-B
Sacramento, CA 95816
By
PARIKH CONSULTANTS, INC.
1497 N Milpitas Blvd
Milpitas, CA 95035
(408) 452-9000
January 8, 2024 PARIKH Project No.: 2023-131-PAV
CONTENTS PAGE NO.
1.0 INTRODUCTION
2.0 SCOPE OF WORK
3.0 PROJECT DESCRIPTION
4.0 FIELD EXPLORATION
5.0 LABORATORY TESTING
6.0 GEOLOGY
7.0 SUBSURFACE CONDITIONS
8.0 LABORATORY TESTING
9.0 STRUCTURAL PAVEMENT SECTIONS
10.0 GRADING
11.0 BASELINE ENVIRONMENTAL INVESTIGATION
12.0 INVESTIGATION LIMITATIONS
LIST OF PLATES
Plate No. 1: Project Location Map
Plate No. 2: Boring Location Map
Plate No. 3: Geologic Map
APPENDICES
APPENDIX A: Boring Logs and Pavement Core Photos
APPENDIX B: Laboratory Test Results
APPENDIX C: Structural Pavement Section Calculations
APPENDIX D : Baseline Environmental Consulting - Limited Soil Investigation Report
GEOTECHNICAL ENGINEERING REPORT
MLK STREETSCAPE IMPROVEMENTS PROJECT
MARTIN LUTHER KING JR. WAY
1.0 INTRODUCTION
This report presents the results of our geotechnical engineering investigation for the proposed
MLK Streetscape Improvements Project (Project) in Oakland, California. The work was generally performed in accordance with our contract with Wood Rodgers, Inc. The project location map is shown on Plate No. 1.
2.0 SCOPE OF WORK
The purpose of this investigation was to evaluate the general subgrade conditions at the project site, and to provide structural pavement recommendations for the proposed roadway improvements. The scope of work performed for this investigation included a review of the readily available geologic literature pertaining to the site, field exploration, laboratory testing, engineering analysis of the data and interaction with the designer, and preparation of this report.
In addition, Baseline Environmental prepared limited Phase 2 testing for the subgrade samples to provide information for potential soil disposal from an environmental standpoint.
3.0 PROJECT DESCRIPTION
The proposed project includes various roadway improvements along Martin Luther King Jr. Way between 2nd and 12th Street. Improvements will include roadway paving/rehabilitation, removal of street parking, widening of sidewalks, buffered bike lanes, added turn lanes, and lighting.
4.0 FIELD EXPLORATION
The field exploration program consisted of advancing 6 exploratory borings (B-1 through B-6) to depths of 10 to 15 feet using a truck-mounted drill rig. The borings were drilled in traffic lanes along the existing roadway. The exploration locations are shown on Plate No. 2, Boring Location
Map.
The borings drilled and sampled at various depths using a Modified California sampler (2.5-inch
I.D. and 3-inch O.D.) or a Standard Penetration Test sampler (SPT, 2-inch O.D. and 1 3/8-inch I.D.
at shoe) under the impact of a 140-lb safety hammer with 30 inches drop. Bulk samples were obtained from soil cuttings from each of the borings between depths of about 1 to 5 feet.
Pavement cores were photographed and the supporting basecourse material was measured;
photos of the pavement cores are presented in Appendix A.
The drilling and sampling operations were observed by Caltrans Cultural Resources personnel for potential cultural artifacts of significance.
Job No. 2023-131-PAV (MLK Streetscape Improvements Project)
January 8, 2024
One drive sample was obtained from each of the borings for the Limited Phase 2 testing investigation by Baseline Environmental. Drive samples obtained for Baseline were driven below the pavement base course using a Modified California sampler cleaned with Tri-Sodium
Phosphate (TSP). Environmental samples were sealed, placed on ice, and transferred to Baseline at the end of the day under a chain-of-custody. Results of Baseline’s investigation are presented in Appendix D.
Geotechnical samples recovered from the borings were logged by our Staff Engineer, sealed, and transported to PARIKH’s Milpitas office for laboratory testing.
5.0 LABORATORY TESTING
Laboratory testing on samples recovered from the borings included moisture content, density, particle-size, and R-Value tests. Laboratory R-value testing was performed on the bulk samples recovered from Borings B-1, B-3 and B-5. The results of the laboratory index testing is presented on the Logs of Test Borings in Appendix A. A summary of the laboratory Sieve and R-Value
Appendix B.
6.0 GEOLOGY
According to the “Maps of Quaternary Deposits and Liquefaction Susceptibility in the Central San
Francisco Bay Region” by Witter, et al. 2006, Martin Luther King Jr. Way between 2nd Street and
12th Street is mapped as underlain by Dune Sand deposited during the Holocene and Latest
Pleistocene epochs (the past 11,700 years). The exploration encountered subsoil that is consistent with geological literature.
7.0 SUBSURFACE CONDITIONS
The borings generally encountered very loose to medium dense silty sand, at site. All holes were backfilled with cement grout per ACPWA permit conditions. Groundwater was encountered during drilling (December 2020) in Boring B-2 at a depth of 10.9 feet below ground surface (bgs).
The existing asphalt and concrete pavement thicknesses, base materials, and subgrade soils encountered in the borings are summarized in the following table.
Table 1 – Summary of Approximate Existing Pavement Sections and Subgrade Soils
Boring
No.
Boring
Depth
(feet)
Approx. Thickness of
Pavement Section
Base Course Material and
Thickness Subgrade Soil Description
B-1 15
5” (2”+1-1/2”+1-1/2”) AC
over 7” Concrete
2” Poorly Graded Sand (SP) Silty Sand (SM) medium dense, dark brown
B-2 15 10” AC
2” Poorly Graded Sand (SP)
Silty Sand (SM) medium dense, dark brown
B-3 15 9” AC
16” Poorly Graded Gravel (GP)
Silty Sand (SM) loose, dark yellowish-brown
B-4 15 6” (2”+4”) AC over 7”
Concrete
17” Poorly Graded Gravel (GP) Silty Sand (SM) loose, brown
B-5 10 5” (2”+3”) AC over 7”
Concrete
9” Poorly Graded Sand with
Gravel (SP) Clayey Sand (SC) very loose, dark yellowish-brown
B-6 10 5” (1-1/2”+3-1/2”) AC over
6” Concrete
2” Poorly Graded Gravel (GP) Poorly Graded Sand (SP) loose, yellowish-brown
Notes: AC: Asphaltic Concrete. Bracketed thicknesses indicate layer thicknesses where AC consists of more than one layer.
Please note that the existing pavement thicknesses presented in Table 1 are approximate and are for the locations explored. The exploration data and the findings should be used with caution for estimation purposes. Pavement sections and soil conditions may vary significantly during construction and may depend on history of construction and maintenance. The Logs of Test
Borings and photos of the existing pavement sections are presented in Appendix A.
8.0 LABORATORY TESTING
Results of the laboratory tests confirm the subgrade soils consist predominantly of silty fine sand.
Three (3) samples were tested for R-value. The R-value test results are presented in Appendix B and summarized in the following table.
Table 2 – Summary of R-value Test Results
Boring No. R-value
B-1 74
B-3 74
B-5 71
9.0 STRUCTURAL PAVEMENT SECTIONS
Based on the test results, an R-value of 40 is recommended for pavement design to account for variation in the subgrade soils. Per information provided by the designer, traffic indices (TI) of
8.5, 9.0, 9.5, 11.5 and 12.0 are used for the pavement section design for Martin Luther King Jr.
Way. The design of the pavement sections is generally in accordance with the State of California
Department of Transportation design procedures (conventional empirical method). The recommended flexible pavement design sections for the TIs are summarized in the following table.
Table 3 – Flexible Pavement Sections (Roadway, R-Value = 40)
TI
Option 1 Option 2
Full Depth HMA HMA AB
8.5 10.0” 5.5” 8.5”
9.0 10.5” 5.5” 10.0”
9.5 11.0” 6.0” 10.5”
11.5 13.5” 7.5” 13.5”
12.0 14.0” 8.0” 13.5”
1. HMA: Hot Mix Asphalt (Type A).
2. AB: Aggregate Base (Class 2) with R-value equal to 78.
At the City’s option, a 2” thick Open Graded HMA (no structural value) may be used on top to help surface drainage. Hot Mix Asphalt (HMA, Type A), Aggregate Base (AB, Class 2, with R-value
= 78) should conform to the Caltrans 2023 Standard Specifications in Section 39 and 26, respectively.
It is recommended that the pavement subgrade be scarified to a depth of at least 6 inches and moisture conditioned to 2% to 3% over optimum moisture content and re-compacted to at least
95% relative compaction per project specifications.
Reclaimed Asphalt Pavement. A portion of Type A HMA can be replaced by Reclaimed Asphalt
Pavement (RAP) in flexible pavement design for the Project. The RAP is specified in Section 39
“Asphalt Concrete” of the Caltrans Standard Specifications (2023). According to the Caltrans specifications, the RAP can substitute for part of the virgin aggregate in a quantity up to 25 percent of the aggregate blend. For Type A HMA using RAP, the maximum allowed binder replacement is 25.0 percent in the upper 0.2 feet exclusive of open grade friction course (OGFC) and 40.0 percent below. The Caltrans Standard Specifications should be referred to for preparation of Type A HMA using RAP.
10.0 GRADING
All grading and compaction operations should be performed in accordance with the project specifications. A representative from this office or regulating agency should observe all excavated areas during grading and perform moisture and density tests on prepared subgrade and compacted fill material.
Areas to receive fill should be clean of vegetation, shrubs, trees, and their roots greater than one
(1) inch in diameter. Areas of soft, organic or saturated soils could be encountered during site grading. Where such conditions are encountered, deeper excavation may be required to expose firm soils. Deeper excavation may also be required in areas of demolition of existing improvements.
Any fill materials imported to the project site should be non-expansive, relatively granular material having a Plasticity Index (PI) of less than 15 and a minimum Sand Equivalent (SE) of 10.
The maximum particle size of fill material should not be greater than 4 inches in largest dimension. It should also be non-corrosive, free of deleterious material and should be reviewed by the Geotechnical Engineer. Pavement subgrade should be compacted to minimum 95% relative compaction as per City standards.
The proposed Project is located along the existing streets. Traffic control is required to maintain traffic flow during construction. Many existing underground utilities are present beneath Martin
Luther King Jr. Way. The contractor should verify the utility lines, be aware of the existing conditions and plan the construction activities accordingly.
In our opinion, conventional equipment can be used to excavate the on-site soils. Subgrade pumping may be encountered during earthwork construction depending on the weather, moisture condition of the subsurface soils, and surface drainage conditions. Equipment mobility may also be difficult if the subgrade is wet. In which case, the subgrade soils may require reworking, aeration, or over-excavation and replacing with fabric and granular fill to facilitate earthwork construction.
To provide a working platform and stable support for structural pavement sections, the subgrade may be stabilized by over-excavating below the planned subgrade and replacing with base rock type of material over a layer of Subgrade Enhancement Geosynthetic fabric, such as Caltrans SEG
Class B1 (Caltrans Standard Specification, Section 96-1.02O, 2022). The actual depth of over-excavation depends on the actual field conditions during construction. The proposed structural pavement sections should then be constructed on top of the properly treated subgrade. The over-excavation and replacement with fabric and granular material is in addition to the design structural sections. It is intended to facilitate construction activities on poor and weak subgrade during construction, if required.
It is possible that unknown old, buried utilities or abandoned structures, concrete rubble, etc. are located along the project alignment. It might require special equipment and additional effort to remove these buried objects.
Prospective contractors for the Project should be advised to evaluate construction-related issues on the basis of their own knowledge and experience in local areas, on the basis of similar projects in other localities, or on the basis of their own field investigation on the site, considering their proposed construction methods and procedures. In addition, construction activities related to excavation and lateral earth support must conform to safety requirements of OSHA and other applicable municipal and State regulatory agencies.
11.0 BASELINE ENVIRONMENTAL INVESTIGATION
Baseline Environmental performed a Limited Soil Investigation for the site to evaluate potential soil contamination beneath areas of proposed project improvements for potential offsite disposal, and to support worker health and safety protocols during construction; results of their investigation are presented in Appendix D.
12.0 INVESTIGATION LIMITATIONS
Our services consist of professional opinions and recommendations made in accordance with generally accepted geotechnical engineering principles and practices and are based on our site reconnaissance and the assumption that the subsurface conditions do not deviate from observed conditions. All work done is in accordance with generally accepted geotechnical engineering principles and practices. No warranty expressed or implied, of merchantability or fitness, is made or intended in connection with our work or by the furnishing of oral or written reports or findings.
The scope of PARIKH’S services did not include any environmental assessment or investigation for the presence or absence of hazardous or toxic materials in structures, soil, surface water, groundwater or air, below or around this site.
Unanticipated soil conditions are commonly encountered and cannot be fully determined by taking soil samples and excavating test borings; different soil conditions may require that additional expenditures be made during construction to attain a properly constructed project.
Some contingency fund is thus recommended to accommodate these possible extra costs.
This report has been prepared for the proposed Project as described earlier, to assist the engineer in the design of this Project. In the event any changes in the design or location of the facilities are planned, or if any variations or undesirable conditions are encountered during construction, our conclusions and recommendations shall not be considered valid unless the changes or variations are reviewed, and our recommendations modified or approved by us in writing.
This report is issued with the understanding that it is the designer's responsibility to ensure that the information and recommendations contained herein are incorporated into the Project and that necessary steps are also taken to see that the recommendations are carried out in the field.
The findings in this report are valid as of the present date. However, changes in the subsurface conditions can occur with the passage of time, whether they are due to natural processes or to the works of man, on this or adjacent properties. In addition, changes in applicable or appropriate standards occur, whether they result from legislation or from the broadening of knowledge.
Accordingly, the findings in this report might be invalidated, wholly or partially, by changes outside of our control.
Respectfully submitted, PARIKH CONSULTANTS, INC.
Mark W. McKee, P.E., G.E. 2897 David Wang, Ph.D., P.E. 52911
Senior Project Engineer Senior Principal Engineer
P in e S t
7th St
F ro n ta ge
Rd
Matson Terminal
(SSA)
Oakland Global Trade &
Logistics Center
Oakland Intermodal
W Tower Ave
38th St 34th S t
32nd St
32nd St
M a n il a A v e
33rd St
T e le g ra p h A v e
B ro a d w a y
W MacArthur Blvd
MacArthur Fwy EBMUD Water
Treatment
Oakland Global Trade &
Logistics Center
Oakland Medical Center
P o s e y T u b e
11th St
16th St
W e b s te r S t
4th St th
A ve
17th St
24th St
24th St
13th St
W es t S t
W e s t S t
8th St
10th St
10th St
26th St W oo d S t
18th St
28th St
L in d e n S t
32nd St
U n io n S t
M y rt le
S t
30th St
F il b e rt
S t
F ra n k li n S t
C e n te r S t
Main St
34t h St
Middl e Harb or Rd
Le e S t
3rd St
B ru sh
S t
10th St
5th St
7th St
7th St
27th St
M a rk e t S t
M a rk e t S t
C a s tr o S t
A d e li n e S t
W Grand Ave
P er al ta
S t
17th St
T e le g ra p h A v e
Grand Ave
8th St
B ro a d w ay
B ro a d w ay
Nimitz Fwy
G ro ve
Sh af te r Fw y
Charles P.
Howard Terminal
Roundhouse Property
Jack London Square
South Prescott Park
Lakeside Park
West Oakland
Oakland th
S t
Buena Vista Ave
Atl antic Ave
O ri o n S t
Singleton Ave
F e rr y P t
V ik in g S t
C o n s titu tio n W a y
M a in
S t
W e b s te r S t
W e b s te r S t
College of Alameda
6t h Av e
4t h Av e
E 11th
S t
P e rk in s S t
San Rafael
San Francisco
San Leandro
Concord
Oakland
San Mateo Fremont
0 4,000
Feet
Scale: 1:24,000
Basemap source: ESRI Exported: 12/19/2023
Map Location
PROJECT LOCATION MAP
PLATE NO.:
MARTIN LUTHER KING STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
JOB NO.: 2023-131-PAV
Project Site Martin Luther King Jr. Way (2nd Street to 12th Street)
MARTIN LUTHER KING STREETSCAPE PROJECT
JOB NO.: 2023-131-PAV PLATE NO.: 1A
CORING LOCATION MAP
BORING LOCATION MAP
P in e S t
7th St
F ro n ta ge
Rd
Matson Terminal
(SSA)
Oakland Global Trade &
Logistics Center
Oakland Intermodal
38th St 34th St
32nd St
32nd St
M a n il a A v e
33rd St
T e le g ra p h A v e
B ro a d w a y
W MacArthur Blvd
MacArthur FwyEBMUD Water Treatment
Oakland Global Trade &
Logistics Center
Oakland Medical Center
P o s e y T u b e
11th St
16th St
W e b s te r S t
4th St th
A ve
17th St
24th St
24th St
13th St
W es t S t
W e s t S t
8th St
10th St
10th St
26th St W oo d S t
18th St
28th St
L in d e n S t
32nd St
U n io n S t
M y rt le
S t
30th St
C e n te r S t
Main St
34t h St
3rd St
B ru sh
S t
10th St
5th St
7th St
7th St
27th St
M a rk e t S t
M a rk e t S t
C a s tr o S t
A d e li n e S t
W Grand Ave
P er al ta
S t
17th St
T e le g ra p h A v e
Grand Ave
8th St
B ro a d w ay
B ro a d w ay
Nimitz Fwy
G ro ve
Sh af te r Fw y
Charles P.
Howard Terminal
Roundhouse Property
Jack London Square
South Prescott Park
Lakeside Park
West Oakland
Oakland th
S t
Buena Vista Ave
Atl antic Ave
O ri o n S t
Singleton Ave
F e rr y P t
V i k in g S t
M a in
S t
W e b s te r S t
W e b s te r S t
College of Alameda afem afem afem afem afem
Qbt
Qbt
Qds
Qds
Qf
Qhf
QofG le n Ec ho C re ek
San Rafael
San Francisco
San Leandro
Concord
Oakland
San Mateo Fremont
0 4,000 Feet
Scale: 1:24,000
Basemap Source: ESRI GEOLOGY MAP
Map Location
Exported: 12/19/2023
Legend
Geologic Data Source: Witter, et al. 2006. Maps of Quaternary Deposits and Liquefaction Susceptibility in the Central San Francisco Bay Region
Early to Late Pleistocene, alluvial fans
Pleistocene, Bay terrace deposits
Holocene to Latest Pleistocene, alluvial fans
Holocene to Latest Pleistocene, dune sand
Holocene, alluvials
Holocene, alluvial fans
Artificial fill over estuarine mud
Artificial fill
Qof
Qbt
Qf
Qds
Qha
Qhf afem af
PLATE NO.:
MARTIN LUTHER KING STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
JOB NO.: 2023-131-PAV
Project Site Martin Luther King Jr. Way (2nd Street to 12th Street)
APPENDIX A
LOGS OF TEST BORINGS
PAVEMENT CORE PHOTOS
MIDTOWN STATION
SAN JOAQUIN REGIONAL RAIL COMMISSION
SACRAMENTO, CALIFORNIA
A-1-A Project No. 2021-149-MTS
A-1-B
2023-131-PAV
ASPHALT CONCRETE (5").
CONCRETE (7").
Poorly graded SAND (SP); gray; moist; medium SAND; trace angular to subangular fine gravel (Fill/Base).
SILTY SAND (SM); medium dense; dark brown; moist;
medium SAND (Native Soil).
Dark yellowish brown; fine SAND; uncemented.
SILTY SAND (SM); medium dense; olive brown; wet;
fine to medium SAND; trace CLAY.
CLAYEY SAND (SC); medium dense; brownish yellow; moist; fine SAND.
Bottom of borehole at 15.0 ft bgs/Elev. -2.0 ft
Boring terminated at a depth of 15.0 ft.
Groundwater not encountered during drilling.
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2022) except as noted on the Soil or Rock Legend or below.
R
SPT HAMMER TYPE
140 lb Auto Hammer with 30'' drop
DRILL RIG
Truck Mounted Mobile B-53
BOREHOLE BACKFILL AND COMPLETION
Borehole backfilled with cement grout.
DRILLING CONTRACTOR
EGS
LOGGED BY
Ocean
BEGIN DATE
10-31-23
COMPLETION DATE
10-31-23
TOTAL DEPTH OF BORING
15.0 ft
BOREHOLE DIAMETER
5 in
BOREHOLE LOCATION (Offset, Station, Line)
SAMPLER TYPE(S) AND SIZE(S) ID
SPT (1.4" ID)
AFTER DRILLING (DATE)
SURFACE ELEVATION
13.0 ft
DRILLING METHOD
Solid-Stem Auger
GROUNDWATER
READINGS
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
37° 47' 53.8686" / -122° 16' 51.6282"
HOLE ID
B-1
DURING DRILLING
HAMMER EFFICIENCY, ERi
95%
A1-1
D ril lin g
M et ho d
R Q
D
R ec ov er y
M oi st ur e C on te nt
D ry
U ni t W ei gh t
(p cf
Job No.: 2023-131-PAV
S am pl e
D ep th
S am pl e
N um be r
E
LE
V A
T
IO
N ft)
11.00
9.00
7.00
5.00
3.00
1.00
-1.00
-3.00
-5.00
D E
P T
H ft)
DESCRIPTION
U C
/U U in S he ar
. S tr
(t sf
LOG OF TEST BORING
Date: 12/15/2023 Boring ID: B-1
Remarks
B lo w s pe r in
M at er ia l G ra ph ic s
B lo w s pe r fo ot
C as in g
D ep th
Plate:This log is part of the report prepared by Parikh Consultants, Inc. for the named project and should be read together with that report for complete interpretation. This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
MLK STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
P C
I- C
T
B R
3-
1- P
A V
.G P
J T
E M
P
LA
T E
-2
2-
.G D
T
1/ 3/
ASPHALT CONCRETE (10").
AGGREGATE BASE.
Poorly graded SAND with GRAVEL (SP); brown;
moist; fine SAND; trace cobbles (Fill/Base).
SILTY SAND (SM); medium dense; dark brown; moist;
fine SAND; uncemented (Native Soil).
Loose; brown; fine SAND.
Very loose; wet.
Medium dense; yellowish brown.
Bottom of borehole at 15.0 ft bgs/Elev. 0.0 ft
Boring terminated at a depth of 15.0 ft.
Groundwater encountered at a depth of 10.9' during drilling.
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2022) except as noted on the Soil or Rock Legend or below.
PA
SPT HAMMER TYPE
140 lb Auto Hammer with 30'' drop
DRILL RIG
Truck Mounted Mobile B-53
BOREHOLE BACKFILL AND COMPLETION
Borehole backfilled with cement grout.
DRILLING CONTRACTOR
EGS
LOGGED BY
Ocean
BEGIN DATE
10-31-23
COMPLETION DATE
10-31-23
TOTAL DEPTH OF BORING
15.0 ft
BOREHOLE DIAMETER
5 in
BOREHOLE LOCATION (Offset, Station, Line)
SAMPLER TYPE(S) AND SIZE(S) ID
SPT (1.4" ID)
AFTER DRILLING (DATE)
SURFACE ELEVATION
15.0 ft
DRILLING METHOD
Solid-Stem Auger
GROUNDWATER
READINGS
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
37° 47' 56.7738" / -122° 16' 49.2846"
HOLE ID
B-2
DURING DRILLING
10.9 ft
HAMMER EFFICIENCY, ERi
95%
A1-2
D ril lin g
M et ho d
R Q
D
R ec ov er y
M oi st ur e C on te nt
D ry
U ni t W ei gh t
(p cf
Job No.: 2023-131-PAV
S am pl e
D ep th
S am pl e
N um be r
E
LE
V A
T
IO
N ft)
13.00
11.00
9.00
7.00
5.00
3.00
1.00
-1.00
-3.00
D E
P T
H ft)
DESCRIPTION
U C
/U U in S he ar
. S tr
(t sf
LOG OF TEST BORING
Date: 12/15/2023 Boring ID: B-2
Remarks
B lo w s pe r in
M at er ia l G ra ph ic s
B lo w s pe r fo ot
C as in g
D ep th
Plate:This log is part of the report prepared by Parikh Consultants, Inc. for the named project and should be read together with that report for complete interpretation. This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
MLK STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
P C
I- C
T
B R
3-
1- P
A V
.G P
J T
E M
P
LA
T E
-2
2-
.G
ASPHALT CONCRETE (9").
Poorly graded GRAVEL (GP); gray; moist; angular to subangular gravel; trace SAND (Fill/Base).
SILTY SAND (SM); loose; dark yellowish brown;
moist; medium to coarse SAND; trace gravel (Fill).
SILTY SAND (SM); medium dense; dark yellowish brown; wet; fine to medium SAND (Native Soil).
Bottom of borehole at 15.0 ft bgs/Elev. 10.0 ft
Boring terminated at a depth of 15.0 ft.
Groundwater not encountered during drilling.
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2022) except as noted on the Soil or Rock Legend or below.
R
SPT HAMMER TYPE
140 lb Auto Hammer with 30'' drop
DRILL RIG
Truck Mounted Mobile B-53
BOREHOLE BACKFILL AND COMPLETION
Borehole backfilled with cement grout.
DRILLING CONTRACTOR
EGS
LOGGED BY
Ocean
BEGIN DATE
11-1-23
COMPLETION DATE
11-1-23
TOTAL DEPTH OF BORING
15.0 ft
BOREHOLE DIAMETER
5 in
BOREHOLE LOCATION (Offset, Station, Line)
SAMPLER TYPE(S) AND SIZE(S) ID
SPT (1.4" ID)
AFTER DRILLING (DATE)
SURFACE ELEVATION
25.0 ft
DRILLING METHOD
Solid-Stem Auger
GROUNDWATER
READINGS
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
37° 48' 3.6324" / -122° 16' 45.393"
HOLE ID
B-3
DURING DRILLING
HAMMER EFFICIENCY, ERi
95%
A1-3
D ril lin g
M et ho d
R Q
D
R ec ov er y
M oi st ur e C on te nt
D ry
U ni t W ei gh t
(p cf
Job No.: 2023-131-PAV
S am pl e
D ep th
S am pl e
N um be r
E
LE
V A
T
IO
N ft)
23.00
21.00
19.00
17.00
15.00
13.00
11.00
9.00
7.00
D E
P T
H ft)
DESCRIPTION
U C
/U U in S he ar
. S tr
(t sf
LOG OF TEST BORING
Date: 12/15/2023 Boring ID: B-3
Remarks
B lo w s pe r in
M at er ia l G ra ph ic s
B lo w s pe r fo ot
C as in g
D ep th
Plate:This log is part of the report prepared by Parikh Consultants, Inc. for the named project and should be read together with that report for complete interpretation. This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
MLK STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
P C
I- C
T
B R
3-
1- P
A V
.G P
J T
E M
P
LA
T E
-2
2-
.G
ASPHALT CONCRETE (6").
CONCRETE (7").
Poorly graded GRAVEL with SAND (GP); yellowish brown; moist; medium to coarse SAND; angular to subangular fine to coarse gravel (1.5" max) (Fill/Base).
SILTY SAND (SM); loose; brown; moist; fine SAND (Native Soil).
Very loose; dark yellowish brown.
Bottom of borehole at 15.0 ft bgs/Elev. 17.0 ft
Boring terminated at a depth of 15.0 ft.
Groundwater not encountered during drilling.
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2022) except as noted on the Soil or Rock Legend or below.
PA
SPT HAMMER TYPE
140 lb Auto Hammer with 30'' drop
DRILL RIG
Truck Mounted Mobile B-53
BOREHOLE BACKFILL AND COMPLETION
Borehole backfilled with cement grout.
DRILLING CONTRACTOR
EGS
LOGGED BY
Ocean
BEGIN DATE
10-31-23
COMPLETION DATE
10-31-23
TOTAL DEPTH OF BORING
15.0 ft
BOREHOLE DIAMETER
5 in
BOREHOLE LOCATION (Offset, Station, Line)
SAMPLER TYPE(S) AND SIZE(S) ID
SPT (1.4" ID)
AFTER DRILLING (DATE)
SURFACE ELEVATION
32.0 ft
DRILLING METHOD
Solid-Stem Auger
GROUNDWATER
READINGS
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
37° 48' 6.5484" / -122° 16' 43.2192"
HOLE ID
B-4
DURING DRILLING
HAMMER EFFICIENCY, ERi
95%
A1-4
D ril lin g
M et ho d
R Q
D
R ec ov er y
M oi st ur e C on te nt
D ry
U ni t W ei gh t
(p cf
Job No.: 2023-131-PAV
S am pl e
D ep th
S am pl e
N um be r
E
LE
V A
T
IO
N ft)
30.00
28.00
26.00
24.00
22.00
20.00
18.00
16.00
14.00
D E
P T
H ft)
DESCRIPTION
U C
/U U in S he ar
. S tr
(t sf
LOG OF TEST BORING
Date: 12/15/2023 Boring ID: B-4
Remarks
B lo w s pe r in
M at er ia l G ra ph ic s
B lo w s pe r fo ot
C as in g
D ep th
Plate:This log is part of the report prepared by Parikh Consultants, Inc. for the named project and should be read together with that report for complete interpretation. This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
MLK STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
P C
I- C
T
B R
3-
1- P
A V
.G P
J T
E M
P
LA
T E
-2
2-
.G
ASPHALT CONCRETE (5").
CONCRETE (7").
Poorly graded SAND with GRAVEL (SP); dark brown;
moist; angular gravel (9") (Fill/Base).
CLAYEY SAND (SC); very loose; dark yellowish brown; moist; medium SAND (Native Soil).
SILTY SAND (SM); very loose; dark yellowish brown;
moist; fine SAND.
Medium dense.
Bottom of borehole at 10.0 ft bgs/Elev. 27.0 ft
Boring terminated at a depth of 10.0 ft.
Groundwater not encountered during drilling.
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2022) except as noted on the Soil or Rock Legend or below.
R
SPT HAMMER TYPE
140 lb Auto Hammer with 30'' drop
DRILL RIG
Truck Mounted Mobile B-53
BOREHOLE BACKFILL AND COMPLETION
Borehole backfilled with cement grout.
DRILLING CONTRACTOR
EGS
LOGGED BY
Ocean
BEGIN DATE
11-1-23
COMPLETION DATE
11-1-23
TOTAL DEPTH OF BORING
10.0 ft
BOREHOLE DIAMETER
5 in
BOREHOLE LOCATION (Offset, Station, Line)
SAMPLER TYPE(S) AND SIZE(S) ID
SPT (1.4" ID)
AFTER DRILLING (DATE)
SURFACE ELEVATION
37.0 ft
DRILLING METHOD
Solid-Stem Auger
GROUNDWATER
READINGS
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
37° 48' 13.1868" / -122° 16' 39.3276"
HOLE ID
B-5
DURING DRILLING
HAMMER EFFICIENCY, ERi
95%
A1-5
D ril lin g
M et ho d
R Q
D
R ec ov er y
M oi st ur e C on te nt
D ry
U ni t W ei gh t
(p cf
Job No.: 2023-131-PAV
S am pl e
D ep th
S am pl e
N um be r
E
LE
V A
T
IO
N ft)
35.00
33.00
31.00
29.00
27.00
25.00
23.00
21.00
19.00
D E
P T
H ft)
DESCRIPTION
U C
/U U in S he ar
. S tr
(t sf
LOG OF TEST BORING
Date: 12/15/2023 Boring ID: B-5
Remarks
B lo w s pe r in
M at er ia l G ra ph ic s
B lo w s pe r fo ot
C as in g
D ep th
Plate:This log is part of the report prepared by Parikh Consultants, Inc. for the named project and should be read together with that report for complete interpretation. This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
MLK STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
P C
I- C
T
B R
3-
1- P
A V
.G P
J T
E M
P
LA
T E
-2
2-
.G
3a
3b
ASPHALT CONCRETE (5").
CONCRETE (6").
AGGREGATE BASE (2") (Fill).
Poorly graded SAND (SP); loose; yellowish brown;
moist; medium to fine SAND (Native Soil).
SILTY SAND (SM); loose; dark yellowish brown;
moist; fine SAND.
SANDY lean CLAY (CL); soft; dark yellowish brown;
moist; medium plasticity fines.
SILTY SAND (SM); medium dense; yellowish brown;
moist; fine SAND.
Bottom of borehole at 10.0 ft bgs/Elev. 29.0 ft
Boring terminated at a depth of 10.0 ft.
Groundwater not encountered during drilling.
This Boring Record was developed in accordance with the Caltrans Soil & Rock Logging, Classification, and Presentation Manual (2022) except as noted on the Soil or Rock Legend or below.
PA
SPT HAMMER TYPE
140 lb Auto Hammer with 30'' drop
DRILL RIG
Truck Mounted Mobile B-53
BOREHOLE BACKFILL AND COMPLETION
Borehole backfilled with cement grout.
DRILLING CONTRACTOR
EGS
LOGGED BY
Ocean
BEGIN DATE
11-1-23
COMPLETION DATE
11-1-23
TOTAL DEPTH OF BORING
10.0 ft
BOREHOLE DIAMETER
5 in
BOREHOLE LOCATION (Offset, Station, Line)
SAMPLER TYPE(S) AND SIZE(S) ID
SPT (1.4" ID)
AFTER DRILLING (DATE)
SURFACE ELEVATION
39.0 ft
DRILLING METHOD
Solid-Stem Auger
GROUNDWATER
READINGS
BOREHOLE LOCATION (Lat/Long or North/East and Datum)
37° 48' 16.743" / -122° 16' 37.1094"
HOLE ID
B-6
DURING DRILLING
HAMMER EFFICIENCY, ERi
95%
A1-6
D ril lin g
M et ho d
R Q
D
R ec ov er y
M oi st ur e C on te nt
D ry
U ni t W ei gh t
(p cf
Job No.: 2023-131-PAV
S am pl e
D ep th
S am pl e
N um be r
E
LE
V A
T
IO
N ft)
37.00
35.00
33.00
31.00
29.00
27.00
25.00
23.00
21.00
D E
P T
H ft)
DESCRIPTION
U C
/U U in S he ar
. S tr
(t sf
LOG OF TEST BORING
Date: 12/15/2023 Boring ID: B-6
Remarks
B lo w s pe r in
M at er ia l G ra ph ic s
B lo w s pe r fo ot
C as in g
D ep th
Plate:This log is part of the report prepared by Parikh Consultants, Inc. for the named project and should be read together with that report for complete interpretation. This summary applies only at the location of this boring and at the time of drilling. Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
MLK STREETSCAPE PROJECT
OAKLAND, CALIFORNIA
P C
I- C
T
B R
3-
1- P
A V
.G P
J T
E M
P
LA
T E
-2
2-
.G
PROJECT NO.: 2023-131-PAV PLATE NO.: A-2-1
OAKLAND, CALIFORNIA
B-2B-1
B-3 B-4
PROJECT NO.: 2023-131-PAV PLATE NO.: A-2-2
B-6B-5
APPENDIX B
LABORATORY TEST RESULTS
B-1 1 1.2 - - - B-1 2 2.7 - - - B-1 3 5.0 - 9.1 - B-1 4 8.5 - 16.7 - B-1 5 13.0 - 16.9 - B-2 2 1.0 - - - B-2 1 2.1 - - - B-2 3 5.0 - 9.5 - 8.4 19.2 B-2 4 8.5 - 17.2 - B-2 5 13.5 - 19.9 - B-3 1 2.1 - - - B-3 2 3.6 - - - B-3 3 5.0 - 22.6 - B-3 4 8.5 - - - B-4 1 2.5 - - - B-4 2 4.0 - - - B-4 3 5.0 - 13.8 - 0.3 22.0 B-4 4 8.5 - - - B-5 1 1.8 - - - B-5 2 3.3 - - - B-5 3 5.0 - 14.7 - B-5 4 8.5 - 13.4 - B-6 3 5.0 - - - B-6 3a 5.0 - 14.2 - 21.6 B-6 3b 6.0 - 22.2 - B-6 4 8.5 - 12.6 -
Sieve 200
Sieve 4
Plasticity Index
Plastic Limit
Water Content
Classi-ficationDepth Liquid
Limit Dry
Density Sample NumberBorehole
Shear Strength
(tsf)
JOB NO: 2023-131-PAV PLATE NO: III-2
MLK STREETSCAPE PROJECT
APPENDIX C
STRUCTURAL PAVEMENT
SECTION CALCULATIONS
PAVEMENT DESIGN
PER HIGHWAY DESIGN MANUAL, CHAP. 600
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: Full depth AC
Design TI= 8.5
RBS= 40
GE AC = 0.0032*TI*(100-R BS ) = 1.63
=> GE'AC= 1.73 (add 0.1 ft safety factor)
=> AC Thickness= 0.78
=> AC Thickness= 0.80 ft (round up to the nearest 0.05 ft)
Design Section:
0.80 ft
Base Soil
AC
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: AC over AB
Design TI= 8.5
RBS= 40
RAB= 78
GE AC+AB = 0.0032*TI*(100-R BS ) = 1.63
GE AC = 0.0032*TI*(100-R AB ) = 0.60
=> GE'AC = 0.80 (add 0.2 ft safety factor)
AC Thickness = 0.41 ft
=> AC Thickness = 0.45 ft (round up to the nearest 0.05 ft)
Gf, AC = 1.94
GEAC = 0.88
GE AB = GE AC+AB - GE AC = 0.76
AB thickness= 0.69 ft
=> AB Thickness= 0.70 ft (round up to the nearest 0.05 ft)
GEAB= 0.77 Gf, AB=1.1
Design Section:
ft ft
AC
Base Soil
AB
0.45
0.70
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: Full depth AC
Design TI= 9
RBS= 40
GE AC = 0.0032*TI*(100-R BS ) = 1.73
=> GE'AC= 1.83 (add 0.1 ft safety factor)
=> AC Thickness= 0.83
=> AC Thickness= 0.85 ft (round up to the nearest 0.05 ft)
Design Section:
0.85 ft
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: AC over AB
Design TI= 9
RBS= 40
RAB= 78
GE AC+AB = 0.0032*TI*(100-R BS ) = 1.73
GE AC = 0.0032*TI*(100-R AB ) = 0.63
=> GE'AC = 0.83 (add 0.2 ft safety factor)
AC Thickness = 0.44 ft
=> AC Thickness = 0.45 ft (round up to the nearest 0.05 ft)
Gf, AC = 1.89
GEAC = 0.85
GE AB = GE AC+AB - GE AC = 0.88
AB thickness= 0.80 ft
=> AB Thickness= 0.80 ft (round up to the nearest 0.05 ft)
GEAB= 0.88 Gf, AB=1.1
Design Section:
ft ft
AC
Base Soil
AB
0.45
0.80
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: Full depth AC
Design TI= 9.5
RBS= 40
GE AC = 0.0032*TI*(100-R BS ) = 1.82
=> GE'AC= 1.92 (add 0.1 ft safety factor)
=> AC Thickness= 0.88
=> AC Thickness= 0.90 ft (round up to the nearest 0.05 ft)
Design Section:
0.90 ft
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: AC over AB
Design TI= 9.5
RBS= 40
RAB= 78
GE AC+AB = 0.0032*TI*(100-R BS ) = 1.82
GE AC = 0.0032*TI*(100-R AB ) = 0.67
=> GE'AC = 0.87 (add 0.2 ft safety factor)
AC Thickness = 0.47 ft
=> AC Thickness = 0.50 ft (round up to the nearest 0.05 ft)
Gf, AC = 1.84
GEAC = 0.92
GE AB = GE AC+AB - GE AC = 0.90
AB thickness= 0.82 ft
=> AB Thickness= 0.85 ft (round up to the nearest 0.05 ft)
GEAB= 0.94 Gf, AB=1.1
Design Section:
ft ft
AC
Base Soil
AB
0.50
0.85
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: Full depth AC
Design TI= 11.5
RBS= 40
GE AC = 0.0032*TI*(100-R BS ) = 2.21
=> GE'AC= 2.31 (add 0.1 ft safety factor)
=> AC Thickness= 1.09
=> AC Thickness= 1.10 ft (round up to the nearest 0.05 ft)
Design Section:
1.10 ft
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: AC over AB
Design TI= 11.5
RBS= 40
RAB= 78
GE AC+AB = 0.0032*TI*(100-R BS ) = 2.21
GE AC = 0.0032*TI*(100-R AB ) = 0.81
=> GE'AC = 1.01 (add 0.2 ft safety factor)
AC Thickness = 0.58 ft
=> AC Thickness = 0.60 ft (round up to the nearest 0.05 ft)
Gf, AC = 1.74
GEAC = 1.04
GE AB = GE AC+AB - GE AC = 1.16
AB thickness= 1.06 ft
=> AB Thickness= 1.10 ft (round up to the nearest 0.05 ft)
GEAB= 1.21 Gf, AB=1.1
Design Section:
ft ft
AC
Base Soil
AB
0.60
1.10
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: Full depth AC
Design TI= 12
RBS= 40
GE AC = 0.0032*TI*(100-R BS ) = 2.30
=> GE'AC= 2.40 (add 0.1 ft safety factor)
=> AC Thickness= 1.14
=> AC Thickness= 1.15 ft (round up to the nearest 0.05 ft)
Design Section:
1.15 ft
PROJECT NAME: MLK Streetscape Project
PROJECT NO.: 2023-131-PAV
Design Case: AC over AB
Design TI= 12
RBS= 40
RAB= 78
GE AC+AB = 0.0032*TI*(100-R BS ) = 2.30
GE AC = 0.0032*TI*(100-R AB ) = 0.84
=> GE'AC = 1.04 (add 0.2 ft safety factor)
AC Thickness = 0.61 ft
=> AC Thickness = 0.65 ft (round up to the nearest 0.05 ft)
Gf, AC = 1.75
GEAC = 1.14
GE AB = GE AC+AB - GE AC = 1.17
AB thickness= 1.06 ft
=> AB Thickness= 1.10 ft (round up to the nearest 0.05 ft)
GEAB= 1.21 Gf, AB=1.1
Design Section:
ft ft
AC
Base Soil
AB
0.65
1.10
Table 1. Calculated Martin Luther King Jr Way Traffic Index (TI) Values
Roadway Segment Direction
Calculated Traffic Index (TI) Value
-Y e ar T
I
-Y e ar T
I
-Y e ar T
I
-Y e ar T
I
Martin Luther King Jr Way
Between Embarcadero West and 2nd Street Northbound 10.0 11.0 11.5 12.0
Southbound 10.5 11.0 11.5 12.0
Between 2nd Street and 3rd Street Northbound 10.5 11.0 12.0 12.0
Southbound 10.5 11.0 11.5 12.0
Between 3rd Street and 4th Street Northbound 9.5 10.5 11.0 11.5
Southbound 8.0 8.5 9.0 9.5
Between 4th Street and 5th Street Northbound 9.5 10.5 11.0 11.5
Southbound 8.0 8.5 9.0 9.5
Between 5th Street and 6th Street Northbound 8.0 8.5 9.0 9.5
Southbound 7.0 7.5 8.0 8.0
Between 6th Street and 7th Street Northbound 7.5 8.0 8.5 9.0
Southbound 7.5 8.0 8.5 8.5
Between 7th Street and 8th Street Northbound 7.5 8.0 8.5 8.5
Southbound 7.0 7.5 8.0 8.5
Between 8th Street and 9th Street Northbound 7.5 8.0 8.5 9.0
Southbound 7.0 8.0 8.0 8.5
Between 9th Street and 10th Street Northbound 7.5 8.0 8.5 8.5
Southbound 7.5 8.0 8.5 8.5
Between 10th Street and 11th Street Northbound 7.5 8.0 8.5 8.5
Southbound 7.5 8.0 8.5 8.5
Between 11th Street and 12th Street Northbound 7.5 8.0 8.5 8.5
Southbound 7.5 8.0 8.5 8.5
Between 12th Street and 13th Street Northbound 7.5 8.0 8.5 9.0
Southbound 7.5 8.0 8.5 9.0
Between 13th Street and 14th Street Northbound 7.5 8.0 8.0 8.5
Southbound 7.5 8.0 8.5 9.0
11th Street
Between Brush Street/I-980 SB On-Ramp and Castro Street/I-980 EB Off-Ramp
Eastbound 7.0 8.0 8.0 8.5
Westbound -- -- -- --
Between Castro Street/I-980 EB Off-Ramp and Martin Luther King Jr Way (4 lanes)
Eastbound 7.5 8.5 8.5 9.0
Westbound -- -- -- --
Between Castro Street/I-980 EB Off-Ramp and Martin Luther King Jr Way (2 lanes)1
Eastbound 8.5 9.0 9.5 9.5
Westbound -- -- -- --
Between Martin Luther King Jr Way and Jefferson Street
Eastbound 7.5 8.5 9.0 9.0
Westbound -- -- -- --
12th Street Between Brush Street/I-980 SB Off-Ramp and Castro Street/I-980 EB On-Ramp
Eastbound -- -- -- --
Westbound 7.0 8.0 8.0 8.5 1 TI values were calculated at 11th Street between Castro Street and Martin Luther King Jr Way for both Project conditions and improved Project conditions
TRAFFIC INDEX INFORMATION PROVIDED BY DESIGNER
Appendix D Structural Pavement Section Calculations
BASELINE ENVIRONMENTAL REPORTBaseline Environmental Consulting - Limited Soil Investigation Report
388 17th Street, Suite 230, Oakland, CA 94612 | (510) 420-8686 | www.baseline-env.com Mailing Address: PO Box 18586, Oakland, CA 94619
January 6, 2024 23311‐00
David Wang PARIKH Consultants Inc.
1497 N. Milpitas Blvd.
Milpitas, CA 95035
Subject: Limited Soil Investigation Report for the Martin Luther King Streetscape Project, Oakland, California
Dear Mr. Wang:
Baseline has prepared this Limited Soil Investigation Report for the Martin Luther King Streetscape Project (project) in the City of Oakland, California. The project extends along Martin Luther King Jr. Way from 2nd Street to 14th Street and will enhance connectivity between West Oakland, Old Oakland, Jack London District, and the waterfront. The proposed project will include bike lane, crosswalk, pavement, curb, gutter, sidewalk, and drainage improvements, as well as installation of streetlight and signal foundations and raised medians with planter strips for trees. The design plans for the proposed project improvements are still being developed, but it is expected that there may be relatively minor soil disturbance throughout the project site with some areas of deeper soil excavation and disposal required to support tree plantings and pole foundations. The purpose of this investigation was to evaluate potential soil contamination beneath areas of proposed project improvements for potential offsite disposal and to support worker health and safety protocols.
SAMPLING ACTIVITIES
On October 31 and November 1, 2023, soil sampling activities were performed by PARIKH Consulting Inc. during the drilling of six geotechnical borings (B‐1 through B‐6) in areas of the proposed project improvements. Soil samples were collected from a depth of approximately 1 foot below the road base material in borings B‐1 through B‐6 along Martin Luther King Jr. Way (Figure 1). The soil samples were collected in stainless steel liners from the desired depth. The samples were sealed, labeled with a project name, date and time of sample collection, and unique sample identification, and placed in a cooler containing ice, and delivered to Enthalpy Analytical, a State‐certified analytical laboratory.
Mr. David Wang
LABORATORY ANALYSIS
Laboratory analysis of the six soil samples included Title 22 Metals by Environmental Protection Agency (EPA) Method 6010B/7471A; total petroleum hydrocarbons as gasoline (TPH‐g), diesel (TPH‐d), and motor oil (TPH‐mo) by EPA Methods 8015B and 8015M; and volatile organic compounds (VOCs) by EPA Method 8260B. Based on elevated total lead concentrations reported in the soil sample from boring B‐3 (see discussion below), soluble lead analysis was performed in accordance with the Waste Extraction Test (WET) method and the Toxicity Characteristic Leaching Procedure (TCLP) method. A copy of the laboratory analytical report is included in Appendix A.
ANALYTICAL RESULTS
As summarized in Table 1, the soil analytical results for Title 22 metals were compared to the San Francisco Bay Regional Water Quality Control Board’s (Regional Water Board’s) Environmental Screening Levels (ESLs) for construction worker direct exposure,1 California hazardous waste criteria, and federal hazardous waste criteria. Concentrations of metals were below the construction worker ESLs and hazardous waste criteria in all soil samples, except the soil sample from boring B‐3. In boring B‐3, the total lead concentration (570 milligrams per kilogram [mg/kg]) exceeded the construction worker ESL of 160 mg/kg and the WET lead concentration (8.9 milligrams per liter [mg/L]) exceeded the California hazardous waste criterion of 5.0 mg/L. The TCLP lead concentration in boring B‐3 was below the federal hazardous waste criterion. All other metal concentrations reported in the soil sample from boring B‐3 were below the construction worker ESLs and hazardous waste criteria.
As summarized in Table 2, the soil analytical results for TPH‐g, TPH‐d, TPH‐mo, and VOCs were all below laboratory reporting limits and construction worker ESLs. Furthermore, no apparent staining or odors that could potentially indicate soil contamination were observed in the field.
CONCLUSIONS AND RECOMMENDATIONS
Based on the soil analytical results, the shallow soils in the vicinity of borings B‐1, B‐2, B‐4, B‐5, and B‐6 would be classified as non‐hazardous waste for disposal purposes and would not pose a potential health risk to construction workers. The shallow soils in the vicinity of boring B‐3 would be classified as a non‐RCRA California hazardous waste for disposal purposes and could pose a potential health risk to construction workers due to the elevated lead concentrations found in boring B‐3.
The vertical and horizontal extent of shallow soil impacted by lead contamination in the vicinity of boring B‐3 has not been defined; therefore, it should be assumed that all soils excavated
1 Regional Water Board, 2019. Environmental Screening Levels, January.
Mr. David Wang between borings B‐2 to B‐4 should be disposed of as a non‐RCRA California hazardous waste based on the current data. Based on the final project design, additional soil sampling in areas of proposed excavation near boring B‐3 to characterize the extent of contamination may help reduce soil disposal costs. The project contractor(s) should also incorporate the soil analytical results from this memorandum into their health and safety plan to ensure appropriate personal protective equipment and soil management procedures (e.g., dust control) are applied.
Sincerely, William Scott, PG No. 6104 Johnathan Rizzo‐Mosbaugh Senior Field Geologist Staff Environmental Scientist
FIGURE
23311-00 Figures /03/2401
Figure 1 LocationsBoring
Martin Luther King Streetscape Project
NN
00 700 Feet700 Feet
Legend
Soil Sampling Locations
TABLES
Table 1: Soil Analytical Results for Title 22 Metals
Sample ID Sample Date A n ti m o n y
A rs en ic
B a ri u m
B er yl li u m
C a d m iu m
C h ro m iu m
C o b a lt
C o p p er
Le a d
W
ET
L ea d
TC
LP
L ea d
M e rc u ry
M o ly b d en u m
N ic ke l
Se le n iu m
Si lv er
Th al li u m
V an ad iu m
Zi n c
Units: mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/L mg/L mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg 500 500 10,000 75 100 2,500 8,000 2,500 1,000 NV NV 20 3,500 2,000 100 500 700 2,400 5,000
NV NV NV NV NV NV NV NV NV 5.0 NV NV NV NV NV NV NV NV NV
NV NV NV NV NV NV NV NV NV NV 5.0 NV NV NV NV NV NV NV NV
50 11 1 3,000 27 51 530,000 27.9 14,000 160 NV NV 44 1,800 86 1,700 1,800 3.5 470 110,000
B‐1;00.0‐01.0 10/31/2023 <2.9 1.6 69 <0.48 <0.48 31 5.7 6.7 6.6 ‐‐ ‐‐ <0.16 <0.96 21 <2.9 <0.48 <2.9 22 22 B‐2;00.0‐01.0 10/31/2023 <2.9 1.6 54 <0.48 <0.48 38 5.5 8.0 9.3 ‐‐ ‐‐ <0.14 <0.95 28 <2.9 <0.48 <2.9 28 25 B‐3;00.0‐01.0 11/1/2023 <2.9 1.8 48 <0.48 <0.48 33 5.9 6.9 570 8.9 0.19 <0.15 <0.96 21 <2.0 <0.48 <2.9 24 17 B‐4;00.0‐01.0 10/31/2023 <2.9 2.2 64 <0.49 <0.49 57 5.2 8.6 5.3 ‐‐ ‐‐ <0.15 <0.98 38 <2.9 <0.49 <2.9 32 25 B‐5;00.0‐01.0 11/1/2023 <2.9 2.3 64 <0.49 <0.49 52 5.7 8.1 3.5 ‐‐ ‐‐ <0.15 <0.97 38 <2.9 <0.49 <2.9 33 25 B‐6;00.0‐01.0 11/1/2023 <2.9 1.7 52 <0.49 <0.49 34 3.9 5.9 2.5 ‐‐ ‐‐ <0.15 <0.98 19 <2.9 <0.49 <2.9 24 15
Key:
<xx = indicates constituent was not identified at or above the laboratory reporting limit of xx
‐‐ = constituent not analyzed
Concentration equal to or greater than hazardous waste criterion
Concentration equal to or greater than Construction Worker ESL
Notes:
mg/kg = milligrams per kilogram; mg/L = milligrams per liter; NV = no value; ESL = Environmental Screening Level (Regional Board, 2019); TTLC = Total Threshold Limit Concentration; STLC = Soluble
Threshold Limit Concentration; Title 22 = the 17 inorganic compounds listed under Title 22 of the California Code of Regulations
Samples were analyzed for Title 22 metals in accordance with U.S. Environmental Protection Agency Methods 6010B and 7471A.
Bay Area was substituted for the construction worker ESL of 0.98 mg/kg.
Assumes the total chromium concentration is chromium III.
1 In accordance with guidance from Regional Water Board, the upper 99th percentile estimate of the naturally‐occurring background arsenic concentrations reported by Duvergé (2011) in the San Francisco
California TTLC California STLC
Federal TCLP Threshold Construction Worker ESL
23311‐00 Summary Table Page 1 of 1
Table 2: Soil Analytical Results for Total Petroleum Hydrocarbons and Volatile Organic Compounds
Sample ID
Sample Depth
(feet bgs) Sample Date
TPH‐g
(mg/kg)
TPH‐d
(mg/kg)
TPH‐mo
(mg/kg)
VOCs
(mg/kg)
NV NV NV NV
1,800 1,100 54,000 NV
B‐1;00.0‐01.0 00.0‐01.0 10/31/2023 <3.0 <9.9 <20 ND
B‐2;00.0‐01.0 00.0‐01.0 10/31/2023 <3.0 <10 <20 ND
B‐3;00.0‐01.0 00.0‐01.0 11/1/2023 <3.0 <10 <20 ND
B‐4;00.0‐01.0 00.0‐01.0 10/31/2023 <3.0 <10 <20 ND
B‐5;00.0‐01.0 00.0‐01.0 11/1/2023 <3.0 <10 <20 ND
B‐6;00.0‐01.0 00.0‐01.0 11/1/2023 <3.0 <9.9 <20 ND
Key:
<xx = indicates constituent was not identified at or above the laboratory reporting limit of xx
ND= Not detected
Concentration equal to or greater than the California hazardous waste criterion
Concentration equal to or greater than Construction Worker Environmental Screening Level
Notes:
bgs = below ground surface; mg/kg = milligrams per kilogram; NV = no value; TPH‐g = total petroleum hydrocarbons as gasoline;
TPH‐d = total petroleum hydrocarbons as diesel; TPH‐mo = total petroleum hydrocarbons as motor oil.
Samples were analyzed for total petroleum hydrocarbons by U.S. Environmental Protection Agency Method 8015.
California Total Threshold Limit Concentration
Construction Worker Environmental Screening Level
23311‐00 Summary Table Page 1 of 1