iv. 1006954 - Final MLK 100% Special Provisions.pdf
PDF 3 MB Posted
- Solicitation number
- 426531,1
- Issued by
- Alameda County, California
About this file
This is a Special Provisions document for the MLK Jr. Way Streetscape Project (City Project 1006954) issued by the City of Oakland, Department of Public Works. The document establishes standard specifications and special provisions for public works construction, modifying the 2015 Edition Standard Specifications for Public Works Construction, and incorporates the City of Oakland Standard Details for Public Works Construction (2002 Edition) and the 2025 State of California Department of Transportation Standard Specifications and Plans. The project encompasses streetscape improvements including site furnishings, concrete work, utility infrastructure, traffic signals, street lighting, landscaping, and irrigation systems. The bid documents were released on December 17, 2025, with work to be performed according to unit price and lump sum bid items detailed in the proposal section. The contract requires a mandatory pre-construction meeting and adherence to specific construction schedules as established by the Engineer. The contractor must maintain progress in accordance with the contract working days specified, with liquidated damages applicable for delays beyond the completion timeline. All work shall comply with applicable federal, state, and local codes, including the California Manual of Uniform Traffic Control Devices, various building codes, and the Work Area Traffic Control Handbook.
The contract requires performance and payment bonds with specific surety requirements based on contract award amounts, with surety bonds furnished by corporate sureties admitted in California or Lloyds of London. The contractor must perform at least 30 percent of contract work with its own organization, with remaining work available for subcontracting subject to prior written City approval. The contract includes materials cost escalation clauses for asphalt concrete, Portland cement, and structural steel products, with price adjustments triggered when fluctuations exceed 10 percent of baseline indices. Compensation for extra work incorporates labor surcharges per the current CALTRANS Labor Surcharge and Equipment Rental Rate Book, with markup percentages of 33 percent for direct labor costs, 15 percent for materials and equipment rental, and 15 percent for other items. The contractor shall provide all required submittals electronically where possible, including a comprehensive submittal schedule within 15 calendar days of the Notice to Proceed, and must comply with Buy America requirements for steel, iron, manufactured products, and specified construction materials. All prevailing wage requirements apply, with electronic payroll submission mandatory, and the contractor is responsible for protecting existing monuments and survey markers, with costs for monument replacement at the contractor's expense if disturbed without City Surveyor approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Special Provisions
MLK Jr Way Streetscape Project Page 1 Bid Documents: December 17, 2025
City Project 1006954
City Project Number: 1006954
CITY OF OAKLAND
STANDARD SPECIFICATIONS
FOR
PUBLIC WORKS CONSTRUCTION
AKA
“SPECIAL PROVISIONS”
The work to be performed under the contract includes the work described in the Notice to Bidders, all items listed in the Bid Schedule, and work shown on the plans or included in the project specifications. The work shall be performed in accordance with:
1. The “Standard Specifications for the Public Works Construction, 2015 Edition” adopted by City Council Ordinance No. 13455 C.M.S. on October 3, 2017 (aka Greenbook and hereinafter referred to as the “Standard Specifications”); and
2. These Special Provisions that modify said Standard Specifications; and
3. The “City of Oakland Standard Details for Public Works Construction 2002 Edition” (hereinafter referred to as the “Standard Details”); and
4. The 2025 State of California, Department of Transportation, “Standard Specifications and Standard
Plans”.
The section numbers used herein (e.g., “1-2 DEFINITIONS”) correspond to the section numbers of the Standard Specifications that are modified by the Special Provisions.
Copies of said Standard Specifications (GREEN BOOK) may be purchased through http://www.bnibooks.com.
A digital version of the Standard Details is available online at https://www.oaklandca.gov/resources/standard-details-for-public-works-construction http://www.bnibooks.com/ https://www.oaklandca.gov/resources/standard-details-for-public-works-construction
MLK Jr Way Streetscape Project Page 2 Bid Documents: December 17, 2025
City Project 1006954
Contents
PART 1 - GENERAL PROVISIONS 26
SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND
SYMBOLS 26
1-2 TERMS AND DEFINITIONS. 26
1-3 ABBREVIATIONS. 27
SECTION 2 - SCOPE AND CONTROL OF WORK 28
2-1 AWARD AND EXECUTION OF THE CONTRACT. 28
2-1.1 City Ordinance. 28
2-1.2 Approximate Estimate. 28
2-1.3 Examination of Plans, Specifications, and Site of Work. 28
2-1.4 Proposal Form. 28
2-1.5 Bid Security. 28
2-1.6 Submission and Opening of Bids. 29
2-1.7. Rejection of Proposals. 29
2-1.8 Complaints. 29
2-1.8.1 Protests. 29
2-1.8.2 Release From Bid. 29
2-1.9 Award of Contract. 29
2-1.10 Contract Execution. 29
2-1.11 Return of Guaranty of the Successful Bidder. 30
2-3 SUBCONTRACTS. 30
2-3.2 Self Performance. 30
2-3.4 Miscellaneous. 30
2-4 CONTRACT BONDS. 30
2-5 PLANS AND SPECIFICATIONS. 31
2-5.1 General. 31
2-5.3 Submittals. 31
2-5.3.1 General. 31
2-5.3.1.1 Electronic Submittals. 31
2-5.3.6 Buy America Requirements 31
2-5.3.7 Submittal Schedule. 32
2-6 WORK TO BE DONE. 33
2-8 RIGHT-OF-WAY. 33
2-9 SURVEYING. 33
2-9.1 Permanent Survey Markers. 33
2-9.2 Survey Service. 33
2-9.2.1 General. 33
MLK Jr Way Streetscape Project Page 3 Bid Documents: December 17, 2025
City Project 1006954
2-9.2.2 City of Oakland Benchmark Replacement. 34
2-9.2.3 Monument Preservation Procedures. 34
2-9.2.4 Payment. 35
2-9.3 Private Engineers. 35
2-10 AUTHORITY OF BOARD AND ENGINEER. 35
2-13 RE-INSPECTION AT THE END OF THE WARRANTY PERIOD. 35
2-14 GPS COORDINATES AND VERTICAL DATUM. 36
SECTION 3 - CHANGES IN WORK 37
3-1 CHANGES REQUESTED BY THE CONTRACTOR. 37
3-1.1 General. 37
3-2 CHANGES INITIATED BY THE AGENCY. 38
3-2.1 General. 38
3-2.2.4 Materials Cost Escalation Clause. 38
3-2.2.4.1 General. 38
3-2.2.4.2 Asphalt Concrete Products. 38
3-2.2.4.3 Portland Cement and Structural Steel Products 39
3-2.4 Agreed Prices. 40
3-3 EXTRA WORK. 40
3-3.2 Payment. 40
3-3.2.2 Basis for Establishing Costs. 40
3-3.2.2.1 Labor. 40
3-3.2.2.3 Tool and Equipment Rental. 40
3-3.2.3 Markup. 41
3-3.2.3.1 Work by the Contractor. 41
3-3.2.3.2 Work by a Subcontractor. 41
3-5 DISPUTED WORK. 41
3-6 PROCEDURE FOR PROTEST BY THE CONTRACTOR. 41
3-7 CLAIMS PROCEDURES. 42
3-8 CLAIM APPEALS. 43
SECTION 4 - CONTROL OF MATERIALS 44
4-1 MATERIALS AND WORKMANSHIP. 44
4-1.1 General. 44
4-1.1.1 Material Furnished by the Agency. 44
4-1.1.2 Required Recycled-Content Material Report. 44
4-1.1.3 Required Construction and Demolition Waste Reduction and Recycling. 44
4-1.3 Inspection Requirements. 44
MLK Jr Way Streetscape Project Page 4 Bid Documents: December 17, 2025
City Project 1006954
4-1.3.2 Sampling and Testing. 45
4-1.3.4 Reinspection and Retesting. 45
4-1.5 Certificate of Compliance. 45
4-1.6 Trade Names or Equals. 45
SECTION 5 - UTILITIES 47
5-1 LOCATION. 47
5-2 PROTECTION. 47
5-5 DELAYS. 47
5-6 COOPERATION. 47
5-6.1 Coordination With Other Projects. 47
5-6.2 Utility Work. 48
5-6.3 Agency Cooperation – AC Transit. 48
5-7 UTILITY EXCAVATION BACKFILL. 48
5-8 SPECIAL POTHOLE INVESTIGATION. 48
SECTION 6 - PROSECUTION, PROGRESS, AND ACCEPTANCE OF THE WORK 50
6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. 50
6-1.1 Construction Schedule. 50
6-1.2 Commencement of the Work 50
6-1.3 Mandatory Pre-Construction Meeting. 50
6-3 SUSPENSION OF THE WORK. 50
6-3.1 General. 50
6-3.3 Hazardous Material and Waste Encountered during Operations. 51
6-6 DELAYS AND EXTENSIONS OF TIME. 51
6-6.1 General. 51
6-6.3 Payment for Delays to Contractor. 51
6-7.2 Working Day. 52
6-7 TIME OF COMPLETION. 52
6-7.4 Contract Working Days. 52
6-8 COMPLETION, ACCEPTANCE, AND WARRANTY. 52
6-8.2 Acceptance 52
6-8.3 Warranty 52
6-9 LIQUIDATED DAMAGES. 52
SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 54
7-1 CONTRACTOR’S EQUIPMENT AND FACILITIES. 54
7-1.1 General. 54
7-1.4 Powered Industrial Trucks, Forklifts, Heavy Equipment and Other Vehicles. 54
7-2 LABOR. 54
7-2.2 Prevailing Wages. 54
7-2.2.1 Electronic Payroll Submission. 54
MLK Jr Way Streetscape Project Page 5 Bid Documents: December 17, 2025
City Project 1006954
7-2.2.2 Electrical Workers Safety Requirement. 55
7-2.2.3 Federal Wage Rates. 55
7-3 INSURANCE. 55
7-3.1 City of Oakland Insurance Requirements. 55
7-3.2 General Liability Insurance. 56
7-3.3 Workers’ Compensation Insurance. 56
7-3.4 Auto Liability Insurance. 56
7-3.5 Responsibility for Damage. 56
7-5 PERMITS AND LICENSES. 56
7-6 THE CONTRACTOR'S REPRESENTATIVE. 56
7-7 COOPERATION AND COLLATERAL. 56
7-8 WORK SITE MAINTENANCE. 57
7-8.1 General. 57
7-8.2 Air Pollution Control. 57
7-8.4.1 General. 57
7-8.5.4 Overflow Emergency Response Plan. 57
7-8.6 Water Pollution Control. 57
7-8.6.1 General. 57
7-8.7 Removal of Graffiti. 60
7-8.8 Contractor's Identification. 60
7-9 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS. 60
7-10 SAFETY. 61
7-10.1 Lead Compliance Plan. 61
7-10.2 Storage of Equipment and Materials in Public Streets. 61
7-10.4 Safety. 61
7-10.4.1-2 Safety Orders. 61
7-10.4.4 Special Hazardous Substances and Processes. 62
7-10.4.5 Confined Spaces. 62
7-10.4.5.4 Additional City of Oakland Requirements. 62
7-10.4.6 Compliance with Laws. 62
7-10.4.6.1 Security. 62
7-10.4.6.2 Supervision. 63
7-10.4.6.3 Employee Training and Qualifications. 63
7-10.4.6.4 Environmental, Health and Safety Requirements. 63
7-10.4.6.5 Prohibited Acts. 64
7-10.4.6.6 Work Site, Material Storage and Disposal. 64
MLK Jr Way Streetscape Project Page 6 Bid Documents: December 17, 2025
City Project 1006954
7-10.4.6.7 Incident Reporting. 64
7-11 PATENT FEES OR ROYALTIES. 64
7-12 ADVERTISING. 65
7-12.1 Contract Information Signs. 65
7-12.2 Door Hanger Notifications. 65
7-13 LAWS TO BE OBSERVED. 65
7-15 VIOLATIONS AND FINES. 65
SECTION 9 - MEASUREMENT AND PAYMENT 67
9-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK. 67
9-1.1 General. 67
9-3 PAYMENT. 67
9-3.2 Partial and Final Payment. 67
9-3.2.1 Subcontractor/Subconsultant/Supplier Payment Certification. 67
9-3.2.2 Submittal of Certified Payrolls. 68
9-3.2.3 Required Job Site Waste Reduction and Recycling Summary Report Form. 68
9-3.2.4 Prompt Payment Transmittal Form. 68
9-3.3 Delivered Materials. 68
9-3.4 Mobilization. 68
9-4 AS-BUILT DRAWINGS. 69
PART 2 - CONSTRUCTION MATERIALS 70
SECTION 200 -- ROCK MATERIALS 70
200-2 UNTREATED BASE MATERIALS. 70
200-2.2 AGGREGATE BASES. 70
200-2.2.1 Quality Assurance and Quality Control. 70
200-2.2.2 Department Acceptance. 70
200-2.2.3 Materials. 71
200-2.2.3.1 General. 71
200-2.2.3.2 Class 2 Aggregate Base. 71
200-2.3 AGGREGATE SUBBASES. 71
200-2.3.1 Quality Assurance and Quality Control. 71
200-2.3.2 Department Acceptance. 72
200-2.3.3 Materials. 72
200-2.3.3.1 General. 72
200-2.3.3.2 Class 1, Class 2, and Class 3 Aggregate Subbases. 72
SECTION 201 -- CONCRETE, MORTAR AND RELATED MATERIALS 74
201-1 PORTLAND CEMENT CONCRETE. 74
201-1.1.1 General. 74
MLK Jr Way Streetscape Project Page 7 Bid Documents: December 17, 2025
City Project 1006954
201-1.4 Mixing. 74
201-1.4.3 Transit Mixers. 74
201-2 REINFORCEMENT FOR CONCRETE. 74
201-2.2.3 Welded Wire Reinforcement. 74
201-6 CONTROLLED LOW STRENGTH MATERIAL (CLSM). 74
201-6.1 General and Quality Assurance. 74
201-6.1.1 Cementitious Material. 74
201-6-1.2 Mix Proportions. 74
201-6.1.3 Strength and Density. 74
201-6.1.4 Mixture. 74
201-6.1.5 Native and Imported Soils. 75
201-6.2 Mix Design. 75
201-6.2.1 Submittals - Mix Design and Testing. 75
201-6.3 Materials. 75
201-6.4 Execution - Batching and Mixing, and Placement. 76
201-6.4.1 Batching and Mixing. 76
201-6.4.2 Placement. 76
201-6.5 Payment. 76
ADD NEW SUBSECTION 201-10 TO READ: 76
201-10 MANHOLES, CLEANOUTS AND APPURTENANT MATERIALS. 76
201-10.1 Materials. 76
201-10.1.1 Rock Base. 76
201-10.1.2 Cement Mortar. 76
201-10.2 Manholes. 76
201-10.2.1 Cast-In-Place Concrete Manholes. 76
201-10.2.2 Pre-cast Manhole Sections. 77
201-10.2.3 Manhole Bases. 77
201-10.2.4 Pipe Connections. 77
201-10.2.5 Manhole Extensions. 77
201-10.2.6 Jointing Manhole Sections. 77
201-10.3 Cleanouts. 77
201-10.4 Lampholes. 77
201-10.5 Appurtenant Materials. 77
201-10.5.1 Pipe and Fittings. 77
MLK Jr Way Streetscape Project Page 8 Bid Documents: December 17, 2025
City Project 1006954
201-10.5.2 Pipe Stubouts for Future Sewer Connections. 77
201-10.5.3 Sealing Manhole Walls. 77
201-10.6 Catch Basin Connector Pipe Screen. 79
ADD NEW SUBSECTION 201-11 TO READ: 79
201-11 VOID FORMER. 79
SECTION 202 – MASONRY MATERIALS 80
202-4 UNIT PAVERS. 80
202-4.1 General. 80
202-4.2 Materials. 80
202-4.2.1 Brick Paver. 80
202-4.2.2 Jointing Sand. 80
202-4.2.3 Bedding Course Sand. 80
202-4.2.4 Metal Paving Restraint. 80
202-4.3 Extra Paving Units. 80
SECTION 203 – BITUMINOUS MATERIALS 81
203-3 EMULSIFIED ASPHALT. 81
203-3.1 General. 81
203-3.1.1 Crack Seal. 81
203-3.1.1.2 Measurement and Payment 81
203-5 SLURRY SEAL. 81
203-5.2 Mix Design. 81
203-5.6 Field Observation and Testing. 82
203-6 ASPHALT CONCRETE. 83
203-6.2.1 Asphalt Binder. 83
203-6.4 Type A Hot Mix Asphalt. 83
203-6.4.1 General. 83
203-6.4.2 Reclaimed Asphalt Pavement. 83
203-6.4.3 Quality Control. 83
203-6.4.3.1Aggregates. 83
203-6.4.3.2 Reclaimed Asphalt Pavement. 83
203-6.4.3.3 Type A Hot Mix Asphalt Production. 84
203-6.4.3.4 Department Acceptance 84
203-6.4.4 Materials. 87
203-6.4.4.1 Type A Hot Mix Asphalt Mix Design. 87
203-6.4.4.2 Asphalt Binder. 88
MLK Jr Way Streetscape Project Page 9 Bid Documents: December 17, 2025
City Project 1006954
203-6.4.4.3 Aggregates. 88
203-6.4.4.3.1 Aggregate Gradations. 88
203-6.4.4.4 Reclaimed Asphalt Pavement 89
203-6.4.4.5 Type A Hot Mix Asphalt Production 89
203-10 LATEX MODIFIED ASPHALT CONCRETE. 89
203-10.2.1 Paving Asphalt. 89
203-10.2.4 Composition and Grading. 90
203-11 ASPHALT RUBBER HOT MIX (ARHM). 90
203-11.2 Materials. 90
203-11.3 Composition and Grading. 90
203-11.10 Equipment for Asphalt Rubber Seal Coat. 90
203-17 BONDED WEARING COURSES – GAP GRADED 91
203-17.1 General Summary. 91
203-17.2 Submittals. 91
203-17.3 Quality Control and Assurance. 91
203-17.4 Materials. 93
203-17.4.1 Asphaltic Emulsion Membrane. 93
203-17.4.2 Asphalt Binder. 94
203-17.4.3 Aggregate. 94
203-17.5 Hot Mix Asphalt Design Requirements. 95
203-17.5.1 Hot Mix Asphalt for Job Mix Formula. 95
203-17.5.2 Job Mix Formula Verification. 95
SECTION 204 – LUMBER AND TREATMENT WITH PRESERVATIVES 97
204-3 TREATED WOOD WASTE. 97
204-3.1 General. 97
204-3.2 Submittals. 97
204-3.3 Training. 98
204-3.4 Storage of Treated Wood Waste. 98
204-3.5 Transport and Disposal of Treated Wood Waste. 98
204-3.6 Measurement and Payment. 99
SECTION 206 – MISCELLANOUS METAL ITEMS 100
206-6 CHAIN LINK FENCE. 100
206-6.10 Temporary Chain Link Fence. 100
206-7 SIGN POLES AND MOUNTING HARDWARE. 100
206-7.1 General. 100
206-7.2 Sign Poles, Extenders, and Mounting Hardware. 100
206-8 SIGN PANELS. 100
MLK Jr Way Streetscape Project Page 10 Bid Documents: December 17, 2025
City Project 1006954
206-8.1 General. 100
206-8.2 Measurement and Payment. 100
SECTION 207 – GRAVITY PIPE 101
207-1 NONREINFORCED CONCRETE PIPE. 101
207-3 LINED REINFORCED CONCRETE PIPE. 101
207-3.1 General. 102
207-3.2 Concrete Embedment Liner. 102
207-3.3 Post Award and Submittals. 102
207-3.4 Qualifications. 102
207-3.5 Material Properties. 102
207-3.6 Material Supply and Handling 104
207-3.7 Welding Procedures and Testing Program 104
207-16 ABS OR PVC COMPOSITE PIPE. 104
207-17 PVC GRAVITY PIPE. 104
207-19 POLYETHYLENE (PE) SOLID WALL GRAVITY PIPE. 104
207-19.1 General. 104
207-19.3 Pipe Acceptance. 104
207-25 POLYETHYLENE (PE) LARGE DIAMETER (36 INCH DIAMETER OR GREATHER) PROFILE
WALL PIPE. 105
207-25.1 General. 105
207-25.2 Material Composition. 105
207-25.3 Test Requirements. 105
207-25.4 Marking. 105
207-25.5 Dimensions. 105
SECTION 209 – PRESSURE PIPE 106
209-1 IRON PIPE AND FITTINGS. 106
209-1.1 Ductile Iron Pipe (DIP). 106
209-1.1.1 General. 106
209-8 DRINKING WATER SYSTEM. 106
209-8.1 General. 106
209-8.2 Materials. 106
209-8.3 Submittals. 106
209-8.4 Guarantee and Quality Assurance. 107
209-8.5 Construction. 107
209-8.5.1 Excavation and Backfilling. 107
209-8.5.2 Installation. 107
209-8.5.3 Testing. 108
209-8.5.4 Sterilization and Flushing. 108
209-8.6 Measurement and Payment. 108
MLK Jr Way Streetscape Project Page 11 Bid Documents: December 17, 2025
City Project 1006954
SECTION 210 - PAINT AND PROTECTIVE COATINGS 110
210-2 PLASTIC LINER. 110
210-5 POLYVINYL CHLORIDE (PVC) COATINGS. 110
SECTION 211 - MATERIAL TESTS 111
211-1.1 Laboratory Maximum Density. 111
211-1.2 Field Density. 111
211-7 IMPORT FILL MATERIAL. 111
211-7.1 Definitions. 111
211-7.2 General. 111
211-7.3 Screening Levels for Import Material. 113
SECTION 213 - ENGINEERING GEOSYNTHETICS 114
213-1 GENERAL. 114
SECTION 214 - TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT
MARKERS 115
214-5 THERMOPLASTIC MATERIAL FOR TRAFFIC STRIPING AND MARKINGS. 115
214-5.1 General. 115
SECTION 217 – BEDDING AND BACKFILL MATERIALS 116
217-2 TRENCH BACKFILL. 116
217-2.1 General. 116
217-2.3 Imported Backfill. 116
217-5 SPECIAL BACKFILL. 116
217-5.1 General. 116
217-5.2 Measurement and Payment. 116
PART 3 - CONSTRUCTION METHODS 117
SECTION 300 - EARTHWORK 117
300-1 CLEARING AND GRUBBING. 117
300-1.1 General. 117
300-1.1.2 Tree Removal. 117
300-1.1.2.1 General. 117
300-1.1.2.2 Site Examination. 117
300-1.1.2.3 Tree Demolition and Reuse. 118
300-1.1.2.4 Certified Arborist. 118
300-1.1.2.5 Safety Standards. 118
300-1.1.2.6 Trees to Remain – Protection. 118
300-1.1.2.7 Trees to Remain – Root Pruning. 118
300-1.1.2.8 Site Clean Up. 118
300-1.1.2.9 Protection of Overhead Utilities. 118
300-1.3 Removal and Disposal of Materials. 119
300-1.3.2 Requirements. 119
MLK Jr Way Streetscape Project Page 12 Bid Documents: December 17, 2025
City Project 1006954
300-1.3.2 (a) Bituminous Pavement. 119
300-1.3.2 (b) Concrete Pavement. 119
300-1.3.2. (c) Concrete Curb, Walk, Gutters, Cross Gutters, Driveways, and Alley Intersections. 119
300-1.4 Payment. 119
300-2 UNCLASSIFIED EXCAVATION. 120
300-2.2.3 Non-RCRA California Hazardous Waste. 121
300-2.8 Measurement. 121
300-2.9 Payment. 121
SECTION 301 – SUBGRADE PEPARATION, TREATED MATERIALS, AND PLACEMENT OF
BASE MATERIALS 122
301-1 SUBGRADE PREPARATION. 122
301-1.6 Adjustment of Manhole Frame and Cover Sets to Grade. 122
301-1.7 Payment. 122
301-2 UNTREATED BASE. 122
301-2.1 Aggregate Base. 122
301-2.1.1 General. 122
301-2.1.2 Subgrade. 122
301-2.1.3 Placing Geosynthetic Materials. 122
301-2.1.4 Spreading. 122
301-2.1.5 Compacting. 123
301-2.1.6 Payment. 123
301-2.2 Aggregate Subbase. 123
301-2.2.1 General. 123
302-2.2.2 Subgrade. 123
302-2.2.3 Placing Geosynthetics Materials. 123
301-2.2.4 Spreading. 123
301-2.2.5 Compacting. 124
301-2.2.6 Payment. 124
SECTION 302 - ROADWAY SURFACING 125
302-4 SLURRY SEAL SURFACING. 125
302-4.3.2 Spreading. 125
302-4.5 Measurement and Payment (Slurry Seal). 126
302-5 ASPHALT CONCRETE PAVEMENT. 126
302-5.4 Tack Coat. 126
302-5.9 Payment. 127
302-7 PAVEMENT FABRIC. 127
MLK Jr Way Streetscape Project Page 13 Bid Documents: December 17, 2025
City Project 1006954
302-7.2.2.1 General. 127
SECTION 303 – CONCRETE AND MASONRY CONSTRUCTION 128
303-1 CONCRETE STRUCTURES. 128
303-1.1 General. 128
303-1.11 Payment. 128
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY INTERSECTIONS,
ACCESS RAMPS, AND DRIVEWAYS. 128
303-5.1 Requirements. 129
303-5.1.1 General. 129
303-5.1.1.1 Curb Ramp Requirement for Contractor-Damaged Curb Return Areas. 129
303-5.1.1.2 Detectable Warning Surface 129
303-5.1.1.3 Replacement of Damaged Utility Boxes for Curb Ramp Work. 129
303-5.1.1.4 Extra Wide Ramps to Accommodate City Utility Boxes within Curb Ramp Areas 130
303-5.1.1.5 Ancillary Work for Concrete Sidewalk, Driveway, and Curb and Gutter Construction.
303-5.4 Joints. 133
303-5.4.1 General. 133
303-5.4.2 Expansion Joints. 133
303-5.5 Finishing. 134
303-5.5.2 Curb. 134
303-5.5.3 Walk. 134
303-5.5.4 Gutter. 134
303-5.5.6 Island Passageway. 135
303-5.9 Measurement and Payment. 135
303-9 INSTALLATION OF MANHOLES, CLEANOUTS, INLETS, AND APPURTENANCES. 138
303-9.1 General. 138
303-9.1.a Structure Excavation and Backfill. 138
303-9.1.b Rock Base. 138
303-9.1.c Concrete Manhole Base. 138
303-9.1.d Placing Precast Manhole Sections. 138
303-9.1.e Manhole Channels. 138
303-9.1.f Drop Connection/Drop Connection Manhole. 138
303-9.1.g Flexible Joints. 138
303-9.1.h Pipe Stubouts For Future Connections. 138
303-9.1.i Permanent Plugs. 139
MLK Jr Way Streetscape Project Page 14 Bid Documents: December 17, 2025
City Project 1006954
303-9.1.j Manhole Extensions. 139
303-9.1.k Manhole Frames and Covers. 139
303-9.1.l Manhole Over Existing Sewers. 139
303-9.1.m Connection to Existing Manholes. 139
303-9.1.n Special Manholes. 139
303-9.1.o Sewer Cleanouts. 139
303-9.1.p Manhole Steps. 139
303-9.2 Structure Testing. 139
303-9.2.a Vacuum Testing. 139
303-9.2.b Hydrostatic Testing. 140
303-9.3 Existing Manholes to Remain. 140
303-9.4 Measurement and Payment. 140
303-10 UNIT PAVERS. 140
303-10.1 General. 140
303-10.2 Construction Test Section. 141
303-10.3 Subgrade. 141
303-10.5 Bedding. 141
303-10.6 Metal Paving Restraint. 141
303-10.7 Paving Unit Placement. 141
303-10.8 Acceptance. 141
303-10.9 Measurement and Payment. 141
SECTION 304 – METAL FABRICATION AND CONSTRUCTION 142
304-3 CHAIN LINK FENCE. 142
304-3.1 General. 142
304-3.2 Fence Construction. 142
304-3.3 Gate Construction. 142
304-3.4 Measurement and Payment. 142
304-6 SITE FURNISHINGS 143
304-6.1 General. 143
304-6.2 Benches. 143
304-6.3 Waste Receptacles. 143
304-6.4 Bike Counter Display. 143
304-6.5 Bicycle Racks. 143
304-6.5.1 General. 143
304-6.5.2 Installation. 143
304-6.6 Drinking Fountain. 144
304-6.7 Pedestrian Barricade. 144
MLK Jr Way Streetscape Project Page 15 Bid Documents: December 17, 2025
City Project 1006954
304-6.8 Measurement and Payment. 144
304-7 ROADSIDE SIGNS, POST AND PARKING METER. 144
304-7.1 General. 144
304-7.2 Measurement and Payment. 145
SECTION 306 – OPEN TRENCH CONDUIT CONSTRUCTION 146
306-1 GENERAL. 146
306-2.9 Pipe Laying. 146
306-3 TRENCH EXCAVATION. 146
306-3.1 General. 146
306-3.2 Removal of Surface Improvements. 146
306-3.3 Removal and Abandonment of Existing Conduits and Structures. 146
306-3.3.1 Removal and Replacement of Building Sewers. 146
306-3.3.2 Removal of Friable Asbestos Materials and Asbestos Cement Pipe. 147
306-3.4 Minimum and Maximum Pipe Zone Trench Width. 147
306-3.5 Maximum Length of Open Trench. 147
306-3.7 Payment for Contaminated Material Disposal. 147
306-6 BEDDING. 148
306-6.1 General. 148
306-7 PREFABRICATED GRAVITY PIPE. 149
306-7.7.2.3 Jointing of Injection-Sealed PVC Pipe. 149
306-7.8.2 Pressure Testing and Leakage Inspection. 149
306-7.8.2.1 General. 149
306-7.8.2.1(e) Pressure Testing and Leakage Inspection. 149
306-7.8.2.4 Air Pressure Test. 149
306-7.8.2.6 Sewer Line Cleaning. 150
306-12 BACKFILL. 150
306-12.3 Mechanically Compacted Backfill. 150
306-12.3.1 General. 150
306-12.3.2 Compaction Requirements. 150
306-12.4 Jetted Trench Backfill. 151
306-12.4.1 General. 151
306-13 TRENCH RESURFACING. 151
306-13.1 Temporary Resurfacing. 151
306-13.2 Permanent Resurfacing. 151
306-15 BASIS OF PAYMENT FOR OPEN TRENCH INSTALLATIONS. 151
306-15.1 Measurement. 151
306-15.1.a Pipe Sewers. 151
MLK Jr Way Streetscape Project Page 16 Bid Documents: December 17, 2025
City Project 1006954
306-15.1.b Building Sewers. 151
306-15.2 Payment. 152
306-15.2.a Payment for Pipe and Conduit. 152
306-17 WATER, SEWER PIPE AND/OR STORM DRAIN PIPE ANCILIARY STRUCTURES. 153
306-17-1. General. 153
306-17.2 Lines Terminating in Cleanout. 153
306-17.3 Cleanout for Soil Cell System. 153
306-17.4 Payment. 153
306-18 SOIL CELLS. 154
306-18.1 General. 154
306-18.2 Submittals. 154
306-18.3 Quality Assurance. 155
306-18.4 Delivery, Storage, and Handling. 155
306-18.5 Field Conditions. 155
306-18.6 Warranty. 155
306-18.7 Products. 155
306-18.7.1. Manufacturer. 155
306-18.7.2 Description. 156
306-18.7.3 Soil Cell Materials and Accessories. 156
306-18.7.4 Geogrid. 156
306-18.7.5 Geotextile Fabric. 156
306-18.7.5 Pipe Filter Fabric. 157
306-18.7.6 Backfill Material. 157
306-18.7.7 Flow Distribution Aggregate. 157
306-18.7.7 Kerb Inlet. 157
306-18.8 Construction. 157
306-18.8.1 Pre-Construction Activities. 157
306-18.9.2 Temporary Protection. 157
306-18.9.3 Excavation. 157
306-18.9.4 Installation of Geotextile Over Subgrade. 158
306-18.9.5 Installation of Aggregate Subbase Below Soil Cell Bases. 158
306-18.9.6 Installation of Soil Cell Base. 158
306-18.9.8 Installation of Soil Cells, Strongbacks, Geogrid, Backfill, and Planting Soil. 158
306-18.9.9 Installation of Soil Cell Deck. 159
306-18.9.10 Final Backfill Placement and Compaction. 159
MLK Jr Way Streetscape Project Page 17 Bid Documents: December 17, 2025
City Project 1006954
306-18.9.11 Installation of Geotextile Fabric and Aggregate Base Course Over Deck. 159
306-18.9.12 Installation of Curb, Aggregate Base, and Pavement Above Soil Cell System. 159
306-18.9.13 Installation of Root Barriers. 159
306-18.9.14 Installation of Planting Soil Within Tree Planting Area. 159
306-18.9.15 Protection. 160
306-18.10 Payment. 160
SECTION 309 – MONUMENTS 161
309-3 CONSTRUCTION. 161
309-3.1 Monumentation Preservation. 161
309-3.2 City of Oakland Bench Mark Replacement. 161
309-4 PAYMENT. 161
SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT
MARKERS 163
314-1 GENERAL. 163
314-2 REMOVAL OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 163
314-2.1 General. 163
314-2.2 Measurement. 163
314-2.3 Payment. 163
314-3 REMOVAL OF PAVEMENT MARKERS. 163
314-3.2 Measurement. 163
314-3.3 Payment. 164
314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 164
314-4.1 General. 164
314-4.2 Curb Paint. 164
314-4.3 Traffic Striping and Pavement Markings. 164
314-4.3.1 Thermoplastic Traffic Striping and Pavement Markings. 164
314-4.3.2 Paint Traffic Striping and Pavement Markings. 164
314-4.3.3 Methyl Methacrylate Paint. 164
314-4.3.3.1 General. 164
314-4.3.3.2 Application. 164
314-4.4 Measurement and Payment. 165
314-5 PAVEMENT MARKERS. 165
314-5.1 General. 165
314-5.6 Measurement. 166
314-5.7 Payment. 166
PART 4 - ROCK PRODUCTS 167
SECTION 400 – ALTERNATE ROCK PRODUCTS, ASPHALT CONCRETE, PORTLAND
CEMENT CONCRETEAND UNTREATED BASE MATERIAL 167
MLK Jr Way Streetscape Project Page 18 Bid Documents: December 17, 2025
City Project 1006954
400-4 ASPHALT CONCRETE. 167
400-4.1 General. 167
PART 5 – PIPELINE SYSTEM REHABILITATION 168
PART 6 – TEMPORARY TRAFFIC CONTROL 169
SECTION 600 – ACCESS 169
600-1 GENERAL. 169
600-2 VEHICULAR ACCESS. 169
600-3 PEDESTRIAN ACCESS. 169
CHANGE SUBSECTION 600-3 TO READ: 169
SECTION 601 – WORK AREA TRAFFIC CONTROL 170
601-1 GENERAL. 170
601-2 RESTRICTED HOURS OF OPERATION AND STREETS. 170
601-3 EXISTING TRAFFIC SIGNALS, STRIPING, STREET SIGNS, REGULATORY SIGNS. 170
601-4 VEHICULAR TRAFFIC. 170
601-5 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS). 171
601-6 STREET CLOSURES, DETOURS, BARRICADES. 171
601-7 CONSTRUCTION PROJECT INFORMATION SIGN. 171
601-8 UNIFORM SAFETY STANDARDS. 171
601-9 PAYMENT. 173
PART 7 - STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS 174
SECTION 700 – MATERIALS 174
700-1 GENERAL. 174
700-3 COMMON COMPONENTS. 174
700-3.1 General. 174
700-3.2 Anchor Bolts, Nuts, and Washers. 174
700-3.3 Standards. 174
700-3.3.1 General. 174
700-3.3.3.2 Steel Standards. 174
700-3.3.4 Fiberglass Standards. 174
700-3.4 Mast Arms. 174
700-3.5 Conduit. 174
700-3.5.1 General. 174
700-3.7 Pull Boxes. 175
700-3.8 Splice Insulation. 175
700-3.8.1 General. 175
700-3.12 Service Pedestal. 175
700-3.12.1 Single Meter Service Pedestal. 176
700-3.12.2 Dual Meter Service Pedestal. 176
700-4 STREET LIGHTING SYSTEM MATERIALS. 176
MLK Jr Way Streetscape Project Page 19 Bid Documents: December 17, 2025
City Project 1006954
700-4.2 Wire/Conductors. 176
700-4.2.1 General. 176
700-4.3.2 Fuse Splice Connectors. 176
700-4.7 Photoelectric Control. 176
700-4.9 Light Emitting Diode (LED) Luminaires. 176
700-4.9.1 General. 176
700-4.9.2 Optical/LED Array. 177
700-4.9.3 Luminaire Requirements. 177
700.4.9.4 Photometric Requirements. 178
700.4.9.5 Performance Claims. 178
700.4.9.6 Measurement/Performance/Safety Standards. 178
700-4.10 Pedestrian Light. 178
700-5 TRAFFIC SIGNAL MATERIALS. 179
700-5.1 Steel Pedestrian Standards and Pedestals for Controller Cabinets. 179
700-5.3 Conductors and Cable. 179
700-5.3.1 General. 179
700-5.3.4 Fiber Optic Cable. 179
700-5.3.4.1 General. 179
700-5.3.4.2 144 SMFO Trunk Cable. 179
700-5.3.4.3 12 SMFO Branch Cable. 179
700-5.3.4.4 Fiber Optic Jumper Cable. 180
700-5.3.4.5 Fiber Optic Pigtails. 180
700-5.3.4.6 Underground Fiber Splice Closures. 180
700-5.3.4.7 Fiber Termination Panel. 180
700-5.3.4.8 Ethernet Edge Switch. 181
700-5.4 Controllers. 182
700-5.4.1 General. 182
700-5.4.1a Central Control System Integration. 183
700-5.4.1b GPS Time Source Receiver. 183
700-5.4.3 Cabinets. 183
700-5.4.3.1 General. 183
700-5.4.3.8 Side-Mounted Enclosure. 183
700-5.5 Traffic Signal Faces and Fittings. 184
MLK Jr Way Streetscape Project Page 20 Bid Documents: December 17, 2025
City Project 1006954
700-5.5.4 Metal Signal Section. 184
700-5.5.5 Plastic Signal Sections. 184
700-5.5.8 Visors. 185
700-5.5.10 Backplates. 185
700-5.5.10.1 General. 185
700-5.5.10.2 Plastic Backplates. 185
700-5.5.11 Circular Light Emitting Diode (LED) Signal Modules. 185
700-5.6 Pedestrian Signal Sections. 185
700.5.6.1 General. 185
700-5.7 Signal Mounting Assemblies. 187
700-5.8 Detectors. 187
700-5.8.3 Video Detection System (VDS). 187
700-5.9 Pedestrian Push Button Assemblies. 193
700-5.10 Splice Chamber. 196
700-5.11 Internally LED Illuminated Street Name Sign (IISNS). 196
700-5.12 Pan-Tilt-Zoom (PTZ) Closed Circuit Television (CCTV) Camera System. 198
700-5.13 Emergency Vehicle Preemption (EVP)/Transit Signal Priority (TSP) System. 198
700-5.14 Rectangular Rapid Flashing Beacon (RRFB) Assembly 202
700-5.14.1 Measurement and Payment. 205
700-5.15 Blank-Out Sign. 205
700-5.15.1 Materials. 205
700-5.15.2 Installation. 206
SECTION 701 - CONSTRUCTION 207
701-1 GENERAL. 207
701-1.1 Equipment List and Drawings. 207
701-1.2 Scheduling of Work. 207
701-2 MAINETNANCE OF EXISTING AND TEMPORARY SYSTEMS. 208
701-2.1 Maintaining Existing Intelligent Transportation System (ITS) Elements During Construction. 208
701-7 EXCAVATION AND BACKFILL. 209
701-7.1. General. 209
701-7.2 Trenches. 209
701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS. 209
701-8.2 Foundations. 209
701-8.2.1 Cast-In-Drilled-Hole Concrete Pile Foundations. 209
701-8.5 Measurement. 210
701-8.6 Payment. 210
MLK Jr Way Streetscape Project Page 21 Bid Documents: December 17, 2025
City Project 1006954
701-10 STANDARDS, PEDESTALS AND MAST ARMS. 210
701-10.1 General. 210
701-10.3 Measurement. 210
701-10.4 Payment. 210
701-11 PULL BOXES. 211
701-11.1 General. 211
701-11.3 Payment. 211
701-12 CONDUIT. 212
701-12.1 General. 212
701-12.7 Payment. 213
701-13 WIRES, CONDUCTORS AND CABLES. 213
701-13.1 General. 213
701-13.2 Splices. 214
701-13.3 Bonding and Grounding. 214
701-13.4 Payment. 214
701-13.5 Restoration of Existing Wires and Cables. 214
701-14 SERVICES. 214
701-14.1 General. 214
701-14.2 Services on Utility-Owned Poles. 214
701-14.4 Measurement. 214
701-14.5 Payment. 214
701-14.6 Service Enclosure. 214
701-14.7 Measurement. 215
701-14.8 Payment. 215
701-15 CIRCUIT BREAKERS. 215
701-15.1 General. 215
701-16 STREET LIGHTING CONSTRUCTION. 215
701-16.2 Conduit. 215
701-16.4 Wiring/Conductors. 215
701-16.6 Services. 215
701-16.7 Luminaires. 215
701-16.7.1 General. 215
701-16.7.3 Measurement. 215
701-16.7.4 Payment. 215
701-17 TRAFFIC SIGNAL CONSTRUCTION. 216
701-17.1 General. 216
701-17.2.6 Measurement. 216
701-17.2.7 Payment. 216
MLK Jr Way Streetscape Project Page 22 Bid Documents: December 17, 2025
City Project 1006954
701-17.4 Wiring, Conductors and Cable. 216
701-17.4.1 General. 216
701-17.4.5 Fiber Optic Cable. 217
701-17.4.5.1 General. 217
701-17.4.5.2 Splicing. 217
701-17.4.5.2a Splice And Cable Logging/Cable Identification. 218
701-17.4.5.3 Installation. 218
701-17.4.5.3a Installation in Conduit Occupied by Existing SIC. 219
701-17.4.5.3b Installation in Conduit Occupied by Existing Traffic Signal Cables and Other Cables.
701-17.4.5.4 Fiber Optic Pigtails. 220
701-17.4.5.5 Ethernet Edge Switch and Hub Switch. 220
701-17.4.5.6 Measurement and Payment. 220
701-17.5 Signal Heads. 221
701-17.5.1 General. 221
701-17.5.2 Signal Head Mountings. 222
701-17.5.5 Measurement. 222
701-17.5.6 Payment. 222
701-17.6 Detectors. 222
701-17.6.4 Video Detection Camera. 222
701-17.6.5 Measurement. 222
701-17.6.6 Payment. 223
701-17.7 Pedestrian Signals. 223
701-17.7.2 Pedestrian Push Buttons. 223
701-17.7.3 Pedestrian Signal Head. 223
701-17.7.3.1 Pedestrian Countdown Signal Head. 223
701-17.7.3.2 Pedestrian Signal Head Mountings. 223
701-17.7.4 Measurement. 223
701-17.7.5 Payment. 223
701-19 PAINTING AND GALVANIZING. 224
701-20 SALVAGE. 224
701-21 GLOBAL POSITIONING SYSTEM (GPS) TIME SOURCE RECEIVER. 224
701-21.1 General. 224
701-21.2 Payment. 224
MLK Jr Way Streetscape Project Page 23 Bid Documents: December 17, 2025
City Project 1006954
701-22 INTERNALLY ILLUMINATED STREET NAME SIGN (IISNS). 225
701-22.1 General. 225
701-22.2 Payment. 225
701-23 EMERGENCY VEHICLE PREEMPTION (EVP) SYSTEM. 225
701-23.1 General. 225
701-23.2 Payment. 225
701-24 TRAFFIC SIGNAL MOUNTED SIGN. 225
701-24.1 General. 225
701-24.2 Measurement and Payment. 225
701-25 TRANSIT SIGNAL PRIORITY (TSP) SYSTEM. 225
701-25.1 General. 225
701-25.2 Payment. 225
PART 8 – LANDSCAPING AND IRRIGATION 227
SECTION 800 –MATERIALS 227
800-1 LANDSCAPING MATERIALS. 227
800-1.1 Topsoil. 227
800-1.1.1 General. 227
800-1.1.2 Class “A” Topsoil. 227
800-1.1.3 Class “B” Topsoil. 229
800-1.1.4 Class “C” Topsoil. 229
800-1.2 Soil Fertilizing and Conditioning Materials. 229
800-1.2.1 General. 229
800-1.2.2 Manure. 229
800-1.2.3 Commercial Fertilizer. 229
800-1.2.4 Organic Soil Amendment. 229
800-1.2.5 Mulch. 231
800-1.2.6 Herbicides. 231
800-1.2.7 Integrated/Organic Pest Management. 231
800-1.4 Plants. 231
800-1.4.1 General. 231
800-1.4.2 Trees. 232
800-1.4.7 Protection, Maintenance and Warranty, Verification of Dimensions and Quantities. 232
800-1.4.8 Soil Analysis Submittals, Samples and Certificates. 232
800-1.4.9 Materials Submittals. 233
800-1.5 Headers, Stakes, and Ties. 233
800-1.5.2 Headers and Stakes. 233
MLK Jr Way Streetscape Project Page 24 Bid Documents: December 17, 2025
City Project 1006954
800-1.5.3 Tree Stakes and Ties. 233
800–1.6 Anti-Desiccant 233
800-1.7 Root Barrier. 233
800-2 IRRIGATION SYSTEM MATERIALS. 233
800-2.1 Pipe and Fittings. 233
800-2.1.1 General. 233
SECTION 801 - INSTALLATION 235
801-2 EARTHWORK AND TOPSOIL PLACEMENT. 235
801-2.1 General. 235
801-2.3 Finish Grading. 235
801-4 PLANTING. 235
801-4.1 General. 235
801-4.3 Layout and Plant Location. 235
801-4.5 Tree and Shrub Planting. 235
801-4.5.1 General. 235
801-4.6 Plant Staking and Guying. 236
801-4.6.1 Method “A” Tree Staking. 236
801-4.6.2 Method “B” Tree Staking. 236
801-6 MAINTENANCE AND PLANT ESTABLISHMENT 236
801-6.1 General. 236
801-6.2 Watering. 236
801-6.3 Spraying. 237
801-6.4 Weed Control. 237
801-6.5 Litter. 237
801-6.6 Pruning. 237
801-6.7 Visual Examination. 237
801-6.8 Mulch. 237
801-8 PAYMENT 237
ATTACHMENTS 239
Attachment 1 – Submittal List 240
Attachment 2 243
Attachment 3 244
Attachment 4 245
Attachment 5 246
Attachment 6: 247
Attachment 7: 249
Attachment 8 250
Attachment 9A: 252
Attachment 10 253
MLK Jr Way Streetscape Project Page 25 Bid Documents: December 17, 2025
City Project 1006954
Attachment 11 254
Attachment 12 255
Attachment 13 256
Attachment 14 258
Attachment 15 259
Attachment 16 260
Attachment 17 261
Attachment 18 262
Attachment 19 263
Attachment 20 264
Attachment 21 265
MLK Jr Way Streetscape Project Page 26 Bid Documents: December 17, 2025
City Project 1006954
PART 1 - GENERAL PROVISIONS
Part 1 of the Special Provisions shall conform to Part 1 of the Standard Specifications except as modified herein.
SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS
1-2 TERMS AND DEFINITIONS.
CHANGE THE DEFINITIONS OF THE FOLLOWING WORDS OF SUBSECTION 1-2:
Addendum: A change or changes made in one or more of the contract documents after bids are invited and before bids are received.
Agency: The City of Oakland, California, a municipal corporation.
Board: The Council of the City of Oakland.
Contract: The written agreement covering performance of the work including, but not limited to, the executed formal contract, Notice to Bidders, proposal, bonds, plans, specifications, addenda and any executed change orders.
Engineer: The City Engineer of the City of Oakland, acting either directly or through authorized agents, such agents acting within the scope of the particular duties entrusted to them.
ADD THE FOLLOWING NEW DEFINITIONS TO SUBSECTION 1-2:
Acceptance: The Engineer’s formal written acceptance of an entire contract that has been completed in all respects in accordance with the plans and specifications and any modifications thereof previously approved.
Architect: Same as "Engineer."
Building Sewer: The 4-inch, 5-inch, 6-inch, or 8-inch sewer pipe, also known as "lateral", within both the public right-of way and the private property connecting the building or house to, and including, the connection at the public sewer in the right-of-way or easement. Includes both the "house sewer" and the "house connection sewer."
Building Sewer Connection: (House Connection) The connection at the public sewer in the public right-of-way or easement, to the 4-inch, 5-inch, 6-inch, or 8-inch building sewer.
City: Same as "Agency."
City Clerk: The City Clerk of the City of Oakland.
Council: Same as "Board."
City Administrator: City Administrator of the City of Oakland.
City Treasury: City Treasury of the City of Oakland.
Contract Services: The Contract Services Division of the Department of Public Works. This division is responsible for advertising, bidding and executing the contracting process.
Contract Compliance: The Contracts and Compliance Division of the City Administrator's Office.
Contract Compliance Officer: A subordinate of the Contracts and Compliance Division who is responsible for enforcement of the labor, subcontractor, and supplier provisions of the contract.
Department: The City of Oakland or Caltrans
Electrolier Standard: The shaft or pole used to support the luminaire arm, luminaire, etc.
Inspector: Same as "Engineer."
Hearing Officer: The Engineer or his/her designee. The Hearing Officer shall be at least one administrative level above the Inspector or Resident Engineer assigned to the project.
Laboratory: The official materials testing laboratory of the City of Oakland or other laboratories authorized by the Engineer to provide quality assurance. The records and reports of tests may be examined if they are available at the job site.
Landscape Architect: Same as "Engineer."
Local Public Agency: The City of Oakland.
Lower Lateral: (House Connection Sewer) That portion of the building sewer existing from the building sewer connection to the Two-Way cleanout.
Owner: The City of Oakland.
Payment Bond: Material and Labor Bond.
Performance Bond: Faithful Performance Bond.
Public Body: The City of Oakland.
MLK Jr Way Streetscape Project Page 27 Bid Documents: December 17, 2025
City Project 1006954
Specifications: The term used herein refers to both the Standard Specifications and Special Provisions.
Two-way Cleanout: (Also known House Connection Cleanout or 2-Way Cleanout.) A 4-inch or 6-inch two-way fitting, no hub, cast iron cleanout installed on the building sewer within the public right-of-way.
Upper Lateral: (House Sewer) That portion of the building sewer existing from the Two-Way Cleanout to the building connection.
1-3 ABBREVIATIONS.
ADD THE FOLLOWING NEW ABBREVIATIONS TO SUBSECTION 1-3:
ABAG: Association of Bay Area Governments ADA: Americans with Disability Act CAL-OSHA: California Occupational Safety and Health Administration CALTRANS: California Department of Transportation EBMUD: East Bay Municipal Utility District HR: Hour OMC: Oakland Municipal Code OPW: Oakland Public Works Department of the City of Oakland ISA: International Society of Arboriculture PAV: Pressure Aging Vessel RTFO: Rolling Thin Film Oven PG: Performance Graded SFRWQCB: San Francisco Regional Water Quality Control Board
MLK Jr Way Streetscape Project Page 28 Bid Documents: December 17, 2025
City Project 1006954
SECTION 2 - SCOPE AND CONTROL OF WORK
CHANGE SUBSECTION 2-1 TO READ:
2-1 AWARD AND EXECUTION OF THE CONTRACT.
2-1.1 City Ordinance.
The bidder shall conform to provisions of Ordinance No. 7937 CMS of the City of Oakland, as amended, that may be applicable to its bid or to the contract awarded it.
2-1.2 Approximate Estimate.
Unless otherwise specified in the Special Provisions or bid documents as being lump sum items, any quantities given in the specifications, proposal and contract forms are approximate only, being given as a basis for comparing bids. The City of Oakland, does not, expressly or by implication, agree that the actual work amount will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work, as may be deemed necessary or advisable by the Engineer.
2-1.3 Examination of Plans, Specifications, and Site of Work.
The bidder shall examine carefully the contemplated work site and the proposal, plans, specifications and contract forms. It will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of work to be performed and materials to be furnished, and as to the requirements of these specifications and the contract. It is mutually agreed that submission of a proposal shall be considered prima facie evidence that the bidder has made such examination.
2-1.4 Proposal Form.
All proposals must be made upon forms contained in the proposal section of the bound project documents.
Bids are required for the entire work. The bid amount, for comparison purposes, will be the total of all items. The total of unit basis items will be determined by extension of the item price bid on the basis of the estimated quantity set forth for the item.
The bidder shall set forth for each item of work, in clearly legible figures, an item price and a total price for the item in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the item price bid on the basis of the estimated quantity.
In case of a discrepancy between the item price and the total set forth for the item, the item price shall prevail. However, if the amount set forth as an item price is ambiguous, unintelligible, or uncertain for any cause, or if omitted, or in the case of unit basis items, is the same amount as the entry on the "Total" column, then the amount set forth in the "Total" column for the items shall prevail in accordance with the following:
1) As to lump sum items, the amount set forth in the "Total" column shall be the item price.
2) As to unit basis items, the amount set forth in the "Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the item price. All bids shall be clearly and distinctly written. The bidder, who shall fill in all blanks in the proposal forms as therein required, shall sign the proposal.
3) As to add or subtract alternate bids, any discrepancy between the proposal form and changes made by the bidder, the amount shown will be for the alternate as shown on the proposal form.
2-1.5 Bid Security.
Each bidder shall submit with the bid security either cash, certified check or cashier's check of or on some responsible United States Bank, in favor of and payable at sight to the City of Oakland, in an amount not less than ten percent (10%) of the base bid amount. The Contractor must use only the City of Oakland bid security form included with the project documents; bid security forms originating from other institutions will not be accepted. Any contractors not complying with this requirement may be determined to be non-responsive/non-responsible bidders.
To be valid, the original copy must be delivered to the City Clerk's Office within 24 hours of the time and date of the bid opening. If the bidder to which the contract is awarded shall, for 20 calendar days after receipt of such contract, fail or neglect to enter into the contract and file the required bonds, the bid security shall be forfeited as liquidated damages. The City Administrator shall draw the money due on such bid security and pay the same or any cash deposited into the City Treasury, and under no circumstances shall it be returned to the defaulting bidder. In lieu of the foregoing, any bid may be accompanied by a surety bond on a forfeiture form supplied by the City of Oakland in said amount furnished by a corporate surety authorized to do a surety business in the State of California, guaranteeing to the City that said bidder will enter into the contract and file the required bonds within said period.
MLK Jr Way Streetscape Project Page 29 Bid Documents: December 17, 2025
City Project 1006954
The bidder’s failure to enter into the contract after award will result in damages to the City. Such damages are, and will continue to be, impracticable and extremely difficult to determine.
All bid securities and bid bonds will be returned to the unsuccessful bidders after contract award to the successful bidder. The bid security and bid bond of the successful bidder shall be returned after execution of the contract and deposit of the necessary bonds.
If all the bids are rejected, all bids and bid bonds will be returned to the bidders.
2-1.6 Submission and Opening of Bids.
All bids shall be sealed, identified as bids on the envelope, and submitted to the City Clerk at the place and time specified in the public Notice to Bidders. The City Administrator or his/her designated representative will open the bids, in public, at the time and place designated in the Notice to Bidders. Bids received after the specified time shall not be accepted, and shall be returned to the bidder unopened.
2-1.7. Rejection of Proposals.
Proposals may be rejected if they contain erasures, interlineations, or irregularities of any kind. The Council reserves the right to reject any and all bids. The Council may reject the bid of any party who has been delinquent or unfaithful in any former contract with the City, and shall reject all bids other than the lowest responsible regular bid.
More than one proposal from an individual, firm, partnership, corporation or combination thereof under the same or different name will not be considered.
Reasonable grounds for believing that any individual, firm, partnership, corporation or combination thereof has a financial interest in more than one proposal for the work contemplated may cause the rejection of all proposals in which such individual, firm, partnership, corporation or combination thereof is interested. If there is reason for believing that collusion exists among bidders, any or all proposals may be rejected. Proposals in which the prices obviously are unbalanced may be rejected. If all bids are rejected, the Agency may again invite sealed proposals as in the first instance.
2-1.8 Complaints.
Any bidder or other interested party desiring to enter a complaint against any part or provision of these specifications or the requirements in bidding must file the same in writing in the Office of the City Clerk not later than five working days preceding the date set for submission of the bids.
2-1.8.1 Protests.
Any bidder or other interested party desiring to protest against any party bid must file a written statement with the Office of the City Clerk not later than five (5) working days after the bid opening date.
2-1.8.2 Release From Bid.
A bidder shall not be relieved of the bid unless by consent of the City, nor shall any change be made in the bid because of a mistake. A bidder may be relieved of its bid if: a mistake is made; he or she gave the Contracts and Compliance Unit and the City Clerk notice within five working days after the bid opening of the mistake, specifying in the notice in detail how the mistake occurred; the mistake made the bid materially different than he or she intended it to be; and, the mistake was made in filling out the bid and not due to error in judgment or to carelessness in inspecting the work site, or in reading the plans and specifications.
2-1.9 Award of Contract.
The contract award, if made, will be by the Council and will be to the lowest responsible bidder whose proposal complies with all the requirements of the Specifications and Ordinance No. 7937 CMS as amended. If the contract award is made within 120 days from opening of the bids, the Contractor will be required to hold the bid price. If the contract award is made more than 120 days, the contractor has the option to notify the City in writing to withdraw their bid within 5 working days from the contract award date. Otherwise, the contractor must hold the bid price. All bids will be compared on the basis of the Engineer's estimate of quantities of work to be done and/or lump sum bid items. The Council reserves the right to waive any informality or minor irregularity in the bids.
2-1.10 Contract Execution.
The contract shall be signed by the successful bidder and returned together with the contract bonds, appropriate insurance documents and a copy of Form DE6 (Quarterly Wage Report) for the prime and subcontractors listed in the bid proposal, within 20 days after the receipt of such contract. If the bidder fails or refuses to enter into the contract to do the work, or fails to provide the contract bonds, appropriate insurance documents and the prime and subcontractor’s Form DE6 (Quarterly Wage Report) as required, then the certified check or bid bond accompanying this bid and the amount herein mentioned shall be forfeited, and/or a fine of $1,000 per day, shall be collected by the City of Oakland and paid into the City Treasury.
MLK Jr Way Streetscape Project Page 30 Bid Documents: December 17, 2025
City Project 1006954
2-1.11 Return of Guaranty of the Successful Bidder.
The check, or bid bond accompanying the accepted bid will be held by the City Clerk until the contract has been entered into, and the bonds accompanying the same are approved and filed, whereupon the certified check or bid bond will be returned to the successful bidder.
2-3 SUBCONTRACTS.
2-3.2 Self Performance.
REPLACE SUB-SECTION 2.3.2 WITH THE FOLLOWING:
The Contractor shall perform, with its own organization, Contract work amounting to at least 30 percent of the Contract Price except that any designated "Specialty Items" may be performed by subcontract and the amount of any such "Specialty Items" so performed will be deducted from the Contract Price before computing the amount required to be performed by the Contractor with its own organization. "Specialty Items" will be identified by the Agency in the Bid or in the Special Provisions. Where an entire item is subcontracted, the value of work subcontracted will be based on the Contract Unit Price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contract Unit Price. This will be determined from information submitted by the Contractor, and subject to approval by the Engineer.
ADD NEW SUBSECTION 2-3.4:
2-3.4 Miscellaneous.
The Contractor may utilize the service of specialty Subcontractors on those parts of the work that, under normal contracting practices, is performed by specialty Subcontractors.
The Contractor shall not award any work to any Subcontractor without prior written approval of the City.
Approval will not be given until the Contractor submits to the City a written statement concerning the proposed award to the Subcontractor, which statement shall contain such information as the City may require.
The Contractor shall be as fully responsible to the City for the acts and omissions of persons directly employed by him.
The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind Subcontractors to the Contractor by the terms of the General Provisions and other contract documents insofar as applicable to the work of Subcontractors and to give the Contractor the same power as regards terminating any subcontract that the City may exercise over the Contractor under any provisions of the contract documents.
Nothing contained in this contract shall create any contractual relation between any Subcontractor and the City.
2-4 CONTRACT BONDS.
REPLACE THE SECOND AND THIRD SENTENCES OF THE FIRST PARAGRAPH WITH THE FOLLOWING:
All surety bonds, including bid, performance and payment bonds, must be furnished by a corporate surety admitted in the State of California or Lloyds of London, except as follows:
• If the contract award is $5,000,000 or less, the surety bond may be furnished by a United States non-admitted corporate surety which appears on the Treasury List subject to the bonding limits which the Treasury List imposes on such surety; or,
• If the contract award is $1,000,000 or less, the surety bond may be furnished…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .