Appendix_C_Go-Live_and_Full_Operational_Capability_(FOC)_Definitions.docx

DOCX document 19 KB Posted

Attached to
Order Management System Retail Sales End to End Solution
Solicitation number
USM-HQ-13-0018
Issued by

About this file

Appendix C - Go-Live and Full Operational Capability Definitions

View the file

Other files

File Type Posted
Amendment_009_USM-HQ-13-0018.pdf PDF
Amendment_008_USM-HQ-13-0018.pdf PDF
Amendment_007_USM-HQ-13-0018.pdf PDF
Amendment_006_USM-HQ-13-0018.pdf PDF
Amendment_005_USM-HQ-13-0018.pdf PDF
Public_Laws.Regulations_and_Policies_Attachment.docx DOCX document
USM_Interval_Report_June_2012.xlsx XLSX spreadsheet
Amendment_004_USM-HQ-13-0018.pdf PDF
Amendment_003_USM-HQ-13-0018.pdf PDF
Amendment_002_USM-HQ-13-0018.pdf PDF
Attachment_9_Contractor_Performance_Questionairre.docx DOCX document
Attachment_14_-_System_Security_Control_Baselines.docx DOCX document
Attachment_G-9_IPP_Waiver.docx DOCX document
Appendix_D_USM_Internal_and_External_Systems_Interface_Descriptions.xlsx XLSX spreadsheet
Attachment_9_Contractor_Performance_Questionairre.docx DOCX document
Attachment_5_Operational_Cost_Scenario_Template.xlsx XLSX spreadsheet
Attachment_1__SOO.docx DOCX document
Attachment_2_USM_Historical_Data.docx DOCX document
Attachment_12_Security_Manual_TD_P_15-71.pdf PDF
Attachment_4_Pricing_Template.xls XLS spreadsheet
Attachment_13_-_HSPD-12.docx DOCX document
Attachment_7_Overall_Factor_and_Sub-Factor_Weighting.pptx PPTX presentation
Attachment_C-1_EIT_Accessibility.pdf PDF
Attachment_H-1_Rules_Of_Behavior_for_United_States_Mint_IT_Systems_Users.pdf PDF
Appendix_A_Functional_and_Business_Requirements.xlsx XLSX spreadsheet
Attachment_G-3_Contractor_Travel_Voucher.pdf PDF
Attachment_10_Contract_Release-_Form_7510.doc DOC document
Appendix_B_Deliverables_and_Content_Requirements.docx DOCX document
Attachment_11_Sample_Labor_Categories_and_Descriptions.doc DOC document
Attachment_3_Legacy_Data_Model.docx DOCX document
RFP_USM-HQ-13-0018.docx DOCX document
Attachment_8_Management_and_Technical__Section_L_ _M.pptx PPTX presentation
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C: Go-Live and Full Operational Capability Definitions

Go-Live shall become the final step upon successful completion of the Physical Design Phase and Transition Phase. The Contractor shall propose Go-Live in accordance with the Performance Work Statement (PWS). At a minimum, Go-Live shall address when the following criteria have been met by the Contractor and approved by the Government:

1. All hardware, software, facilities, and infrastructure are in place to fully service a USM customer.

2. All scheduled testing activities have been completed (test plans, test case execution, test reports, etc.).

3. All Severity 1 and 2 Defect Reports (or equivalents) are resolved, deferred, waivered, or closed.

4. A call center facility is fully staffed and business processes are in place to execute operations. Staff is fully trained and the call center has obtained all necessary telephony infrastructure to include hardware, software, and lines.

5. An order fulfillment center is fully staffed and business processes are in place to execute operations. Staff is fully trained and the physical warehouse facility has all the necessary hardware and software for order fulfillment center resources use.

6. USM personnel have been fully trained on systems they will use.

7. Authorization to Operate is issued by the USM.

The Contractor shall propose Full Operational Capability (FOC) in accordance with the PWS. At a minimum, FOC shall address when the following criteria has been met by the Contractor and approved by the Government:

1. All temporary waivers have been remediated and closed.

2. All Severity 3 and 4 Defect Reports are resolved, deferred, waivered or closed.