USDA GF HNRC MRU Remodel - IFC Bid Schedule - RFQ.docx
DOCX document 14 KB Posted
- Attached to
- Renovation of Metabolic Research Lab.
- Solicitation number
- 12805B22R0017
About this file
This document contains a bid schedule and solicitation for a renovation project. The bid schedule outlines a base bid for architectural, mechanical, plumbing, and electrical work to renovate metabolic research lab spaces at the USDA Grand Forks facility. It also includes an alternate bid line item to replace all cast iron piping identified in ceiling and wall spaces. The solicitation is from the USDA Agricultural Research Service to renovate the Metabolic Research Unit in Grand Forks, North Dakota. The contractor will provide all labor, equipment, materials and perform work in accordance with plans and specifications to renovate the unit. The project value is estimated between $1,000,000 to $5,000,000. Bids are due by the date specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GFHNRC Metabolic Research Unit Renovation RFI - Bidding Questions (002).docx | DOCX document | |
| Fill In Biobased Statement Letter.docx | DOCX document | |
| UPDATE Site visit registration deadline is Monday the 27th.docx | DOCX document | |
| 12805B22R0017 (3).pdf | ||
| (UPDATED) RFP Terms and Conditions.docx | DOCX document | |
| RFP Terms and Conditions.docx | DOCX document | |
| Attachment 5 Pre-Award Survey Form.doc | DOC document | |
| 12805B22R0017 (2).pdf | ||
| USDA GF HNRC MRU Remodel - IFC Specifications - 24 Mar 22.pdf | ||
| USDA GF HNRC MRU Remodel - IFC Drawings - 24 Mar 22.pdf | ||
| Wage Determination nd14.r2.txt | TXT text file | |
| Attachment 4 Contractor Certification Regarding EMR.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Grand Forks - HNRC MRU Renovation Bid Schedule
CLIN 0001 BASE BID:
· Preconstruction submittals and documents
· Demolition for the spaces
· Architectural, mechanical, plumbing, and electrical work to provide a complete project.
Period of Performance: 84 days Price / Cost: ___$_________
CLIN 0002 ALTERNATE 1: Provide for the replacement of all cast iron piping as identified
· Provide for the replacement of all cast iron piping as identified in the ceiling and wall spaces of the 3rd floor work area as identified on drawing P101.
Period of Performance: 14 days Price / Cost: ______$
Total Cost $__________