Union Theater Drawing.pdf
PDF 5 MB Posted
- Contract number
- 26-506ALPLM-ALPLM-P-88482
- Issued by
- Illinois
About this file
This document is a project phasing schedule for construction work, divided into two distinct sections with sequential availability timelines. Section 1 is available for commencement on November 3, 2025, while Section 2 becomes available three working days after the completion of Section 1.
The project involves the construction and fit-out of two separate venue sections, as depicted in the floor plan. Section 1 is presented in beige and Section 2 in purple, with both areas containing tiered seating arrangements typical of an auditorium or theater configuration. The construction specifications reference 2-hour rated construction as a typical requirement for critical structural elements. The phased approach allows for sequential project execution, with work beginning in Section 1 first, followed by Section 2 only after Section 1 reaches completion, ensuring efficient project workflow and resource allocation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .