These technical specifications are for the University of Colorado Boulder (UCB) and the City and County of Boulder, Colorado, detailing a potable waterline replacement project designated as UCB000817. The project involves removing existing paved surfaces on 18th Street between Euclid Avenue and Broadway Street, replacing full-depth surfaces with new paving and aggregate layers, relocating a portion of the water main, and abandoning existing water main and services. The total project scope includes approximately 450 linear feet of 8-inch diameter waterline replacement, with a critical connection to the City of Boulder's main waterline on Broadway Avenue. The project requires careful coordination with campus events, including restrictions around student move-in periods, finals, home football games, and the Bolder Boulder race, with contractors required to work within specific time constraints and obtain project manager approvals for various activities.
The contract specifications outline detailed requirements for contractor access, coordination, payments, and quality control. For contractor agreements exceeding $150,000, a 5% retainage will be withheld, and contractors must submit specific documentation including state form SBP-7.2, proof of insurance, and construction schedules. Contractors must obtain all necessary City of Boulder permits at no cost to the University, complete background checks for workers, and adhere to strict campus access and safety protocols. The project emphasizes thorough utility locates, erosion control, and specific technical requirements for asphalt paving, trenching, and tracer wire installation, with comprehensive inspection and testing protocols to ensure quality and compliance with University and municipal standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UCB000817-01.00-Table of Contents.docx | DOCX document | |
| UCB000817-09.00-Sales _ Use Tax Forms.pdf | ||
| UCB000817-13.00-Drawings.pdf | ||
| UCB000817-15.00-Attestation Form.docx | DOCX document | |
| UCB000817-06.00-Unit Pricing.docx | DOCX document | |
| UCB000817-07.00-Bid Bond.docx | DOCX document | |
| UCB000817-08.00-UCB Supplemental Terms _ Conditions.pdf | ||
| UCB000817-12.00-Wage Determination and Apprenticeship Rates.pdf | ||
| UCB000817-03.00-Information to Bidders.docx | DOCX document | |
| UCB000817-10.00-Labor Burden Form example.PDF | ||
| UCB000817-11.00-Apprenticeship Utilization Certification example.pdf | ||
| UCB000817-14.00-Code Compliance Inspection Authorization (CCIA).pdf | ||
| UCB000817-04.00-Bid Form.docx | DOCX document | |
| UCB000817-05.00-Alternates.docx | DOCX document | |
| UCB000817-Pre-Bid Attendance Sheet.pdf | ||
| UCB000817-02.00-Advertisement for Bids.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS
FOR
18th Street Potable Waterline Replacement & Pavement Replacement CU Project # UCB000817
CITY AND COUNTY OF BOULDER
STATE OF COLORADO
Prepared: March 26, 2025 for:
University of Colorado Boulder
453 UCB
Boulder, Colorado 80309
Prepared by:
HARRIS KOCHER SMITH
1120 Lincoln Street, Suite 1000 Denver, CO 80203
(303) 623-6300
HKS Project No. 230851 Table of Contents
| Section 01 1110 | 4 |
| SUMMARY OF THE WORK | 4 |
| Section 01 3050 | 7 |
| APPLICATIONS FOR PAYMENT | 7 |
| Section 01 3110 | 9 |
| RESTRICTED ACCESS | 9 |
| Section 01 3115 | 12 |
| PROJECT COORDINATION | 12 |
| Section 01 3119 | 17 |
| PROJECT MEETINGS | 17 |
| Section 01 3150 | 19 |
| UTILITY LOCATES | 19 |
| Section 01 3155 | 23 |
| OUTAGE INFORMATION | 23 |
| Section 01 3300 | 28 |
| PROJECT SUBMITTALS | 28 |
| Section 01 4500 | 31 |
| CONTRACTOR QUALITY CONTROL & OWNER QUALITY ASSURANCE | 31 |
| Section 01 4550 | 34 |
| INSPECTIONS | 34 |
| Section 01 5025 | 38 |
| LOCK OUT / TAG OUT | 38 |
| Section 01 5519 | 40 |
| TEMPORARY PARKING | 40 |
| Section 01 5813 | 43 |
| TEMPORARY PROJECT SIGNAGE | 43 |
| Section 01 7400 | 46 |
| CLEANING | 46 |
| Section 03 11 00 | 48 |
| CONCRETE FORMWORK | 48 |
| Section 03 21 00 | 51 |
| CONCRETE REINFORCEMENT | 51 |
| Section 31 25 00 | 53 |
| EROSION AND SEDIMENTATION CONTROL | 53 |
| Section 32 12 26 | 59 |
| ASPHALT PAVING | 59 |
| Section 31 23 16 13 | 65 |
| TRENCHING AND EXCAVATIONS | 65 |
| Section 32 80 00 | 68 |
| IRRIGATION SYSTEMS | 68 |
| Section 32 92 00 | 71 |
| LANDSCAPE – TURF AND GRASSES: Not used | 71 |
| Section 32 92 13 | 72 |
| LANDSCAPE – SOIL PREPARATION: Not used | 72 |
| SECTION 32 93 01 | 73 |
| TREES, SHRUBS AND GROUND COVERS: Not used | 73 |
| Section 33 00 05 | 74 |
| TRACER WIRE | 74 |
Section 01 1110
SUMMARY OF THE WORK
Part 1 – Section Description
1. Project Summary
0. This project, UCB000817 18th Street Waterline, proposes the removal of existing paved surfaces on 18th Street between Euclid Avenue and Broadway Street; replacing the full depth of surfaces with new paving and aggregate layers; relocating a portion of water main, and abandoning existing water main and services.
Part 2 – Special Considerations
1. City of Boulder Permits
0. The contractor is responsible to obtain at no cost to the University any permit required by the City of Boulder for any portion of the work on City of Boulder property, Right of Way and/or easement.
0. City of Boulder on campus areas include but limited to:
0. 18th Street
0. Euclid Avenue at intersection with 18th Street
0. Broadway Street at intersection with 18th Street
0. Submit the permit request no less than two (2) weeks prior to mobilization at https://bouldercolorado.gov/services/right-way-permits.
Part 3 - Application/Installation
1. Contractor Scheduling
0. Various campus events or activities may restrict Contractor access to the campus and are to be accounted for in the Project Schedule. Review Campus academic and sports calendars and at minimum discuss with the Project Manager the following:
0. Student Move-in (Spring and Fall)
0. Contractors with Projects on main campus must enter the Construction site before 7AM and may not leave before 3PM.
0. Student Finals/Exams (Spring and Fall)
1. Construction activities that produce noise and vibration may be restricted.
0. Home football games (Fall)
2. Campus preparations for the expected heavy pedestrian and vehicular traffic may limit Work the day before and the day of (Usually Saturday’s) home football games. Contractors must obtain approval from the Project Manager to Work during a home football game.
0. Bolder Boulder race (Spring)
3. Project Manager approval for Contractors working during this event is required on a case-by case basis.
0. Shakespeare Festival (Summer)
4. Project Manager approval for Contractors working during this event is required on a case-by case basis.
0. Campus holiday schedule
5. Contractors may schedule Work during the dates/times the Campus is closed for holidays but Facilities Management and Shops support (inspections) may not be available.
0. Quiet Hours
1. Noise and vibration producing activities during Student Finals, Exams and Wellness Days is prohibited.
0. Weather
2. Project Schedules shall include no less than two (2) weather days for every 180 days of Project Schedule or portion thereof.
1. Contractor Staging and Parking
1. Coordinate all campus parking and staging needs with the Project Manager.
0. Section 01 3115 Project Coordination
0. Section 01 5519 Temporary Parking Part 4 - Tests, Inspections, Special Warranty
1. All required tests, inspections and warranties are noted in the relevant Project Specification Sections.
End of Section 01 1110
Section 01 3050
APPLICATIONS FOR PAYMENT
Part 1 Summary A. This Section covers payment procedures for Contractors and Vendors.
B. Submittals I. For Contractor Agreement values $150,000 or less.
0. Invoice II. For Contractor Agreement values that exceed $150,000.
i. Invoice
ii. State Form SBP-7.2
iii. Attachments as required Part 2 Related A. General Condition Article 9, 31, 32, & 33 B. Colorado Contractor Sales Tax Exemption Part 3 Installation/Application A. Invoice with Contractor/Vendor legal name registered with CU Marketplace and unique invoice number indicating the value of the dated payment request.
I. Include official CU Project number and name as the subject line of the Invoice.
B. Submit payment requests simultaneously to the Architect/Engineer, CU Project Manager and CU Project Coordinator.
C. For Contractor Agreement values $150,000 or less
0. No retainage is held.
D. For Contractor Agreement values that exceed $150,000 I. 5% is withheld for Retainage.
II. Attachments as required by the Contract General Conditions
i. Submittal Schedule
ii. Construction Schedule
iii. Proof of insurance for off-site stored materials Part 4 Testing and Inspections: Not used.
End of Section 01 3050
Section 01 3110
RESTRICTED ACCESS
Part 1 Summary A. Contractor/Vendor access to campus buildings and spaces is limited and restricted.
I. The primary Contractor/Vendor is responsible to inform and hold in compliance every subconsultant and subcontractor to these requirements.
B. Contractor/Vendor Submittals II. Non-Public Areas
i. Employee list III. Utility Services
i. Background Checks
0. Verification from each employer on company letterhead that lists each employee having access to the project site(s) with no disqualifying concerns.
ii. OSHA confined space certification (if applicable)
iii. Safety briefing employee list Part 2 Related A. SC6.23 Article 53.K Supplemental Terms and Conditions I. Background Checks B. Division 01 3515 Project Coordination Part 3 Installation/Application A. Do not tamper with locks or prop open any facility door/window at any time. Violations may result in individuals or companies being removed from campus.
B. Contractor/Vendor identification such as company insignia on service vehicles, uniforms and/or badges.
I. Company badges must be displayed by each employee and contain the company and employee names.
C. Non-Public Areas I. Athletic practice fields and facilities.
II. Building Spaces
i. Attics/crawlspaces
ii. Electrical Rooms
iii. Elevator shaft/pits
iv. Information Technologies (IT) Spaces
v. Mechanical Rooms
vi. Research Facilities
vii. Roofs III. Wilderness Research Facility D. Utility Services I. All Utility Services buildings and structures require escort.
i. East District Energy Plant (EDEP)
ii. West District Energy Plant (WDEP)
iii. Williams Village Heating Plant (WVHP)
a. Owned by HDS and operated by Utility Services.
iv. Power Distribution Centers, Utility Tunnels, Utility Vaults, and Manholes to include Chilled Water, Electrical, Steam/Condensate, Storm and Sanitary utilities.
a. OSHA Confined Space Training Certification must be current.
II. EDEP is the primary location for Contractors and Vendors to gain access to any Utility Services facility for unannounced visits.
i. Ring the bell at the front entrance to alert the Control Desk and follow instructions.
ii. Contractors/Vendors may schedule unescorted access through the Project Manager for job specific requirements.
III. Scheduled – Unescorted Access
i. All employees working at the construction site must pass a back-ground check using a national criminal database for unescorted access.
ii. See Division 01 3115 Project Coordination for Buff OneCard, key, and other information.
iii. If more than one individual is entering the Contractor/Vendor must identify a lead individual to sign in for the group of workers each day.
a. No more than two lead individuals for any one project.
iv. Lead individual responsibilities:
a. Obtain a Buff OneCard and/or key(s).
b. Provide a list of each employee’s name to the Plant Control Desk at the start of each day.
0. Plant Control Desk has temporary ID badges for contractor use if needed.
0. Confirm all employees have left at the end of the day with the Plant Control Desk.
a. Return temporary ID badges to Plant Control Desk if used.
IV. Prior to start of any project at any Utility Services facility a safety briefing will be conducted.
i. Submit the list of employees to attend prior to requesting the safety briefing.
a. Identify the lead individual.
Part 4 Testing and Inspections: Not used.
End of Section 01 3110
Section 01 3115
PROJECT COORDINATION
Part 1 Summary A. Section Description I. This section will instruct Contractors/Vendors how to gain access and coordinate work.
B. Related I. General Conditions Article 10.B Safety Precautions C. Submittals I. Buff OneCard Requests II. Key Request Information III. Staging and Laydown Drawing IV. Pedestrian and Vehicular Traffic Control Plans V. Communication Plan VI. Site Specific Safety Plan Part 2 Other A. Permits I. CU Property
i. CU will issue all permits if they are needed at no additional cost to the Contractor.
a. EH&S Special Permit for draining cooling towers. See Division 01 3155.
II. City of Boulder
i. The Contractor is responsible to obtain any permit if required by the City of Boulder at no additional cost to the University.
Part 3 Installation/Application A. Buff OneCard I. For each Buff OneCard needed submit the name(s), Company, individual email address(es), each individual job title, with Project Number and Name to the CU Project Manager and CU Project Coordinator. The CU Project Coordinator will process a request for the Buff OneCard.
II. You will receive a confirmation email the Buff OneCard Office has received the request.
i. Respond to this email with a picture of yourself and your date of birth.
III. Bring a government issued photo ID and Payment to the Buff OneCard Office in Center for Community (C4C) N180 (2249 Willard Loop Drive, Boulder, CO, 80309, M-F 8:00 am – 4:30 pm) to pick up your card.
IV. Each Buff OneCard costs $5 V. Buff OneCards expire every 12 months.
i. It is the responsibility of cardholder to request a new Buff OneCard to the Project Coordinator. CU does not issue renewals.
B. Access/Key Requests I. A Buff OneCard is required to request access and/or keys.
II. Provide the following information to the Project Manager and Project Coordinator.
i. Name, Buff OneCard number(s) and expiration date for anyone needing access and/or keys.
ii. Building Number/Utility Tunnel Number
iii. Room/Door/Hatch Number
a. If a door number is not available provide a sketch or photograph of the building, tunnel hatch or otherwise indicate the exact door access is being requested.
iv. Duration the access and/or keys are required.
III. Project Coordinator can then request the access and/or keys. You will be notified by Access Services when your access has been granted and/or when your keys are ready for pick-up.
i. The keys can be picked up from the Access Services office located in the basement level of Gate 8 on the East side of the Stadium.
IV. Return the keys when work is completed to the Access Services office.
C. Staging and Laydown I. Prior to mobilization submit for review and record the site fence limits, access gate location, lock combination, and after-hours emergency contact information.
i. All disturbed areas inside the site limits are to be included in the bid and restored accordingly.
ii. Any areas disturbed by the Contractor outside the site limits are to be restored at no additional cost to the University.
iii. Irrigation timing and sprinkler patterns can be adjusted. Contact the Project Manager for coordination with Grounds.
D. Pedestrian and Vehicular Traffic Control I. Prior to mobilization submit construction vehicle access route, pedestrian and vehicular traffic control plans around the construction site for review and consideration.
II. Transportation of materials and equipment such as dumpsters on sidewalks must have flagmen before and after the transporting vehicle to ensure student and faculty safety.
E. Communication Plan I. Indicate the primary means of written communication for the project. Examples include:
i. Owner Architect Contractor (OAC) Meeting Minutes
ii. Email
a. Include the CU Project Number and Name in the subject line.
b. Copy the AE, CU Project Manager and CU Project Coordinator.
II. Identify primary stakeholders contact information.
III. Identify the expected frequency of communicating.
F. Site Specific Safety Plan I. Emergency 24-hour Contact List
i. Project Superintendent and Project Manager II. Report all safety incidents in writing to the CU Project Manager.
i. Provide an after-incident investigation report to the CU Project Manager within two weeks of the reported incident. Report to include lessons learned from the incident.
III. Identify all hazardous materials to be encountered, used, and/or stored on site.
i. Hazardous material spill response
a. Temporary toilet chemicals are treated as hazardous waste if spilled.
ii. Draining of building or utility systems
a. See Division 01 3155 Utility Outage Information IV. Equipment MOP’s
i. Crane Lift Plan
a. See Division 01 3155 Utility Outage Information Part 4 Permits and Inspections: Not used.
End of Section 01 3115
Section 01 3119
PROJECT MEETINGS
Part 1 Summary A. Project meeting categories:
I. Pre-Construction II. Owner- Architect- Contractor (OAC) Progress III. Unscheduled Coordination Part 2 Related A. General Conditions Article 11, 12 Part 3 Installation/Application A. Projects with General Contractor site trailer offices and conference rooms:
I. The contractor will provide the venue, time, duration and frequency for all recurring OAC project meetings.
B. Projects using University conference rooms:
I. The CU Project Manager AND Project Coordinator will provide the venue, time, duration and frequency for all recurring OAC project meetings.
C. The Contractor shall record and distribute the minutes of all progress meetings throughout the construction period.
I. Decide who will record the meeting minutes at the pre-construction meeting.
II. Provide copies to all team members within two (2) business days following the meeting.
D. Typical Agenda Items I. Project Schedule update.
II. AE and Contractor compare updated Submittal, RFI, Change Order Proposal (COP), Change Order Bulletin (COB), and Amendment Logs III. Coordinate inspections and tests with UCB Accela Inspectors, Shops, AHJ’s, Grounds and others.
IV. Deliveries and Outages.
V. Site safety for activities during the week.
End of Section 01 3119
Section 01 3150
UTILITY LOCATES
Part 1 Summary A. Section Description I. University of Colorado Boulder is a Tier 1 Facility Owner.
II. Any work that disturbs the existing ground surface(s) in ANY manner is required to have a Utility Locate Request called in.
III. NOTE: THE CONTRACTOR ACTUALLY DIGGING IS REQUIRED TO CALL IN FOR UTILITY LOCATES.
i. Proxy requests are not permitted. Example: A General Contractor may not call in Utility Locates for a sub-Contractor.
B. Related Sections I. All Utilities Specifications C. Submittals I. Field Test Reports
i. Contractor Pothole Data II. Emergency Locate Request
i. Reason for Request III. Damaged/Unmarked Utility Part 2 Products A. Utility pothole data to be COCO Harn- NAD83 HARN Colorado State Plane North US Foot - EPSG 2876 – FIPS 0501 coordinates.
B. Marking Paints I. All marking paint is to be chalk or water based.
II. Pre-Marks must be in White or Pink Paint.
C. Utility Locate Flags-Not Used On Landscaped Areas on CU.
Part 3 Installation/Implementation A. Utility Locates Request I. Design Professionals and Contractors
i. All underground utility locate requests must be initiated by calling the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987 or 811 for and set ‘Meet Request”.
ii. Only CU Boulder authorized Utility Locators are approved to mark CU Boulder owned utility infrastructure.
iii. ONLY THE DIGGING CONTRACTOR CAN CALL FOR PRODUCTION LOCATES.
a. Design Professionals who are designing or planning projects that may impact underground utilities must identify the request as a ‘Engineering Request”.
1. Information obtained through an Engineering Request is never to be used for excavation activities.
2. Locate requests for engineering work that do not specify “Engineering” as the type of work will not be located until corrected through UNCC.
3. Fluorescent pink is the only color paint used for engineering purposes.
iv. The Contractor must make every effort possible to fully define and describe any area when the utility locate request is called into UNCC.
a. Requests must include official building addresses, landmarks, building names and relative compass locations in the locate request description.
b. The physical address of each building on campus may be obtained from the Master Building List (MaBL) on the UCB Facilities Management website: https://www.colorado.edu/space-optimization/resources/reports/master-building-list-mabl.
1. If this link is not working contact the CU Project Manager for this Project for an updated list.
c. Indicate the type of Work.
d. Provide excavator contact information.
v. Non-university utility owners that have utilities on university property are responsible for their own utility locates.
a. When locate requests are initiated thru UNCC these owners will also receive notice.
b. The contractor must make sure that the locators representing these utility owners have completed their work before excavation starts.
II. Contractors MUST pothole existing Utilities in their work areas prior to the start of work.
i. High and Medium Voltage duct banks, Bran Fiber, CU OIT copper & fiber, Chilled Water and Steam/Condensate Utilities require Contractor to visually inspect top and bottom of exposed utility prior to excavation.
ii. Identify all found Utilities’ and the depth from existing grade to top of utility.
B. Refresh Locates I. Request as needed. Partial paint must still be on the ground otherwise a ‘NEW’ ticket request is required.
C. Emergency Locate Request I. Emergency Utility Locate Requests must be made through UNCC.
II. The Contractor must give all utility locators two (2) hours to respond in person or by telephone.
III. Under no circumstance should excavation commence unless the contractor has spoken with all of the utility locators representing utility owners listed on the UNCC Emergency Locate ticket.
D. Damage Notification or Notification of unknown and/or unmarked utility.
IV. A Damage Notification Request must be processed when an underground utility has been damaged or an unknown and/or unmarked utility has been exposed.
V. In the event a utility is damaged or exposed during excavation the following steps must be taken:
i. Immediately evacuate the area and call 911 if a dangerous or potentially dangerous situation exists.
ii. Call UNCC 1-800-922-1987 or 811 to report the damage.
iii. Allow UNCC to process a Damage Notification Ticket and report the damage(s) to all utility owners in area.
iv. Cease excavation and immediately notify UCB representatives to report damage or exposed utility.
v. Continue excavation only after the appropriate utility representatives have arrived and given permission to proceed.
vi. After submitting a Damage Notification Request to UNCC, the excavator must contact the affected utility owners/ operator to mitigate damages. See page four (4) and five (5) on link below. “Damage Notification Request” http://colorado811.org/c/doUCBment_library/get_file?uuid=6002e339-e5b5- 4c60-a7a0-bd761ba57028&groupId=18.
vii. Damage to a tracer wire is a “Damage” that must be reported by a Damage Notification Request through UNCC.
Part 4 Testing/Inspections/Other A. Pot hole data is to be sent to the CU Project Manager for distribution to CAD and CU Civil AHJ.
B. Emergency Locates and Damage Notifications are to be sent to the CU Project Manager.
End of Section 01 3150
Section 01 3155
OUTAGE INFORMATION
Part 1 Summary A. Section Description: Planned utility and building outages reduce the risk of damaging and/or negatively impacting the critical research, sporting events, and public ceremonies. Proper coordination is critical for success project outcomes.
I. Hot Work Permits
i. Three (3) business days’ notice required.
II. Campus System Outages
i. Three (3) business days’ notice required.
a. If a crane is being used provide an MOP for the Lift Plan two (2) weeks prior to requesting the System Outage as noted in paragraph 1.A.V.
1. Request Crane Lift & Rigging and Crane Lift Plan forms from the Project Manager.
III. Draining of building or utility systems:
i. To Sanitary Sewer requires a discharge permit from the City of Boulder (COB). Coordinate the request and activity with EH&S through the Project Manager. The COB requires a two (2) week review of Discharge Permit Applications.
ii. To open space requires EH&S review and approval.
iii. To Storm Water systems is not approved or acceptable. Discharge to Storm systems may lead to significant damages and fines to the Contractor.
IV. Utility Generation and Distribution (UG&D) and/or Building System Outage Request an eight (8) business day process:
i. A five (5) business day review period is required to complete the Operations Control Center (OCC) comment/approval.
ii. A three (3) calendar day campus notice is required after OCC approval.
V. Contractors are required to submit Method of Procedure (MOP) documents for any work impacting the operation of the UG&D and/or Building system two (2) days prior to the start of work that does not require a customer outage and two (2) weeks prior for any work that requires a customer or Campus System outage.
i. MOP must be approved prior to submitting an UG&D and/or Building System Outage Request.
ii. MOP document shall include all dates, times, durations, and details to complete the work in a step-by-step line item breakdown description of activities.
B. Related I. General Conditions Article 12.B.3 II. All planned outages with durations noted above shall be shown on the construction schedule.
C. Contractor Submittals I. Hot Work Permits
i. Building Systems
a. http://www.colorado.edu/firelifesafety/hot-work.
ii. UG&D Systems
a. UG&D How Work Permit application through District Energy Plant (DEP) Plant Operations.
1. Coordinate requests through the Project Manager.
II. Campus Systems Information
i. Crane Setup and Lift MOP III. Building and Utility Outage Information for each outage event.
i. Detailed MOP for each activity in accordance with paragraph 1.A.IV.
ii. Approved COB Discharge Permit and MSDS as applicable.
iii. Confirmed local Utility (COB and/or XCEL) Outage as applicable.
Part 2 Outage Categories and Types A. Hot Work B. Campus sidewalk, road, loading dock, open space field C. Building systems D. UG&D systems Part 3 Installation/Application A. General information required for all Outages I. Indicate the following:
i. Date of Outage.
ii. Task description.
a. Identify all Utilities Types to be impacted
b. Provide sketches and drawings as needed.
c. Approved MOP number for UG&D and Buildings Systems
d. Approved Discharge Permit as applicable.
e. Confirmed local Utility (COB and/or XCEDL) Outage as applicable.
iii. Start Time
iv. End Time/Date
v. Onsite personnel contact information.
B. Hot Work Permit for all Outage Types.
I. Contractors shall obtain a Hot Work Permit for any work that involves spark, flame or heat in the work being performed.
i. For one-time hot work authorization, a hot work permit is required.
C. Campus, sidewalks, road, loading docks, open space fields.
I. The use of cranes and other delivery vehicles or equipment blocking any sidewalk, road, or loading dock requires an approved MOP prior to requesting the outage.
i. Include all support equipment to include service trucks and tractor trailers with crane counterweights in the plan.
ii. Indicate all tractor trailer parking and staging locations on campus.
iii. No more than two (2) tractor trailers may be on campus at any one time.
iv. MOP approval is not Outage Approval.
II. Consider material delivery, staging, and the connection to existing utilities for testing and inspection activities.
III. Consider bike racks, sidewalks, noise and odor disruptions near building entrances and windows.
D. UG&D and Building Systems I. CU Boulder personnel are the only authorized group to manipulate equipment at the site for system isolation and outages.
i. See Division 01 5025 lock-out/tag-out (LOTO) II. Do not proceed with the Outage until it has been approved by the Operation Control Center (OCC) and Project Manager.
i. MOP approval is not Outage approval.
III. Do not deviate from the approved MOP for any Outage unless approved in writing.
i. Damage to research caused by failure to comply may be the responsibility of the Contractor.
E. Other Considerations I. The utility and building systems operate 24/7 for the CU Boulder campus and cannot be isolated for prolonged periods of time. Unless approved otherwise Contractors are hereby notified that outage work is required to occur in a continuous manner until systems are back in service.
i. Continuous manner is defined as no less than two (2) consecutive 8 -hour shifts for a total of 16-hour continuous working hours with no more than 8-hours downtime between consecutive shifts.
IV. Notify the Project Manager as soon as practical if the Outage will extend past the approved time.
V. Noise and odor disruptions.
i. Hammer drilling in residential and/or research facilities without approval is subject to financial penalty.
ii. Hammer drilling in occupied residential facilities before 8AM is prohibited.
iii. Construction activities that involve strong odors or causes small debris particles to be in the air must be controlled replacing building filters and/or wetting the area to keep dust and debris to a minimum.
Part 4 Permits and Inspections: Not used.
End of Section 01 3155
Section 01 3300
PROJECT SUBMITTALS
Part 1 Summary of the Work A. Project submittals requirements reside in multiple parts of the contract.
I. Submittal definition is SC6.23 General Conditions Article 1, item 27.
B. Contract Document Submittals I. Administrative Submittals
i. General Conditions Articles 11, 13, 15, 31, and 41
ii. Division 01 II. Production Submittals
i. Technical Specifications (CSI Division Chapters 02-48) III. Closeout Submittals
i. Operation & Maintenance (O&M) manuals, Commissioning Reports, Warranties C. Request for Information (RFI) and Schedules I. General Conditions Article 12 Part 2 Contractor Submittal Software A. The University will attempt to use Contractor/Vendor programs for the responsibilities listed herein without guarantee of accommodation.
Part 3 Application/Installation A. Contractor Document Submittal Instructions I. Distribution
i. Must be in Adobe .pdf format except product Samples.
ii. Send all submittals to the AE for review.
iii. The prime contractor must have reviewed the submittal before sending it for review.
iv. Each submittal must have a transmittal form with the following information:
a. Transmittal number
b. Contract source reference
1. Specification Section
2. Drawing Sheet/Detail
c. Itemized submittal description.
1. Identify submittal type such as Product Data, Shop Drawing, or Test Report.
d. Contractor review has taken place the submittal is ready for AE review and comment.
v. Each submittal must be identified by a contract source.
a. Do not combine multiple contract sources in a single submittal.
b. Do not submit incomplete Production submittal assemblies.
1. Combine Manufacturers Product Data, Shop Drawings, Calculations, Mix Designs, Samples as example which is required in a single submittal for a comprehensive review.
2. Incomplete submittal packages may be returned without review.
vi. Cut sheets must highlight the relevant product attributes such as size, color, operating range.
II. Schedule for AE and PM Review (General Conditions Article 12)
i. Allow seven (7) business day review period.
a. Holidays do not count as review days.
ii. Materials shall be ordered in accordance with approved submittals
iii. The AE will issue all final responses to both the Contractor and the PM and PC.
III. Resubmittal
i. The nature of all corrections will be made to the Shop Drawings and Product Data shall be clearly noted.
a. The Contractor shall direct specific attention in writing on the transmittal cover to revisions other than those corrections requested by the AE on any previously checked submittal.
ii. Do not resubmit items until the original has been returned to the Contractor.
iii. Submittals with more than one (1) revision may be subject to back charges to cover CU and AE administrative review costs.
a. AE and CU back charges will be billed hourly for the duration needed at published rates.
B. RFI Instructions I. Must be in Adobe .pdf format.
II. Send all RFI’s to AE, CU Project Manager (PM) and CU Project Coordinator (PC) simultaneously for review and consideration.
i. Provide a proposed solution to the question if applicable.
ii. If costs are anticipated for the proposed solution a SC-6.312 Change Order Proposal (COP) form must be included with the RFI for evaluation.
C. Maintain the Submittal and RFI Log for the Project.
I. Updated logs shall indicate the determination of all reviewed Submittals and RFI’s and is required for review at each Project Meeting.
End of Section 01 3300
Section 01 4500
CONTRACTOR QUALITY CONTROL & OWNER QUALITY ASSURANCE
Part 1 Summary A. The contractor shall establish a Quality Control (QC) system to ensure conformance of the contract documents for the materials, workmanship, finish, functional performance and identification is as directed.
B. QC inspections are not for QA testing and reporting purposes.
C. Contractor Submittal I. Pre-bid QC firm/vendor(s) qualifications.
Part 2 Related A. SC 6.23 General Condition Articles 6, 12 and 14 B. Section 01 4550 Inspections Part 3 Installation/Application A. QC services shall be performed by qualified firm/vendors.
I. Pre-qualification of any firm/vendor licensed in the state of Colorado for at least five-years prior to the date of the contract is not required.
i. Submit for review and consideration unqualified firm/vendors no less than two (2) days prior to bid for written confirmation of acceptance.
a. After bid unqualified firm/vendors will not be considered.
B. Contractor QC testing criteria and reporting requirements are specified in the contract documents include:
I. ADA
II. Electrical Transformer III. Elevator IV. Factory Equipment [chillers, motors, pumps, windows] V. Field asphalt/concrete/soil VI. Laboratory asphalt/concrete/soil VII. Medium Voltage Cable VIII. Roof IX. Shoring X. Transformer oil sampling XI. Welding buried utility pipe of all kinds XII. Welding structural and non-structural steel and piping C. Contractor QC Exclusions for University, AE and/or 3rd Party QC to perform and report.
I. Commissioning [3rd party] II. Factory equipment witness inspection [AE, Shops/Utility Services] III. Information Technologies (IT) [IT] IV. Irrigation ponds, ditches, piping and control wiring [University/HFS Grounds] V. Landscape, trees and grasses. [AE, University Landscape Architect] VI. Security [BCPD, University Shops] VII. Utility Generation and Distribution (UGD) Services.
D. Coordinate the scheduling of all inspections and testing at the OAC meetings with the AE and Project Manager.
Part 4 Testing and Inspections A. University, AE and/or 3rd Party QC I. Factory equipment witness inspections require 21-day notice.
II. All other inspections require minimum 3-day notice.
B. Owner Quality Assurance (QA) I. QA is at no additional cost to the Contractor.
II. QA may mirror any QC required by the contract documents.
i. 100% of buried steam and condensate piping will be X-ray tested.
ii. Contractor may not be notified of intent to conduct other QA testing.
C. Indicate all testing events on the Project Schedule.
I. Additional costs due to poor scheduling and/or failed and repeat inspections University, AE and/or 3rd Party QC and QA may be the responsibility of the Contractor.
End of Section 01 4500
Section 01 4550
INSPECTIONS
Part 1 Summary A. This section covers Code Required Inspections and Utility, Generation, and Distribution (UGD) Inspections, and Non-Code Related Inspections.
B. Contractor Submittal I. Inspection Requests
i. Accela Inspection Request for Code Required Inspections
a. https://www.colorado.edu/fm/divisions/planning-design-construction/inspections
ii. UGD Inspection Request & Non-Code Related Inspection Request
a. Request through the Project Manager II. Inspection Reports
i. Completed Inspection(s) Reports for Record Part 2 Authority A. State Code & Building Permits I. All disciplines inside a building to 5’ outside the building footprint.
i. UDG Facilities
a. Electrical 110V to 600V systems
b. HVAC
c. Plumbing
ii. Excludes all UGD and Non-Code Related jurisdiction disciplines 5’ outside the building penetration of each utility.
B. UGD Jurisdiction Inspection Elements I. Chilled Water
i. UGD Mechanical Lead
ii. Includes piping inside a building to the isolation valve and meter.
II. Compressed Air
i. UGD Mechanical Lead
ii. Includes piping inside a building to the isolation valve and meter.
III. Concrete Housekeeping Pads
i. UGD Mechanical Lead IV. All Electrical Less Than 110V and Greater Than 600V.
i. UGD Electrical Lead
a. Equipment Controls & Monitoring Systems
b. Includes conduit inside a building to the disconnect and meter.
c. Transformers and Primary Side Terminations when located inside a building.
V. Sanitary Sewer
i. CU Civil AHJ VI. Steam/Condensate
i. UGD Mechanical Lead
ii. Includes piping inside a building to the isolation valve and meter.
VII. Storm Sewer
i. UDG Maintenance Tech VIII. Welding
i. 3rd Party
ii. AE C. Non-Code Related Inspections 5’ or greater outside of any building.
I. ADA
i. CU Landscape Architect II. Art Work, Benches Bike Racks, Decorative Rocks, Donor Plaques and other Owner Equipment and Furnishings
i. CU Landscape Architect III. Asphalt, Concrete Curb & Gutter, Sidewalk
i. CU Civil AHJ IV. Civil Excavations, Trenching and Backfill, Ponds, and Historical Ditches
i. CU Civil AHJ V. Irrigation Mainlines, Laterals and Sprinkler Heads
i. Main Campus Grounds
ii. Housing Facility Services (HFS) Grounds VI. Landscape Plants and Sod
i. CU Landscape Architect VII. Brick pavers, Sandstone Walks and Walls
i. CU Civil AHJ
ii. CU Landscape Architect VIII. Parking Lots and Signs
i. Parking and Transportation Part 3 Installation/Application A. Accela Inspections.
I. Refer to the linked website in Part 1 for instructions.
B. UGD Jurisdiction & Non-Code Related Inspections 5’ or greater outside of any building Inspection Requests I. For each inspection request provide the following information to the Project Manager:
i. Project Number
ii. Contractor
a. The Contractor shall be present during inspection.
iii. Item(s) to be inspected
a. Provide contract Specification source
iv. Inspection location
a. Provide contract Drawing source
v. Requested date and time for the inspection to take place.
II. Minimum 24-hour notice required.
III. Inspections that have failed two (2) times may be subject to back charges to cover CU, AE, and/or 3rd Party inspections may result back charges for each failed inspection thereafter.
i. Back charges will be billed hourly as needed at published rates.
Part 4 Reports A. Accela Inspectors I. Electronic through Accela.
B. UDG Inspectors & Non-Code Related Inspectors.
I. Paper through the Project Manager.
End of Section 01 4550
Section 01 5025
LOCK OUT / TAG OUT
Part 1 Summary A. Section Description I. Lock out/Tag out (LOTO) is the process of authorized placement and administrative control of tags and locks used to ensure the protection of personnel and equipment from hazardous energy sources.
II. Modifications or deviations from this procedure require written Plant Manager or Utilities Director approval.
B. Related Sections I. All Utility Services generation and distribution systems.
II. All Building Mechanical and Electrical room isolation valves and disconnects.
C. Contractor Submittals I. List of items requiring LOTO.
Part 2 Products: Not used.
Part 3 Installation/Application A. Provide the following information no less than five (5) days before the LOTO is to be applied:
I. Provide item description & location.
II. Start date & end date A. Installation Instructions I. Utility Services does not allow for outside locks to be hung on utility equipment.
II. Powerhouse and Utility Distribution Systems.
i. If a contractor requires a lock to be placed on a piece of equipment the Utilities Services group will provide a lock for that purpose.
ii. The key to the Utility Services lock will be placed in a lockbox onto which the contractor may place their Company lock.
iii. Contractor shall provide the on-site supervisor and Project Manager the following:
a. Contact information and 24-7 contact numbers for emergency response.
b. The energy source(s) to be isolated.
c. Indicate the purpose and duration of the LOTO.
d. Describe possible impacts on the Utility Plant.
e. Sign in and out with the LOTO holder each day III. Building Mechanical and Electrical Rooms
i. Contractors must coordinate with the designated CU Shop responsible for the Utility and the Project Manager to schedule any energy source(s) LOTO.
Part 4 Testing and Inspections B. Inspections I. The Powerhouse employee and CU Shop representative responsible for the Utility System will make periodic inspections for the isolated systems to ensure safety and compliance.
II. Contractors making unauthorized modifications to any LOTO without prior approval may be removed from the campus.
End of Section 01 5025
Section 01 5519
TEMPORARY PARKING
Part 1 Summary A. This section informs Contractors and Vendors that parking on the campus of the University of Colorado Boulder is paid parking.
B. See https://www.colorado.edu/pts/ for permit costs and additional information.
C. Contractor Submittals I. Parking Spaces Request Part 2 Parking Type & Notification Requirements A. Business I. No prior notice needed.
B. Construction I. Staging, laydown, and traffic control plans
i. See Division 01 3115 Project Coordination.
ii. All requests may not be accommodated.
II. Request parking spaces at least ten (10) days in advance of mobilization.
C. Service Vehicles Part 3 Permits & Costs A. Business I. Self-Pay at the pay station for the desired time limit.
II. University Business Parking Permit
i. See the website.
B. Construction I. Parking within project site fencing limits is permitted at no additional cost provided:
i. All construction vehicles stay within the perimeter fence.
ii. Vehicles must be marked with company insignia.
iii. Designated carpool vehicle.
II. Staging and working in parking lots and lawns is permitted at no additional cost provided:
i. Restoration is included in the bid to include and not be limited to:
a. All asphalt holes and penetrations are properly repaired.
b. All concrete curb, gutter and sidewalk damage are properly repaired.
c. All signs, paint striping and bumper blocks have been reinstalled.
d. All sod, plantings, irrigation and electrical services are restored.
ii. Time extensions due to Owner caused schedule delays.
a. Unapproved time extensions are a direct cost to Contractors.
iii. Provide the Project Manager with the following submittal information.
a. Parking Lot number designation.
b. Number of parking spaces required.
1. Provide a sketch.
c. Start and end date spaces are needed.
III. Worksite permits are a direct cost to Contractors.
i. Restrictions are listed on the permit itself.
ii. Damage caused by parking in non-traditional areas such as lawns not related to an emergency response will require restoration at no additional cost to the Owner.
a. Emergency response time is limited to no more than 24-hours after initial notification.
C. Service Vehicles I. Parking
i. Self-Pay at the pay station for the desired time limit.
II. University Business Parking Permit
i. Business Parking Permits are a direct cost to Contractors/Vendors.
III. Worksite
i. See Part 3.B.III this Section.
Part 4 Testing and Inspections A. Notify the Project Manager and PTS when all restoration is completed for a final inspection.
End of Section 01 5519
Section 01 5813
TEMPORARY PROJECT SIGNAGE
Part 1 Summary A. Section Description I. This section will instruct Contractors how to post project information typically at the job-site trailer or within the primary staging and laydown area of the work.
B. Related I. Office of the State Architect (OSA)
i. Prevailing Wage Information Poster
a. Local Prevailing Wage Determination Rates
b. Only required for projects that exceed $500,000
ii. Sexual Harassment Information Poster II. Section 01 3115 Project Coordination C. Submittals I. Product data for sign backboard and mounting material II. Shop Drawing for sign size, location and mounting method.
Part 2 Other A. Sign Size and Materials I. The sign must be sized to accommodate all required items to be posted with no more than 1” of border space.
i. Project signs 2’ x 2’ or less may be made of lightweight backing material for use in indoor.
ii. Project signs greater than 2’ x 2’ must be made of ½” treated plywood and limited to outdoor locations.
Part 3 Installation/Application A. Sign Content I. Items required to be posted by contract such as the UCB construction permit, and sexual harassment information.
II. After-hours emergency contact information.
III. UCB Project Name and Number IV. Company Name & logo
i. Permitted but not required.
B. Lightweight signs I. For use indoor the sign must be securely displayed in a conspicuous location for workers that does not compete with signage for the students, faculty and staff.
II. For use outdoor the sign must be securely displayed and able to withstand exposure to the elements.
C. Plywood signs I. Not for use indoors.
II. Not for commercial advertising.
III. Display methods:
i. Hardware for mounting to walls and fences
ii. Weighted base with single post.
iii. Wood posts and concrete footing for mounting in the ground.
a. Section 01 3150 Utility Locates D. Most prominent display location in order of precedence for the specific project.
I. Indoor/outdoor project sign at main employee entrance.
II. General Contractor job-site trailer conference room.
III. Primary material staging and laydown area.
IV. Service Vehicle parked in parking lots, on lawns and sidewalks:
i. Section 01 5519 Temporary Parking
ii. Visible through the front windshield.
iii. Exteriorly mounted on the vehicle’s rear.
V. Make available upon request for projects that have no practical method or place to display when working such as paving, paint striping, or cleaning pavers.
VI. Do not place signs on doors or operable gates.
E. Sign Removal I. Remove all signs upon substantial completion.
i. Repair all walls if mounting hardware caused damaged.
ii. Repair all soil, sod and irrigation when mounted outdoor.
Part 4 Inspections and Testing A. Notify the CU Project Manager for final inspection of all repairs if needed.
End of Section 01 5813
Section 01 7400
CLEANING
Part 1 Summary A. This Section instructs the Contractor and Vendors to maintain clean and safe work environments.
Part 2 Related A. SC6.23, SC8.1 & SC 9.1 General Conditions Articles 8 & 24 B. SC6.4 Articles 3.20 & 8.4 Part 3 Installation/Application A. Campus dumpsters and waste receptacles may not be used for construction debris.
B. Campus waste receptacles may not be used for Project Workers personal use.
C. Exterior Work and Staging Areas I. See Division 01 31 15.
II. Restore all staging areas to original or new condition safe for public use.
i. Remove all barriers and signs upon Substantial Completion.
III. All mud and debris from construction vehicular traffic or caused by other activities tracked into the roadways, sidewalks or other areas is to be removed within one (1) hour after such activities cease, or at the end of the day if the work is continuous throughout the day.
i. Continuous work activities must be periodically cleaned throughout the day to avoid excessive build up.
IV. Clean all tire tracks and other construction marks left on surfaces to include but not limited to sidewalks, parking lots, driveways, loading docks, and roadways.
i. Do not damage crosswalks or paint striping in roadways.
D. Interior Work and Staging Areas I. For Capital Construction Projects Interior Work is defined by the Project boundaries of the site perimeter fence or erosion control limits whichever is greater.
II. At the completion of each day’s work the Contractor shall leave his work area safe and clean if the general public has access to or through the Work area.
i. Secure worksites from public access.
III. Each contractor and sub-contractor shall keep the building and premises free from all surplus material, waste material, dirt and rubbish caused by his employees and the Work.
IV. Each sub-contractor shall perform his clean-up daily and shall transport his rubbish to an on-site location designated by the Contractor who will arrange for its removal.
End of Section 01 7400
UTILITY SERVICES
Section 03 11 00
CONCRETE FORMWORK
Part 1 - Summary of Work A. Concrete forms may be manufactured materials or earthen forms.
B. Related Sections I. 03 30 00 – Cast-In-Place Concrete C. Submittals I. Manufacturers Product Data
i. Form material if other than earth.
ii. Form Ties
iii. Flashing Reglets
iv. Form Liners II. Inspection Request
i. Formwork Part 2 - Products A. Form Material If Other Than Earth I. Plywood: Use new plywood for the project for exposed surfaces. Do not reuse plywood more than four (4) times. Do not use patched forms or plywood previously used on another job for exposed concrete.
II. Glass Fiber Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to structural tolerances and appearance of finished concrete surface.
B. Formwork Accessories I. Form Ties: Snap-off metal of fixed length; gang form through-bolt, tapered ties cone type; one and one half (1-½) inch break back dimension; free of defects that will leave holes no larger than one (1) inch diameter in concrete surface, with waterproofing washer. Gang form through-bolt or tapered tie type, free of defects that will leave holes no larger than one (1) inch diameter in concrete surface.
II. Flashing Reglets: Galvanized steel; twenty-four (24) gage; longest possible lengths; release tape sealed slots; with alignment splines for joints; securable to concrete formwork.
III. Form Liners: Fabricated from fiberglass, elastomeric material, or urethane.
Part 3 - Application/Installation A. Installation Instructions I. Construct formwork to maintain tolerances in accordance with ACI 301. Use Class B formwork tolerances for concrete exposed to view and Class C tolerances for unexposed concrete.
II. Chamfer Strips (ACI 301 4.2.4): Install forty-five (45) degree chamfer strips at exposed outside corners, beams, joists and columns.
III. Forms for exposed concrete
i. Drill forms to suit ties used and to prevent leakage of concrete mortar around tie holes. Do not splinter forms by driving ties through improperly prepared holes.
ii. Do not use metal cover plates for patching holes or defects in forms.
iii. Use extra studs, whalers and bracing to prevent bowing of forms between studs and to avoid bowed appearance in concrete. Do not use narrow strips of form material which will produce bow.
iv. Assemble forms so they may be readily removed without damage to exposed concrete surfaces.
v. Form molding shapes, recesses and projections with smooth-finish materials, and install in forms with sealed joints to prevent displacement.
IV. Tolerances
i. Finished concrete surfaces and corners must conform to Table 4.3.1, ACI 301 and ACI 117.
ii. Cumulative tolerances will not be acceptable where other materials or elements related to concrete dimensions or positions will have their tolerances or normal adjustments exceeded in a manner affecting their appearance or performance.
iii. In addition, architectural concrete surfaces and surfaces to receive thin-set tile or other thin finishes are limited to one-eighth (1/8) inch in ten (10) feet, with no abrupt offsets or changes in plane or other defects that would prevent the proper installation of other materials or adversely affect the finished appearance of the concrete or applied finishes.
Part 4 - Inspections and Testing A. Inspections I. Formwork – Provide written request for inspection with the Submittal Transmittal form.
i. CU or 3rd Party Inspector will provide Contractor with Inspection Report and punch list.
End of Section 03 11 00
Section 03 21 00
CONCRETE REINFORCEMENT
Part 1 – Summary of the Work A. Reinforcing steel bars, welded steel wire fabric, fabricated steel bar or mats for cast-in-place concrete.
B. Related Sections I. 03 11 00 – Concrete Formwork II. 03 30 00 – Cast-In-Place Concrete C. Submittals I. Shop Drawing: Indicate bar size, spacing, pattern and clearances II. Manufacturers Product Data
i. Reinforcing steel bars
ii. Welded Wire Fabric
iii. Stirrup Steel for electrical duct banks
iv. Accessories to include chairs, bolsters, spacers, bar supports, tie wire
v. Epoxy glue for dowels III. Inspection Reports
i. Reinforcement placement Part 2 - Products A. Reinforcement Steel I. ASTM A615 and ASTM A706 where welding is required.
II. Grade 60 if not otherwise specified with plain finish.
III. Welded wire fabric: ASTM A185, with plain finish.
IV. Stirrup steel: ASTM A82.
B. Products I. Metal bolsters and/or chairs which bear against the forms shall be equipped with snug fitting, high density polyethylene tips which provide one-half (½) inch minimum clearance between metal and exposed surfaces.
i. NOTE: Rebar, clay, dirt, rock, and/or brick may not be used as supports II. Epoxy Glue Part 3 - Application/Installation A.