About this file
These construction drawings are for the University of Colorado Boulder (UCB) 18th Street Waterline & Pavement Replacement project (Project #UCB000817), prepared by Harris Kocher Smith and dated 03-26-2025. The project involves replacing approximately 450 linear feet of waterline on 18th Street between Euclid Avenue and Broadway, with a connection to the City of Boulder's main waterline. The comprehensive set of 11 technical drawings includes detailed plans for traffic control, site removal, stormwater management, utility replacement, street profiles and cross-sections, and pavement/striping design. The project is governed by multiple codes including the University of Colorado Boulder Facility Standards, 2021 International Building Code, 2021 International Mechanical Code, 2021 International Energy Conservation Code, 2023 National Electrical Code, and relevant National Fire Protection Association standards.
The project involves multiple phases, with specific traffic control plans for waterline installation (base bid) and subsequent paving operations (bid alternates 2, 3, 4). The drawings indicate complex utility work, including waterline replacement, irrigation sleeve installation, and full-depth pavement replacement. A typical pavement section is detailed, showing multiple layers including aggregate base, asphalt, and surface treatments. The project area includes the Wardenburg Parking Lot and impacts campus transportation routes, necessitating careful planning to maintain traffic flow, particularly for campus and city buses. The engineering drawings provide precise measurements, elevations, and technical specifications to guide construction, with a focus on maintaining infrastructure quality and minimizing disruption to the university and city transportation network.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UCB000817-01.00-Table of Contents.docx | DOCX document | |
| UCB000817-09.00-Sales _ Use Tax Forms.pdf | ||
| UCB000817-15.00-Attestation Form.docx | DOCX document | |
| UCB000817-06.00-Unit Pricing.docx | DOCX document | |
| UCB000817-07.00-Bid Bond.docx | DOCX document | |
| UCB000817-08.00-UCB Supplemental Terms _ Conditions.pdf | ||
| UCB000817-12.00-Wage Determination and Apprenticeship Rates.pdf | ||
| UCB000817-03.00-Information to Bidders.docx | DOCX document | |
| UCB000817-13.00-Technical Specs.docx | DOCX document | |
| UCB000817-10.00-Labor Burden Form example.PDF | ||
| UCB000817-11.00-Apprenticeship Utilization Certification example.pdf | ||
| UCB000817-14.00-Code Compliance Inspection Authorization (CCIA).pdf | ||
| UCB000817-04.00-Bid Form.docx | DOCX document | |
| UCB000817-05.00-Alternates.docx | DOCX document | |
| UCB000817-Pre-Bid Attendance Sheet.pdf | ||
| UCB000817-02.00-Advertisement for Bids.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fil ep ath : P
:\2
3\2
1\E
NG
IN
EE
RI
NG
\C
D\
CD
CO
VE
R
SH
EE
T.
DW
G La yo ut:
LA
YO
UT
2 X
RE
Fs : c ity ap pr ov al, st am p-cd Pl ott ed
: F
RI
/28
/25
:01 :47
A B y:
Ma rk W es t
NO
C
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
Know what's below.
Call before you dig.
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
ISSUE DATE:
DATE REVISION COMMENTS
PROJECT #: 23085103-26-2025
03-26-2025 FOR BID
UCB000817 - 18TH ST WATERLINE & PAVEMENT
REPLACEMENT
BOULDER, CO 80309 GOVERNING CODES FOR THIS PROJECT:
1. UNIVERSITY OF COLORADO BOULDER FACILITY STANDARDS, AS MODIFIED FOR THIS PROJECT.
2. THE 2021 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC)
(AS ADOPTED BY THE COLORADO STATE BUILDINGS PROGRAM AS FOLLOWS: CHAPTER 1 AS AMENDED, CHAPTERS 2-35 AND
APPENDICES C AND I)
3. THE 2021 EDITION OF THE INTERNATIONAL MECHANICAL CODE (IMC)
(AS ADOPTED BY THE COLORADO STATE BUILDINGS PROGRAM AS FOLLOWS: CHAPTERS 2-15 AND APPENDIX A)
4. THE 2021 EDITION OF THE INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
(AS ADOPTED BY THE COLORADO STATE BUILDINGS PROGRAM)
5. THE 2023 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC)
(AS ADOPTED BY THE COLORADO STATE ELECTRICAL BOARD)
6. THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)
(AS ADOPTED BY THE DEPARTMENT OF PUBLIC SAFETY/DIVISION OF FIRE PREVENTION AND CONTROL AS APPLICABLE)
THE CONTRACTOR'S WORK SHALL BE IN CONFORMANCE WITH THE ABOVE CODESAND CONTRACTOR SHALL OBTAIN ALL NECESSARY
PERMITTING PRIOR TO WORK
GENERAL NOTES:
1. ANY WORK PERFORMED OUTSIDE THE LIMITS OF DISTURBANCE SHALL BE AT THE CONTRACTOR'S EXPENSE, UNLESS THE WORK IS
SPECIFICALLY AUTHORIZED IN ADVANCE BY THE ENGINEER. ANY PROPERTY OUTSIDE THE LIMITS OF DISTURBANCE THAT IS DAMAGED BY ANY ACT OR OMISSION OF THE CONTRACTOR SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES DESIGNATED ON THE PLANS. VERIFICATION OF THE ELEVATIONS AND LOCATIONS SHALL BE BY POTHOLES. REPORT ANY DISCREPANCIES IMMEDIATELY TO
THE OWNER PRIOR TO COMMENCING CONSTRUCTION.
3. THE EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS REPRESENT THE BEST INFORMATION AVAILABLE AND ARE SHOWN FOR INFORMATION ONLY. THE CONTRACTOR MUST TAKE SOLE RESPONSIBILITY FOR DAMAGE TO ANY UTILITY LINE ENCOUNTERED WHETHER OR NOT SHOWN ON THE DRAWINGS AND WHETHER OR NOT ACTUALLY LOCATED IN THE FIELD AS SHOWN ON THE DRAWINGS.
THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR FIELD LOCATIONS PRIOR TO THE START OF CONSTRUCTION.
4. ALL EXISTING UTILITIES AND LANDSCAPING ARE TO REMAIN IN PLACE UNLESS OTHERWISE INDICATED ON THE PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT AND SUPPORT EXISTING UTILITIES AND LANDSCAPING AS NECESSARY TO
ACCOMPLISH THE WORK.
5. THE CONTRACTOR SHALL PROVIDE FOR WATER FLOWS TO BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
6. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, ELEVATION AND SIZE OF EXISTING PIPES THAT ARE TO BE CONNECTED TO NEW
PIPES OR STRUCTURES. REPORT ANY DISCREPANCIES IMMEDIATELY TO THE ENGINEER AND OWNER PRIOR TO COMMENCING
CONSTRUCTION.
7. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE SPECIFICATIONS IN THE PROJECT MANUAL.
8. IF HEAT GUNS, SOLDERING, BRAZING, WELDING, GRINDING, POWDER DRIVEN STUDS, METAL CUTTING, USING POWER TOOLS OR OTHER
ACTIVITIES INVOLVING FLAMES OR SPARKS ARE REQUIRED FOR CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN A REQUIRED HOT WORK PERMIT. HOT WORK PERMIT FORMS ARE AVAILABLE FROM CU PROJECT MANAGERS, FACILITIES MANAGEMENT OFFICE OF PLANNING, DESIGN AND CONSTRUCTION AND THE FLS WEB SITE (HTTP://FM.COLORADO.EDU/FIRESAFETY/).
9. IF ANY UNPLANNED WATER OUTAGES SUCH AS A LEAKING OR RUPTURED PIPE OCCURS DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE FIRE AND LIFE-SAFETY GROUP AND PIPE TRADES SHOP OF FACILITIES MANAGEMENT.
10. STAGING AREAS FOR EQUIPMENT AND/OR MATERIALS ARE MINIMAL AND ARE SHOWN ON THE PLANS. CONTRACTOR SHALL ACQUIRE
APPROVAL OF ANY ADDITIONAL STAGING AREAS FROM UCB PRIOR TO CONSTRUCTION.
11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL LANDSCAPING IN THE AREA OF THE PROJECT. THE CONTRACTOR SHALL KEEP TO A MINIMUM THE DISTURBANCE OF ANY AND ALL LANDSCAPING. ANY LANDSCAPING DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED AND/OR REPLACED TO ITS ORIGINAL CONDITION WITHOUT ADDITIONAL COST TO THE OWNER. TREES SHALL BE PROTECTED AT THE CRITICAL ROOT ZONE (CRZ) BY CONSTRUCTING FENCING AND NO VEHICLE, MATERIAL OR EQUIPMENT SHALL BE STORED WITHIN THIS FENCED AREA. (CRITICAL ROOT ZONE - THE ZONE SHALL BE EQUAL TO ONE FOOT RADIALLY FROM THE
TREE FOR EVERY ONE INCH OF TRUNK DIAMETER AT BREAST HEIGHT).
12. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE OSHA PROGRAMS, INCLUDING BUT NOT LIMITED TO: CONFINED SPACE ENTRY, ASBESTOS, LOCKOUT-TAGOUT, HOT WORK, RESPIRATORY PROTECTION, TRENCHING AND SHORING, AND HAZCOM.
13. THE CONTRACTOR MUST PROTECT STORM SEWER DRAINS (INCLUDING FLOOR DRAINS), MANHOLES, INLET, TRENCHES AND SURFACE RUN-OFF DRAINAGES, ROOF DRAINS, ETC. FROM DISCHARGES OF PROCESS WATER, SEDIMENT, PETROLEUM RESIDUES, AND ALL OTHER CONTAMINANTS. DISCHARGES OF CONTAMINATED OF PROCESS WATER MAY ONLY BE PERMITTED INTO THE SANITARY SEWER IF
AUTHORIZED BY UCB EH&S.
14. THE CONTRACTOR MUST COMPLY WITH UCB DUST CONTROL POLICY TO PREVENT ODORS, VAPORS, DUST, ETC. FROM IMPACTING OTHER AREAS (INCLUDING ADJACENT BUILDINGS) THROUGH OPENINGS, HVAC SYSTEMS AND AIR INTAKES. IF CONSTRUCTION GENERATES DUST OR FUMES INSIDE A BUILDING, THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT THE NUISANCE ACTUATION OF ANY NEARBY SMOKE OR DUCT PROTECTORS AS DIRECTED BY THE UCB FIRE ALARM SHOP.
15. ANY DISRUPTION OF ELECTRICAL SERVICE CAUSED BY THE CONTRACTOR MUST BE RESTORED IMMEDIATELY. THERE ARE ELECTRICAL LINES SERVING OUTSIDE LIGHTING THAT PROVIDE SECURITY AND SAFETY FOR THE CAMPUS THAT MUST NOT HAVE DISRUPTION OF
SERVICE. ALL RESTORED WORK MUST BE INSPECTED PRIOR TO BURIAL.
16. A. BACKFILL MATERIAL, ROAD BASE MATERIAL, ASPHALT, AND COMPACTION TO FOLLOW UCB STANDARDS FOR PARKING LOTS B. CONTRACTOR SHALL ERECT DETOURS FOR PEDESTRIANS AND BICYCLIST WHEN CLOSING OR IMPACTING SIDEWALKS AND BIKE
PATHS
C. STAGING AREAS SHALL BE DEFINED BY TEMPORARY CHAIN LINK FENCE OR CONSTRUCTION FENCE.
22. SAW-CUT SLURRY, SEDIMENT/SOILS, AND ALL OTHER MATERIALS AND PROCESS WATERS MUST BE CAPTURED FOR PROPER DISPOSAL AND NOT ALLOWED TO BE DISCHARGED TO STORM DRAINS, GUTTERS, PARKING LOTS, OR OTHER STORM CONVEYANCES. USE PROPER BEST MANAGEMENT PRACTICES (BMP'S) TO PROTECT FROM CONTAMINATED RUN-OFF THAT COULD END UP IN BOULDER CREEK; THE FOLLOWING WEB SITE HAS EXAMPLES THAT CAN BE REVIEWED AS APPLICABLE; http://pacepartners.com/municipal-operations
23. THE CONTRACTOR SHALL MAKE ALL NECESSARY PARKING ARRANGEMENTS A MINIMUM OF 10 DAYS IN ADVANCE TO THE START OF
CONSTRUCTION.
SUMMARY OF APPROXIMATE QUANTITIES:
LEGEND:
(NOTE THAT SYMBOLS MAY BE SCALED LARGER THAN ACTUAL SIZE FOR CLARITY)
EXISTING PROPOSED
EE
E
SS
ST
T
E
E
ABBREVIATIONS
BOP BOTTOM OF PIPE
BS BOTTOM OF STEP
BW BOTTOM OF WALL (FG)
CONC CONCRETE
DIA DIAMETER
DIP DUCTILE IRON PIPE
DR DOOR
DS DOWNSPOUT
E EAST, EASTING
EGL ENERGY GRADE LINE
EL ELEVATION
EOA EDGE OF ASPHALT
EOC EDGE OF CONCRETE
EOP EDGE OF PAVEMENT
ESMT EASEMENT
EX EXISTING
FES FLARED END SECTION
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FLOW LINE
FO FIBER OPTICES LINE
GB GRADE BREAK
GV GATE VALVE
HC HANDICAP
HCL HORIZONTAL CONTROL LINE
HGL HYDRAULIC GRADE LINE
HORZ HORIZONTAL
HP HIGH POINT
INV INVERT
LP LOW POINT
LSD LANDSCAPE DRAIN
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MJ MECHANICAL JOINT
N NORTH, NORTHING
PG PROFILE GRADE
PHS PHASE
PR PROPOSED
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
ROW RIGHT-OF-WAY
SAN SANITARY
SS SANITARY SEWER
STA STATION
STM STORM
TB THRUST BLOCK
TBC TOP/BACK OF CURB
TEL TELECOM LINE
TOP TOP OF PIPE
TS TOP OF STEP
TW TOP OF WALL (FG)
TYP TYPICAL
UE UNDERGROUND ELECTRIC
UG UNDERGROUND
UT UNDERGROUND TEL/FO
VERT VERTICAL
WAT WATER
SHEET INDEX
Sheet Number Sheet Title
1 COVER SHEET
2 TRAFFIC CONTROL PLAN
3 EXISTING SITE PLAN & REMOVAL PLAN
4 SWMP
5 SWMP - DETAILS
6 FINAL UTILITY PLAN
7 UTILITIES DETAILS
8 18TH STREET PLAN & PROFILE
9 18TH STREET CROSS SECTIONS
10 18TH STREET CROSS SECTIONS
11 PAVING & STRIPING PLAN
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
CITYOF BOULDER STANDARD CONSTRUCTION NOTES:
1. “ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE “DESIGN AND CONSTRUCTION STANDARDS” OF THE CITY OF BOULDER, AND SHALL BE COMPLETED TO THE SATISFACTION OF THE DIRECTOR OF PUBLIC WORKS. IN THE EVENT THAT A DESIGN ELEMENT DOES NOT REFLECT CITY STANDARDS, THE MATTER MUST BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER AND THE DIRECTOR OF PUBLIC WORKS. 1-8 DESIGN AND CONSTRUCTION STANDARDS EFFECTIVE: JUNE 20, 2019 THE ENGINEER SHALL BE RESPONSIBLE FOR RECOMMENDING A SOLUTION OR ALTERNATIVE SOLUTIONS TO THE CITY FOR REVIEW AND APPROVAL.”
2. “THE APPROVAL OF A CONSTRUCTION PLAN DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF CONSTRUCTING WORKABLE PUBLIC IMPROVEMENTS. ALL REVISIONS AND/OR CORRECTIONS REQUIRED WILL BE SOLELY THE CONTRACTOR'S
RESPONSIBILITY, AND AT THEIR EXPENSE.”
3. “THESE PLANS HAVE BEEN CHECKED BY THE CITY OF BOULDER ONLY FOR CONFORMANCE WITH THE “DESIGN AND CONSTRUCTION STANDARDS,” COMPLIANCE WITH DEVELOPMENT AGREEMENT CONDITIONS, AND FOR GENERAL CONCEPTUAL APPROVAL OF PUBLIC IMPROVEMENTS AS SHOWN. THE CITY’S REVIEW DOES NOT VERIFY OR ENSURE THE ACCURACY OF EXISTING OR PROPOSED DIMENSIONS, LINES, COORDINATES, OR GRADES SHOWN, INCLUDING ALL EXISTING UTILITIES SHOWN OR NOT SHOWN.”
4. “UTILITY LOCATIONS SHOWN REFLECT AVAILABLE RECORD DATA. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT ALL UTILITY LINES SHOWN AND OTHER UTILITY LINES OTHERWISE LOCATED. THE CONTRACTOR SHALL CONTACT THE “UTILITY NOTIFICATION CENTER OF COLORADO” AT 1-800-922-1987 OR 811 FOR UTILITY LOCATES 24 HOURS PRIOR TO BEGINNING
CONSTRUCTION.”
5. “BEFORE WORK BEGINS, THE CONTRACTOR SHALL OBTAIN A PERMIT TO WORK IN THE RIGHT-OF-WAY FROM THE CITY AND MUST NOTIFY THE CITY RIGHT-OF-WAY INSPECTION STAFF AT LEAST 24 HOURS IN ADVANCE OF COMMENCING CONSTRUCTION ACTIVITIES.”
6. “THE CONTRACTOR SHALL OBTAIN AND MAINTAIN A COMPLETE AND APPROVED SET OF CONSTRUCTION PLANS. THESE DRAWINGS, AND ANY REQUIRED PERMITS, SHALL BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES AND SHALL BE MADE AVAILABLE TO CITY STAFF UPON REQUEST. IF CONSTRUCTION PLANS ARE NOT READILY AVAILABLE AT THE PROJECT SITE, THE DIRECTOR OF PUBLIC WORKS MAY ISSUE A STOP WORK ORDER AND HALT ALL CONSTRUCTION ACTIVITIES PENDING COMPLIANCE BY THE CONTRACTOR.”
7. “THE CONTRACTOR AGREES TO COMPLY WITH THE PROVISIONS OF THE TRAFFIC CONTROL PLAN AND THE CURRENT EDITION OF THE “MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES,” “TEMPORARY TRAFFIC CONTROL” SECTION, FOR CONSTRUCTION SIGNAGE AND
TRAFFIC CONTROL.”
8. “ALL SURPLUS MATERIALS, TOOLS, AND TEMPORARY STRUCTURES, FURNISHED BY THE CONTRACTOR, SHALL BE REMOVED FROM THE PROJECT SITE BY THE CONTRACTOR. ALL DEBRIS AND RUBBISH CAUSED BY THE OPERATIONS OF THE CONTRACTOR SHALL BE REMOVED, AND THE AREA OCCUPIED DURING CONSTRUCTION ACTIVITIES SHALL BE RESTORED TO ITS ORIGINAL CONDITION, WITHIN 48 HOURS OF PROJECT COMPLETION, UNLESS OTHERWISE DIRECTED BY THE DIRECTOR OF PUBLIC WORKS.”
9. “THE CONTRACTOR SHALL PROVIDE TREE AND LANDSCAPE PROTECTION AS SET FORTH IN CHAPTER 6-6, “PROTECTION OF TREES AND PLANTS,” BOULDER REVISED CODE (B.R.C.) 1981 AND THE CITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS (DCS). ALL LANDSCAPING SHALL BE PROVIDED AND MAINTAINED IN COMPLIANCE WITH THE APPROVED LANDSCAPING PLAN, B.R.C. AND DCS.”
10. “THE CONTRACTOR IS REQUIRED TO PROVIDE AND MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE URBAN DRAINAGE AND FLOOD EFFECTIVE: JUNE 20, 20 19 DESIGN AND CONSTRUCTION STANDARDS 1-9 CONTROL DISTRICT “URBAN STORM DRAINAGE CRITERIA MANUAL VOLUME 3”, THE M-STANDARD PLANS OF THE COLORADO DEPARTMENT OF TRANSPORTATION, AND THE APPROVED STORMWATER MANAGEMENT PLAN. THE DIRECTOR OF PUBLIC WORKS MAY REQUIRE THE CONTRACTOR TO PROVIDE ADDITIONAL EROSION CONTROL MEASURES DUE TO UNFORESEEN EROSION PROBLEMS OR IF THE PLANS DO NOT FUNCTION AS
INTENDED.”
11. "THE CITY OF BOULDER REQUIRES THAT SIDEWALKS CONSTRUCTED HAVE A CROSS SLOPE OF LESS THAN 2%. SIDEWALKS SHALL BE DESIGNED AND CONSTRUCTED WITH CROSS SLOPES SUFFICIENTLY LESS THAN 2% TO ENSURE THAT THEY DO NOT EXCEED THE 2%
MAXIMUM."
03-26-2025
SHEET NUMBER
ISSUE DATE:
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\R
OA
DW
AY
\C D
- T
RA
FF
IC
C
ON
TR
OL
P
LA
N.
DW
G
LA
YO
UT
: L
AY
OU
T1
6 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -u til[ U]
, p -b as e, p-uti l[U ], s tam p-cd
PL
OT
TE
D:
T
HU
/27 /25
:54
:16 P
B Y:
M
AR
K W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
TRAFFIC CONTROL PLAN 2
<CLIENT NAME>
03-26-2025
VCB
MAW
VCB
NO
C
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
PHASE 2 TRAFFIC CONTROL PLAN - PAVING OPERATION (BID ALTERNATES 2, 3, 4)
SCALE: 1" = 20'
SCALE: 1" =
20 20 40
20' 3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
PHASE 1 TRAFFIC CONTROL PLAN - WATERLINE INSTALLATION (BASE BID)
SCALE: 1" = 20'
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
E
ST
E
SSSS
E E
ST
EE
EE
T
T T
EE
EE
E
E
E
ST
E
SSSS
E E
ST
EE
EE
T
T T
EE
EE
E
E
SHEET NUMBER
ISSUE DATE:
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\C D\
CD
SI
TE
-R
EM
OV
AL
P
LA
N.
DW
G
LA
YO
UT
: L
AY
OU
T1
5 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -u til, p-ba se
, s tam p-cd
PL
OT
TE
D:
F
RI
/28
/25
:08 :33
A B
Y:
M
AR
K
W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
EXISTING SITE PLAN & REMOVAL PLAN 3
<CLIENT NAME>
03-26-2025
VCB
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
SCALE: 1" =
20 20 40
20'
EXISTING SITE PLAN
SCALE: 1" = 20'
DEMOLITION-REMOVAL-ABANDON PLAN
SCALE: 1" = 20'
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
E
SSSS
E E
ST
EE
EE
T
T T
EE
EE
E
E
IP
IP
GB
GB
VTC
GB
GB
GB
SSA CWA
VTC
GB GB
PHASE 2
PHASE 1
GB
SHEET NUMBER
ISSUE DATE:
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\E
RO
SI
ON
\C D
- S W
MP
FI
NA
L.D W
G
LA
YO
UT
: S W
MP
FI
NA
L 8 X
RE
Fs
: c ity ap pr ov al, e-ba se , e
-u til, ke ym ap [U
], p -b as e, p-uti l, s tam p-cd
, to po
_2
1[U
PL
OT
TE
D:
W
ED
/26 /25
1:
:43 P
B Y:
M
AR
K W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
SWMP 4
<CLIENT NAME>
03-26-2025
GRS
MAW
GRS
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
SCALE: 1" =
30 30 60
30'
STORMWATER MANAGEMENT PLAN (SWMP)
SCALE: 1" = 30'
CWA
IP
GB
SSA
VTC
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\E
RO
SI
ON
\C D
- S W
MP
FI
NA
L.D W
G
LA
YO
UT
: D
ET
AI
LS
8 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -u til, ke ym ap
[U ], p
-b as e, p-uti l, s tam p-cd , to po _2
1[U
PL
OT
TE
D:
W
ED
/26
/25 1:
:15
P B
Y:
M
AR
K
W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
SWMP - DETAILS 5
<CLIENT NAME>
03-26-2025
GRS
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
GRATE INLET PROTECTION
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
E
SSSS
E E
ST
EE
EE
T
T T
EE
EE
E
E
E
E
SS
LEGEND:
(NOTE THAT SYMBOLS MAY BE SCALED LARGER THAN ACTUAL SIZE FOR CLARITY)
EXISTING PROPOSED
SHEET NUMBER
ISSUE DATE:
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\U
TI
LIT
IE
S\ W
AT
ER
\C D
- F
IN
AL
U
TI
LIT
Y
PL
AN
.D
W G
LA
YO
UT
: W
AT
ER
LIN
E
8 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -le ga l, e
-u til, ke ym ap [U
], p -b as e, p-uti l, s tam p-cd
PL
OT
TE
D:
T
HU
/27
/25 1:
:18
P B
Y:
M
AR
K
W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
FINAL UTILITY PLAN 6
<CLIENT NAME>
03-26-2025
VCB
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
WATERLINE REPLACEMENT PLAN VIEW
SCALE: 1" = 20'
SCALE: 1" =
20 20 40
20'
EE
E
SS
ST
T
E
E
IRRIGATION SLEEVES PLAN VIEW
SCALE: 1" = 10'
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\U
TI
LIT
IE
S\
CD
UT
ILI
TI
ES
D
ET
AI
LS
.D
W G
LA
YO
UT
: L
AY
OU
T1 1 X
RE
F:
ci ty ap pr ov al
PL
OT
TE
D:
W
ED
/26
/25 2:
:35
P B
Y:
M
AR
K
W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
UTILITIES DETAILS 7
<CLIENT NAME>
03-26-2025
VCB
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
18TH STREET C.L. PROFILE
HORIZONTAL SCALE: 1" = 30'
VERTICAL SCALE: 1" = 3'
E
ST
E
SSSS
E E
ST
EE
EE
T
T T
EE
EE
E
E
BUS ONLY BUS ONLY
Δ Δ
SHEET NUMBER
ISSUE DATE:
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\R
OA
DW
AY
\C D
- 1 8T
H
ST
RE
ET
P &P
.D W
G
LA
YO
UT
: L
AY
OU
T1
6 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -u til, p-ba se
, p -u til, st am p-cd
PL
OT
TE
D:
W
ED
/26 /25
2:
:51 P
B Y:
M
AR
K W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
18TH STREET PLAN & PROFILE 8
<CLIENT NAME>
03-26-2025
VCB
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
SCALE: 1" =
30 30 60
30'
18TH STREET PLAN
SCALE: 1" = 30'
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\R
OA
DW
AY
\C D
- 1 8T
H
ST
RE
ET
C
RO
SS
S
EC
TI
ON
S.
DW
G
LA
YO
UT
: L
AY
OU
T( 1)
7 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -u til, p-ba se
, p -co rri do r, p-uti l, s tam p-cd
PL
OT
TE
D:
W
ED
/26 /25
2:
:12 P
B Y:
M
AR
K W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
18TH STREET CROSS SECTIONS 9
<CLIENT NAME>
03-26-2025
VCB
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\R
OA
DW
AY
\C D
- 1 8T
H
ST
RE
ET
C
RO
SS
S
EC
TI
ON
S.
DW
G
LA
YO
UT
: L
AY
OU
T( 2)
7 X
RE
Fs : c ity ap pr ov al, e-ba se
, e -u til, p-ba se
, p -co rri do r, p-uti l, s tam p-cd
PL
OT
TE
D:
W
ED
/26 /25
2:
:30 P
B Y:
M
AR
K W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
18TH STREET CROSS SECTIONS 10
<CLIENT NAME>
03-26-2025
VCB
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
BUS ONLY BUS ONLY
ISSUE DATE:
DATE REVISION COMMENTS
DESIGNED BY:
CHECKED BY:
DRAWN BY:
PROJECT #:
1120 Lincoln Street, Suite 1000 Denver, Colorado 80203
P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com
Know what's below.
Call before you dig.
FI
LE
PA
TH
: P :\2
3\2
1\E
NG
IN
EE
RI
NG
\R
OA
DW
AY
\C D
- P
AV
IN
G
ST
RI
PI
NG
.D
W G
LA
YO
UT
: S
TR
IP
IN
G
PA
VI
NG
P
LA
N 4 X
RE
Fs
: c ity ap pr ov al, e-ba se , p
-b as e, sta mp -cd
PL
OT
TE
D:
F
RI
/28
/25
:10 :04
A B
Y:
M
AR
K
W
ES
T
230851
UCB000817 - 18TH ST WATERLINE & PAVEMENT REPLACEMENT
PAVING & STRIPING PLAN 11
<CLIENT NAME>
03-26-2025
GRS
MAW
HA
NG
ES
A
RE
T
O
BE
M
AD
E
TO
T
HI
S
DR
AW
IN
G W
IT
HO
UT
W
RI
TT
EN
P
ER
MI
SS
IO
N
OF
H
AR
RI
S
KO
CH
ER
S
MI
TH
SCALE: 1" =
20 20 40
20'
SUMMARY OF PAVEMENT MARKING QUANTITIES
MATERIAL COLOR AREA (SQ FT) QUANTITY (GALLONS)
LATEX YELLOW 241 2.76
LATEX WHITE 324 3.70
LATEX GREEN 40 0.34
*RATE OF APPLICATION FOR PAVEMENT MARKING PAINT IS 87.5
SQ FT PER GALLON; ASSUMED 18 MM THICK
FROM TO
PAVEMENT MARKING TYPE
STATION OFFSET STATION OFFSET
4+88.54 0 4+90.93 18.42' R STOP BAR (24" x 19')
4+89.15 0.59' R 6+32.25 0.13' R CENTERLINE, DOUBLE YELLOW (4" WIDE)
5+26.40 11.92' R 5+44.90 11.89' R LANE DROP LINE, WHITE, 8" WIDE x 2.5' LONG, 8' ON CENTER
5+31.80 4.00' L 5+41.80 8.00' L SHARROW, WHITE ARROWS AND BICYCLE ON GREEN BACKGROUND
5+50.33 15.30' R 5+66.48 15.32' R "BUS ONLY", WHITE LETTERS, 4' HIGH, 2'3" LONG "BUS", 2'10.5" LONG "ONLY", 12' ON CENTER
5+50.40 11.88' R 6+16.21 11.77' R CHANNELIZING LINE, WHITE, 8" WIDE
6+21.71 11.78' R 6+32.21 11.79' R LANE DROP LINE, WHITE, 8" WIDE x 2.5' LONG, 8' ON CENTER
6+60.49 11.82' R 6+70.99 11.83' R LANE DROP LINE, WHITE, 8" WIDE x 2.5' LONG, 8' ON CENTER
6+62.38 0.20' L 7+40.38 0.13' R CENTERLINE, DOUBLE YELLOW (4" WIDE)
6+76.42 15.17' R 6+92.53 15.20' R "BUS ONLY", WHITE LETTERS, 4' HIGH, 2'3" LONG "BUS", 2'10.5" LONG "ONLY", 12' ON CENTER
6+76.49 11.84' R 7+17.85 11.88' R CHANNELIZING LINE, WHITE, 8" WIDE
7+23.35 11.89' R 7+33.85 11.90' R LANE DROP LINE, WHITE, 8" WIDE x 2.5' LONG, 8' ON CENTER
7+70.53 18.19' R 7+82.75 17.06' L CROSSWALK LINES, WHITE, 24" WIDE x 6' LONG (SEE NOTES)
7+83.71 0.22' R 9+24.56 0.53' L CENTERLINE, DOUBLE YELLOW (4" WIDE)
8+60.07 9.58' R 9+11.11 9.74' R CHANNELIZING LINE, WHITE, 8" WIDE
8+67.62 4.45' R 8+75.62 4.50' R ARROW, LEFT, 8' LONG (REFER TO CDOT S-627-1 FOR GUIDANCE)
8+67.53 16.34' R 8+75.53 16.40' R ARROW, LEFT & RIGHT, 8' LONG (REFER TO CDOT S-627-1 FOR GUIDANCE)
PAVING & STRIPING PLAN
SCALE: 1" = 20'
3/3/2025
P R O
FESSIONA L EN
GI
NE
E R
CO
LO
RAD
O LICENSED
38561
WESTMA
RK
A.
TYPICAL FULL DEPTH REPLACEMENT PAVEMENT SECTION
NTS
| Sheets and Views |
| Layout1 |
| 2 |
| Layout1 |
| 3 |
| Layout1 |
| 3 |
| Layout1 |
| 4 |
| SWMP - FINAL |
| 5 |
| Details |
| 6 |
| WATERLINE |
| 7 |
| Layout1 |
| 8 |
| Layout1 |
| 9 |
| Layout(1) |
| 10 |
| Layout(2) |
| 11 |
| Striping & Paving Plan |
File details come from the government source that posted it. Updated .