Typical_Ingress_Egress_Block_Diagram.pdf
PDF 32 KB Posted
- Solicitation number
- 280-3041306-GK (Step Two of a Two-Step Procurement)
- Issued by
- Orange County, California
About this file
This is a technical specification document supporting a Design-Build Request for Proposal from the County of Orange, California, for replacement of the Parking Access Revenue Control System (PARCS) at John Wayne Airport. The diagram illustrates the typical ingress/egress infrastructure architecture required for the system replacement project, which includes replacing aging gate arms, kiosks, and license plate reader technology; implementing a cloud-based system with business intelligence and dashboard capabilities; updating signage; and modifying electric vehicle parking assignments. The system design incorporates multiple interconnected components including electrical panels, communication panels, gate arm and motor enclosures, ticket dispensers, power distribution assemblies, Power over Ethernet switches, CCTV cameras with license plate recognition functionality, and payment stations. Network connectivity utilizes Cat 6 cabling or fiber connections, with power distribution provided through dedicated power conductors as necessary. The cloud-based management system will integrate with JWA Genetech VMS, with integration methodology to be determined during the project execution phase.
The block diagram demonstrates the technical infrastructure standards and component integration requirements that responding firms must address in their proposals. All proposals must be submitted electronically through the County's eProcurement Portal, with no facsimile or email submissions accepted. Respondents must meet minimum qualifications outlined in the Request for Proposal and demonstrate capability to deliver all services identified in the Scope of Work. The proposed schedule of activities is subject to modification, with any changes communicated to all respondents through addenda posted on the County's eProcurement Portal. Technical questions and clarifications must be submitted through the solicitation system only, and verbal clarifications from County personnel will not be considered binding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Panel
Comm Panel
Gate Arm and Motor Enclosure
Ticket Dispenser
Typical Ingress/Egress Block Diagram
Power Distribution Assembly/sub-panel (may share housing with other components)
Power over Ethernet switch (may share housing with other components)
CCTV camera for LPR functionCat 6
Or fiber
Cat 6
Cat 6
Power Conductors
Power Conductors (if necessary)
Power and control
Cloud-based management system
JWA Genetech VMS (manner of integration TBD)
Payment Station or Power Conductors
File details come from the government source that posted it. Updated .