Attachment_B_-_Cost_Proposal.pdf

PDF 143 KB Posted

Attached to
DESIGN-BUILD FOR PARKING ACCESS REVENUE CONTROL SYSTEM REPLACEMENT
Solicitation number
280-3041306-GK (Step Two of a Two-Step Procurement)
Issued by
Orange County, California

About this file

This is a Cost Proposal Attachment for a Design-Build contract between the County of Orange, California and a Design-Build Entity (D-BE) for the replacement of the Parking Access Revenue Control System (PARCS) at John Wayne Airport. The project encompasses replacement of aging equipment including gate arms, kiosks, and license plate reader technology; installation of a cloud-based system with business intelligence and dashboard capabilities; updating signage; removing two-hour parking restrictions; and updating electric vehicle parking assignments. The contract operates on a two-phase structure: Phase I covers design services and pre-construction activities, while Phase II encompasses construction services. This is a fully electronic Request for Proposals submitted through the County's eProcurement Portal, with all proposals required to be submitted online only.

The contract is structured as a Guaranteed Maximum Price (GMP) agreement, with respondents required to submit separate pricing for Phase I (Design Services & Pre-Construction Phase) and Phase II (Construction Services Phase), with the sum of both components representing the total GMP for the project. Notably, Attachment B is not to be submitted with initial proposals but rather at the time of interview by shortlisted respondents only. The D-BE agrees to accept the specified compensation as full remuneration for all services, staffing, labor, vehicles, equipment, tools, materials, overhead, travel, and any reasonably unforeseen difficulties or risks encountered during execution of services until acceptance. No other compensation beyond the stated GMP is available to the contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B OF MODEL CONTRACT

COST/COMPENSATION

**DO NOT SUBMIT WITH YOUR PROPOSAL. TO BE SUBMITTED AT TIME OF INTERVIEW BY

SHORTLISTED RESPONDENTS**

I. COMPENSATION: This is a Guaranteed Maximum Price (GMP) Contract between County and D-BE for design and construction services for Design-Build for Parking Access Revenue Control System

Replacement, as set forth in Attachment A, “Statement of Work”.

D-BE agrees to accept the specified compensation as set forth in this Contract as full remuneration for performing all services and furnishing all staffing, labor, vehicles, equipment, tools, materials, overhead, travel, etc. required, for any reasonably unforeseen difficulties which may arise or be encountered in the execution of the services until acceptance, for risks connected with the services, and for performance by D-BE of all its duties and obligations hereunder. D-BE shall only be compensated as set forth below for work performed in accordance with the Statement of Work.

II. PRICE:

A. Proposed Fee:

i. Phase I – Design Services & Pre-Construction Phase: $___________

ii. Phase II – Construction Services Phase: $ ___________

iii. Guaranteed Maximum Price (Sum of Components i and ii) $ ___________

Total GMP for Project: $ ___________