Triton Bid for Dishwasher Installation.pdf

PDF 367 KB Posted

Attached to
Release Competitive Sealed Bidding IL|23-416CMS-BOPM4-P-41059
Contract number
23-416CMS-BOPM4-P-41059
Issued by
Illinois

About this file

This document is a proposal from Triton Test, Balance and Design, a commercial, industrial, and residential service company located in Freeport, IL, addressed to the Mabley Developmental Center in Dixon, IL. The proposal is dated August 21, 2025, and is specifically regarding the replacement of Hobart dishwashers at the facility.

The proposal outlines a comprehensive dishwasher replacement service involving the removal of (7) existing dishwashers and their subsequent replacement with new units in the same location. The total proposed cost is $15,876.00, broken down into $3,780 for materials (7 dishwashers at $540.00 each) and $12,096.00 for labor (84 total hours at $144.00 per hour for two plumbers). The scope of work includes disconnecting and reconnecting power and plumbing, as well as checking, testing, and startup of the new equipment. The proposal explicitly notes that overtime, previous labor, equipment, and extended warranties are not included in the pricing. Contact information is provided for follow-up questions, with a toll-free number for Triton.

View the file

Other files

File Type Posted
23-416CMS-BOPM4-P41059.53 PO.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 21, 2025

Mabley Developmental Center 1120 Washington Ave Dixon IL 61021

Re: Hobart Dishwashers

Triton is pleased to offer the following for your consideration Provide labor, material, and equipment to complete the following work.

• Remove (7) existing dishwashers, disconnect power and plumbing

• Install (7) dishwashers in same location as original o Reconnect power o Reconnect plumbing

• Check, test, Startup

Proposal Amount Total Installed………………….……………………………………………………………………………………………………$15,876.00 Material 7 @ $540.00= $3,780 Labor 2 Plumbers 6 hrs each 12 hrs total x 7 units = 84 hrs at $144.00/hr = $12,096.00

Not Included

• Overtime

• Previous Labor

• Equipment

• Extended Warranties

Thank you for the opportunity to provide this proposal. Please contact me at 866.TRITON (874-8662) with any questions.

Sincerely, Kevin Rauch

File details come from the government source that posted it. Updated .