TJ-304-001 MCT Locations Rev1.pdf

PDF 3 MB Posted

Attached to
MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS Federal contract opportunity
Solicitation number
1305M226Q0100REF
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This is a technical drawing document for the NOAA Ship Thomas Jefferson, specifically detailing MCT (Machinery Control Station) cable penetration locations and specifications across multiple decks.

The drawing (TJ-304-001, Revision 1, dated 10/8/2021) provides comprehensive cable penetration designations for the vessel's 04, 03, 02, 01 Main, and 2nd and 3rd decks. The document includes detailed tables cataloging each cable penetration with specifications including designation identifier, boundary type (Deck or Bulkhead), penetration type (K, B, O, P, D classifications), dimensions (length/diameter, width, depth), originating and destination spaces, class designation, and SOLAS classification ratings (A-60, A-0, B-0, C, NT). Cable penetrations are organized by deck level with accompanying visual plans showing penetration locations. The drawing references supporting documents including the Booklet of General Plans (TJ-085-002), Fire Control Plan (TJ-985-6634639), and Cable Penetrations Survey and Data documents. Revision 1 added penetration type and boundary classifications to all cable penetration designations and expanded documentation with additional detailed tables and reference sheets. The document was prepared by ECS Maritime Systems Division for NOAA Office of Marine & Aviation Operations, with approvals from ABS (American Bureau of Shipping) and USCG (United States Coast Guard), indicating compliance with maritime safety and classification standards.

View the file

Other files for this federal contract opportunity

Other files attached to MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS, newest first.
File Type Posted
DirecTV Configuration.pdf PDF
TJ_FY2027 DD_Fire System Inventory_SCBA Tanks.pdf PDF
NOAA Standard Specification 997-1B Drydocking-Routine_Drydock-Work.pdf PDF
NOAA Standard Specification MOC-573-2 Overhaul Repair of Hydraulic Cylinders.pdf PDF
NOAA Standard Specification AMC-300-1_Overhaul of Electrical Rotating Machinery.pdf PDF
NOAA Standard Specification MOC-300-3 General Requirements for Electrical_Electronic Items.pdf PDF
NOAA Standard Specification MOC-631-3B Underwater Body Ablative Coating System.pdf PDF
NOAA Standard Specification AMC-634-1A_Deck Coverings.pdf PDF
Lufkin Marine Gears Spare Parts List RS2719S_LM584 RevB.pdf PDF
The NOAA Small Boat Standards and Procedures Manual_4.2 Edition_January 2024.pdf PDF
NAVSEA Standard Item 009-32_Cleaning and Painting Requirements.pdf PDF
1701-05 - Lockout - Tagout (public).docx DOCX document
Spurs Drawing -002_Rope Cutter MV-19_15.pdf PDF
TJ_FY2027 DD_Fire System Devices.pdf PDF
NOAA General Technical Requirements (GTR) Rev -.pdf PDF
TJ_FY2027 DD_Fire System Inventory.pdf PDF
OMAO Procedure 0606-01 - Shipboard Lifting Appliance Certification and Inspections.doc DOC document
OMAO Procedure 0606-01 - Shipboard Lifting Appliance Certification and Inspections.pdf PDF
Weight Report.xls XLS spreadsheet
TJ-437D-01 Tank Level Indication System.pdf PDF
TJ-311-05 Engine Ship_s Service Generator Series 60.pdf PDF
085-6980295E TJ Tank Capacities and Soundings.pdf PDF
501-6634837B Reach Rod ARR and Details.pdf PDF
TJ-152-001A Main Deck and 01 Deck Mods General Arrangment.pdf PDF
512-3275003-9 HVAC MODS 2ND DECK and BLW REV B.pdf PDF
TJ-079-01 Rev C Intact Stability_97515713.pdf PDF
514-3275003-6 REV A AC PIPING INSTL 2ND DK and BLW.pdf PDF
634-6634945B Deck Covering Schedule.pdf PDF
TJ-551-002A_Compressed Air System Piping Diagram Modification As Built.pdf PDF
320-6634691 Cable Wtrtight Penetrations-removal.pdf PDF
TJ-985-6634639O Fire Control Plan_130928347.pdf PDF
TJ-528-010A - Waste Water Tank Structural Modifications_102021653.pdf PDF
514-6634840 HVAC Load Calculations.pdf PDF
525-6634776E Fill Vents and Sounds Diagram.pdf PDF
101-6634860D Structural Module 1.pdf PDF
TJ-461A-001C Transducer Installation_102018594.pdf PDF
321-3274004-3A HVAC Elec Control Mods Incdt HVAC Mods.pdf PDF
622-6634895 Machinery Space Floor Plates and Grating.pdf PDF
501-6634831_Piping Module No 3.pdf PDF
514-003_-_Refrigerant System and Condensate Piping Modifications.pdf PDF
TJ-529-6634787D_Bilge and Ballast System Diagram.pdf PDF
505-6634825 Standard Piping Details.pdf PDF
TJ-524-001 Sea Chest Cross-Over Piping.pdf PDF
551-6634801_Rev E Compressed Air Sys Diag.pdf PDF
501-6634830 Piping Module No 2.pdf PDF
101-6634861 Structural Module 2.pdf PDF
101-6634879 Deck and Bottom Scantlings.pdf PDF
245-6634744_Propeller Diagram.pdf PDF
624-6634931 Joiner Door Schedule.pdf PDF
TJ-551-002A_Compressed Air System Piping Diagram Modification (As Built).pdf PDF
Show all 50

MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ofSheet

Rev

Scale

C

A

D

Maritime Systems Division 2750 Prosperity Avenue Suite 600 Fairfax VA 22031

(703) 270 1540

Size

Drawing Title

Drawn by Date Prepared for

Date

Date

Checked by

Approved by

NOAA Office of Marine & Aviation Operations 8403 Colesville Road

Silver Spring MD 20910

B

C

A

D

Drawing Number

THIRD ANGLE PROJECTION

UNLESS OTHERWISE SPECIFIED

DIM ARE IN INCHES

TOL ON ANGLE ± 0.01°

INTERPRET DIM AND TOL PER

ASME Y14.5M-2009

ABS Approval Date

DateUSCG Approval

HULL NUMBER

TJ-304-001D

S-222

NOAA SHIP THOMAS JEFFERSON

SWBS

MCT LOCATIONS

D W

G :T

J-

4-

R

EV

GENERAL NOTES

NWT 8/13/2021

REVISIONS

ZONE REV DESCRIPTION DATE APPROVED

ALL 1 ADDED TYPES AND BOUNDARY

CLASSIFICATIONS TO ALL CABLE

PENETRATION DESIGNATIONS. ADDED

SHEETS 1A-1C. ADDED TABLES 6-D, 6-B, 14A-D,

14A-B, 11A-B, 11B-B, 11C-C

10/8/2021

REFERENCES

NO. TITLE DRAWING NO.

1 BOOKLET OF GENERAL PLANS TJ-085-002

2 FIRE CONTROL PLAN TJ-985-6634639

3 NOAAS THOMAS JEFFERSON CABLE PENETRATIONS SURVEY

4 NOAAS THOMAS JEFFERSON CABLE PENETRATIONS DATA

DRAWING INDEX

SHT REV TITLE

1 1 GENERAL NOTES

1A 1 GENERAL NOTES (CONT)

1B 1 GENERAL NOTES (CONT)

1C 1 GENERAL NOTES (CONT)

2 1 04 & 03 DECK

3 1 02 DECK

4 1 01 DECK FORWARD

5 1 01 DECK AFT

6 1 MAIN DECK FORWARD

7 1 MAIN DECK AFT

8 1 2ND DECK FORWARD

9 1 2ND DECK AFT

10 1 3RD DECK FORWARD

GENERAL NOTES

1 THIS DRAWING IS A VISUAL REPRESENTATION OF ALL CABLE PENETRATIONS IDENTIFIED BY

THE ECS MCT SURVEY TEAM ABOARD NOAA SHIP THOMAS JEFFERSON AS OF JULY 2021.

2 CABLE PENETRATION DESIGNATIONS ON THIS DRAWING UTILIZE THE DESIGNATION SCHEME

OUTLINED IN FIGURE 5-D. FULL MCT DATA CAN BE FOUND IN REFERENCES 3 AND 4.

.\mct designations.jpg

FIGURE 3-D: CABLE PENETRATION DESIGNATION BREAKDOWN

SYMBOLS

DECK PENETRATION

BULKHEAD PENETRATION

TABLE 6-D: CABLE PENETRATIONS - 04 DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

04-29-0-D-B-WTHR D B 4 8 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

04-29-1-D-K-WTHR D K 1 10 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-29-2-D-K-WTHR-1 D K 1 6 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-29-2-D-K-WTHR-2 D K 1.5 8 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-29-3-D-K-WTHR-1 D K 1.5 8 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-29-3-D-K-WTHR-2 D K .75 7 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-30-1-D-K-WTHR-1 D K .75 10 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-30-1-D-K-WTHR-2 D K 1 9 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-30-2-D-K-WTHR D K .75 9 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-33-0-D-B-WTHR D B 4 9 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-34-2-D-K-WTHR D K .75 8 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-35-2-D-K-WTHR D K .75 10 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-37-2-D-K-WTHR D K 1 10 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-37-4-D-B-WTHR D B 5 6 3 03-27-0 PILOT HOUSE 04 DECK WEATHER WTHR NT

04-40-2-D-K-WTHR D K .75 11 03-39-2 AFT RADIO ROOM 04 DECK WEATHER WTHR NT

04-43-0-B-K-WTHR-1 B K 2.5 3 03-36-0 CHART ROOM 04 DECK WEATHER WTHR NT

04-43-0-B-K-WTHR-2 B K .75 3 03-36-0 CHART ROOM 04 DECK WEATHER WTHR NT

04-43-0-B-K-WTHR-3 B K 1 3 03-36-0 CHART ROOM 04 DECK WEATHER WTHR NT

04-43-1-D-K-WTHR-1 D K .75 10 03-36-0 CHART ROOM 04 DECK WEATHER WTHR NT

04-43-1-D-K-WTHR-2 D K 1 10 03-36-0 CHART ROOM 04 DECK WEATHER WTHR NT

04-43-2-D-K-WTHR D K .75 10 03-39-2 AFT RADIO ROOM 04 DECK WEATHER WTHR NT

04-44-1-D-K-WTHR D K .75 10 03-36-0 CHART ROOM 04 DECK WEATHER WTHR NT

04-44-2-D-K-WTHR D K 1 12 03-39-2 AFT RADIO ROOM 04 DECK WEATHER WTHR NT

04-44-4-D-K-WTHR D K .75 10 03-39-2 AFT RADIO ROOM 04 DECK WEATHER WTHR NT

TABLE 6-B: CABLE PENETRATIONS - 03 DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

03-26-0-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-1-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-2-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-3-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-4-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-5-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-6-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-7-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-8-B-K-WTHR B K .5 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-26-9-B-K-WTHR B K 1 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-27-1-D-K-A-1 D K .75 4 03-27-0 PILOT HOUSE 02-24-1 CAPTAINS OFFICE A A-60

03-27-1-D-K-A-2 D K .75 4 03-27-0 PILOT HOUSE 02-24-1 CAPTAINS OFFICE A A-60

03-27-1-D-K-A-3 D K .75 4 03-27-0 PILOT HOUSE 02-24-1 CAPTAINS OFFICE A A-60

TABLE 6-B: CABLE PENETRATIONS - 03 DECK

03-27-2-D-K-A-1 D K .75 4 03-27-0 PILOT HOUSE 3-25-2 STAIRTOWER A A-0

03-27-2-D-K-A-2 D K .75 4 03-27-0 PILOT HOUSE 3-25-2 STAIRTOWER A A-0

03-27-2-D-K-A-3 D K .75 4 03-27-0 PILOT HOUSE 3-25-2 STAIRTOWER A A-0

03-27-4-D-B-A D B 9 4.5 3 03-27-0 PILOT HOUSE 02-24-2 XOS OFFICE A A-60

03-28-1-B-K-WTHR B K 1 2 03-27-0 PILOT HOUSE 03 DECK WEATHER WTHR NT

03-29-0-D-B-A-1 D B 8.5 5 3 03-27-0 PILOT HOUSE 02-26-0 PASSAGEWAY A A-0

03-29-0-D-B-A-2 D B 8.5 5 3 03-27-0 PILOT HOUSE 02-26-0 PASSAGEWAY A A-0

03-29-1-D-B-A D B 4 3 03-27-0 PILOT HOUSE 02-26-0 PASSAGEWAY A A-0

03-29-2-D-B-A-1 D B 11 4.5 3 03-27-0 PILOT HOUSE 3-25-2 STAIRTOWER A A-0

03-29-2-D-B-A-2 D B 11 4.5 3 03-27-0 PILOT HOUSE 3-25-2 STAIRTOWER A A-0

03-29-3-D-B-A-1 D B 11 4.5 3 03-27-0 PILOT HOUSE 02-24-1 CAPTAINS OFFICE A A-60

03-29-3-D-B-A-2 D B 11 4.5 3 03-27-0 PILOT HOUSE 02-24-1 CAPTAINS OFFICE A A-60

03-29-4-D-B-A D B 6 3 03-27-0 PILOT HOUSE 02-24-2 XOS OFFICE A A-60

03-29-5-D-B-A D B 6 3 03-27-0 PILOT HOUSE 02-24-1 CAPTAINS OFFICE A A-60

03-33-2-B-O-B B O 1 0 03-27-0 PILOT HOUSE 03-33-2 RADIO ROOM B A-0

03-33-4-B-P-B B P 12 4.5 1.5 03-27-0 PILOT HOUSE 03-33-2 RADIO ROOM B A-0

03-35-2-D-P-A D P 6 9 03-27-0 PILOT HOUSE 02-26-0 PASSAGEWAY A A-0

03-36-1-B-P-B B P 12 7 4 03-36-0 CHART ROOM 03-33-1 PUBLIC TOILET B NT

03-36-3-D-P-A D P 6 9 03-36-0 CHART ROOM 02-24-1 CAPTAINS OFFICE A A-60

03-38-2-B-O-B B O 3 4 03-36-0 CHART ROOM 03-33-2 RADIO ROOM B A-0

03-38-4-B-O-B B O 8 4 0 03-36-0 CHART ROOM 03-33-2 RADIO ROOM B A-0

03-39-2-B-O-A B O 4 0 03-36-0 CHART ROOM 03-33-2 RADIO ROOM A A-0

03-39-4-B-B-A B B 6 3 03-33-2 RADIO ROOM 03-39-2 AFT RADIO ROOM A A-0

03-39-6-B-B-A B B 6 3 03-33-2 RADIO ROOM 03-39-2 AFT RADIO ROOM A A-0

03-39-8-B-B-A B B 6 3 03-33-2 RADIO ROOM 03-39-2 AFT RADIO ROOM A A-0

03-39-10-B-B-A B B 6 3 03-33-2 RADIO ROOM 03-39-2 AFT RADIO ROOM A A-0

03-44-1-B-K-WTHR B K 1 2 03-36-0 CHART ROOM 03 DECK WEATHER WTHR NT

03-44-2-B-K-WTHR B K 1 2 03-39-2 AFT RADIO ROOM 03 DECK WEATHER WTHR NT

03-45-0-D-B-WTHR D B 7.5 4 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-1 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-10 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-2 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-3 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-4 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-5 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-6 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-7 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-8 D K 1 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

03-46-0-D-K-WTHR-9 D K .75 8 03-36-0 CHART ROOM 02-26-0 PASSAGEWAY WTHR A-0

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

GENERAL NOTES (CONT)

1ANTS

16A

16A

15A

15A

14A

14A

13A

13A

12A

12A

11A

11A

10A

10A

9A

9A

TABLE 14A-D: CABLE PENETRATIONS - 02 DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

02-20-0-D-K-WTHR D K 1 10 01-17-0 PASSAGEWAY 02 DECK WEATHER WTHR NT

02-24-0-B-K-WTHR-1 B K 1 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-24-0-B-K-WTHR-2 B K 1 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-24-1-B-K-WTHR B K 1 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-24-2-B-K-WTHR B K 1 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-26-2-B-O-B B O 5 4 0 02-24-2 XOS OFFICE 02-26-0 PASSAGEWAY B B-0

02-27-2-D-B-A-1 D B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-27-2-D-B-A-2 D B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-28-0-B-P-B B P 13 5 4 02-26-0 PASSAGEWAY 02-24-1 CAPTAINS OFFICE B B-0

02-29-1-B-K-WTHR-1 B K 1.5 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-29-1-B-K-WTHR-2 B K 1.5 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-29-1-B-K-WTHR-3 B K 1.5 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-29-1-B-K-WTHR-4 B K 1 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-29-2-B-B-A-1 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-26-0 PASSAGEWAY A A-0

02-29-2-B-B-A-2 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-26-0 PASSAGEWAY A A-0

02-29-2-B-B-A-3 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-26-0 PASSAGEWAY A A-0

02-29-2-B-B-A-4 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-26-0 PASSAGEWAY A A-0

02-29-4-B-B-A-1 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-29-4-B-B-A-2 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-29-4-B-B-A-3 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-29-4-B-B-A-4 B B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-30-2-B-K-WTHR-1 B K 1.5 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-30-2-D-B-A-1 D B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-30-2-B-K-WTHR-2 B K 1.5 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-30-2-D-B-A-2 D B 11 4.75 2.25 3-25-2 STAIRTOWER 02-24-2 XOS OFFICE A A-0

02-30-2-B-K-WTHR-3 B K 1.5 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-30-2-B-K-WTHR-4 B K 1 2 02-24-2 XOS OFFICE 02 DECK WEATHER WTHR NT

02-31-1-B-K-WTHR-1 B K 1 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-31-1-B-K-WTHR-2 B K 1 2 02-24-1 CAPTAINS OFFICE 02 DECK WEATHER WTHR NT

02-35-1-B-B-A-1 B B 10 4.75 2.25 03-27-0 PILOT HOUSE 02-37-3 CAPTAINS STATEROOM A A-60 02-35-1-B-B-A-2 B B 10 4.75 2.25 03-27-0 PILOT HOUSE 02-37-3 CAPTAINS STATEROOM A A-60 02-35-1-B-B-A-3 B B 10 4.75 2.25 03-27-0 PILOT HOUSE 02-37-3 CAPTAINS STATEROOM A A-60

02-36-2-B-P-B B P 11 5 4 02-26-0 PASSAGEWAY 02-31-2 XOS SR B B-0

02-41-0-B-P-B B P 14 4 4 02-26-0 PASSAGEWAY 02-37-3 CAPTAINS STATEROOM B B-0

02-41-2-B-P-B B P 2 4 02-26-0 PASSAGEWAY 02-40-2 STATEROOM (2 MAN) B B-0

02-45-0-B-P-B B P 2 4 02-26-0 PASSAGEWAY 02-37-3 CAPTAINS STATEROOM B B-0

02-45-2-B-P-B B P 2 0 02-26-0 PASSAGEWAY 02-40-2 STATEROOM (2 MAN) B B-0

02-46-2-B-K-WTHR B K .75 2 02-40-2 STATEROOM (2 MAN) 02 DECK WEATHER WTHR NT

02-57-1-B-K-WTHR B K 1.5 2 1-58-0 UPTAKE 02 DECK WEATHER WTHR NT

02-57-2-B-K-WTHR B K 1.5 2 1-58-0 UPTAKE 02 DECK WEATHER WTHR NT

TABLE 14A-B: CABLE PENETRATIONS - 01 DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

01-F-0-D-K-AW-1 D K .75 12 1-C-0 BOATSWAIN STORAGE 02 DECK WEATHER A NT

01-F-0-D-K-AW-2 D K .75 12 1-C-0 BOATSWAIN STORAGE 02 DECK WEATHER A NT

01-F-0-D-K-AW-3 D K .75 12 1-C-0 BOATSWAIN STORAGE 02 DECK WEATHER A NT

01-F-0-D-K-AW-4 D K .75 12 1-C-0 BOATSWAIN STORAGE 02 DECK WEATHER A NT

01-F-0-D-K-AW-5 D K .75 12 1-C-0 BOATSWAIN STORAGE 02 DECK WEATHER A NT

01-F-0-D-K-AW-6 D K .75 12 1-C-0 BOATSWAIN STORAGE 02 DECK WEATHER A NT

01-8-0-D-K-WTHRW-1 D K .75 6 1-8-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-8-0-D-K-WTHRW-2 D K 1.25 6 1-8-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-8-0-D-K-WTHRW-3 D K 1 6 1-8-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-8-0-D-K-WTHRW-4 D K 1 8 1-8-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-17-0-B-K-WTHRW B K 1 2 01-17-0 PASSAGEWAY 02 DECK WEATHER WTHR NT

01-19-1-B-K-B-1 B K 1.25 2 01-17-1 LOCKER 01-17-0 PASSAGEWAY B B-0

01-19-1-B-K-B-2 B K .75 2 01-17-1 LOCKER 01-17-0 PASSAGEWAY B B-0

01-19-2-B-K-WTHR B K .75 2 01-19-2 OPERATIONS OFFICERS

OFFICE

02 DECK WEATHER WTHR NT

01-20-0-B-K-B B K .75 4 01-17-1 LOCKER 01-25-1 CHIEF ENGINEERS

STATEROOM

B B-0

01-21-0-B-O-B B O 1 01-17-0 PASSAGEWAY 01-25-1 CHIEF ENGINEERS

STATEROOM

B B-0

01-23-2-B-P-B-1 B P 2 4 01-17-0 PASSAGEWAY 01-19-2 OPERATIONS OFFICERS

OFFICE

B B-0

01-23-2-B-P-B-2 B P 1 0 01-17-0 PASSAGEWAY 01-19-2 OPERATIONS OFFICERS

OFFICE

B B-0

01-24-2-B-O-B B O 01-17-0 PASSAGEWAY 01-19-2 OPERATIONS OFFICERS

OFFICE

B B-0

01-25-0-B-P-B B P 2 4 01-25-1 CHIEF ENGINEERS

STATEROOM

01-17-0 PASSAGEWAY B B-0

01-26-0-B-K-B B K 1.25 3 01-17-0 PASSAGEWAY 01-25-1 CHIEF ENGINEERS

STATEROOM

B B-0

TABLE 14A-B: CABLE PENETRATIONS - 01 DECK

01-27-0-B-O-B B O 6 01-17-0 PASSAGEWAY 01-25-1 CHIEF ENGINEERS

STATEROOM

B B-0

01-30-1-B-K-A B K .75 4 01-30-3 FAN ROOM 01-30-1 CLEANING GEAR LOCKER A A-0

01-30-2-B-B-A-1 B B 11 4.75 2.25 3-25-2 STAIRTOWER 01-17-0 PASSAGEWAY A A-0

01-30-2-B-B-A-2 B B 11 4.75 2.25 3-25-2 STAIRTOWER 01-17-0 PASSAGEWAY A A-0

01-30-3-B-K-A B K .75 3 01-30-3 FAN ROOM 01-25-1 CHIEF ENGINEERS

STATEROOM

A A-0

01-31-0-B-K-A B K .75 3 01-17-0 PASSAGEWAY 01-30-1 CLEANING GEAR LOCKER A B-0

01-32-0-B-K-A B K .75 4 01-17-0 PASSAGEWAY 01-30-3 FAN ROOM A A-0

01-33-0-B-B-A B B 5 4 01-17-0 PASSAGEWAY 01-30-3 FAN ROOM A A-0

01-35-0-B-P-B B P 8 4 4 01-17-0 PASSAGEWAY 01-34-1 STATEROOM (2 MAN) B B-0

01-36-0-B-P-B B P 1.5 2 01-17-0 PASSAGEWAY 01-34-1 STATEROOM (2 MAN) B B-0

01-36-2-B-P-B B P 2 3 01-17-0 PASSAGEWAY 01-34-4 STATEROOM (2 MAN) B B-0

01-38-2-B-P-B B P 3 0 01-17-0 PASSAGEWAY 01-34-4 STATEROOM (2 MAN) B B-0

01-39-0-B-O-B B O 4 01-17-0 PASSAGEWAY 01-39-1 STATEROOM (1 MAN) B B-0

01-41-2-B-P-B B P 2 3 01-17-0 PASSAGEWAY 01-39-2 STATEROOM (1 MAN) B B-0

01-43-1-B-B-A B B 5.5 3 01-43-5 DECK STORAGE LOCKER 01-39-1 STATEROOM (1 MAN) A B-0

01-44-0-B-K-A-1 B K .75 0 01-17-0 PASSAGEWAY 01-43-1 LINEN LOCKER A B-0

01-44-0-B-K-A-2 B K .75 0 01-17-0 PASSAGEWAY 01-43-1 LINEN LOCKER A B-0

01-44-0-B-K-A-3 B K .75 3 01-17-0 PASSAGEWAY 01-43-1 LINEN LOCKER A B-0

01-44-0-B-K-A-4 B K .75 3 01-17-0 PASSAGEWAY 01-43-1 LINEN LOCKER A B-0

01-44-1-B-O-A-1 B O 1 0 01-43-3 DECK GEAR LOCKER 01-43-1 LINEN LOCKER A A-0

01-44-1-B-K-A-2 B K .75 2 01-43-3 DECK GEAR LOCKER 01-43-1 LINEN LOCKER A C

01-44-1-B-K-A-3 B K .75 3 01-43-3 DECK GEAR LOCKER 01-43-1 LINEN LOCKER A C

01-44-1-B-O-A-4 B O .75 0 01-43-3 DECK GEAR LOCKER 01-43-1 LINEN LOCKER A A-0

01-44-3-B-K-A-1 B K .75 4 01-43-5 DECK STORAGE LOCKER 01-43-3 DECK GEAR LOCKER A C 01-44-3-B-K-A-2 B K .75 6 01-43-5 DECK STORAGE LOCKER 01-43-3 DECK GEAR LOCKER A C

01-45-2-B-P-B B P 2 4 01-17-0 PASSAGEWAY 01-43-4 STATEROOM (1 MAN) B B-0

01-46-0-B-K-A-1 B K .75 4 01-17-0 PASSAGEWAY 01-43-1 LINEN LOCKER A B-0

01-46-0-B-K-A-2 B K .75 4 01-17-0 PASSAGEWAY 01-43-1 LINEN LOCKER A B-0

01-46-2-B-O-B B O 01-17-0 PASSAGEWAY 01-43-4 STATEROOM (1 MAN) B B-0

01-47-1-B-K-WTHR B K .75 4 01-43-1 LINEN LOCKER 01 DECK WEATHER WTHR NT

01-47-2-B-K-WTHR B K 1.5 4 01-17-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-47-3-B-K-WTHR B K 1 2 01-43-3 DECK GEAR LOCKER 01 DECK WEATHER WTHR NT

01-47-4-B-K-WTHR B K 1 2 01-43-4 STATEROOM (1 MAN) 01 DECK WEATHER WTHR NT

01-55-1-D-K-WTHRW-1 D K .75 6 1-50-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-55-1-D-K-WTHRW-2 D K .75 6 1-50-0 PASSAGEWAY 01 DECK WEATHER WTHR NT

01-59-1-D-K-A-1 D K .75 9 1-58-0 UPTAKE 1-50-0 PASSAGEWAY A A-0

01-59-1-D-K-A-2 D K .75 9 1-58-0 UPTAKE 1-50-0 PASSAGEWAY A A-0

01-59-1-D-K-A-3 D K .75 9 1-58-0 UPTAKE 1-50-0 PASSAGEWAY A A-0

01-59-1-D-K-A-4 D K .75 9 1-58-0 UPTAKE 1-50-0 PASSAGEWAY A A-0

01-61-1-D-B-A D B 8 4 01-61-0 HPU ENCLOSURE 1-50-0 PASSAGEWAY A A-0

01-61-2-B-K-A B K .75 4 01-61-0 HPU ENCLOSURE 1-58-0 UPTAKE A A-0

01-75-0-D-K-AW D K .75 4 1-50-0 PASSAGEWAY 01 DECK WEATHER A NT

TABLE 11A-B: CABLE PENETRATIONS - MAIN DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

1-5-1-D-K-NW D K .75 9 1-C-0 BOATSWAIN STORAGE 4-0-0 FOREPEAK BALLAST N NT

1-8-1-B-B-AW B B 6.5 4.75 2.25 1-C-0 BOATSWAIN STORAGE 1-8-0 PASSAGEWAY A B-0

1-8-2-D-K-AW-1 D K .75 9 2-8-0 PASSAGEWAY 1-8-0 PASSAGEWAY A A-0

1-8-2-D-K-AW-2 D K .75 9 2-8-0 PASSAGEWAY 1-8-0 PASSAGEWAY A A-0

1-8-2-D-K-AW-3 D K .75 9 2-8-0 PASSAGEWAY 1-8-0 PASSAGEWAY A A-0

1-14-2-B-B-A B B 4.75 3 1-8-0 PASSAGEWAY 1-8-4 FAN ROOM A A-0

1-14-4-B-K-A B K 3.25 3.5 1-8-0 PASSAGEWAY 1-8-4 FAN ROOM A A-0

1-16-0-B-B-AW B B 11 4.75 2.25 1-8-0 PASSAGEWAY 1-16-0 PASSAGEWAY A C

1-17-1-B-O-A-1 B O .125 0 1-16-0 PASSAGEWAY 1-16-1 MESS DECK A B-0

1-17-1-B-K-A-2 B K .125 0 1-16-0 PASSAGEWAY 1-16-1 MESS DECK A B-0

1-17-1-B-K-A-3 B K 1 0 1-16-0 PASSAGEWAY 1-16-1 MESS DECK A B-0

1-23-2-B-O-A B O .125 0 1-16-2 GALLEY 1-16-0 PASSAGEWAY A A-0

1-24-2-B-O-A B O 1 0.5 1-16-2 GALLEY 1-16-0 PASSAGEWAY A A-0

1-24-4-B-B-A B B 6 4.75 2.25 1-16-2 GALLEY 1-16-0 PASSAGEWAY A A-0

1-25-2-B-B-A-1 B B 11 4.75 2.25 3-25-2 STAIRTOWER 1-16-0 PASSAGEWAY A A-0

1-25-2-B-B-A-2 B B 11 4.75 2.25 3-25-2 STAIRTOWER 1-16-0 PASSAGEWAY A A-0

1-30-1-B-P-A B P 6.5 4.5 4 1-16-0 PASSAGEWAY 1-16-1 MESS DECK A B-0

1-30-2-B-B-A-1 B B 11 4.75 2.25 3-25-2 STAIRTOWER 1-16-0 PASSAGEWAY A A-0

1-30-2-B-B-A-2 B B 11 4.75 2.25 3-25-2 STAIRTOWER 1-16-0 PASSAGEWAY A A-0

1-30-2-B-B-A-3 B B 11 4.75 2.25 3-25-2 STAIRTOWER 1-16-0 PASSAGEWAY A A-0

1-30-2-B-B-A-4 B B 11 4.75 2.25 3-25-2 STAIRTOWER 1-16-0 PASSAGEWAY A A-0

1-31-1-B-P-A B P 6.5 4.5 4 1-16-0 PASSAGEWAY 1-30-1 LOUNGE A B-0

1-31-2-B-O-A B O 1.5 0.5 1-32-2 SSFC/UPS SPACE 3-25-2 STAIRTOWER A A-0

1-31-4-B-K-A-1 B K 2.5 3 3-25-2 STAIRTOWER 1-32-4 PLOT RM A A-0

1-31-4-B-K-A-2 B K 0.75 3 3-25-2 STAIRTOWER 1-32-4 PLOT RM A A-0

1-33-2-B-B-A B B 6 4.75 2.25 1-32-2 SSFC/UPS SPACE 1-8-0 PASSAGEWAY A A-0

1-33-4-D-B-A D B 9 4.75 2.25 1-32-4 SERVER RM 2-22-2 SCIENTIFIC STORAGE A A-0

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

GENERAL NOTES (CONT)

1BNTS

16B

16B

15B

15B

14B

14B

13B

13B

12B

12B

11B

11B

10B

10B

9B

9B

TABLE 11A-B: CABLE PENETRATIONS - MAIN DECK CONT

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

1-33-6-D-B-AW D B 5.75 10 1-32-4 SERVER RM 2-22-2 SCIENTIFIC STORAGE A A-0

1-34-2-B-K-A B K 2 2 1-32-2 SSFC/UPS SPACE 1-32-4 PLOT RM A A-0

1-35-2-B-O-A-1 B O 0.5 .25 1-16-0 PASSAGEWAY 1-32-4 PLOT RM A A-0

1-35-2-B-O-A-2 B O 2 .25 1-16-0 PASSAGEWAY 1-32-4 PLOT RM A A-0

1-38-2-B-O-C B O 8 4 0.25 1-32-4 SERVER RM 1-37-2 SURVEY CONTROL CENTER C A-0

1-38-4-B-O-C B O 8 4 0.25 1-32-4 SERVER RM 1-37-2 SURVEY CONTROL CENTER C A-0

1-40-2-B-P-A B P 4.25 4 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-41-2-B-B-A B B 11 4.75 2.25 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-41-4-B-B-A B B 4.5 4 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-41-6-B-K-A-1 B K 1 3 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-41-6-B-K-A-2 B K 1 3 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-41-6-B-K-A-3 B K 1 3 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-41-6-B-K-A-4 B K 2 3 1-37-2 SURVEY CONTROL CENTER 1-16-0 PASSAGEWAY A A-0

1-46-1-B-O-B B O 1 3 1-16-0 PASSAGEWAY 1-42-1 HOSPITAL B A-0

1-50-1-B-B-AW-1 B B 11 4.75 2.25 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-1-B-B-AW-2 B B 11 4.75 2.25 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-1-B-B-AW-3 B B 11 4.75 2.25 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-1-B-B-AW-4 B B 11 4.75 2.25 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-2-B-K-AW B K 1 2 1-37-2 SURVEY CONTROL CENTER MAIN DECK WEATHER A A-0

1-50-3-B-B-AW-1 B B 1 4.5 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-3-B-B-AW-2 B B 1 4.5 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-3-B-B-AW-3 B B 1 4.5 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-4-B-K-WTHRW-1 B K 2 4 1-32-4 SERVER RM MAIN DECK WEATHER WTHR A-0

1-50-4-B-K-WTHRW-2 B K 1 4 1-32-4 SERVER RM MAIN DECK WEATHER WTHR A-0

1-50-5-B-P-AW B P 6 6.25 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-50-7-B-B-AW B B 6 4.25 1-16-0 PASSAGEWAY 1-50-0 PASSAGEWAY A A-0

1-51-2-D-K-WTHRW-1 D K 1 8 2-51-2 STATEROOM (2 MAN) MAIN DECK WEATHER WTHR A-0

1-51-2-D-K-WTHRW-2 D K 1 8 2-51-2 STATEROOM (2 MAN) MAIN DECK WEATHER WTHR A-0

1-51-2-D-K-WTHRW-3 D K 1 8 2-51-2 STATEROOM (2 MAN) MAIN DECK WEATHER WTHR A-0

1-51-4-D-K-WTHRW-1 D K 1 8 2-51-2 STATEROOM (2 MAN) MAIN DECK WEATHER WTHR A-0

1-51-4-D-K-WTHRW-2 D K 1 8 2-51-2 STATEROOM (2 MAN) MAIN DECK WEATHER WTHR A-0

1-54-1-B-K-AW-1 B K 1 1 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-54-1-B-K-AW-2 B K 1 1 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-54-1-B-K-AW-3 B K 1 1 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-54-2-B-K-WTHRW B K 1 3 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-55-1-B-K-AW-1 B K 1 1 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-55-1-B-K-AW-2 B K 1 1 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-56-1-D-B-AW D B 4 10 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-58-1-B-P-AW B P 5 2.25 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-60-1-D-P-AW-1 D P 11 4.75 2.25 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-60-1-D-P-AW-2 D P 11 4.75 2.25 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-60-1-D-P-AW-3 D P 11 4.75 2.25 4-55-0 ENGINE ROOM 1-50-0 PASSAGEWAY A A-0

1-61-2-B-O-A-1 B O .5 .25 1-50-0 PASSAGEWAY 1-55-2 DAMAGE CONTROL LOCKER A A-0

1-61-2-B-O-A-2 B O .5 .25 1-50-0 PASSAGEWAY 1-55-2 DAMAGE CONTROL LOCKER A A-0

1-61-2-B-O-A-3 B O .5 .25 1-50-0 PASSAGEWAY 1-55-2 DAMAGE CONTROL LOCKER A A-0

1-62-1-D-B-WTHRW D B 4 4 4-55-0 ENGINE ROOM MAIN DECK WEATHER WTHR A-0

1-63-2-D-B-WTHRW D B 4 4 4-55-0 ENGINE ROOM MAIN DECK WEATHER WTHR A-0

1-63-4-D-B-WTHRW D B 4 4 4-55-0 ENGINE ROOM MAIN DECK WEATHER WTHR A-0

1-65-1-D-B-WTHRW D B 4 4 2-63-1 MACHINERY CONTROL

STATION

MAIN DECK WEATHER WTHR A-0

1-67-1-D-B-WTHRW D B 4 4 2-63-1 MACHINERY CONTROL

STATION

MAIN DECK WEATHER WTHR A-0

1-67-2-D-B-WTHRW D B 4 4 4-55-0 ENGINE ROOM MAIN DECK WEATHER WTHR A-0

1-70-2-B-K-WTHRW-1 B K 1 .5 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-70-2-B-K-WTHRW-2 B K 1 .5 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-71-1-B-K-WTHRW-1 B K 1 8 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-71-1-B-K-WTHRW-2 B K 1 8 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-71-1-B-K-WTHRW-3 B K 1 8 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-1-D-K-WTHRW D K 1 9 2-75-1 ENGINEERS STORAGE MAIN DECK WEATHER WTHR A-0

1-76-2-B-K-WTHRW-1 B K 1 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-2-B-K-WTHRW-2 B K 1 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-2-B-K-WTHRW-3 B K 1 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-2-B-K-WTHRW-4 B K 1 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-2-B-K-WTHRW-5 B K 1 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-2-B-K-WTHRW-6 B K 1 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-76-4-B-P-WTHRW B P 8 2 1-50-0 PASSAGEWAY MAIN DECK WEATHER WTHR A-0

1-77-1-B-B-A-1 B B 11 4.75 2.25 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-77-1-B-B-A-2 B B 11 4.75 2.25 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-77-3-B-B-A-1 B B 5 2.25 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-77-3-B-B-A-2 B B 5 2.25 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-77-5-B-K-A-1 B K 1 4 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-77-5-B-K-A-2 B K 1 4 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-77-5-B-K-A-3 B K 1 4 1-77-0 DIVE LOCKER 1-50-0 PASSAGEWAY A A-0

1-80-1-D-K-WTHRW D K 1 6 2-75-1 ENGINEERS STORAGE MAIN DECK WEATHER WTHR A-0

1-80-3-D-K-WTHRW D K 1 8 2-75-1 ENGINEERS STORAGE MAIN DECK WEATHER WTHR A-0

1-81-1-B-B-WTHRW B B 5 6.5 1-77-0 DIVE LOCKER MAIN DECK WEATHER WTHR A-0

TABLE 11A-B: CABLE PENETRATIONS - MAIN DECK CONT

1-81-3-B-K-WTHRW-1 B K 1 7 1-77-0 DIVE LOCKER MAIN DECK WEATHER WTHR A-0

1-81-3-B-K-WTHRW-2 B K 2 2 1-77-0 DIVE LOCKER MAIN DECK WEATHER WTHR A-0

1-83-1-B-K-A B K 1 5 1-77-0 DIVE LOCKER 1-83-0 EMERGENCY GENERATOR

ROOM

A A-0

1-83-2-B-P-A B P 4 4 1-83-0 EMERGENCY GENERATOR

ROOM

1-77-0 DIVE LOCKER A A-0

1-83-3-B-B-A-1 B B 11 4.75 2.25 1-77-0 DIVE LOCKER 1-83-0 EMERGENCY GENERATOR

ROOM

A A-0

1-83-3-B-B-A-2 B B 11 4.75 2.25 1-77-0 DIVE LOCKER 1-83-0 EMERGENCY GENERATOR

ROOM

A A-0

1-83-4-B-K-A B K 1 3 1-83-0 EMERGENCY GENERATOR

ROOM

1-77-0 DIVE LOCKER A A-0

1-83-5-B-K-A-1 B K 1 6 1-77-0 DIVE LOCKER 1-83-0 EMERGENCY GENERATOR

ROOM

A A-0

1-83-5-B-K-A-2 B K 1 6 1-77-0 DIVE LOCKER 1-83-0 EMERGENCY GENERATOR

ROOM

A A-0

1-83-5-B-K-A-3 B K 1 6 1-77-0 DIVE LOCKER 1-83-0 EMERGENCY GENERATOR

ROOM

A A-0

1-83-6-B-P-A B P 6 5 1-83-0 EMERGENCY GENERATOR

ROOM

1-77-0 DIVE LOCKER A A-0

1-83-8-D-K-AW D K .75 8 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-84-2-D-B-AW-1 D B 11 4.75 2.25 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-84-2-D-B-AW-2 D B 11 4.75 2.25 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-84-4-D-B-AW-1 D B 11 4.75 2.25 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-84-4-D-B-AW-2 D B 11 4.75 2.25 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-84-6-D-B-AW-1 D B 11 4.75 2.25 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-84-6-D-B-AW-2 D B 11 4.75 2.25 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-87-2-D-K-AW D K .75 1-83-0 EMERGENCY GENERATOR

ROOM

2-75-0 WORKSHOP A A-0

1-89-1-B-K-A-1 B K 1 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-1-D-K-WTHRW-1 D K 1 6 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-89-1-B-K-A-2 B K 2 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-1-D-K-WTHRW-2 D K 1 6 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-89-1-B-K-A-3 B K 2.5 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-1-D-K-WTHRW-3 D K 1 6 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-89-1-B-K-A-4 B K 1 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-1-D-K-WTHRW-4 D K 1 6 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-89-1-B-K-A-5 B K 2 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-1-B-K-A-6 B K 2 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-1-B-K-A-7 B K 1 3 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-89-2-B-K-A B K 5 10 1-83-0 EMERGENCY GENERATOR

ROOM

MAIN DECK WEATHER A A-0

1-94-2-D-K-WTHRW-1 D K 1 8 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-94-2-D-K-WTHRW-2 D K 1 8 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-95-1-D-B-WTHRW D B 4 4 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-95-3-D-K-WTHRW-1 D K 1 8 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-95-3-D-K-WTHRW-2 D K 1 8 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-95-3-D-K-WTHRW-3 D K 1 8 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

1-95-3-D-K-WTHRW-4 D K 1 8 4-87-0 STEERING GEAR ROOM MAIN DECK WEATHER WTHR A-0

TABLE 11B-B: CABLE PENETRATIONS - 2ND DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

2-22-0-B-B-AW-1 B B 11 5 3 2-25-0 PASSAGEWAY 2-34-0 PASSAGEWAY A C

2-22-0-B-B-AW-2 B B 11 5 3 2-25-0 PASSAGEWAY 2-34-0 PASSAGEWAY A C

2-22-1-B-P-AW B P 1.25 8 2-25-0 PASSAGEWAY 2-34-0 PASSAGEWAY A C

2-25-2-B-B-A-1 B B 11 4.75 2.25 3-25-2 STAIRTOWER 2-25-0 PASSAGEWAY A A-0

2-25-2-B-B-A-2 B B 11 4.75 2.25 3-25-2 STAIRTOWER 2-25-0 PASSAGEWAY A A-0

2-25-4-B-B-A B B 11 4.75 2.25 3-25-2 STAIRTOWER 2-22-2 SCIENTIFIC STORAGE A A-0

2-25-6-D-B-AW D B 11 5 4 2-22-2 SCIENTIFIC STORAGE 3-22-2 LAUNDRY A A-0

2-26-1-B-O-B B O 3 0 2-25-0 PASSAGEWAY 2-25-1 STATEROOM (2 MAN) B B-0

2-27-1-B-O-A B O 2 0 2-25-0 PASSAGEWAY 2-25-1 STATEROOM (2 MAN) A B-0

2-32-2-B-O-A-1 B O 1.25 4 2-22-2 SCIENTIFIC STORAGE 2-25-0 PASSAGEWAY A A-0

2-32-2-B-O-A-2 B O 1.25 4 2-22-2 SCIENTIFIC STORAGE 2-25-0 PASSAGEWAY A A-0

2-33-0-B-O-A-1 B O 1 0 2-22-2 SCIENTIFIC STORAGE 2-25-0 PASSAGEWAY A A-0

2-33-0-B-O-A-2 B O 1 0 2-22-2 SCIENTIFIC STORAGE 2-25-0 PASSAGEWAY A A-0

2-33-0-B-O-A-3 B O 1 0 2-22-2 SCIENTIFIC STORAGE 2-25-0 PASSAGEWAY A A-0

2-33-1-B-O-B B O 2 0 2-25-0 PASSAGEWAY 2-30-1 STATEROOM (2 MAN) B B-0

2-33-2-D-B-AW D B 7.5 9 2-22-2 SCIENTIFIC STORAGE 4-30-0 TRANSDUCER VOID A NT

2-33-4-D-B-AW D B 6 9 2-22-2 SCIENTIFIC STORAGE 4-30-0 TRANSDUCER VOID A NT

2-33-6-D-B-AW D B 8.5 5 3 2-22-2 SCIENTIFIC STORAGE 4-30-0 TRANSDUCER VOID A NT

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

GENERAL NOTES (CONT)

1CNTS

16C

16C

15C

15C

14C

14C

13C

13C

12C

12C

11C

11C

10C

10C

9C

9C

TABLE 11B-B: CABLE PENETRATIONS - 2ND DECK CONT

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

2-33-8-D-K-AW-1 D K .75 7 2-22-2 SCIENTIFIC STORAGE 4-30-0 TRANSDUCER VOID A NT

2-33-8-D-K-AW-2 D K .75 8 2-22-2 SCIENTIFIC STORAGE 4-30-0 TRANSDUCER VOID A NT

2-34-1-B-K-B B K .75 3 2-34-0 PASSAGEWAY 2-34-1 STATEROOM (2 MAN) B B-0

2-34-2-B-B-AW-1 B B 11 5 3 2-34-0 PASSAGEWAY 2-25-0 PASSAGEWAY A B-0

2-34-2-B-B-AW-2 B B 11 5 3 2-34-0 PASSAGEWAY 2-25-0 PASSAGEWAY A B-0

2-35-1-B-O-B B O .75 2 2-34-0 PASSAGEWAY 2-35-1 CLEANING GEAR LOCKER B B-0

2-35-2-B-O-B B O 3 2 4 2-34-0 PASSAGEWAY 2-34-2 STATEROOM (2 MAN) B B-0

2-36-0-B-K-A-1 B K .75 2 2-34-0 PASSAGEWAY 2-35-1 CLEANING GEAR LOCKER A B-0

2-36-0-B-K-A-2 B K .75 2 2-34-0 PASSAGEWAY 2-35-1 CLEANING GEAR LOCKER A B-0

2-39-2-B-O-B B O 2 0 2-34-0 PASSAGEWAY 2-37-2 T/SH B B-0

2-40-0-B-K-A-1 B K .75 3 2-37-1 STAIR PASSAGE 2-34-0 PASSAGEWAY A A-0

2-40-0-B-K-A-2 B K .75 3 2-37-1 STAIR PASSAGE 2-34-0 PASSAGEWAY A A-0

2-40-0-B-K-A-3 B K .75 3 2-37-1 STAIR PASSAGE 2-34-0 PASSAGEWAY A A-0

2-42-1-B-P-B B P 3 2-34-0 PASSAGEWAY 2-39-1 STATEROOM (2 MAN) B B-0

2-43-1-B-O-B B O 2 0 2-43-0 PASSAGEWAY 2-43-1 STATEROOM (2 MAN) B B-0

2-43-2-B-B-A-1 B B 11 5 2-34-0 PASSAGEWAY 2-43-0 PASSAGEWAY A C

2-43-2-B-B-A-2 B B 11 5 2-34-0 PASSAGEWAY 2-43-0 PASSAGEWAY A C

2-43-3-B-O-B B O 2 0 2-43-0 PASSAGEWAY 2-43-1 STATEROOM (2 MAN) B B-0

2-44-0-B-K-B-1 B K .75 3 2-43-0 PASSAGEWAY 2-44-1 CLEANING GEAR LOCKER A B-0

2-44-0-B-K-B-2 B K .75 3 2-43-0 PASSAGEWAY 2-44-1 CLEANING GEAR LOCKER B B-0

2-44-2-B-O-B B O 2 2-34-0 PASSAGEWAY 2-43-2 STATEROOM (2 MAN) B B-0

2-45-2-B-O-B B O 2 0 2-34-0 PASSAGEWAY 2-43-2 STATEROOM (2 MAN) B B-0

2-47-2-B-O-B B O 2-34-0 PASSAGEWAY 2-46-2 T/SH B B-0

2-48-0-B-K-A-1 B K 1 3 2-44-1 STAIR PASSAGE 2-43-0 PASSAGEWAY A A-0

2-48-0-B-K-A-2 B K .75 3 2-44-1 STAIR PASSAGE 2-43-0 PASSAGEWAY A A-0

2-48-0-B-K-A-3 B K .75 3 2-44-1 STAIR PASSAGE 2-43-0 PASSAGEWAY A A-0

2-49-0-B-K-A-1 B K .75 3 2-44-1 STAIR PASSAGE 2-43-0 PASSAGEWAY A A-0

2-49-0-B-K-A-2 B K .75 3 2-44-1 STAIR PASSAGE 2-43-0 PASSAGEWAY A A-0

2-49-0-B-K-A-3 B K .75 3 2-44-1 STAIR PASSAGE 2-43-0 PASSAGEWAY A A-0

2-49-1-D-K-A D K .75 9 2-44-1 STAIR PASSAGE 4-43-0 SEWAGE HOLDING TANK A NT

2-50-1-B-O-B B O 3 0 2-34-0 PASSAGEWAY 2-47-1 STATEROOM (2 MAN) B B-0

2-50-2-B-O-B B O 2 0 2-34-0 PASSAGEWAY 2-47-2 STATEROOM (2 MAN) B B-0

2-51-1-B-P-B B P 14 4 4 2-34-0 PASSAGEWAY 2-51-1 STATEROOM (2 MAN) B B-0

2-51-2-B-P-B B P 2 4 2-34-0 PASSAGEWAY 2-51-2 STATEROOM (2 MAN) B B-0

2-55-1-B-B-AW-1 B B 11 5 3 4-55-0 ENGINE ROOM 2-51-1 STATEROOM (2 MAN) A B-0

2-55-1-B-B-AW-2 B B 11 5 3 4-55-0 ENGINE ROOM 2-51-1 STATEROOM (2 MAN) A B-0

2-64-1-D-B-AW-1 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-64-1-D-B-AW-2 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-64-3-D-B-AW-1 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-64-3-D-B-AW-2 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-64-5-D-B-AW D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-66-1-D-B-AW D B 10 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-68-1-D-B-AW-1 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-68-1-D-B-AW-2 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-69-1-D-B-AW-1 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-69-1-D-B-AW-2 D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-70-1-D-B-AW D B 3 4 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-1-D-B-AW D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-3-D-K-AW-1 D K 1 5 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-3-D-K-AW-2 D K 1 5 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-5-D-K-AW-1 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-5-D-K-AW-2 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-5-D-K-AW-3 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-5-D-K-AW-4 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-7-D-K-AW-1 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-7-D-K-AW-2 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-7-D-K-AW-3 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-7-D-K-AW-4 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-7-D-K-AW-5 D K 3 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-9-D-B-AW D B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-73-11-D-K-AW D K 1 8 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-74-1-D-B-AW-1 D B 7.5 4.5 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-74-1-D-B-AW-2 D B 7.5 4.5 2.25 4-55-0 ENGINE ROOM 2-63-1 MACHINERY CONTROL

STATION

A A-60

2-75-1-B-B-AW-1 B B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-75-0 WORKSHOP A A-0

2-75-1-B-B-AW-2 B B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-75-0 WORKSHOP A A-0

2-75-1-B-B-AW-3 B B 11 4.75 2.25 4-55-0 ENGINE ROOM 2-75-0 WORKSHOP A A-0

2-75-2-B-P-AW B P 4 6.25 4-55-0 ENGINE ROOM 2-75-0 WORKSHOP A A-0

2-75-3-B-K-AW-1 B K 1 6 2-63-1 MACHINERY CONTROL

STATION

2-75-0 WORKSHOP A A-60

2-75-3-B-K-AW-2 B K 1 6 2-63-1 MACHINERY CONTROL

STATION

2-75-0 WORKSHOP A A-60

2-75-5-B-B-AW B B 4 6 4-55-0 ENGINE ROOM 2-75-0 WORKSHOP A A-0

2-87-0-B-K-AW B K .5 1 2-75-0 WORKSHOP 4-87-0 STEERING GEAR ROOM A A-0

2-87-1-B-B-AW-1 B B 11 4.75 2.25 2-75-0 WORKSHOP 4-87-0 STEERING GEAR ROOM A A-0

2-87-1-B-B-AW-2 B B 11 4.75 2.25 2-75-0 WORKSHOP 4-87-0 STEERING GEAR ROOM A A-0

2-87-3-B-K-AW B K 1 6 2-63-1 MACHINERY CONTROL

STATION

4-87-0 STEERING GEAR ROOM A A-15

TABLE 11C-C: CABLE PENETRATIONS - 3RD DECK

Designation

Bo un da ry

Ty pe

Le ng th /D ia

W id th

De pt h

From Space To Space

Cl as s

SO

LA

S De si gn at io n

3-25-0-B-B-A B B 4.75 11 2.25 3-25-2 STAIRTOWER 3-22-0 EXERCISE ROOM A A-0

3-25-2-B-B-A B B 4.75 11 2.25 3-25-2 STAIRTOWER 3-22-2 LAUNDRY A A-0

3-27-1-B-B-A B B 5 11 4 3-22-0 EXERCISE ROOM 3-27-0 POTABLE WATER

MACHINERY ROOM

A A-0

3-30-1-B-K-AW B K .75 3 4-30-0 TRANSDUCER VOID 3-22-0 EXERCISE ROOM A B-0

3-30-3-B-K-AW B K .75 5 4-30-0 TRANSDUCER VOID 3-22-0 EXERCISE ROOM A B-0

3-30-5-B-K-AW B K .75 2 4-30-0 TRANSDUCER VOID 3-22-0 EXERCISE ROOM A B-0

2530354045505560 2530354045505560

SCALE:

04 DECK

NTS

PLAN 9-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

04 & 03 DECKS

2NTS

SCALE:

03 DECK

NTS

PLAN 13-B

04-29-2-D-B-WTHR (2)

04-30-2-D-K-WTHR

04-29-3-D-K-WTHR

04-29-1-D-K-WTHR

04-30-1-D-K-WTHR (2)

04-33-0-D-B-WTHR

04-43-0-B-K-WTHR (3)

03-26-9-B-K-WTHR

03-26-7-B-K-WTHR

03-26-5-B-K-WTHR

03-26-3-B-K-WTHR

03-26-1-B-K-WTHR

03-26-0-B-K-WTHR

03-26-6-B-K-WTHR

03-26-4-B-K-WTHR

03-26-2-B-K-WTHR

03-26-8-B-K-WTHR

03-29-4-D-B-A 03-29-2-D-B-A (2) 03-29-0-D-B-A (2)

03-29-5-D-B-A 03-29-3-D-B-A (2)

03-29-1-D-B-A

03-33-2-B-O-B 03-34-4-B-P-B

03-39-4-B-B-A 03-39-2-B-O-A

03-38-4-B-O-B 03-38-2-B-O-B

03-36-1-B-P-B

04-29-0-D-B-WTHR

04-34-2-D-K-WTHR

04-35-2-D-K-WTHR

04-37-4-D-B-WTHR

04-37-2-D-K-WTHR

04-40-2-D-K-WTHR

04-43-1-D-K-WTHR (2)

04-44-1-D-K-WTHR

04-43-2-D-K-WTHR

04-44-4-D-K-WTHR

04-44-2-D-K-WTHR

03-27-1-D-K-A (3)

03-27-2-D-K-A (3) 03-27-4-D-B-A

03-28-1-B-K-WTHR

03-36-3-D-P-A

03-35-2-D-P-A

03-44-2-B-K-WTHR

03-39-6-B-B-A 03-39-8-B-B-A

03-39-10-B-B-A

03-44-1-B-K-WTHR

03-45-0-D-B-WTHR

03-46-0-D-K-WTHR (10)

E

1520253035404550556065

SCALE:

03 DECK

NTS

PLAN 17-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

02 DECK

3NTS

02-27-2-D-B-A

02-20-0-D-K-WTHR

02-24-0-B-K-WTHR (2)

02-24-2-B-K-WTHR

02-26-2-B-O-B

02-29-2-B-B-A (4) 02-29-4-B-B-A (4)

02-30-2-B-K-WTHR (4)

02-36-2-B-P-B 02-41-2-B-P-B 02-45-2-B-P-B

02-46-2-B-K-WTHR

02-28-0-B-P-B

02-29-1-B-K-WTHR (4)

02-31-1-B-K-WTHR

02-35-1-B-B-A 02-41-0-B-P-B 02-45-0-B-P-B

02-24-1-B-K-WTHR

02-57-1-B-K-WTHR

02-57-2-B-K-WTHR

02-30-2-D-B-A (2)

0 A B C D E F G5101520253035404550

01 DECK FORWARD

NTS

PLAN 25-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

01 DECK FORWARD

4NTS

01-19-2-B-K-WTHR

01-F-0-K-AW (6)01-8-0-D-K-WTHRW (4)

01-23-2-B-P-B (2) 01-24-2-B-O-B

01-30-2-B-B-A (2) 01-36-2-B-P-B 01-39-2-B-O-B

01-41-2-B-P-B

01-45-2-B-P-B

01-47-4-B-K-WTHR 01-17-0-B-K-WTHRW

01-19-1-B-K-B (2) 01-20-0-B-K-B 01-21-0-B-O-B

01-25-0-B-P-B

01-27-0-B-O-B

01-31-0-B-K-A 01-32-0-B 01-33-0-B 01-35-0-B

01-39-0-B-O-B

01-46-0-B-K-A (2)

01-47-1-B-K-WTHR

01-43-1-B-B-A

01-44-1-B-K-A (4) 01-30-3-B-K-A

01-23-0-B-P-B

01-26-0-B-K-B

01-30-1-B-K-A

01-36-0-B

01-44-0-B-K-A (4)

01-44-3-B-K-A (2)

01-47-4-B-K-WTHR

01-47-2-B-K-WTHR

01-46-2-B-O-B

AutoCAD SHX Text E

556065707580859095

01 DECK AFT

NTS

PLAN 33-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

01 DECK AFT

5NTS

01-55-1-D-K-WTHRW (2)

01-61-2-B-K-A

01-59-1-D-K-A (4) 01-61-1-D-B-A01-75-0-D-K-A

0 A B C D E F G5101520253035404550

MAIN DECK FORWARD

NTS

PLAN 41-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

MAIN DECK FORWARD

6NTS

1-5-1-D-K-W

1-8-1-B-B-AW

1-16-0-B-B-AW

1-14-2-B-B-A 1-14-4-B-K-A

1-8-2-D-K-AW (3)

1-23-2-B-O-A 1-24-2-B-O-A

1-25-2-B-B-A (2) 1-30-2-B-B-A (4)

1-33-2-B-B-A

1-35-2-B-O-A (2)

1-40-2-B-P-A 1-41-2-B-B-A 1-41-4-B-B-A

1-38-2-B-O-C 1-38-4-B-O-C

1-17-1-B-K-A (3)

1-30-1-B-P-A 1-31-1-B-P-A

1-46-1-B-O-B

1-24-4-B-B-A

1-31-4-B-K-A (2)

1-31-2-B-O-A

1-33-4-D-B-A 1-33-6-D-B-A 1-34-2-B-K-A

1-41-6-B-K-A (4)

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

A

226.8504

50556065707580859095

SCALE:

MAIN DECK AFT

NTS

PLAN 49-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

MAIN DECK AFT

7NTS

1-50-4-B-K-WTHRW (2)

1-51-4-D-K-WTHRW (2)

1-50-2-B-K-AW

1-50-1-B-B-AW (4)

1-51-2-D-K-WTHRW (3)

1-63-2-D-B-WTHRW

1-67-2-D-B-WTHRW

1-94-2-D-K-WTHRW (2)

1-62-1-D-B-WTHRW

1-65-1-D-B-WTHRW

1-67-1-D-B-WTHRW

1-76-1-D-K-WTHRW

1-80-1-D-K-WTHRW

1-80-3-D-K-WTHRW

1-89-1-D-K-WTHRW (4)

1-95-1-D-B-WTHRW

1-95-3-D-K-WTHRW (4)

1-54-1-B-K-AW (3)

1-55-1-B-K-AW (2)

1-58-1-B-P-AW

1-71-1-B-K-WTHRW (3)

1-77-5-B-K-A (3) 1-77-3-B-K-A (2) 1-77-1-B-B-A (2)

1-83-3-B-B-A (2)

1-83-1-B-K-WTHRW

1-81-1-B-B-WTHRW

1-81-3-B-K-WTHRW (2)

1-60-1-D-P-AW (3)

1-54-2-B-K-WTHRW

1-61-2-B-O-A (3)

1-70-2-B-K-WTHRW (2)

1-76-2-B-K-WTHRW (6)

1-76-4-B-P-WTHRW

1-83-2-B-P-A 1-83-4-B-K-A

1-89-2-B-K-A

1-50-3-B-B-AW (3)

1-50-5-B-P-AW

1-50-7-B-B-AW

1-56-1-D-B-AW

1-63-4-D-B-WTHRW

1-83-5-B-K-A (3)

1-83-6-B-P-A

1-83-8-D-K-AW

1-84-2-D-B-AW (2)

1-84-4-D-B-AW (2)

1-84-4-D-B-AW (2)

1-87-2-D-K-AW

1-89-1-B-K-A (7)

0 A B C D E F G510152025303540455055

2ND DECK FORWARD

NTS

PLAN 57-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

2ND DECK FORWARD

8NTS

2-22-0-B-B-AW (2)

2-25-4-B-B-A

2-22-1-B-P-AW

2-26-1-B-O-B 2-27-1-B-O-A2-33-1-B-O-B

2-34-1-B-K-B 2-35-1-B-O-B

2-42-1-B-P-B 2-43-1-B-O-B

2-50-1-B-O-B 2-51-1-B-P-B

2-32-2-B-O-A (2)

2-34-2-B-B-AW (2)

2-39-2-B-O-B

2-43-2-B-B-A (2)

2-44-0-B-K-B (2)

2-51-2-B-P-B 2-50-2-B-O-B 2-47-2-B-O-B

2-45-2-B-O-B 2-44-2-B-O-B

2-35-2-B-B-AW

2-25-6-D-B-AW

2-25-2-B-B-A (2) 2-33-0-B-O-A (3)

2-33-2-D-B-AW

2-33-4-D-B-AW

2-33-6-D-K-AW

2-33-8-D-K-AW (2)

2-36-0-B-K-A (2) 2-43-3-B-O-B

2-40-0-B-K-A (3)2-48-0-B-K-A (3) 2-49-0-B-K-A (3)

2-49-1-D-K-A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

556065707580859095

2ND DECK AFT

NTS

PLAN 65-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

2ND DECK AFT

9NTS

2-55-1-B-B-AW (2)2-64-1-D-B-AW (2)

2-64-3-D-B-AW (3)

2-64-5-D-B-AW

2-66-1-D-B-AW

2-68-1-D-B-AW (2)

2-69-1-D-B-AW (2)

2-70-1-D-B-AW

2-73-11-D-K-AW

2-73-9-D-B-AW

2-73-7-D-K-AW (5)

2-73-3-DK-AW (2)

2-75-3-B-K-AW (3)

2-75-1-B-B-AW (3)

2-87-3-B-K-AW 2-74-1-D-B-AW (2)

2-75-2-B-P-AW

2-73-1-D-B-AW

2-73-5-D-K-AW (4)

2-75-5-B-B-AW

2-87-1-B-K-AW (2)

2-87-0-B-K-AW

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text A

0 A B C D E510152025303540455055

3RD DECK FORWARD

NTS

PLAN 73-B

ofSheet

Rev

Scale

Size Drawing Number

D TJ-304-001

A

D

C

B

A

C

B

D

Title

Maritime Systems Division 2750 Prosperity Avenue Ste 600

Fairfax VA 22031

(703) 270 1540

3RD DECK FORWARD

10NTS

3-25-0-B-B-A

3-27-1-B-B-A

3-25-2-B-B-A

3-30-5-B-K-AW

3-30-3-B-K-AW

3-30-1-B-K-AW

File details come from the government source that posted it. Updated .