T202607701 Proposal.pdf
PDF 1 MB Posted
- Attached to
- BRIDGE PAINTING, NEW CASTLE COUNTY, FY27
- Solicitation number
- T202607701
- Issued by
- New Castle County, Delaware
About this file
This is a bid proposal document issued by the Delaware Department of Transportation (DelDOT) for bridge painting services in New Castle County, Delaware, under Federal Aid Project No. ESTP-2026(02). The contract involves furnishing all labor and materials to paint nine bridges located throughout New Castle County, including structures on Rising Sun Road, US Route 13, Old Capitol Trail, State Route 2, State Route 273, Centerville Road, Otts Chapel Road, and Interstate 95. Bids are due on August 4, 2026, prior to 2:00 p.m. local time, with submission available through both internet-based and paper methods. There is no pre-bid meeting scheduled. The project completion timeline is 244 calendar days, with work anticipated to commence on or about April 1, 2027. Bidders must be registered with DelDOT, provide a surety bond equal to at least 10 percent of the bid amount, and comply with all Delaware contractor registration requirements.
The contract is federally funded under CFDA 20.205 and requires compliance with Buy America provisions, prevailing wage requirements as determined by the Delaware Department of Labor, and mandatory drug testing regulations for all contractors and subcontractors. There is currently a 0 percent Disadvantaged Business Enterprise (DBE) goal, as all DelDOT-certified DBEs were decertified as of September 30, 2025, pending recertification. Contractors with performance ratings of 85 percent or higher may bid without retainage restrictions; those below 85 percent must execute an Agreement to Accept Retainage. The contract includes road user cost (RUC) penalties for delays in opening projects to traffic, with specific penalty schedules established for each bridge location ranging from $100 to $5,000 per 15-minute increment depending on location and lane closure type. No retainage will be withheld unless specified through the performance-based rating system. Bidders must submit a completed Bidders List Form with all prime contractor and subcontractor information, including firm name, address, NAICS code, firm age, and annual gross receipts range.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T202607701 Referenced Documents.pdf | ||
| T202607701 BOS.xlsx | XLSX spreadsheet | |
| public.ejs?command=PublicBusinessPlanholderList&projid=T202607701 | — | |
| T202607701 Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF DELAWARE
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL
CONTRACT T202607701
BRIDGE PAINTING, NEW CASTLE COUNTY, FY27
Federal Aid No. ESTP-2026(02)
CFDA: 20.205
Advertisement Date: July 6, 2026
INCLUDED IN THIS DOCUMENT: ADDITIONAL BID PROPOSAL ITEMS:
BID PROPOSAL:
GENERAL DESCRIPTION
PROSPECTIVE BIDDERS NOTES
GENERAL NOTICES
ATTACHED OR POSTED DOCUMENTS:
PROJECT PLANS
QUESTIONS & ANSWERS (if posted)
REFERENCED DOCUMENTS
BREAKOUT SHEETS
BIDDERS LIST
PAPER BIDDERS CONTACT DELDOT
FOR BID SUBMITTAL DOCUMENTS:
DRUG TESTING AFFIDAVIT
CERTIFICATION FORM
BID BOND FORM
CD FOR BID PRICE ENTRY & PRINTING
BIDDERS LIST
This Bid Proposal and related documents can be viewed on bids.delaware.gov and bidx.com/de/
Internet Bids for Bidders with Bid Express® accounts can be submitted at BIDX.com/de; OR;
Paper Bids with CD will be received in the Bidder's Room at the DelDOT Administration Building, Dover, DE;
ALL BIDS DUE PRIOR TO 2:00 P.M. Local Time, AUGUST 4, 2026 https://bids.delaware.gov/ https://bidx.com/de/main
Contract No. T202607701
Bridge Painting, New Castle County, FY27 Federal Aid Project No. ESTP-2026(02)
GENERAL DESCRIPTION
A. BIDS DUE: AUGUST 4, 2026 PRIOR TO 2:00 P.M. Local Time – unless changed via Addendum.
BIDS MUST BE SUBMITTED VIA:
(a) Internet - Bidders with DelDOT Bid Express® accounts can submit bids at bidx.com/de/.
OR:
(b) Paper Bid Delivered To: Delaware Department of Transportation (DelDOT), Administration Building North Entrance, Bidders Room, 800 Bay Road, Dover, DE 19901
For paper bids, contact DelDOT at dot-ask@delaware.gov or (302) 760-2031 to request a CD for bidding, required forms, and instructions. Bidders enter their Bid Item prices onto the supplied CD then print the form and deliver in a sealed envelope; the Bid Form, completed CD, and required documents prior to the Bid due date and time.
(CD’s cannot be used to submit bids to bidx.com)
Do not submit both Internet and Paper Bids. If so, the Internet bid and documents will be rejected.
BID OPENING: Bids will be publicly opened and read aloud at the Date and Time of the Bid Opening. The Bid Opening will be held at the ‘Paper Bid Delivered To’ address shown above. Bidder bears the risk of late delivery, bids received after the stated time will be returned unopened.
Attendance is not required. DelDOT offers a call-in number to hear the Bid Opening telephonically.
The telephone number to call is (302) 504-8986.
When prompted, enter Meeting number (access code): 651 529 280# It is anticipated the telephone access information will remain the same for all Bid Openings.
B. PRE-BID MEETING: No
C. DBE GOAL: 0% Disadvantaged Business Enterprise Goal.
Pursuant to the Interim Final Rule (“IFR”) issued by the United States Department of Transportation (“U.S. DOT”) on September 30, 2025, this letting does not have a DBE participation goal as all DelDOT DBEs were decertified by the IFR. DelDOT is undertaking the recertification process for DBEs pursuant to the IFR requirements. As DelDOT currently has no certified DBEs, it is not feasible to impose or enforce a DBE participation goal for this letting. Upon completion of DelDOT’s DBE recertification process, or upon any modification of the IFR, whether through amendment, clarification, or judicial action, DelDOT reserves the right to revise or reestablish a DBE participation goal for this letting as may be directed by the U.S. DOT and in accordance with applicable federal regulations.
D. OJT TRAINEES: n/a
E. LOCATION: New Castle County
These improvements are more specifically shown on the Location Map(s) of the attached Plans.
F. DESCRIPTION: The improvements consist of furnishing all labor and materials to paint 9 Bridges in New Castle
County.\nBR 1-001, Rising Sun Road over Brandywine\nBR 1-027P, over US 13 at Wilm U\nBR 1-155, Old Capitol Trail over RCC\nBR 1-229A, SR2 over Middle Run\nBR 1-279E&W, SR 273 over Christina\nBR 1-640 SR 2 over Centerville Road\nBR 1-701, Otts Chapel Road over I95\nBR 1-740, Ramp to I-295 NB over I-295 SB.. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.
G. BUY AMERICA REQUIREMENTS APPLY – Build America, Buy America Act, refer to ‘GENERAL NOTICES’.
H. COMPLETION TIME: All work on this contract must be complete within 244 Calendar Days.
Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days.
It is estimated a Notice to Proceed is issued such that work starts on or about April 1, 2027.
mailto:dot-ask@delaware.gov
I. SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, DELAWARE DEPARTMENT OF
TRANSPORTATION, JANUARY 2026 apply to this Bid Proposal and Project. The Contractor shall make himself aware of any revisions and corrections and apply them to the applicable item(s) of this contract. The Standard Specifications can be viewed here. Units of Measure can be found at 101.4.
J. ATTACHMENTS: Included as part of this Bid Proposal are; Project Plans; Questions & Answers (if posted);
Addenda, Referenced Documents, Documents Posted with this Bid Proposal; and Bid documents mailed to contractors.
K. ADDENDA: All Addenda are posted on the internet at bids.delaware.gov, and bidx.com/de/ and are included as part of the Bid Proposal. The Bidder is responsible to check the Website as needed to ensure that the Bidder is aware of Addenda that are included in the Bid Proposal. If Addenda are issued, the final Addendum will be posted no later than the end of the day two business days prior to the bid date. Each Addendum number and issue date must be entered on the submitted Certification Form. This original Bid Proposal will not be updated, you must refer to each Addendum.
L. QUESTIONS: E-MAIL TO; dot-ask@delaware.gov
Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions and responses are posted at bids.delaware.gov, and bidx.com/de/. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form.
M. ROAD USER COSTS:
FAILURE TO OPEN PROJECT TO UNRESTRICTED HIGHWAY TRAFFIC ON TIME
Late Opening of Extended Duration Detours A Road User Cost (RUC) will be assessed for each calendar day the roadway is not fully opened to traffic in excess of the allowable closure duration identified in the Plans. The full daily RUC is assessed regardless of what time of day the roadway or ramp is reopened, starting at 12:00 AM. As such, no consideration will be given for partial calendar days.
Table 1
BR 1-001, Rising Sun Lane Allowable Extended Duration Detour Road User Cost Per Day Exceeding
Allowable Detour Duration 45 days $1000
Table 2 BR 1-155, Old Capitol Trail
Allowable Extended Duration Detour Road User Cost Per Day Exceeding Allowable Detour Duration
30 days $2000
Example calculation for assessment of Road User Cost:
A RUC of $2,000 will be assessed for each calendar day Old Capitol Trail is not fully opened to traffic in excess of the allowable closure duration The duration of the allowable closure of Old Capitol Trail according to the Plans is 30 calendar days. If the roadway is reopened at 12:05 AM on day 31, the full amount of the $2,000 RUC will be assessed.
Late Opening of Temporary Lane Closures Interim Road User Costs (RUC) for delays in opening lanes will be assessed according to the below charts. Refer to the Allowable Lane Closure Table in the Maintenance of Traffic (MOT) plans for start and end times of allowable lane closures.
http://www.deldot.gov/Publications/manuals/standard_specifications/index.shtml https://bids.delaware.gov/ https://bidx.com/de/main mailto:%20dot-ask@delaware.gov https://bids.delaware.gov/
Table 3 BR 1-027P, US 13 at Lincoln Ave Time All Lanes Reopened After End of Road User Cost
Allowable Closure Hours 1st 15-minute increment $400 2nd 15-minute increment $800 3rd 15-minute increment $1200 4th 15-minute increment $1600 5th 15-minute increment $2000 6th 15-minute increment $2500 7th 15-minute increment $3000 8th 15-minute increment $3500 *After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $500 per 15 min, up to a day total of $7400. The RUC values within the chart are not cumulative, payments made after the first two hours are.
Table 4
BR 1-279 E & W, SR 273
Time All Lanes Reopened After End of Road User Cost
Allowable Closure Hours 1st 15-minute increment $400 2nd 15-minute increment $800 3rd 15-minute increment $1200 4th 15-minute increment $1600 5th 15-minute increment $2000 6th 15-minute increment $2500 7th 15-minute increment $3000 8th 15-minute increment $3500 *After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $500 per 15 min, up to a day total of $7400. The RUC values within the chart are not
Table 5 BR 1-640, Centerville Road Time All Lanes Reopened After End of Road User Cost
Allowable Lane Closure Hours 1st 15-minute increment $100 2nd 15-minute increment $200 3rd 15-minute increment $300 4th 15-minute increment $400 5th 15-minute increment $600 6th 15-minute increment $800 7th 15-minute increment $1000 8th 15-minute increment $1200 *After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $200 per 15 min, up to a day total of $2500. The RUC values within the chart are not
Table 6 BR 1-701, Otts Chapel Road Time All Lanes Reopened After End of
Allowable Lane Closure Hours Road User Cost
1st 15-minute increment $100 2nd 15-minute increment $200 3rd 15-minute increment $300 4th 15-minute increment $400 5th 15-minute increment $600 6th 15-minute increment $800 7th 15-minute increment $1000 8th 15-minute increment $1200 *After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $200 per 15 min, up to a day total of $2500. The RUC values within the chart are not
Table 7
BR 1-701, I-95 NB & SB
Time All Lanes Reopened After End of Road User Cost
Allowable Lane Closure Hours 1st 15-minute increment $250 2nd 15-minute increment $500 3rd 15-minute increment $750 4th 15-minute increment $1000 5th 15-minute increment $2000 6th 15-minute increment $3000 7th 15-minute increment $4000 8th 15-minute increment $5000
*After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $1000 per 15 min, up to a day total of $15,000. The RUC values within the chart are not cumulative, payments made after the first two hours are.
Table 8 BR 1-740, Ramp over I-295 SB Time All Lanes Reopened After End of Road User Cost
Allowable Lane Closure Hours 1st 15-minute increment $250 2nd 15-minute increment $500 3rd 15-minute increment $750 4th 15-minute increment $1000 5th 15-minute increment $2000 6th 15-minute increment $3000 7th 15-minute increment $4000 8th 15-minute increment $5000
*After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $1000 per 15 min, up to a day total of $15,000. The RUC values within the chart are not cumulative, payments made after the first two hours are.
Table 9 BR 1-740, I-295 SB under Ramp Time All Lanes Reopened After End of Road User Cost
Allowable Lane Closure Hours 1st 15-minute increment $250 2nd 15-minute increment $500 3rd 15-minute increment $750 4th 15-minute increment $1000 5th 15-minute increment $2000 6th 15-minute increment $3000 7th 15-minute increment $4000 8th 15-minute increment $5000
*After the first two hours beyond the allowable lane closure hour limit, RUC will accrue at $1000 per 15 min, up to a day total of $15,000. The RUC values within the chart are not cumulative, payments made after the first two hours are.
Example calculation for assessment of Road User Cost:
For the use of this example, the lane closure matrix on the MOT plans will have all lanes open time of 6:00 AM.
1) Failure to reopen I-95 NB until 7:05 AM, during the 5th 15-minute increment, local time: Per table 7, RUC of $2000 will be accessed.
2) Failure to reopen I-95 NB until 8:20 AM, local time:
Per table 1, a RUC of $11,000 will be accessed.
• 6:00 AM – 7:59 AM = $5000 for the first two-hour period
• 8:00 AM – 9:20 AM= $1000 x (6) 15min increments = $6000
Assessment of RUC will be made through Item 763525 – Road User Cost. The Engineer will be the sole approving authority as to when the project is complete after traffic is returned to its ultimate alignment and when the contractors work activities will permit highway traffic ultimate lane width and shoulder width.
N. FLAGGERS:
A. Included in the Bid Proposal are the prevailing wages for highway construction as determined by the Department of Labor of the State of Delaware in accordance with Title 29 Del. C. §6960, relating to wages and the regulations implementing that Section.
B. Flaggers must be bid at a minimum equal to the Laborer wage rate and may be bid up to, but not to exceed, 3 times the Laborer wage rate in accordance with the County where the Work is being performed.
C. The Department will adjust the bid to the minimum for prices bid below the minimum acceptable bid and to the maximum for prices bid above the maximum allowable bid prior to award of the Contract.
1. Flagger overtime must be bid at minimum of 1.45 times and may be bid up to a maximum of 4.35 times, the
Laborer wage rate in accordance with the County where the Work is being performed.
2. When a Contract for a Project contains both Federal Davis-Bacon and State of Delaware prevailing wage standards, the employer’s minimum wage obligations are determined by whichever standards are higher.
D. Overtime:
1. Payment for overtime will be considered on a weekly basis for time worked in excess of 40 hours for a continuous 7-day period beginning Monday and ending Sunday inclusive.
2. Time worked on other Projects or Work activities other than flagging will not be counted in the normal 40 hours or the overtime.
https://delcode.delaware.gov/title29/c069/sc04/index.html
E. The cost of the flagging operation when performed by others who are not the Contractor’s employees will not be included in the 50% subcontracting limit as outlined in Section 108.1.
O. PROSPECTIVE BIDDERS NOTES:
1. BIDDERS MUST BE REGISTERED with DelDOT in order to submit a bid. Registrations are now completed online through SimpliGov. To complete registration or for more information, click here.
2. SURETY BOND - Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid.
3. DELAWARE’S CONTRACTOR REGISTRATION ACT - 19 Del.C. §§ 3601 et seq, requires all contractors and subcontractors to register with the Delaware Department of Labor before performing construction services or maintenance. Refer to the GENERAL NOTICES section for further information.
4. DRUG TESTING - Regulation 4104; The state Office of Management and Budget has developed regulations that require Contractors and Subcontractors to implement a program of mandatory drug testing for Employees who work on Large Public Works Contracts funded all or in part with public funds pursuant to 29 Del.C. §6908(a)(6). Refer to the full requirements at the following link:
https://regulations.delaware.gov/AdminCode/title19/4000/4100/4104.shtml#TopOfPage Note a few of the requirements;
* At bid submission - Each bidder must submit with the bid a single signed affidavit certifying that the bidder and its subcontractors has in place or will implement during the entire term of the contract a Mandatory Drug Testing Program that complies with the regulation (a blank affidavit form is attached);
* At least two business days prior to contract execution - The awarded Contractor shall provide to DelDOT copies of the Employee Drug Testing Program for the Contractor, each participating DBE firm, and all other listed Subcontractors;
* Subcontractors - Contractors that employ Subcontractors on the job site may do so only after submitting a copy of the Subcontractor's Employee Drug Testing Program along with the standard required subcontractor information. A Subcontractor shall not commence work until DelDOT has approved the program in writing.
5. PERFORMANCE-BASED RATING SYSTEM - 29 Del.C. §6962 (c)(12)(a) requires DelDOT to include a performance-based rating system for contractors. The Performance Rating for each Contractor shall be used as a prequalification to bid at the time of bid. Refer to 'General Notices' for details.
6. NO RETAINAGE will be withheld on this contract unless through the Performance-Based Rating System.
7. EXTERNAL COMPLAINT PROCEDURE can be viewed on DelDOT’s Website, Contractor Compliance/EEO -
Delaware Department of Transportation calling (302) 760-2035
REVISED
8. DBE PROGRAM REQUIREMENTS As a result of the Issuance of the IFR on September 30, 2025, all of DelDOT
DBEs were decertified. DelDOT is undertaking the recertification process for DBEs pursuant to the IFR requirements.
As DelDOT currently has no certified DBEs, it is not feasible to require the submission of a DelDOT DBE Project Participation Affidavit for this letting. Companies bidding on this letting are NOT required to submit a DBE Project Participation Affidavit with their bid. Once DelDOT has recertified DBEs using the IFR requirements, this requirement will be reinstated.
REVISED
9. DelDOT CERTIFIED DBE UTILIZATION COMMITMENT STATEMENT As a result of the Issuance of the IFR on September 30, 2025, all DelDOT DBEs were decertified. DelDOT is undertaking the recertification process for DBEs pursuant to the IFR requirements. As DelDOT currently has no certified DBEs, it is not feasible to require https://deldot.gov/Business/bids/index.shtml?dc=const_contractor_reg https://regulations.delaware.gov/AdminCode/title19/4000/4100/4104.shtml#TopOfPage https://deldot.gov/Business/cc/ https://deldot.gov/Business/cc/ the submission of a DelDOT Certified DBE Utilization Commitment Statement for this letting. Companies bidding on this letting are NOT required to submit a DelDOT Certified DBE Utilization Commitment Statement with their bid.
Once DelDOT has recertified DBEs using the IFR requirements, this requirement will be reinstated.
10. FLATWORK CONCRETE TECHNICIAN CERTIFICATION TRAINING:
Section 501.3, 503.3, 505.3, 610.3, 701.3 and 702.3 of the 2026 Standard Specifications require contractors to provide an American Concrete Institute (ACI) or National Ready-Mix Concrete Association (NRMCA) certified concrete flatwork technician to supervise all finishing of flatwork concrete.
11. BREAKOUT SHEETS MUST be submitted with your bid documents. Attach the breakout sheet(s) to the proposal.
Failure to submit the breakout sheet with the proposal will result in the Department declaring the proposal as non-responsive and rejecting the bid.
12. NOTE that FHWA Form 1273 (attached) has been modified effective October 23, 2023. Changes are reviewed here.
13. SIGNAGE LANGUAGE:
In order to maintain effective communication with the traveling public, only place signs, banners, flags, or other displays within the projects limits that meet the requirements of the latest version of the Delaware Manual on Uniform Traffic Control Devices. Any signs or other materials which deviate from the MUTCD, must be preapproved by the Engineer.
The only signage and materials which may be displayed upon vehicles and equipment within the Project area are signs denoting the name of the Contractor and any subcontractors and other signs and/or materials required and approved pursuant to the MUTCD and the Engineer. Contractor shall immediately remove any signs or materials within the Project that does not meet these requirements immediately upon notification by the Engineer. Failure to remove signs or other materials following notification from the Engineer will result in Liquidated Damages being assessed in the manner and amount specified in the Standard Specifications section 108.9.A.
14. Bidders List Requirement:
Under 49 CFR 26.11 DelDOT must collect bidders list information from ALL contractors and subcontractors who seek to work on federally assisted contracts. The submitted information must be complete and must include the required information for the prime and all (DBE and non-DBE) subcontractors, service providers, manufacturers, distributors, and suppliers.
ALL bidders must complete the Bidders List Form (attached as an exhibit) and submit it at the time of bid.
Late submission of this information will not be accepted. Submitted information must include the following for those being proposed to work on the contract if awarded:
Firm name;
Firm address including ZIP code;
Firm's status as a DBE or non-DBE (SEE NOTE BELOW effective 10-1-2025);
NAICS code applicable to each scope of work the firm sought to perform in its bid;
Age of the firm; and The annual gross receipts of the firm shown as an approximate range (i.e., $1-3 million)
This information will be maintained as confidential to the extent allowable by federal and state law.
NOTE: Based upon the IFR issued September 30, 2025, all DelDOT certified DBEs have been decertified. As such, for this letting, bidders should NOT identify in the bidders list whether a proposed contractor or subcontractor is a DBE as no companies have currently been certified as a DBE under the new IFR requirements. That block should be left blank. Bidders will be advised once DBE’s have been re-certified pursuant to the requirements of the IFR at which time bidders will be required to provide this information.
https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf https://www.ecfr.gov/current/title-49/subtitle-A/part-26/subpart-A/section-26.11 https://deldot.gov/Business/bids/index.shtml?dc=const_proj_bid_info
Additionally, pursuant to the IFR, and the guidance letter issued by U.S. DOT on September 30, 2025, DelDOT has been directed not to use race or sex as presumptions for consideration of a company as a DBE. As such, bidders should NOT identify in the bidders list a proposed contractor or subcontractor’s sex or race. Those blocks should be left blank. DelDOT anticipates providing a revised Bidders List Form in the near future, which contains only those sections required by the IFR.
Failure to submit the required bidders list documentation at the time bid will result in the bidder being deemed non-responsive and therefore ineligible for award of the contract.
15. 1273-23 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS is posted with Referenced Documents and part of this Bid Proposal.
16. PREVAILING WAGE RATES are posted with Referenced Documents and part of this Bid Proposal.
17. SPECIAL PROVISIONS LIST is posted with Referenced Documents and part of this Bid Proposal.
18. STATEMENTS are posted with the Referenced Documents and are part of this Bid Proposal.
19. ITEMS (Quantity Summary Sheets) are posted with the Referenced Documents and are part of this Bid Proposal.
20. 8 SETS of ARCHIVE PLANS have been posted for “INFORMATIONAL PURPOSES” Only.
21. REVISED SPEC LANGUAGE:
The Revised Inspection Framework – January 2026 (2026 Inspection Framework) shall apply to this contract.
Delete from Section 101.3 Primary inspection. The inspection (formerly referred to as Final Inspection) conducted by the engineer to determine if the contractor has satisfactorily completed the project, or a portion of the project, in accordance with the contract.
Insert within Section 101.3 Acceptance Inspection. The inspection (formerly referred to as Primary Inspection) conducted by the Administering Section, contractor, and accepting section confirming that primary inspection punch list items have been addressed.
Primary inspection. The inspection (formerly referred to as initial inspection) conducted by the Department to review all contract work has been completed in accordance with the Plans, Standard Specifications, Special Provisions, and Standard Construction Details. The inspection is confirmation of the work completed per the contract documents.
Project Acceptance. The Department’s notification to the Contractor that the time charges will cease, and construction activities are completed, releasing the contractor from liability and repairs or maintenance to the completed work.
Revise Section 104.12.A as follows.
A. Before acceptance inspection, clean rubbish, excess materials, temporary structures, and equipment from the project, from any publicly owned borrow source used to complete the work, and from areas affected by the contractor in connection with the work within the right-of-way. Cut all grass and weeds taller than 6-inches.
The cost of the final cleanup is incidental to Item 763000, Initial Expense, De-Mobilization.
Revise Section 105.4.F as follows.
F. Submit copies of manufacturer’s catalog cuts, drawings, wiring diagrams, and other relevant documents with working drawings for electrical and mechanical equipment. After the Department has reviewed all items of a particular system, prepare an instruction book for the particular system. Fasten and bind the items listed below in a leather or heavy plastic cover book with a title clearly shown. Provide five copies of the book to the engineer before acceptance inspection. Make the books available when connecting and energizing electrical and mechanical systems. Ensure that the final bound copies reflect changes or adjustments made during the work.
Include the following in the instruction book:
https://deldot.gov/Business/drc/pd_files/plan_development/Revised%20Inspection%20Framework%20-%20January%202026.pdf?cache=1770037794995
1. An equipment list.
2. A complete description of the equipment.
3. The sequence of operation including inter-locking and protective features.
4. The use of by-pass switches.
5. A detailed description of all wiring circuits.
6. A recommended spare parts list.
7. Renewal parts bulletins.
8. Instruction bulletins for the provided equipment.
9. Diagrams and drawings of reduced size suitable for binding.
10. An index listing all items.
Revise Section 105.13.D as follows.
D. Include the cost of maintenance work during construction and before completion of the acceptance inspection punch list in the proposal. The Department will pay the cost of maintenance work occurring after completion of the acceptance inspection punch list.
Revise Section 105.14.A as follows.
A. The engineer may order opening of certain sections of the work to traffic or other use before the contractor completes the work or before the engineer accepts the work. The Department will not consider opening sections of the work as constituting acceptance of the work or a waiver of any contract provisions. The engineer will pay the cost of repairing damage to the work caused by opening work to vehicular traffic unless opening the roadway is due to the fault, or inactivity of, the contractor or the contractor caused the damage. All other maintenance costs including, but not limited to, mowing grass and general cleanup are the contractor’s responsibility until completion of the acceptance inspection punch list to the Department’s satisfaction.
Maintenance costs for work involving landscaping and vegetative growth are the contractor’s responsibility until final acceptance.
Revise Section 105.16 as follows.
A. Partial Acceptance.
1. The decision to partially accept a portion of the project is solely at the discretion of the engineer. The engineer may partially accept portions of the work. The Department will not consider partial acceptance as constituting acceptance of the work that has not been partially accepted or a waiver of any contract provisions. The Department will maintain the partially accepted portion of the project, including repairing damage caused by the public.
B. Project Acceptance
1. The Department will cease counting contract time when the project reaches substantial completion as defined in Section 101.3, Definitions.
2. Substantial Completion Verification
a. Upon receiving the contractor’s notice of substantial completion of the project, the Department will verify all contract items are complete as defined in Section 101.3, Definitions. Items not deemed complete shall be completed by contractor prior to Department issuance of Substantial Completion.
b. After issuance of Substantial Completion, request Primary Inspection from the Department.
c. The Department will schedule the Primary Inspection within 30 calendar days of the request.
3. Primary Inspection
a. The Department/Administering Section will conduct a Primary Inspection with the completion of
105.16.2 Substantial Completion Verification. The Administering Section will note and provide a written punch list by stations and in detail identifying work or conditions requiring correction. The punch list will include ADA inspection deficiencies.
b. Perform the corrective work noted on the punch list within 30 calendar days upon receipt of the punch list created by the Administering Section, unless the parties mutually agree to extend the time frame.
c. Upon completion of the primary inspection punch list, request an acceptance inspection from the Department. Prior to acceptance inspection scheduling, the Administering Section will confirm and annotate the primary inspection punch list and ensure ADA Inspection deficiencies have been addressed and documented.
d. The Administering Section will schedule Acceptance inspection with the Maintenance District within 30 days of confirmation of primary punch list item completion.
4. Acceptance (formerly primary) Inspection.
a. The Department will conduct an acceptance inspection with the completion of 105.16.B.3, primary inspection. The Administering Section will provide a written punch list identifying deficiencies not satisfactorily addressed from the primary inspection punch list within 7 calendar days of the acceptance inspection.
b. Perform the corrective work noted on the punch list within 15 calendar days upon receipt of the punch list created by the Administering Section, unless the parties mutually agree to extend the time frame.
c. The Administering Section will verify remediation work and will provide a list with dates that remedial activities were resolved to the Maintenance District when requesting Project Acceptance.
C. Project Acceptance
1. The Administering Section will notify the Maintenance District that acceptance inspection punch list items have been addressed.
2. The Maintenance District and/or other accepting entities will verify acceptance inspection punch list items have been addressed within 30 calendar days of notice from the Administering Section.
D. Final Acceptance
1. The engineer will provide final acceptance in writing that will state the acceptance date as defined in Section 101.3, Definitions.
E. Project Closeout
1. Upon final acceptance, provide the exempted documents, certificates, or proofs of compliance within 90 calendar days.
2. The Department will not issue the final payment until the contractor executes and delivers the required documents.
Revise Section 108.8.K as follows.
K. Once the Department determines that the work is substantially complete, the Department will suspend time charges and the assessment of liquidated damages. Failure to complete all punch list work identified during the primary and acceptance inspections within the timeframes allotted, will result in the Department restarting liquidated damages in accordance with the chart specified in Section 108.9, Schedule of Liquidated Damages.
The assessment of post-substantial-completion liquidated damages will continue until project completion.
Revise Section 610.3.9.A.2 as follows.
2. The engineer will measure the width, length, and depth of each crack and establish the precise location of the crack termination points relative to permanent reference points on the member. The engineer will monitor and document the growth of individual cracks at an inspection interval the engineer will choose to determine if cracks are active or dormant after acceptance inspection.
Revise Section 722.3.2.A as follows.
A. Provide on-site field instruction by the system manufacturer, at a location determined by the engineer. Provide a minimum of 2 training sessions consisting of installation training before beginning cable barrier construction and maintenance training before acceptance inspection. The manufacturer shall establish the training duration and shall provide field training on all aspects of the system. Coordinate the training schedule and location with the engineer. The engineer will advise the appropriate department staff, including construction inspectors and maintenance personnel regarding the training location and schedule. Provide all training materials in both hard copy and electronic PDF format.
Revise Section 722.3.2.C.1 as follows.
1. Hold the maintenance training a minimum of 7 calendar days before acceptance inspection of the system.
Submit the proposed training date to the engineer a minimum of 14 calendar days prior to the training session date for review and approval. Include the following participants:
a. District Maintenance Engineer, or designated representative;
b. District Maintenance Superintendent, or designated representative;
c. Area Yard Supervisor, or designated representative; and
d. District maintenance personnel.
Revise Section 722.3.3.L as follows.
L. Within 10 calendar days of the primary inspection, supply spare parts for the HTCB system. Deliver the parts to the DelDOT maintenance facility as directed by the engineer. Provide an extra supply of the following:
1. Socketed-type line posts, including post hardware, caps, reflective sheeting, straps, spacers, and socket covers. Include 200 posts and accessories.
2. Rigging screws and threaded terminals. Provide enough materials to complete 8 turnbuckle assemblies.
3. Anchor posts including post hardware and caps, reflective sheeting, straps, fittings, spacers, and socket covers. Provide enough materials to complete 3 end anchor installations.
4. Fitting gaskets or socket covers. Provide 100 socket covers.
Revise Section 843.3.5.C as follows.
C. Repair defects identified by the Department during periodic or primary inspections in accordance with this specification, including all highway lighting systems and components within the project limits. Begin highway lighting system repairs immediately following notice of the lighting system defect unless weather limitations prevent the corrective work. Provide notification to the Department before beginning corrective work.
Revise Section 843.3.5.D as follows.
D. The Department will not consider the highway lighting system as substantially complete until correction of the deficiencies noted during the primary and acceptance inspections. Provide a maintenance bond for item 843001
– Electrical Testing upon substantial completion. Provide a maintenance bond meeting the following requirements:
1. A bond sum equal to 100 percent of the value of all highway lighting system items the Department paid to the contractor;
2. With original signatures, in ink, and not mechanical reproductions or facsimiles of any kind, naming the contractor as the principle;
3. term of 1-year beyond the completion of the highway lighting system work; and
4. written by a surety or insurance company licensed to write surety bonds in the State of Delaware by the
Delaware Department of Insurance.
Revise 911.3.6.G as follows.
G. Water bi-weekly during the period June 15 through October 1. Continue watering, without interruption, until completing watering of all the plants on the project. Use water in accordance with Section 911.2.9. The Department will allow use of tree watering bags as a part of the watering operation. Remove the tree watering bags before acceptance inspection.
- end – remainder of page is blank
GENERAL NOTICES
CONTRACTOR REGISTRATION ACT
On July 1, 2021, the Contractor Registration Act, as codified in 19 Del.C. §§ 3601 et seq, took effect. This law requires all contractors to register with the Delaware Department of Labor before performing construction services or maintenance. The Contractor Registration Act applies to all contractors that engage in construction and maintenance within the State of Delaware. Additionally, it requires contractors to have Delaware workers’ compensation insurance where required, compliance with labor laws, and proof of a state business license. The Delaware Department of Labor’s Office of Contractor Registration is responsible for enforcement of the requirements of the Contractor Registration Act. If you have any questions about the contractor registration process, please call 302-430-7739 or email Contract.Registry@delaware.gov. Registration at https://onestop.delaware.gov/.
BUY AMERICA REQUIREMENT REVISED
The Build America, Buy America Act (BABA), enacted as part of the Bipartisan Infrastructure Law (BIL) requires iron, steel, manufactured products, and construction materials used in infrastructure projects funded by Federal financial assistance to be produced in the United States (U.S.).
In accordance with 23 U.S.C. 313 and 23 CFR 635.410, all iron and steel materials permanently incorporated into this project will be produced in the U.S. and all manufacturing processes involving these materials will occur in the U.S., except that a minimal amount of foreign steel or iron materials may be used, provided the cost of the foreign materials does not exceed 0.1 percent of the total Contract cost or $2,500.00, whichever is greater. If such minimal amount of foreign steel is used, the Contractor shall maintain a record of the costs to ensure that the allowable limit is not exceeded.
In accordance with 23 CFR 635.410, the final manufacturing process of all manufactured products that will be permanently incorporated into this project will be performed in the U.S. Iron or steel components of precast concrete products and cabinets or enclosures of any intelligent transportation systems and other electronic hardware systems classified as a manufactured product which is permanently incorporated into this project will be produced in the U.S. and all manufacturing processes involving the iron and steel will occur in the U.S., except that a minimal amount of foreign steel or iron materials may be used, provided the cost of the foreign materials does not exceed 0.1 percent of the total Contract cost or $2,500.00, whichever is greater. If such minimal amount of foreign steel is used, the Contractor shall maintain a record of the costs to ensure that the allowable limit is not exceeded.
In accordance with 2 CFR 184, all non-ferrous metals, plastic and polymer-based products, glass, fiber optic cable, optical fiber, lumber, drywall, and engineered wood construction material permanently incorporated into this project will be produced in the U.S.
DelDOT maintains a list of all pay items, the applicable BABA category designation, and additional guidance at the following address: https://deldot.gov/Business/prodlists/index.shtml?dc=buyAmerica.
By signing and submitting this proposal, the bidder certifies that:
“All materials that will be permanently incorporated into this project will meet the Buy America material requirements.
At the Department's request, I/we will provide manufacturer's/supplier's documentation verifying domestic origin as defined in the Contract. All Materials accepted on the basis of such Certificate of Compliance may be sampled by the Department and tested at any time. Use of Material on the basis of Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating Material in the Project conforming to the requirements of the Contract.
Any Material not conforming to such requirements will be subject to rejection whether in place or not. The Department reserves the right to refuse to permit the use of Material on the basis of Certificate of Compliance.”
SPECIFICATIONS :
The Delaware specifications entitled "Standard Specifications for Road and Bridge Construction January, 2026", with the applicable version defined in the ‘GENERAL DESCRIPTION’ and hereinafter referred to as the Standard Specifications;
shall govern the work to be performed under this contract. The Contractor shall make itself aware of these specifications, revisions and corrections, and apply them to the applicable item(s) of this contract.
mailto:Contract.Registry@delaware.gov https://onestop.delaware.gov/ https://deldot.gov/Business/prodlists/index.shtml?dc=buyAmerica
CLARIFICATIONS :
Under any Section or Item included in the Contract, the Contractor shall be aware that when requirements, responsibilities, and furnishing of materials are outlined in the details and notes on the Plans and in the paragraphs preceding the " Basis of Payment" paragraph in the Standard Specifications or Special Provisions, no interpretation shall be made that such stipulations are excluded because reiteration is not made in the "Basis of Payment" paragraph.
DelDOT requires the use of various electronic applications for various documentation processes.
These processes will be identified, and the Contractor's required use will be detailed during the Preconstruction Meeting.
No additional payments will be made to the contractor to use or interface with the applications.
ATTESTING TO NON-COLLUSION :
DelDOT requires as a condition precedent to acceptance of bids a sworn statement executed by, or on behalf of, the person, firm, association, or corporation to whom such contract is to be awarded, certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract. The form for this sworn statement is included in the proposal and must be properly executed in order to have the bid considered.
QUANTITIES :
The quantities shown are for comparison of bids only. DelDOT may increase or decrease any quantity or quantities without penalty or change in the bid price.
PERFORMANCE-BASED RATING SYSTEM
29 Del.C. §6962 (c)(12)(a) requires a DelDOT project, excluding a municipal street aid contract, to include a performance-based rating system. At the time of bid, the Performance Rating for each Contractor shall be used as a prequalification to bid.
Bidders with Performance Rating scores equal to or greater than 85% shall be permitted to bid. Bidders with scores of less than 85% who comply with the retainage requirements of 29 Del.C. §6962 shall be permitted to bid provided the Agreement to Accept Retainage (located on the Certification Page) is executed and submitted with the bid. Lack of an executed Agreement to Accept Retainage will result in the rejection of the bid by DelDOT. Successful bidders awarded DelDOT contracts who have no performance history within the last five (5) years will be assigned a provisional Performance Rating of 85% at the date of advertisement.
Notification of Performance Rating. DelDOT shall post publicly the Performance Rating for all Contractors on DelDOT’s website. DelDOT will complete performance-based evaluations on the construction company contracted by DelDOT to build the project (the "Contractor"). Provisions to appeal Performance Ratings are described in the regulations. The regulations are set forth in Section 2408 of Title 2, Delaware Administrative Code, found here.
EQUALITY OF EMPLOYMENT OPPORTUNITY ON PUBLIC WORKS :
Delaware Code, Title 29, Chapter 69, Section 6962, Paragraph (d), Subsection (7) states;
a. As a condition of the awarding of any contract for public works financed in whole or in part by State appropriation, such contracts shall include the following provisions:
During the performance of this contract, the contractor agrees as follows:
1. The contractor will not discriminate against any employee or applicant for employment because of race, creed, color, sex, sexual orientation, gender identity or national origin. The contractor will take positive steps to ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, sex, sexual orientation, gender identity or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or https://www.deldot.gov/Business/bids/PreQual/index.shtml http://regulations.delaware.gov/register/february2019/final/22%20DE%20Reg%20691%2002-01-19.htm termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places available to employees and applicants for employment notices to be provided by the contracting agency setting forth this nondiscrimination clause.
2. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, creed, color, sex, sexual orientation, gender identity or national origin.
3. The contractor will ensure employees receive equal pay for equal work, without regard to sex. Employee pay differential is acceptable if pursuant to a seniority system, a merit system, a system which measures earnings by quantity or quality of production, or if the differential is based on any other factor other than sex.
TAX CLEARANCE :
As payments to each vendor or contractor aggregate $2,000, the Division of Accounting will report such vendor or contractor to the Division of Revenue, who will then check the vendor or contractor's compliance with tax requirements and take such further action as may be necessary to ensure compliance.
LICENSE :
A person desiring to engage in business in this State as a contractor on a project designated to include federal funds, shall obtain a Delaware business license upon making application to the Division of Revenue. Proof of said license compliance to be made prior to, or in conjunction with, the execution of a contract to which he has been named.
SUBCONTRACTOR LICENSE: 29 DEL. C. §6967:
(c) Any contractor that enters a public works contract must provide to the agency to which it is contracting, within 30 days of entering such public works contract, copies of all occupational and business licenses of subcontractors and/or independent contractors that will perform work for such public works contract. However, if a subcontractor or independent contractor is hired or contracted more than 20 days after the contractor entered the public works contract the occupational or business license of such subcontractor or independent contractor shall be provided to the agency within 10 days of being contracted or hired.
DIFFERING SITE CONDITIONS:
SUSPENSIONS OF WORK and SIGNIFICANT CHANGES IN THE CHARACTER OF WORK:
Differing site conditions: During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before they are disturbed and before the affected work is performed.
Upon written notification, the engineer will investigate the conditions, and if he/she determines that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding loss of anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of his/her determination whether or not an adjustment of the contract is warranted.
No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice. No contract adjustment will be allowed under their clause for any effects caused on unchanged work.
Suspensions of work ordered by the engineer: If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment.
Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in writing accordingly. The engineer will notify the contractor of his/her determination whether or not an adjustment of the contract is warranted.
No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided for or excluded under any other term or condition of this contract.
Significant changes in the character of work: The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project.
Such changes in quantities and alterations shall not…