PROJECT: CEFOP BUILDING

Place: CUCUTA , N de S.

Date: 4/30/2015

BASE BID

ITEM DESCRIPTION

MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL

UNIT COST

LABOR UNIT

LABOR

QUANTITY

LABOR UNIT

COST

EQUIPMENT

UNIT

EQUIPMENT

QUANTITY

EQUIPMENT

UNIT COST

TOTAL COST TOTAL COST BY CHAPTER

A. GENERAL REQUIREMENTS $ 0.00

1 GENERAL REQUIREMENTS $ 0.00

01 32 16 Construction Progress Documentation $ 0.00

$ 0.00

01 33 00 Submittal Procedures $ 0.00

$ 0.00

01 50 00 Temporary Facilities and Controls $ 0.00

$ 0.00

01 78 00 Execution and Closeout Requirements $ 0.00

$ 0.00

B. CEFOP BUILDING $ 0.00

2 EXISTING CODITIONS $ 0.00

02 41 00 Demolition $ 0.00

$ 0.00

3 CONCRETE $ 0.00

03 11 13.00 10 Structural Cast-in-Place Concrete Forming $ 0.00

$ 0.00

03 20 00.00 10 Concrete Reinforcing $ 0.00

$ 0.00

03 30 00 Cast-in-Place Concrete $ 0.00

$ 0.00

4 MASONRY $ 0.00

04 20 00 Masonry $ 0.00

$ 0.00

5 METALS $ 0.00

05 05 23 Welding, Structural $ 0.00

$ 0.00

05 12 00 Structural Steel $ 0.00

$ 0.00

05 50 13 Miscellaneous Metal Fabrications $ 0.00

$ 0.00

05 50 14 Structural Metal Fabrications $ 0.00

$ 0.00

6 WOODS, PLASTICS AND COMPOSITES $ 0.00

06 10 00 Rough Carpentry $ 0.00

$ 0.00

06 20 00 Finish Carpentry $ 0.00

$ 0.00

7 THERMAL AND MOISTURE PROTECTION $ 0.00

07 21 16 Mineral Fiber Blanket Insulation $ 0.00

$ 0.00

07 41 63 Fabricated Roof Panel Assemblies $ 0.00

$ 0.00

07 60 00 Flashing and Sheet Metal $ 0.00

$ 0.00

07 92 00 Joint Sealants $ 0.00

$ 0.00

OFFICIAL BIDDING CHART

CEFOP BUILDING Page 1 of 4 CUCUTA

8 OPENINGS $ 0.00

08 11 13 Steel Doors and Frames $ 0.00

$ 0.00

08 51 13 Aluminum Windows $ 0.00

$ 0.00

08 71 00 Door Hard Ware $ 0.00

$ 0.00

08 81 00 Glazing $ 0.00

$ 0.00

08 91 00 Metal Wall louvers $ 0.00

$ 0.00

9 FINISHES $ 0.00

09 06 90 Color Schedule $ 0.00

$ 0.00

09 24 23 Stucco $ 0.00

$ 0.00

09 26 00 Veneer Plaster $ 0.00

$ 0.00

09 30 00 Ceramic Tile $ 0.00

$ 0.00

09 51 00 Acoustical Ceilings $ 0.00

$ 0.00

09 90 00 Paints and Coatings $ 0.00

$ 0.00

10 SPECIALTIES $ 0.00

10 28 13 Toilet Accessories $ 0.00

$ 0.00

10 44 16 Fire Extinguishers $ 0.00

$ 0.00

12 FURNISHINGS $ 0.00

12 21 00 Window Blinds $ 0.00

$ 0.00

12 36 00 CounterTops $ 0.00

$ 0.00

13 SPECIAL CONSTRUCTION $ 0.00

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT $ 0.00

$ 0.00

22 PLUMBING $ 0.00

22 00 00 PLUMBING GENERAL PURPOSE $ 0.00

$ 0.00

23 HEATING, VENTILATING, AND AIR CONDITIONING $ 0.00

23 00 00 Air Supply, Distribution, Ventilation and Exhaust Systems $ 0.00

$ 0.00

23 03 00.00 20 Basic Mechanical Materials and Methods $ 0.00

$ 0.00

23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment $ 0.00

$ 0.00

23 07 00 Thermal Insulation for Mechanical Systems $ 0.00

$ 0.00

23 23 00 Refrigerant Piping $ 0.00

$ 0.00

CEFOP BUILDING Page 2 of 4 CUCUTA

23 34 23.00 40 HVAC Power Ventilators $ 0.00

23 81 00.00 20 Unitary Air Conditioning Equipment $ 0.00

$ 0.00

23 82 02.00 10 Unitary Heating and Cooling Equipment $ 0.00

$ 0.00

26 Electrical $ 0.00

26 00 00 Basic Electrical Materials and Methods $ 0.00

$ 0.00

26 05 00 Common Work Results for Electrical $ 0.00

$ 0.00

26 09 13 Power Monitoring System $ 0.00

$ 0.00

26 20 00 Interior Distribution System $ 0.00

$ 0.00

26 24 16 Pannelboards $ 0.00

$ 0.00

26 28 01 Coordinated Power System Protection $ 0.00

$ 0.00

26 28 21.00 40 Automatic Transfer Switches (ATS) $ 0.00

$ 0.00

26 32 14.00 10 Diesel-Generator Set $ 0.00

$ 0.00

26 32 33.00 10 Uninterruptible Power Supply (UPS) System Above 15 KVA Capacity $ 0.00

$ 0.00

$ 0.00

$ 0.00

26 51 00.00 40 Interior Lighting $ 0.00

$ 0.00

26 56 00 Exterior Lighting $ 0.00

$ 0.00

27 Communications $ 0.00

27 10 00 Building Telecommunications Cabling System $ 0.00

$ 0.00

27 41 16 Integrated Audio-Video Systems and Equipment $ 0.00

$ 0.00

28 Electronic Safety and Security $ 0.00

28 20 01.00 10 Electronic Security System $ 0.00

$ 0.00

28 23 23.00 10 Closed Circuit Television Systems $ 0.00

$ 0.00

28 31 00.00 10 Fire Detection and Alarm System. Direct Current Loop. $ 0.00

$ 0.00

C. EXTERIOR WORKS $ 0.00

31 Earthwork $ 0.00

31 00 00 Earthwork $ 0.00

$ 0.00

31 11 00 Clearing and Grubbing $ 0.00

$ 0.00

31 23 00.00 20 Excavation and Fill $ 0.00

$ 0.00

31 60 00 Foundation Preparation $ 0.00

CEFOP BUILDING Page 3 of 4 CUCUTA

32 Exterior Improvements $ 0.00

32 92 23 Sodding $ 0.00

$ 0.00

33 Utilities $ 0.00

33 11 00 Water Distribution $ 0.00

$ 0.00

33 30 00 Sanitary Sewer $ 0.00

$ 0.00

33 40 00 Storm Drainage Utilities $ 0.00

$ 0.00

33 70 02.00 10 Electrical Distribution System, Underground $ 0.00

$ 0.00

33 71 01.00 40 Overhead Transmission and Distribution $ 0.00

$ 0.00

33 71 02 Underground Electrical and Telecomunications Distribution $ 0.00

$ 0.00

D. MARKUPS $ 0.00

D TOTAL DIRECT COST PHYSICAL ADECUATION WORKS $ 0.00

D Administration % $ 0.00 D Unforenseens % $ 0.00 D Profit % $ 0.00 D TAX(Over the profit value) % $ 0.00

T TOTAL COSTS (Base bid) $ $ 0.00

CEFOP BUILDING Page 4 of 4 CUCUTA