Statement of Work Lift Replacement.pdf
PDF 147 KB Posted
- Attached to
- Vehicle Maintenance Shop Lift Replacement
- Solicitation number
- 51291PR250000089
About this file
This document is a Statement of Work (SOW) for a vehicle lift replacement project at the U.S. Coast Guard Base in Kodiak, Alaska. The project requires the contractor to supply and install three vehicle lifts: two two-post symmetric lifts with three-stage arms (12-15,000-lb capacity) and one four-post drive-on lift with ~25,000-lb capacity and a 300" wheelbase. The two-post lifts will be temporarily installed in the N94 VAS building, while the four-post lift will be installed in Building N1.
Key project details include a 30-day performance period after Notice to Proceed, with work restricted to Monday through Friday from 0730-1630. The contractor must ensure all lifts are certified per Automotive Lift Institute standards and provide a one-year warranty on workmanship and parts. Strict base access requirements are in place, including RapidGate enrollment, Real ID Act compliant identification, and coordination with Base Security. The contractor is responsible for daily cleanup, debris removal, and proper disposal of construction waste, with specific instructions to prevent dust and hazards in the work area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 51291PR250000089 Solicitation Amendment 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PN: PR Nr:
11 AUG 2025 Page 1 | 3
N1 Vehicle Maintenance Shop Lift Replacement
GENERAL REQUIREMENTS
Contractor will provide all supervision, labor, equipment, materials, and transportation to replace three vehicle lifts at the N1 Vehicle Maintenance Shop on USCG Base Kodiak.
The contractor is responsible to provide a complete and usable facility upon completion of this project. This scope of work overviews the major items of work and in no way limits the details and work the contractor is responsible for that is not included in this document. This may include requirements in referenced documents, code requirements, and workmanship details. The contractor is responsible for a high level of workmanship in the execution of work.
SCOPE
The following items comprise the scope of work for this project. Items will not necessarily be completed in the order listed.
1. Supply and ship the following materials to USCG Base Kodiak, AK, 99619:
a. (02) two-post symmetric lifts with three-stage arms and between 12-15,000-lb capacity.
b. (01) four-post drive on lift with ~25,000-lb capacity and 300” wheelbase
2. Install the above equipment following arrival on site. The two-post lifts will be temporary installed in N94 VAS building while the four-post lift will be installed in Building N1.
3. Ensure the installed equipment meets all requirements and is certified per Automotive Lift Institute standards.
APPLICABLE DOCUMENTS
N/A
PERFORMANCE PERIOD
Work will be completed 30 days after Notice to Proceed.
WORK HOURS
Normal working hours for this project shall Monday through Friday 0730-1630 excluding all Federal holidays. Work outside these hours shall require verbal or written approval of the Contracting Officer or his/her authorized representative.
GOVERNMENT FURNISHED MATERIALS AND EQUIPMENT
N/A
IDENTIFICATION:
All contractors shall wear identification (Badges, hard-hats, vests) that clearly identifies them with their associated company.
All personnel visiting the Site will be required to present and maintain Real ID Act compliant valid picture identification. (Note: Not all state issued drivers licenses are Real ID Act compliant. Inform your employees, and subcontractors and delivery personnel as needed to avoid
11 AUG 2025 Page 2 | 3 denial at entry.) All personnel working on the Project site must be legal to work in the United States of American and obtain a “RapidGate” identification. Confirm Base Security office hours with the Base. All personnel shall carry proper identification (ID) when on any portion of Base Kodiak. Proper ID is defined as either the individual's driver's license, state or federal picture ID or Passport. The identification must be laminated and show a facial picture of the individual.
RAPID GATES: The contractor shall enroll his company, subcontractor’s companies, and all personnel within the Rapid Gates Program. See the attached form for more information.
Personnel will not gain access on base until submitting the required information and receiving government approval. The contractor shall anticipate that it could take up to 2 weeks to receive approval. It is the contractor’s responsibility to submit this list in a timely manner and with all required information provided. Any delays to the project due to the access list not being approved (late submission of list or missing/incorrect information) are the contractor’s responsibility and not the governments. The contractor shall update and resubmit “Rapid Gates” information for new contractor personnel, subcontractor personnel and contractor visitors before they can gain access to the base.
Persons bringing vehicles on base will need to have a valid driver’s license, vehicle registration, and proof of insurance in addition to having Rapid Gates registration. The contractor can obtain this pass at Building N38. If the contractor or his personnel cannot present these items at the gate, the vehicle(s) and/or person(s) will not gain access on base.
WORK RESTRICTIONS
In no event shall any understanding or agreement between the contractor and any government employee other than the Contracting Officer on any contract, modification, change order, letter or verbal direction to the Contractor be effective or binding upon the Government. Formalize all such actions by a proper contractual document executed by an appointed Contracting Officer. The contractor is hereby put on notice that in the event a government employee, other than the Contracting Officer, directs a change in the work to be performed, or increases the scope of the work to be performed, it is the contractor's responsibility to make an inquiry to the Contracting Officer before making the deviation. No payments will be paid without being authorized by an appointed Contracting Officer with the legal authority to bind the government.
Contractor access and use of premises: Ensure that contractor personnel employed on the base become familiar with and obey base regulations. Personnel shall be appropriately dressed for the work and weather. Wear hard hats and protective equipment in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. The contractor’s equipment and personnel shall be conspicuously marked for identification.
The work area must be free of hazards, materials, and equipment during non-working hours. The contractor will erect barricades closing the work area off to traffic as required and shall erect barricades closing the work area off to pedestrian traffic during work performance. Barricades shall be removed before the end of each work period unless the work requires barriers to remain overnight for safety.
If road closures are necessary, provide alternate traffic plan to USCG Base Facilities Engineering, Fire Department, and Military Police.
PERMITS/NOTIFICATIONS
Burn permits will be obtained from the Base Fire Department prior to all hot work such as welding, torch cutting, etc. Call 487-5808 three days before work to schedule.
11 AUG 2025 Page 3 | 3
Contractor shall notify Stan Skaw (Stan.s.skaw@uscg.mil) in the event of an outage of any facility or to obtain a dig permit.
SUBMITTALS REQUIREMENTS
Warranty information for vehicle lifts
WARRANTY
Contractor shall guarantee all workmanship for a period of one (1) year after completion of work.
Contractor must provide a 1-year parts/support warranty on all work completed.
CLEANUP
Remove rubbish and debris from the project site daily; do not allow accumulations inside or outside the buildings. The work includes demolition, and removal of resulting rubbish and debris.
Store materials that cannot be removed daily in areas specified by the Contracting Officer. The Contractor is responsible for the security of all materials stored onsite. No materials may be stored at the work area unless approved by the Contracting Officer.
The Contractor is responsible for proper disposal and any associated fees to the local landfill operated by the Kodiak Island Borough. The on-base dumpsters will not be used to dispose of construction generated waste.
Prevent the spread of dust and debris and avoid the creation of a nuisance, or hazard, in the surrounding area. Police project areas for wire, screws, and other hazards as often as necessary to control the spread of debris that may result in injury to residents.
ATTACHMENTS
N/A mailto:Stan.s.skaw@uscg.mil