Statement of Work.pdf

PDF 103 KB Posted

Attached to
Aircraft Parking Apron Concrete Repairs
Solicitation number
W50S8D21Q0007
Issued by

View the file

Other files

File Type Posted
Pre-Proposal Conference Minutes.pdf PDF
Pre-Proposal Conference Attendance Sheet.pdf PDF
Solicitation Amendment W50S8D21Q0007_0001.pdf PDF
W50S8D21Q0007.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

105 AIRLIFT WING (ANG)

ONE MAGUIRE WAY

NEWBURGH NY 12550-5075

1. Background

The 105th Airlift Wing is experiencing delamination in some portions of the concrete apron. The size of the areas of concern necessitate the full depth replacement of 8 (20’x 20’) concrete panels.

2. Scope

Contractor shall furnish all engineering, supervision, tools, parts, material, labor, supplies, permits, equipment and incidentals required to properly perform work outlined below.

All work shall be performed in a safe manner and shall be accomplished in accordance with all local, state, federal, and safety regulations to include any hazardous waste disposal if necessary.

All materials to be installed must be submitted and approved prior to installation.

3. Objectives

The Contractor shall observe the attached drawings and specifications to replace eight 20’ by 20’ concrete panels.

1. The contractor shall remove existing panels to be replaced in accordance with the attached specifications (Division 02).

2. All concrete from existing panels to be replaced shall be remove and discarded by the contractor.

3. The contractor shall ensure sufficient base course is provided in accordance with attached plans (sheet C-500, detail 3).

4. The contractor shall ensure proper compressive strength of underlying base course in accordance with the attached specifications (Division 31).

5. Observe sheet C-501 detail 2 & 4 for proper installation of dowels. Dowels are required along all joints between new panels and existing panels.

6. Contractor shall install concrete in accordance with attached plans (sheet C-500 detail 3).

7. Concrete shall meet the compressive strength, 650 psi Flex mix with 4,000 psi compressive strength.

8. Compressive strength testing must be performed in accordance with all ASTM C39 and flexural strength testing shall be performed in accordance with ASTM C78 requirements.

9. The contractor shall submit 3 day, 7 day and 28 day breaks.

10. The contractor shall install joint sealant along all joints adjacent to new panels in accordance with attached specifications & plans (sheet C-501, detail 6).

11. Contractor shall observe cleaning specifications for end of each workday to ensure no

FOD issues are created by construction.

4.Delivery

All parts and materials shall be new parts and materials, as manufactured or recommended by the manufacturer. Performance shall take place at the 105th Airlift Wing, Stewart ANGB, Newburgh, NY. The Performance Period shall be 75 days.

5.Pre-Construction Meeting

The Contractor shall be required to meet with the Contracting Office, BCE representative and other members as required prior to the commencement of any work in order to coordinate the project construction. Topics of discussion will include: Hours of work, lay-down and storage areas, work area limits, safety compliance, emergency notifications and any other topics deemed necessary by the Contracting Officer or Contracting Officer representative.

6. Government Furnished Property:

None.

7. Security

Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 105 AW Base Defense Squadron. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 105th AW Base Defense Squadron. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer.

A contractor’s badge will be issued once The Contractor enters the main gate at Stewart Air National Guard Base. All employees are required to have the proper ID (social security card, driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away. Vendors should be aware that Anti- Terrorism Force Protection Measures are applicable to this contract. Vendors will be briefed on these measures by Base Defense personnel if recurring or long term access is required to Stewart ANG Base. Otherwise you will be escorted at all times by a member of Stewart ANG Base.

Work will be performed within a restricted area. The Contractor shall coordinate on a daily basis with the Contracting Officer & Contracting Officer’s Representative to ensure escorts are provided during working hours.

8. Safety Requirements

The Contractor shall comply with all Occupational Safety and Health Act (OSHA), federal, state, and local laws, regulations, and requirements regarding safety, as applicable to the services provided under this contract. In the event safety laws or regulations change during the term of this contract, The Contractor is required to comply as such laws come into effect.

File details come from the government source that posted it. Updated .