Drawings.pdf
PDF 2 MB Posted
- Attached to
- Aircraft Parking Apron Concrete Repairs
- Solicitation number
- W50S8D21Q0007
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Conference Minutes.pdf | ||
| Pre-Proposal Conference Attendance Sheet.pdf | ||
| Solicitation Amendment W50S8D21Q0007_0001.pdf | ||
| Statement of Work.pdf | ||
| W50S8D21Q0007.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ckdbyno. date description
95822
Contract WHAY142002
Contract Drawings
New York Air National Guard
REPAIR APRON
Stewart International Airport Newburgh, New York
AUGUST 2018
C O
P Y
R I G
H T
RI
A DRUG AN
LAOIT
A N
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\_WKSPACE\BORDERS\95822-CVR.DWG 7/16/2018 9:27 AM KWARRENDER
PRELIMINARY - NOT FOR
CONSTRUCTION
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
B U
R N
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
B-3 100% Submittal
KNWA 12/12/17 LMG TYPE B-1 SUBMITTAL
KNWB 04/06/18 LMG TYPE B-2 SUBMITTAL
KNWC 07/20/18 LMG TYPE B-2 SUBMITTAL
TO NGB
KNWD 08/24/18 LMG TYPE B-3 SUBMITTAL
Index ckdbyno. date description
ELEVATION CALLOUT EXAMPLE
DETAIL CALLOUT EXAMPLE
SECTION CALLOUT EXAMPLE
DRAWING SEQUENCE NUMBER
INDICATES WHERE TITLE IS
LOCATED (MAY NOT BE
PRESENT IF CALLOUT AND
TITLE ARE ON THE SAME
DRAWING)
LETTER OR
NUMBER DESIGNATOR
THE WORD "SECTION"
MAY BE REPLACED WITH
"ELEVATION" OR "DETAIL"
SECTION, DETAIL, AND ELEVATION
IDENTIFICATION SYSTEM
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
SYMBOL IDENTIFIERS
SECTION, DETAIL, AND ELEVATION
SECTION
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR
(MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE
ON DRAWINGS WITHIN THE
SAME DISCIPLINE)
A
FP001
A
FP001
A
FP001
A
FP001
B A001
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\_WKSPACE\BORDERS\95822-INDX.DWG 7/16/2018 9:28 AM KWARRENDER
WHAY142002
New York Air National Guard
REPAIR APRON
VICINITY MAP
SOURCE: NEWBURGH & CORNWALL ON HUDSON USGS MAPS
Contract Drawings
CIVIL DRAWINGS
DRAWING INDEX
DRAWING DESCRIPTION
CVR COVER SHEET
INDX INDEX
G-001 CONSTRUCTION ACCESS AND SAFETY PLAN
G-002 ACCESS AND SAFETY NOTES
CS100 OVERALL PLAN
CS101 SITE PLAN - 1
CS102 SITE PLAN - 2
CS103 SITE PLAN - 3
CS104 SITE PLAN - 4
CS105 SITE PLAN - 5
CS106 SITE PLAN - 6
CS107 PAVEMENT MARKING PLAN
C-500 REPAIR DETAILS - 1
C-501 REPAIR DETAILS - 2
C-502 SOIL EROSION DETAILS AND NOTES
SITE
SCALE IN FEET
2000' 4000'
NORTH
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
C O
P Y
R I G
B U
R N
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
KNWA 12/12/17 LMG TYPE B-1 SUBMITTAL
B-3 100% Submittal Contract WHAY142002 LIST OF ABBREVIATIONS (NOT ALL ARE USED)
AC ASBESTOS CEMENT PIPE
ALUM ALUMINUM
ANG AIR NATIONAL GUARD
ASSY ASSEMBLY
AT / FP ANTI TERRORISM / FORCE PROTECTION
BIT BITUMINOUS CONCRETE
BLDG BUILDING
CB CATCH BASIN
CATV CABLE TELEVISION
CI CAST IRON PIPE
CIC CAST IRON COVER
C/L CENTERLINE
CLF CHAIN LINK FENCE
CMP CORRUGATED METAL PIPE
CO CLEANOUT
CONC CONCRETE
DI DUCTILE IRON PIPE
DIA DIAMETER
DMH DRAINAGE MANHOLE
E EASTING
EL ELECTRICAL
EMH ELECTRIC MANHOLE
FAR FEDERAL AVIATION REGULATION
FF FINISH FLOOR
GALV GALVANIZED
HMA HOT MIX ASPHALT
HT HEIGHT
HYD HYDRANT
INV INVERT
KSM KILOGRAM / SQUARE METER
LF LINEAR FOOT
LOD LIMIT OF DISTURBANCE
MAX MAXIMUM
MC MINOR CONSTRUCTION
MFR MANUFACTURER
MIN MINIMUM
N NORTHING
NO NUMBER
NOM NOMINAL
OC OFF CENTER
OD OUTSIDE DIMENSION
PE POLYETHYLENE (PIPE)
PERF PERFORATED (PIPE)
PIV POST INDICATOR VALVE
POB POINT OF BEGINNING
PVC POLYVINYL CHLORIDE PIPE
RAD RADIUS
RCP REINFORCED CONCRETE PIPE
R/W RUNWAY
SESC SOIL EROSION AND SEDIMENT CONTROL
SMH SANITARY MANHOLE
SQ FT SQUARE FOOT
SQ M SQUARE METER
SRM SUSTAINMENT, RESTORATION & MAINTENANCE
TDZ TOUCH DOWN ZONE
TYP TYPICAL
UP UTILITY POLE
VC VITRIFIED CLAY PIPE
W/O WITHOUT
KNWB 04/06/18 LMG TYPE B-2 SUBMITTAL
KNWC 07/20/18 LMG TYPE B-2 SUBMITTAL
3 4
TU
S K
E G
E E
R D
TUSKEGEE RD
HER
CULE
S
AV
EN
UE
FALCON DRIVE
P O
N D
G
AL
AX
Y
LA
N
E
EAGLE DRIVE
FR
E
E D
O M
R O
A D
McDONALD St.
T U
S K
E G
E E
R D
PATROL ROAD 2
RT. 17K
P R
O P
A N
E T
A N
K S
BL
AS
T
FE
N C
IN
G
ALPHA
JU
LI
ET
KI
LO
A M
M U
N
IT
IO
N
B U
N K
E R
S
E X
IS
TI
N G
R O
A D
E X
IS
TI
N G
R O
A D
E A
R T
H B
E R
M
R
ES
TR
IC
TE
D
RESTRICTED
RESTRICTED
(UTIL. C
ENTER)
LO
X
/N
IT
R O
T A
N K
S
M A
IN
G
A T
E
P A
V
IL
E C
P
USMCR
AVIONICS
VAN PAD-1
P A
T R
O L
R O
A D
P A
T R
O L
R O
A D
P A
TR
O
L R
O A
D
PATROL ROAD 2
T T
USMCR
AVIONICS
VAN PAD-2
MILIT
IA
W
AY
M
IL
IT
IA
W
AY
M
IL
IT
IA
W A
Y
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
FACILITIES
C
O P
Y R
I G
APRIL 4, 2017 S.CATONE
L. GUERIN K. WARRENDER
CONSTRUCTION ACCESS
AND SAFETY PLAN
G-001 D
95822_G001.DWG
B U
R N
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
0 400'200'
SCALE IN FEET
NORTH
SITE ACCESS/
HAUL ROUTE
PROJECT LIMITS
A 12/12/17 LMG KNW TYPE B-1 SUBMITTAL
S
T
A
G
I
N
G
A
R
E
A
CHECK POINT
M
I
L
I
T
I
W
Y
M
I
L
I
T
I
W
Y
F
R
E
E
D
O
A
D
E
X
I
S
T
I
G
A
D
TUSKEGEE R
OAD
CHECK POINT
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
WHAY142002 95822
REPAIR APRON
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\CIVIL\SHEETS\95822_G001.DWG 7/18/2018 11:53 AM KWARRENDER
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
B 04/06/18 LMG KNW TYPE B-2 SUBMITTAL
RESTRICTED AREA
CHECK POINT
C 07/20/18 LMG KNW TYPE B-2 SUBMITTAL
TO NGB
KNWD 08/24/18 LMG TYPE B-3 SUBMITTAL
AutoCAD SHX Text
PAD
AutoCAD SHX Text
PLATFORM
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PL
AutoCAD SHX Text
ORR AVE.
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
PL
AutoCAD SHX Text
214 VEHICLE MAINTENANCE BUILDING
AutoCAD SHX Text
213 ENGINEERING INSTALLATION SQUADRON
AutoCAD SHX Text
415 SIMULATOR FACILITY
AutoCAD SHX Text
112 ECP GUARD SHED
AutoCAD SHX Text
7402 POL TANK FARM
AutoCAD SHX Text
220 SAND & SALT SHED
AutoCAD SHX Text
215 BALLFIELD/PAVILION
AutoCAD SHX Text
113 BASE SHED SUPPORT AND EQUIPMENT
AutoCAD SHX Text
211 BASE CIVIL ENG. COVERED STRG.
AutoCAD SHX Text
100 COMPOSITE MAINT. HANGAR
AutoCAD SHX Text
101 CORROSION CONTROL/FUEL CELL
AutoCAD SHX Text
102 FUEL CELL NOSE DOCK
AutoCAD SHX Text
105 FIRE STATION
AutoCAD SHX Text
106 AERIAL PORT
AutoCAD SHX Text
107 COMPOSITE MAINT. FACILITY
AutoCAD SHX Text
108 UTILITY CENTER
AutoCAD SHX Text
200 SUPPORT EQUIPMENT MAINT. SHOP
AutoCAD SHX Text
201 GUARD HOUSE
AutoCAD SHX Text
203 COMPOSITE OPERATIONAL TRAINING
AutoCAD SHX Text
204 ANG / USMCR BASE SUPPLY
AutoCAD SHX Text
207 BASE ENGINEERING
AutoCAD SHX Text
208 AUTOMOTIVE VEHICLE MAINT. SHOP
AutoCAD SHX Text
209 AUTO PARKING SHED
AutoCAD SHX Text
300 COMPOSITE AIRCRAFT MAINT./SQ OPS. (USMCR)
AutoCAD SHX Text
202 COMPOSITE SQUADRON OPS./TELECOM.
AutoCAD SHX Text
301 FUEL CELL HANGAR (USMCR)
AutoCAD SHX Text
302 INTERMEDIATE MAINT. ACTIVITY (USMCR)
AutoCAD SHX Text
303 AVIONICS PAD (USMCR)
AutoCAD SHX Text
405 GATE HOUSE
AutoCAD SHX Text
111 OIL/FUEL SEPERATOR
AutoCAD SHX Text
110 WATER SUPPLY BOOSTER PUMP STATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
205 HAZARDOUS STORAGE (USMCR)
AutoCAD SHX Text
206 HAZARDOUS STORAGE (ANG)
AutoCAD SHX Text
HIGH VOLTAGE SWITCHGEAR
AutoCAD SHX Text
401 PUMP HOUSE
AutoCAD SHX Text
402 CONTROL HOUSE
AutoCAD SHX Text
403 OPERATIONS BUILDING
AutoCAD SHX Text
HAZARDOUS MATERIAL STORAGE
AutoCAD SHX Text
400 MARINE RUN-UP PAD
AutoCAD SHX Text
7410 LOX/LIN PAD
ACCESS AND SAFETY NOTES
ACCESS AND STAGING
1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL,
VEHICLES, EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON
DRAWING G001 AND ARE SUBJECT TO THE APPROVAL OF THE
CONTRACTING OFFICER. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES WITH THE
APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE
AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES ARE
SUBJECT TO CHANGE AT THE DIRECTION OF THE CONTRACTING
OFFICER AND MAY CHANGE BASED ON OPERATIONAL
REQUIREMENTS OF THE BASE.
2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL
ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS
UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS,
AIRFIELD/AIRPORT AREAS, AND EXISTING ROADWAYS AT ALL TIMES
WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE
RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO
CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL
OTHER EMERGENCY SERVICES OF THE CLOSURE.
4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE
FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON
A DAILY BASIS.
5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN
THE CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE
WITH THE CONTRACTING OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AREA
FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S
STAGING SHALL BE AS ILLUSTRATED ON DRAWING G001 WITHIN THE
LIMITS OF CONSTRUCTION AND IS SUBJECT TO THE APPROVAL OF
THE CONTRACTING OFFICER. CONTRACTOR MAY SUBMIT
ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN.
CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE
DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE
BASED ON OPERATIONAL REQUIREMENTS OF THE BASE.
7. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STOCKPILE
AREA WITHIN CLOSE PROXIMITY TO THE CONSTRUCTION AREA.
LOCATIONS SHALL BE FIRST APPROVED BY THE CONTRACTING
OFFICER AND MAY CHANGE BASED ON OPERATIONAL
REQUIREMENTS OF THE BASE.
8. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES,
CONTRACTOR'S EQUIPMENT AND VEHICLES SHALL BE PARKED IN
THE STAGING AREA.
9. CONTRACTOR SHALL PROVIDE AND INSTALL AT THE CONSTRUCTION
ENTRANCE A PROFESSIONALLY PAINTED SIGN, MEETING CLIENT
REPRESENTATIVE APPROVAL, TO DIRECT MATERIAL SUPPLIERS,
EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION SITE. THE
SIGN SHALL READ “CONSTRUCTION VEHICLES ONLY - NO VENDORS
ALLOWED.”
10. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO
THE CONTRACTING OFFICER REGARDING CONSTRUCTION
DELIVERIES PRIOR TO THOSE DELIVERIES. DELIVERIES SHALL BE
SCHEDULED MONDAY-FRIDAY, 8:00 AM TO 3:00 PM.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO
SEARCH BY SECURITY WHEN ENTERING THE BASE AND MAY
EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND
VALID PHOTO IDENTIFICATION PER BASE SECURITY REQUIREMENTS,
AND ALL VEHICLES MUST HAVE CURRENT AND VALID REGISTRATION
AND INSURANCE.
12. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE
RESPONSIBLE FOR COORDINATING WITH THE BASE SECURITY
OFFICE IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING
PRIOR TO ENTERING SECURE AREAS.
13. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER
AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO
THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
COORDINATION AND COMMUNICATION
1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION
SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE
CONTRACTING OFFICER, WHO SHALL BE PRESENT ON THE
CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS AND
ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE
PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED
THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL
BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S
PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON
THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL
BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT
INFORMATION OF REPRESENTATIVES TO THE CONTRACTING
OFFICER PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND
THE CONTRACTING OFFICER. ALL CONSTRUCTION ACTIVITIES
PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND
APPROVED BY THE CONTRACTING OFFICER.
3. IN CASE OF EMERGENCY, CONTRACTOR SHALL CALL 911.
4. THE CONTRACTING OFFICER SHALL PROVIDE THE APPROPRIATE
POINTS OF CONTACT FOR THE BASE AT THE PRE-CONSTRUCTION
MEETING.
TRAFFIC CONTROL
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE
CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS AND
AIRFIELD AREAS BY USING LIGHTED LOW PROFILE BARRICADES AS
SHOWN ON DRAWING SHEET C-500 AND APPROVED BY THE
CONTRACTING OFFICER.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED
WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH
ARE CLEARLY VISIBLE. CONTRACTOR SHALL PROVIDE EACH
VEHICLE WITH A FLAG ATTACHED TO THE VEHICLE WHICH SHOULD
BE AT LEAST 3 FEET SQUARE HAVING INTERNATIONAL ORANGE AND
WHITE CHECKERED PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING
DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING
PAVEMENT-TO-REMAIN.
5. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE
CONSTRUCTION LIMITS.
6. WHEN ROAD CLOSURES ARE NECESSARY TO COMPLETE WORK,
CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 1 WEEK TO
BASE AND THE CONTRACTING OFFICER PRIOR TO THE ROAD
REQUIRING CLOSURE.
7. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL
DEVICES, THE CONTRACTOR SHALL REQUEST THE CONTRACTING
OFFICER TO SCHEDULE AN INSPECTION. NO ROADWAY OR PORTION
OF THE AIRFIELD SHALL BE RE-OPENED UNTIL THE CONTRACTING
OFFICER HAS COMPLETED INSPECTION AND APPROVED THE
RE-OPENING OF ACTIVE AREAS.
8. CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE
OPERATOR OR FOREIGN OBJECT DEBRIS/DAMAGE (FOD) CONTROL
TRAINING COURSE.
9. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO
CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO
RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL
CONDITION TO THE SATISFACTION OF THE CONTRACTING OFFICER.
AIRFIELD OPERATIONS COORDINATION
1. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS INDICATED
IN FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR
(AC) 150/5370-2F, OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION (CURRENT EDITION).
2. CONTRACTOR SHALL NOT ACCESS THE AIRCRAFT OPERATIONS
AREA, AND SHALL CONDUCT WORK IN SUCH A MANNER TO ENSURE
A MINIMUM HINDRANCE TO AVIATION OPERATIONS. SHOULD
ACCESS TO THE AIRCRAFT OPERATION AREA BECOME NECESSARY,
CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 4 DAYS TO
BASE OPERATIONS. PEDESTRIAN TRAFFIC AND PRIVATELY OWNED
VEHICLES SHALL NOT BE ALLOWED IN THE AIRCRAFT OPERATIONS
AREA.
3. CONSTRUCTION ACTIVITY AFFECTING AIRCRAFT MOVEMENT AREAS
AND AIRFIELD SAFETY REQUIREMENTS SHALL BE COORDINATED
WITH BASE OPERATIONS AND THE CONTRACTING OFFICER. NO
AIRCRAFT OPERATIONS AREA SHALL BE CLOSED WITHOUT
APPROVAL FROM BASE.
4. NOTICES TO AIRMEN (NOTAMS) SHALL BE ISSUED IN ACCORDANCE
WITH AC 150/5370-2F OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION, AND AC 150/5200-28D NOTICES TO AIRMEN FOR
AIRPORT OPERATORS. ALL NOTAMS SHALL BE COORDINATED WITH
BASE OPERATIONS AND THE CONTRACTING OFFICER. THE NOTAM
INFORMATION SHALL INCLUDE PORTIONS OF THE AIRFIELD THAT
ARE CLOSED OR DISPLACED, THE DATE AND TIME OF THE
BEGINNING AND ENDING OF WORK, AND THE DURATION OF THE
WORK.
5. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO
BASE OPERATIONS REGARDING THE NEED FOR NOTICES TO AIRMEN
(NOTAMS). CONTRACTOR SHALL NOT COMMENCE WORK ACTIVITIES
ON AIRFIELD AREAS UNTIL APPROPRIATE NOTAMS HAVE BEEN
ISSUED TO IDENTIFY WORK ACTIVITIES.
6. ALL CONSTRUCTION AREAS THAT POSE A HAZARD TO OPERATING
AIRCRAFT SHALL BE PROPERLY MARKED WITH LOW-PROFILE
BARRICADES. ALL BARRICADES LOCATED WITHIN OR ADJACENT TO
AIRCRAFT OPERATIONS AREAS SHALL BE LOW-PROFILE TYPE WITH
ORANGE MARKINGS AND RED FLASHING LIGHTS. LOW PROFILE
BARRICADES SHALL BE KEPT OUTSIDE THE LIMITS OF ANY ACTIVE
AIRFIELD SAFETY AREA. SEE DETAIL 7 ON DRAWING C501 FOR
LOW-PROFILE BARRICADE DETAIL.
7. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING
DAMAGE TO AIRCRAFT AND HELICOPTER LANDING GEAR,
PROPELLERS AND ROTORS, OR OF BEING INGESTED BY JET
ENGINES, SHALL NOT BE LEFT WITHIN ACTIVE AIRCRAFT OPERATION
AREAS. CONTRACTOR IS REQUIRED TO IMMEDIATELY CLEAN ANY
DEBRIS CARRIED ONTO AIRFIELD FROM CONTRACTOR'S EQUIPMENT
OR OPERATIONS TO PREVENT FOREIGN OBJECT DAMAGE (FOD).
MATERIAL DROPPED WITHIN THESE AREAS SHALL BE
CONTINUOUSLY REMOVED BY SURFACE SWEEPERS OR OTHER
APPROVED METHODS DURING WORKING HOURS. CONSTRUCTION
FENCE MAY BE REQUIRED TO FULFILL THIS RESPONSIBILITY.
STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR
JET BLAST
8. ANY DAMAGE TO EXISTING AIRFIELD LIGHTING, AIRCRAFT
NAVIGATIONAL AIDS (NAVAIDS), OR AIRFIELD
PAVEMENTS-TO-REMAIN DUE TO CONSTRUCTION SHALL BE
COMMUNICATED TO THE CONTRACTING OFFICER AND SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
EQUIPMENT AND STOCKPILE HEIGHT
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR AC
150/5370-2F AND AC 150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH
SURFACES OR WHEN CRANES WILL BE USED ON-SITE, CONTRACTOR
SHALL PROVIDE A MINIMUM NOTICE OF 60 DAYS TO THE
CONTRACTING OFFICER AND BASE OPERATIONS PRIOR TO THE
START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL OF FAA
FORM 7460-1 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE
CRANES SHALL BE ISSUED BY BASE OPERATIONS AND THE
CONTRACTING OFFICER AFTER APPROVAL BY THE FAA.
2. DURING PERIODS OF LOW VISIBILITY, VEHICLES AND EQUIPMENT
SHALL BE IDENTIFIED BY AN APPROPRIATELY SIZED FLASHING OR
STEADY BURNING AMBER BEACON MOUNTED ON THE UPPER MOST
PART OF THE VEHICLE OR EQUIPMENT SUCH THAT IT IS
CONSPICUOUS FROM ANY DIRECTION INCLUDING FROM THE AIR. IF
A VEHICLE OR PIECE OF EQUIPMENT IS NOT FURNISHED WITH SUCH
A BEACON, IT MUST BE ESCORTED INTO THE AIRCRAFT OPERATIONS
AREA BY A PROPERLY LIT VEHICLE.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL
HAVE BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
4. CONTRACTOR SHALL NOT STOCKPILE CONSTRUCTION MATERIALS,
SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD
PENETRATE AVIATION SURFACES. ALL STOCKPILES ADJACENT TO
AIRCRAFT OPERATIONS AREA SHALL BE IDENTIFIED WITH A
360-DEGREE RED OBSTRUCTION LIGHT PLACED AT THE HIGHEST
POINT OF THE STOCKPILE. STOCKPILING OF MATERIAL WITHIN THE
AIRFIELD SAFETY AREAS IS PROHIBITED.
EXCAVATION AND TRENCHES
1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION
OF OSHA REGULATIONS AND THE STATE OF NEW YORK LAWS
CONCERNING EXCAVATION.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL
EXCAVATION, TRENCHING, AND SHORING ARE PERFORMED IN A
MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS FOR CONSTRUCTION.
3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE
SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH
FLASHING RED LIGHTS ACCEPTABLE TO THE CONTRACTING
OFFICER.
4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO
THE CONTRACTING OFFICER AND ASSOCIATED UTILITY COMPANIES
AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION.
5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY
BE REQUIRED.
6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND
AND READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER
THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL
AND COMPACT TRENCHES AS SPECIFIED.
OTHER SAFETY REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM
TO OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
REGULATIONS.
2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND
PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR
CONSTRUCTION AND EQUIPMENT.
3. THE CONTRACTOR SHALL PERFORM ON-SITE INSPECTIONS
THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS
IMMEDIATELY.
4. THERE SHALL BE NO PERMANENT WASTE SITES ON BASE
PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY
THE CONTRACTING OFFICER AND SHALL BE KEPT IN AN ORDERLY
CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY
MAINTAINED IS SUBJECT TO THE DIRECTION OF THE CONTRACTING
OFFICER.
5. CONTRACTOR SHALL COORDINATE THE RELOCATION OF ANY
GOVERNMENT/CLIENT-OWNED EQUIPMENT WITH THE CONTRACTING
OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL
REQUIREMENTS WITH STATE AND LOCAL AUTHORITIES AND
SUBMITTING DOCUMENTS FOR PERMITTING FOR EROSION,
SEDIMENT CONTROL, AND STORMWATER POLLUTION PREVENTION.
7. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND
HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES
WHEN NECESSARY TO CONTROL EROSION AND STORM WATER
RUNOFF.
8. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS.
9. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST
CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO
BASE OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING
DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK
AREA REGARDLESS OF SOURCE.
10. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM
CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE REMOVED
FROM THE PROJECT LIMITS.
11. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING
FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE
PROPERLY DISPOSED OF IN ACCORDANCE WITH THE
SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND
PROPERLY REMOVED FROM THE PROJECT PROPERTY. IF
HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED
DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY THE CONTRACTING OFFICER.
12. IF CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION
OF ANY WATER LINES OR FIRE HYDRANTS ON PROJECT PROPERTY
OR ADJOINING PROPERTY, THE CONTRACTOR SHALL PROVIDE A
MINIMUM ADVANCE NOTICE OF 48 HOURS TO THE LOCAL FIRE
AUTHORITY AND ALL OTHER EMERGENCY SERVICES.
13. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE
CONTRACTING OFFICER SAFETY REQUIREMENTS SHALL RESULT IN
THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY
CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
14. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY
PLAN OR BASE OPERATIONS SHALL IMMEDIATELY BE REMOVED
FROM THE WORK AREA AND SHALL NOT BE PERMITTED TO RETURN
THROUGHOUT THE REMAINDER OF THE PROJECT.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING UTILITY
MARKOUTS PRIOR TO THE START OF CONSTRUCTION.
C O
P Y
R I G
APRIL 4, 2017 S. CATONE
L. GUERIN K. WARRENDER
ACCESS AND SAFETY NOTES
G-002 D
95822_G002.DWG
B U
R N
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
A 12/12/17 LMG KNW TYPE B-1 SUBMITTAL
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
WHAY142002 95822
REPAIR APRON
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\CIVIL\SHEETS\95822_G002.DWG 7/16/2018 9:31 AM KWARRENDER
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
B 04/06/18 LMG KNW TYPE B-2 SUBMITTAL
C 07/20/18 LMG KNW TYPE B-2 SUBMITTAL
1" MIN.
RE-ESTABLISH JOINT SEAL
INSERT FIBERBOARD WITH
EXPANSION JOINT CAP INTO
SOCKET ALONG EXISTING
JOINT LINES
STEP 2
STEP 3
APPLY PRIMER
REMOVE PCC TO SOUND
CONCRETE
EXISTING CONCRETE
JOINT
1/2" WIDE SAW CUT
DISTRESSED AREA
SAW CUT VERTICAL
FACE (TYP)
2" MIN.
OR 1/2"
BELOW
SOUND
CONCRETE
6" MIN.
2"
5" MIN.
PLAN VIEW
LIMITS OF PCC REMOVAL
CLEAN OVERCUTS AND FILL
WITH GROUT
SAW CUT
EXISTING CONCRETE
PAVEMENT JOINT
SAWCUT MIN. 5" DEEP WITH 1/2"
STACKED BLADES TO CREATE
SOCKET FOR FIBERBOARD (TYP)
DISTRESSED AREA
SEE NOTE 7
3"
EXISTING CONCRETE
JOINT
EXISTING CONCRETE
JOINT
STEP 1
EXISTING CONCRETE
JOINT
90°
2" MIN.
90°
2" MIN.
1. MAKE VERTICAL SAW CUT A MINIMUM OF 2" OUTSIDE OF THE DISTRESSED AREA. SAW CUTS MUST BE SQUARE WITH
ADJACENT JOINTS, FORMING A RECTANGULAR PATCH AREA.
2. REMOVE ALL CONCRETE AND LOOSE MATERIAL A MINIMUM OF 2" OR 1/2" INTO SOUND CONCRETE, WHICH EVER IS
DEEPER. REMOVAL PROCESS SHALL NOT INCORPORATE A PNEUMATIC HAMMER LARGER THAN 30 LBS.
3. APPLY PRIMER (AS RECOMMENDED BY MATERIAL MANUFACTURER) TO THE ENTIRE SURFACE OF THE AREA TO BE
REPAIRED.
4. FILL AREA WITH PATCH MATERIAL AND ALLOW TO CURE.
5. REMOVE EXPANSION JOINT CAP AND SEAL JOINT.
6. SAW CUT OVERCUTS SHALL BE THOROUGHLY CLEANED AND COMPLETELY FILLED WITH EPOXY.
7. MINIMUM DISTANCE BETWEEN ADJACENT EDGE SPALL PATCHES IS 2'. IF LESS SPACE IS REQUIRED, PATCHES SHALL BE
COMBINED AND CONTINUOUS.
8. MINIMUM DISTANCE BETWEEN ADJACENT EDGE SPALL PATCH AND EXISTING JOINT SHALL BE MORE THAN 12". IF LESS
SPACE IS REQUIRED, PATCH SHALL BE EXTENDED TO THE EXISTING JOINT.
REPLACE WITH NEW
PATCH MATERIAL (SEE
SPECIFICATIONS)
STEP 4
CS101
CS102
CS103
CS104
CS105
CS106
PARTIAL DEPTH
SPALL/PATCH REPAIR
NOT TO SCALE
PORTLAND CEMENT CONCRETE
CRUSHED ROCK BASE
NOT TO SCALE
#4 EPOXY COATED
BARS @ 6" O.C.E.W.
(REINFORCED CONCRETE
ONLY)
6" MIN. COVER
AND EDGE
DISTANCE
PROOF-ROLLED SUBGRADE
NOTES:
1. REINFORCE ODD-SHAPED PANELS.
STEP 2
STEP 1
SECTION A-A
SAW CRACK TO DESIGNATED
WIDTH (W) AND DEPTH (T)
FOR TYPE AND SIZE OF
SEALANT REQUIRED TO
REPAIR CRACK.
PLAN VIEW
EXISTING CONCRETE
PAVEMENT JOINT
LINEAR CRACK
IN PAVEMENT
LIMITS OF PARTIAL
DEPTH PATCH
A A
GENERAL NOTES:
1. SAW CUT OVERCUTS SHALL BE THOROUGHLY CLEANED
AND COMPLETELY
FILLED WITH EPOXY.
2. SAWCUTS MAY BE MADE A MAXIMUM 24 HOURS PRIOR TO
PAVEMENT REMOVAL.
CS101
CS102
CS103
CS104
CS105
CS106
LINEAR CRACK REPAIR FOR
CRACK WIDTH 3/16" TO < 2"
NOT TO SCALE
W
T
SAWCUT
W
T
D
" TO
REMOVE ALL DEBRIS AND LOOSE
MATERIAL FROM CRACK. CLEAN CRACK
FACES BY SANDBLASTING, REMOVE
DEBRIS WITH COMPRESSED AIR THEN
HIGH PRESSURED WATER.
CLEAN AREA
AROUND THE
CRACK WITH
BROOM OR VACUUM
NOTES:
1. PLACE BACKER ROD IMMEDIATELY PRIOR TO SEALING
CRACK. BACKER ROD SHALL BE MINIMUM 25% LARGER IN
DIAMETER THAN WIDTH OF CRACK. BACKER ROD MUST BE
PLACED AT THE PROPER DEPTH FOR SEALANT BEING USED
TO ACHIEVE A SHAPE FACTOR (S) BETWEEN 1.0 AND 2.0.
2. S = D/W
D = DEPTH OF SEALANT
W = WIDTH OF CRACK
3. SEALANT SHALL BE
" TO
" BELOW PAVEMENT SURFACE
BACKER
ROD
SEALANT
CS103
CS104
CS105
CS106
3CONCRETE PAVEMENT SECTION
RED OMNI-DIRECTIONAL
FLASHER
2"X8" (NOMINAL)
2'-0"
6' OR 8' (PER MANUFACTURER)
(TYP)
1. SAFETY BARRICADE SHALL HAVE LIGHTS, REFLECTIVE STRIPING AND SHALL BE:
· MODEL AR-1OX96 AS MANUFACTURED BY OFF THE WALL PRODUCTS, SALT LAKE CITY,
UTAH, OR
· MODEL NAC-PC-2410 AIRPORT LOW-PROFILE BARRICADES AS MANUFACTURED BY
NEUBERT AERO CORP., TAMPA, FLA, OR
· APPROVED EQUAL
2. SAFETY BARRICADE SHALL BE INSTALLED AROUND CLOSURES. THE BARRICADE AND LIGHTS
SHALL BE MAINTAINED IN GOOD OPERATIONAL CONDITION DURING ALL CLOSURES.
3. FLASHERS SHALL BE SOLAR POWER OPERATED. LENS SHALL BE RED AND OMNI-DIRECTIONAL.
SUPPORT BRACES SHALL BE SECURELY ATTACHED TO 2"x8".
4. SAND BAGS SHALL BE PLACED ON EACH SUPPORT BRACE.
5. FACING OF 8'x8" TO BE COVERED WITH REFLECTIVE TAPE OR PAINT.
6. LOW-PROFILE BARRICADES TO BE SPACED END TO END ACROSS THE FULL WIDTH OF
PAVEMENT TO PREVENT VEHICLES AND AIRCRAFT FROM PASSING THROUGH.
7. BARRICADES SHALL BE BRACED TO PREVENT TIP OVER OR DISPLACEMENT AS MAY BE
INDUCED BY WEATHER OR AIRCRAFT OPERATIONS.
8. BARRICADES SHALL NOT BE LOCATED WITHIN AN ACTIVE RUNWAY SAFETY AREA.
BARRICADES SHALL BE LOCATED OUTSIDE OF ANY ACTIVE TAXIWAY OBJECT FREE AREA.
9. BARRICADE LOCATIONS SHALL BE COORDINATED WITH THE AIRPORT AND OWNER'S
REPRESENTATIVE.
2"X4", 24" IN LENGTH SECURELY FASTENED
WITH A FRANGIBLE COUPLING (TYP)
ALTERNATING 6" BANDS OF
AVIATION WHITE & ORANGE
M
A X
NOT TO SCALE
G-002
LIGHTED LOW
PROFILE BARRICADE
C-501
A 04/18/17 KNW LRM TYPE A-1 SUBMITTAL
B 07/14/17 KNW LRM TYPE A-2 SUBMITTAL
C 10/27/17 KNW LRM SUBMITTAL TO NGB
D 12/12/17 LMG KNW TYPE B-1 SUBMITTAL
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
WHAY142002 95822
REPAIR APRON
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\CIVIL\SHEETS\95822-C-500.DWG 7/16/2018 12:12 PM KWARRENDER
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
C O
P Y
R I G
B
U R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
03/06/17 L. GUERIN
K. WARRENDER L. MONZON
REPAIR DETAILS - 1
C-500 G
95822-C-500.dwg
E 04/06/18 LMG KNW TYPE B-2 SUBMITTAL
F 07/20/18 LMG KNW TYPE B-2 SUBMITTAL
TO NGB
KNWG 08/24/18 LMG TYPE B-3 SUBMITTAL
NOTES:
NOT TO SCALE
SAWED JOINT FACE
BUTTED JOINT
PAVEMENT
SURFACE
GREASE ONE END
OF DOWEL.
SOLID STEEL EPOXY COATED DOWEL 2"
DIA - 20" LONG SPACED AT 18" OC BAR
CLEARANCE AT EDGE OF PANEL SHALL
BE A MINIMUM OF 6" AND A MAXIMUM OF
9" CLEARANCE.
DOWELS SHALL BE EPOXYED INTO
DRILLED HOLES HAVING A DIAMETER OF
1/8'' LARGER THAN THE DOWEL
DIAMETER. HOLES SHALL NOT BE
DRILLED UNTIL AT LEAST 48 HOURS
AFTER CONCRETE IS POURED.
T
T
L/2
W
D
PREFORMED
COMPRESSION
SEAL
LUBRICANT/ADHESIVE
NOTES:
1. DEPTH (D) & WIDTH (W) : AS RECOMMENDED BY MANUFACTURER
PER TYPE OF SEAL BEING USED.
(DEPTH NOT LESS THAN 1.5 INCHES)
2. TOP OF PREFORMED SEAL WILL BE 1/8 - 1/4 INCH BELOW
PAVEMENT SURFACE.
3. COMPRESSION SEAL MUST BE IN COMPRESSION AT ALL TIMES.
CS101
CS102
CS103
CS104
CS105
CS106
6CONSTRUCTION JOINT SEALING
NOT TO SCALE
C-501
TYPE D - DOWELED
CONSTRUCTION JOINT
T
T
C-501
TYPE G - HINGED
CONTRACTION JOINT
NOT TO SCALE
NOT TO SCALE
CS103
CS104
CS105
CS106
1QUARTER PANEL REPLACEMENT
NOT TO SCALE
CS103
CS104
CS105
CS106
2FULL PANEL REPLACEMENT
G
G
D
D
D
D
D D
EXISTING JOINT (TYP.)EXISTING JOINT (TYP.)
PCC PAVEMENT
PCC PAVEMENT
C-500
SOLID STEEL EPOXY COATED DOWEL 2"
DIA - 20" LONG SPACED AT 18" OC BAR
CLEARANCE AT EDGE OF PANEL SHALL
BE A MINIMUM OF 6" AND A MAXIMUM OF
9" CLEARANCE
DOWELS SHALL BE EPOXYED INTO
DRILLED HOLES HAVING A DIAMETER OF
1/8'' LARGER THAN THE DOWEL
DIAMETER. HOLES SHALL NOT BE
DRILLED UNTIL AT LEAST 48 HOURS
AFTER CONCRETE IS POURED
GREASE ONE END
OF DOWEL
L/2
3"
1"
EXPANSION CAP, SLIP FIT
C-501
C-501
C-500
NOT TO SCALE
CS105
PARTIAL DEPTH PAVEMENT REPAIR
AT DRAINAGE STRUCTURE
EXISTING
JOINT (TYP.)
EXISTING DRAINAGE
INLET
PARTIAL DEPTH
PAVEMENT REPAIR
SAWCUT AT JOINT
(TYP.)
C-500
C-501
TYP.
C-501
TYP.
C-501
TYP.
A 12/12/17 LMG KNW TYPE B-1 SUBMITTAL
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
WHAY142002 95822
REPAIR APRON
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\CIVIL\SHEETS\95822-C-500.DWG 7/16/2018 12:12 PM KWARRENDER
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
12/26/17 L. GUERIN
K. WARRENDER L. MONZON
REPAIR DETAILS - 2
C-501 D
95822-C-500.dwg
B 04/06/18 LMG KNW TYPE B-2 SUBMITTAL
C 07/20/18 LMG KNW TYPE B-2 SUBMITTAL
CS101
CS102
CS103
CS104
CS105
CS106
1INLET FILTER
NOT TO SCALE
LENGTH=L
WIDTH=W
DEPTH=D
DUMP STRAP
1" REBAR FOR BAG
REMOVAL FROM INLET
DUMP STRAP
FOAM
CURB OPENING
DUMP STRAPS
1" REBAR FOR BAG
REMOVAL FROM INLET
EXPANSION
RESTRAINT (1/4"
NYLON ROPE, 2"
FLAT WASHERS)
INLET FILTER
BAG
DUMP STRAPS
(2 EACH)
FOAM
BAG DETAIL
INSTALLATION DETAIL
NOTE:
INLET FILTER SHALL BE PLACED INSIDE ALL EXISTING CATCH
BASINS PRIOR TO STARTING WORK
EROSION CONTROL NOTES:
1. AT THE PRECONSTRUCTION CONFERENCE OR PRIOR TO THE START OF THE APPLICABLE
CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT FOR ACCEPTANCE HIS SCHEDULES FOR
ACCOMPLISHMENT OF TEMPORARY AND PERMANENT EROSION CONTROL WORK AS ARE APPLICABLE
FOR EXCAVATION WORK, AND ANY OTHER ELEMENTS OF THE PROJECT WHICH MAY CONTRIBUTE TO
GROUND EROSION OR SITUATION. NO WORK SHALL BE STARTED UNTIL THE EROSION CONTROL
SCHEDULES AND METHODS OF OPERATIONS HAVE BEEN ACCEPTED BY THE CONTRACTING OFFICER.
2. THE CONTRACTING OFFICER HAS THE AUTHORITY TO LIMIT THE SURFACE AREA OF ERODIBLE EARTH
MATERIAL EXPOSED BY EXCAVATING AND GRADING OPERATIONS, AND TO DIRECT THE CONTRACTOR
TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY POLLUTION CONTROL MEASURES, SUCH WORK
MAY INVOLVE THE CONSTRUCTION OF TEMPORARY BERMS, DIKES, DAMS, SEDIMENT BASINS, AND USE
OF TEMPORARY MULCHES, MATS, SEEDING OR OTHER CONTROL DEVICES OR METHODS AS
NECESSARY TO CONTROL EROSION. CUT SLOPES SHALL BE TEMPORARILY SEEDED AND MULCHED
AS THE EXCAVATION PROCEEDS TO THE EXTENT CONSIDERED DESIRABLE AND PRACTICAL.
3. TEMPORARY CONTROL MEASURES WILL BE USED TO CORRECT CONDITIONS THAT DEVELOP DURING
CONSTRUCTION THAT WERE NOT FORESEEN DURING THE DESIGN STAGES THAT ARE NEEDED
TEMPORARILY TO CONTROL EROSION THAT DEVELOPS DURING NORMAL CONSTRUCTION PRACTICES
BUT ARE ASSOCIATED WITH PERMANENT CONTROL FEATURES ON THE PROJECT.
4. WHERE EROSION IS LIKELY TO BE A PROBLEM, EXCAVATION AND GRADING OPERATIONS SHALL BE SO
SCHEDULED AND PERFORMED THAT PERMANENT EROSION CONTROL FEATURES CAN FOLLOW
IMMEDIATELY: OTHERWISE TEMPORARY EROSION CONTROL MEASURES MAY BE REQUIRED BETWEEN
SUCCESSIVE CONSTRUCTION STAGES.
5. IN THE EVENT OF CONFLICT BETWEEN THESE REQUIREMENTS AND POLLUTION CONTROL LAWS, RULES AND REGULATION OF OTHER FEDERAL OR STATE OR LOCATIONS AGENCIES, THE MORE
RESTRICTIVE LAWS, RULES OR REGULATIONS SHALL APPLY.
6. DURING LAND DISTURBANCE ACTIVITIES AND DURING CONSTRUCTION, ANY ADDITIONAL CONTROL
MEASURES AS DEEMED NECESSARY TO PREVENT EROSION AND CONTROL OF SEDIMENT BEYOND
THOSE SHOWN ON THE APPROVED PLANS SHALL BE INSTALLED AS DIRECTED BY THE CONTRACTING
OFFICER.
7. THE CONTRACTOR SHALL MONITOR PERFORMANCE OF SEDIMENT CONTROL MEASURES. THE
CONTRACTOR SHALL INSPECT AT THIRTY (30) DAY INTERVALS OR FOLLOWING A RAINFALL,
WHICHEVER IS SOONER. THE CONTRACTOR SHALL REMOVE ALL SILT ACCUMULATION IN THE
SEDIMENT CONTROL STRUCTURES.
8. LOW AND CRITICAL SLOPE AREAS SHALL BE MONITORED AT WEEKLY INTERVALS. ANY BARE OR
ERODED AREAS WILL BE RE-ESTABLISHED AS REQUIRED. SHOULD ISOLATED AREAS REPEATEDLY
RESIST STABILIZATION, CONTACT LOCAL COUNTY CONSERVATION DISTRICT FOR ASSISTANCE.
9. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY MUST BE
REMOVED IMMEDIATELY.
10. THE EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED UNTIL ALL SOIL
DISTURBING ACTIVITIES CEASE AND PERMANENT STABILIZATION OF DISTURBED AREAS IS COMPLETE
AND ACCEPTED BY THE CONTRACTING OFFICER. PERMANENT STABILIZATION IS DEFINED AS A
UNIFORM EROSION RESISTANT PERENNIAL VEGETATIVE COVER OF AT LEAST 70% OF THE DISTURBED
AREA.
11. THE CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENTATION CONTROL DEVICES AFTER
EACH RAINFALL OR SNOWMELT EVEN AND REMOVE ALL ACCUMULATED SEDIMENT WHENEVER THE
LEVEL OF ACCUMULATION HAS REACHED ON THIRD OF THE DEPTH OF THE SEDIMENT DEVICE.
DEPOSITS FROM THE SEDIMENT STRUCTURES WILL BE REMOVED TO THE CONTRACTOR'S DISPOSAL
AREA.
12. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF HE SUSPECTS THAT
ANY SEDIMENT OR EROSION CONTROL DEVICE IS NOT OPERATING CORRECTLY. THE EXITING PAVED
ROADWAY WILL BE KEPT CLEAN OF ALL SEDIMENT AND SHALL BE INSPECTED DAILY BY THE
CONTRACTOR. WHEN THE LOOSE STONE TIRE TREAD CLEANER AT THE CONSTRUCTION ENTRANCE
BECOMES CHOKED WITH SEDIMENT, THE CONTRACTOR WILL REPLACE THE STONE OR PROVIDE
ADDITIONAL TOP DRESSING OF CLEAN ASTMC-33 SIZE NO. 2 OR 3 COARSE AGGREGATE AS DIRECTED
BY THE CONTRACTING OFFICER.
A 04/06/18 LMG KNW TYPE B-2 SUBMITTAL
S c a l e
F o r
M i c r o f i l m i n g
I n c h e s
M i l l i m e t e r s
no. date descriptionby
1 1312111098765432
I
H
G
F
E
D
C
B
A date detailed checkeddesigned ofsheet sheets project contract rev.drawing file ckd
NEW YORK AIR NATIONAL GUARD
STEWART INTERNATIONAL AIRPORT
WHAY142002 95822
REPAIR APRON
Z:\CLIENTS\ANF\USNGB\ANG\NY\95822_REPAIRAPRON\DESIGN\CIVIL\SHEETS\95822-C-500.DWG 7/16/2018 12:12 PM KWARRENDER
LICENSEE NO. 000165
(973) 884-8701
MORRISTOWN, NJ 07960
10 NORTH PARK PLACE, SUITE 330
C O
P Y
R I G
R
D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
12/26/17 L. GUERIN
K. WARRENDER L. MONZON
SOIL EROSION DETAILS AND NOTES
C-502 C
95822-C-500.dwg
B 07/20/18 LMG KNW TYPE B-2 SUBMITTAL
TO NGB
KNWC 08/24/18 LMG TYPE B-3 SUBMITTAL
INLET GRATE
| 95822-CVR |
| 95822-NDX |
| 95822-G001 |
| 95822-G002 |
| 95822-CS100 |
| 95822-CS101 |
| 95822-CS102 |
| 95822-CS103 |
| 95822-CS104 |
| 95822-CS105 |
| 95822-CS106 |
| 95822-CS107 |
| 95822-C-500 |
| 95822-C-501 |
| 95822-C-502 |