Statement_of_Work.pdf
PDF 151 KB Posted
- Attached to
- STAIRCASE, AIRCRAFT BOARDING, STANDARD TRUCK
- Solicitation number
- FA853420Q0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers.pdf.pdf | ||
| Questions_and_Answers.pdf | ||
| CID Revision Page 1.pdf | ||
| Questions_and_Answers.pdf | ||
| Combined Synopsis Solicitation---Amendment 1.pdf | ||
| QuestionsandAnswers.pdf | ||
| AF_TMCR.pdf | ||
| Combined Synopsis Solicitation---.pdf | ||
| IUID_SCT_18122019.pdf | ||
| Exhibit A__.pdf | ||
| Exhibit B__.pdf | ||
| First Article Reqs SCT 18122019.pdf | ||
| AFMC Form 158.pdf | ||
| DDForm 1653.pdf | ||
| CID_A-A-59888B.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION STATEMENT A. Approved for public release: Distribution is unlimited.
12 February 2020
Statement of Work (SOW) for
STAIRCASE, AIRCRAFT BOARDING, STANDARD TRUCK
Prepared by
Kavita Singh, AFLCMC/WNZ
Mechanical Engineer
SUPPORT EQUIPMENT AND VEHICLES PROGRAM OFFICE
235 BYRON ST STE 19A
ROBINS AFB GA 31098-1813
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS
1. SCOPE
2. APPLICABLE DOCUMENTS
2.1 Government documents
2.1.1 Specifications, standards, and handbooks
2.1.2 Other Government documents, drawings, and publications
2.2 Order of precedence
3. REQUIREMENTS
3.1 Program management
3.1.1 Program manager
3.1.2 Plant access
3.1.3 Monthly status report
3.2 Conferences and program reviews
3.2.1 Postaward conference
3.2.2 Program Management Review support
3.2.3 Conference room
3.2.4 Meeting agendas
3.2.5 Meeting minutes
3.3 Systems engineering
3.3.1 Environment, Safety, and Occupational Health (ESOH)
3.3.1.1 System safety
3.3.1.2 Hazardous materials
3.4 Logistics
3.4.1 Technical Order (TO) requirements
3.4.2 Commissioning
3.5 Testing and evaluation
3.5.1 First article test
3.5.1.1 First article test procedures
3.5.1.2 First article testing
3.5.1.3 First article test report
3.5.2 Restoration
3.5.3 Disposition
3.6 Configuration management
3.6.1 Configuration requirements
3.6.1.1 Baselines
3.6.1.1.1 Functional baseline
3.6.1.1.2 Product baseline
3.6.1.2 Production release………………………………………………………………
3.6.2 Engineering Change Proposals (ECPs)
3.6.3 Request for Variance (RFV)
3.7 Service Bulletins
1. SCOPE
This document defines the tasks associated with the procurement of the aircraft staircase as described by Commercial Item Description (CID) A-A-59888B, dated 12 July 2019, and revision pages (if applicable), and is to be used in conjunction with A-A-59888B.
2. APPLICABLE DOCUMENTS
The following documents are applicable to the SOW to the extent specified herein.
2.1 Government documents.
2.1.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks of the exact revision listed below form a part of this SOW to the extent specified herein.
DEPARTMENT OF DEFENSE STANDARDS
MIL-STD-882E System Safety
2.1.2 Other Government documents, drawings, and publications.
AIR FORCE INSTRUCTION (AFI)
AFI 32-7086 Hazardous Materials Management, dated 4 February
(Copies of this document are available online at http://www.e-publishing.af.mil/.)
DATA ITEM DESCRIPTIONS (DIDs)
DI-SAFT-80101C
System Safety Hazard Analysis Report
(SSHAR)
CDRL A005
DI-MGMT-80227
Contractor's Progress, Status and
Management Report
CDRL A001
DI-NDTI-80603A Test Procedure CDRL A006
DI-SESS-80639D Engineering Change Proposal (ECP) CDRL A009
DI-SESS-80640D Request for Variance (RFV) CDRL A011
DI-SESS-80642D Notice of Revision (NOR) CDRL A010
DI-NDTI-80809B NOT 1 Test/Inspection Report CDRL A007
DI-CMAN-81218 Product Base Line Index (PBLI) CDRL A008
DI-ADMN-81249B Conference Agenda CDRL A002
DI-ADMN-81250B Conference Minutes CDRL A003
DI-SAFT-81626 System Safety Program Plan (SSPP) CDRL A004
DI-MISC-81618 Service Bulletins CDRL A012
(Copies of these documents are available online at http://quicksearch.dla.mil.)
http://www.e-publishing.af.mil/
DEPARTMENT OF DEFENSE GUIDES
(no identifier) Risk Management Guide for DoD Acquisition, Sixth
Edition, Version 1.0
DEPARTMENT OF DEFENSE MANUALS
TM-86-01N Air Force Technical Manual Contract Requirements CDRL TM-86-01
COMMERCIAL ITEM DESCRIPTIONS
A-A-59888B STAIRCASE, AIRCRAFT BOARDING, STANDARD TRUCK
2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1 Program management.
3.1.1 Program manager. The contractor shall identify to the Government and maintain a single point of contact (Program Manager) for all matters under this contract. The contractor shall also ensure that all program management personnel assigned to the program shall be available, as required, to meet program objectives.
3.1.2 Plant access. The contractor shall arrange for full access to applicable contractor facilities and offices by Government representatives conducting any business, making observations, or performing inspections required by public law or by this contract.
3.1.3 Monthly status report. The contractor shall track program progress and document such via monthly status reports. The contractor shall submit a monthly status report that shall cover the engineering and technical development of the system and subsystems as well as a projection of planned work for the remaining effort. Reports shall document tasks, issues, actions, and deliverables. Problem areas shall be identified with proposed solutions and outcomes.
(DI-MGMT-80227, Contractor's Progress, Status and Management Report; CDRL A001)
3.2 Conferences and program reviews.
3.2.1 Postaward conference. The Government will convene a postaward conference with the contractor at a location that is mutually agreeable to both parties within 30 days after contract award. The Program Manager will coordinate the actual date, time, and location of the conference with the contractor.
3.2.2 Program Management Review support. The contractor shall participate in and support all reviews, audits, and meetings as requested by the Program Manager or the contractor. Program
Management Reviews shall be conducted as required at a mutually agreeable location or via teleconferences.
3.2.3 Conference room. The contractor shall provide a conference room suitable for meetings of up to 10 Government representatives, plus contractor personnel, in support of scheduled meetings at the contractor’s facility.
3.2.4 Meeting agendas. The contractor shall publish an agenda for all meetings and conferences specified in 3.2.3. The contractor shall request from the Government any items or issues to be discussed or presented at the meetings, and shall include such items in the agenda. Agendas shall be submitted not less than five working days prior to any meeting. (DI-ADMN-81249, Conference
Agenda; CDRL A002)
3.2.5 Meeting minutes. The contractor shall provide a written record of the discussions, decisions, and action items identified at each meeting. Minutes shall include presentation material.
(DI-ADMN-81250, Conference Minutes; CDRL A003)
3.3 Systems engineering.
3.3.1 Environment, Safety, and Occupational Health (ESOH).
3.3.1.1 System safety. The contractor shall establish, conduct, document, and maintain a system safety program in accordance with MIL-STD-882. The contractor shall document their approach for analyzing, eliminating, or minimizing ESOH hazards during all phases of the program. The contractor shall initiate changes in the system design based on safety analysis results such that the associated risk is reduced to a level acceptable to the Government. An initial system safety program plan and system safety hazard analysis shall be provided 90 days after contract award; an updated version of the plan and analysis shall be provided with the First Article test report.
(DI-SAFT-81626, System Safety Program Plan; CDRL A004; DI-SAFT-80101, System Safety
Hazard Analysis Report; CDRL A005)
3.3.1.2 Hazardous materials. The contractor shall manage hazardous materials, including those embedded in the system or used during operation or maintenance, as an element of the Systems
Engineering process. The system shall not generate or use Class I or Class II Ozone Depleting
Substances (ODS) during operation, maintenance, or disposal. The use of hexavalent chromium is also prohibited. The contractor shall list any hazardous materials, as defined in AFI 32-7086, to be delivered under this contract, including locations, quantities, and special handling and disposal procedures.
3.4 Logistics.
3.4.1 Technical Order (TO) requirements. The contractor shall develop and deliver technical manuals in accordance with TM-86-01. (TM-86-01, Air Force Technical Manual Contract
Requirements; CDRL TM-86-01)
3.4.2 Commissioning. The Government will order commissioning in delivery orders issued against the contract. Commissioning may or may not be required in every delivery order. When commissioning is ordered, the contractor shall provide a minimum of two day of vehicle orientation, user familiarization, and general maintenance information at the Government base identified in the delivery order – subsequent to first delivery of the vehicle to that location.
Commissioning may include, but is not limited to, a walk around of the vehicle noting the component layout and operational function, structure, design, capacity, and safety features, servicing and troubleshooting of the engine, as well as other components of the vehicle, and over-the-shoulder instructions for operation of the vehicle and its various components.
3.5 Testing and evaluation.
3.5.1 First article test.
3.5.1.1 First article test procedures. The contractor shall develop detailed First Article test procedures, which shall address all requirements identified in the CID A-A-59888B and this SOW.
The test procedures shall include data record sheets, charts, graphs, identification of test instruments by manufacturer, model number, and serial number. The test procedures shall address modeling and simulation (M&S); if M&S is not applicable, the test procedures shall be so noted.
(DI-NDTI-80603, Test Procedure; CDRL A006)
3.5.1.2 First article testing. After Government approval of the First Article test procedures, the contractor shall schedule the testing to be conducted. If shipping is required to move the item(s) to and from a test site away from the contractor’s facility, the contractor shall be responsible for all costs associated with the shipment. The contractor shall notify the Government of the date, time, and location of First Article testing 30 days prior to the start of testing. The test will be witnessed by one or more Government representatives.
3.5.1.3 First article test report. The contractor shall submit a First Article test report upon completion of the First Article test. The test report shall document all testing performed, including results of any unsuccessful test attempts. (DI-NDTI-80809, Test/Inspection Report; CDRL A007)
3.5.2 Restoration. After completion of First Article acceptance, the First Article aircraft staircase shall be shipped, within 30 days, to the contractor’s facility for restoration. The contractor shall be responsible for any repairs that may be necessary to restore the First Article aircraft staircase to a serviceable, “like new” condition while retaining configuration integrity. The contractor shall be responsible for all costs associated with shipping of the First Article aircraft staircase to the contractor's facility for restoration.
3.5.3 Disposition. The First Article aircraft staircase shall be retained at the contractor’s facility, to serve as a manufacturing standard, until the last shipment.
3.6 Configuration management.
3.6.1 Configuration requirements.
3.6.1.1 Baselines.
3.6.1.1.1 Functional baseline. The functional baseline is A-A-59888B, dated 12 July 2019, and corresponding revisions or change pages, if applicable.
3.6.1.1.2 Product baseline. All of the documents used to produce and define the accepted First
Article aircraft staircase shall be identified in a Product Base Line Index (PBLI). The list shall identify the applicable version number as required. (DI-CMAN-81218, Product Base Line Index
(PBLI); CDRL A008)
3.6.1.2 Production release. Production release is acknowledgment by the procuring activity that the contractor has satisfied all requirements to proceed with delivery of hardware to be furnished under the contract. The contractor assumes all risks in initiating production before the First Article test report and TOs have been delivered and approved by the procuring activity.
3.6.2 Engineering Change Proposals (ECPs). Notwithstanding any other provision in the contract, no contractor or subcontractor's change in design, fabrication, assembly, part, material, process, or source of supply shall be made to the allocated or product baseline unless such change is submitted in writing by ECP and approved by the procuring activity. Any request for change shall be accompanied by complete documentation supporting the need for the change. A system safety impact statement shall be provided as part of the submittal; it shall quantify and qualify the system safety risk identified and how it impacts the system safety risk already identified for the system.
A Notice of Revision (NOR) shall be submitted with each ECP. Should the Government approve an ECP, the contractor shall be responsible for submitting updated TOs and the system safety hazard analysis report (see 3.3.1.1) to reflect the changes made in the ECP. (DI-SESS-80639, Engineering Change Proposal (ECP); CDRL A009; DI-SESS-80642, Notice of Revision (NOR);
CDRL A010).
3.6.3 Request for Variance (RFV). The contractor shall prepare an RFV whenever a departure from the contractually-specified base line is proposed for a specific number of units or for a specific time. (DI-SESS-80640, Request for Variance (RFV); CDRL A011)
3.7 Service bulletins. The contractor shall prepare service bulletins as required to notify the
Government of new maintenance problems and/or procedures to be implemented on the contractor’s equipment prior to issuance of permanent changes to the technical manuals. The service bulletins shall also identify any potential safety hazards previously identified. (DI-MISC-
81618, Service Bulletins; CDRL A012)
File details come from the government source that posted it. Updated .