Questions_and_Answers.pdf

PDF 114 KB Posted

Attached to
STAIRCASE, AIRCRAFT BOARDING, STANDARD TRUCK
Solicitation number
FA853420Q0007
Issued by

View the file

Other files

File Type Posted
Questions_and_Answers.pdf.pdf PDF
CID Revision Page 1.pdf PDF
Questions_and_Answers.pdf PDF
Combined Synopsis Solicitation---Amendment 1.pdf PDF
QuestionsandAnswers.pdf PDF
AF_TMCR.pdf PDF
Combined Synopsis Solicitation---.pdf PDF
IUID_SCT_18122019.pdf PDF
Exhibit A__.pdf PDF
Exhibit B__.pdf PDF
First Article Reqs SCT 18122019.pdf PDF
Statement_of_Work.pdf PDF
AFMC Form 158.pdf PDF
DDForm 1653.pdf PDF
CID_A-A-59888B.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

1. Question: Are offerors allowed to submit their proposal electronically?

Answer: Yes, quotes are to be emailed to petite.jacque.1@us.af.mil and sandra.adams.5@us.af.mil.

2. Question: What is the last date allowed for questions?

Answer: 5:00pm EST April 30, 2020. This is due to the proposal due date being extended from 27 April 20 to 11 May 20.

3. Question: I didn’t see a Standard Form 1449 in the attachments on SAM.gov. Are offerors required to provide a Standard Form 1449 in conjunction with the Combined Synopsis Solicitation.

Answer: The RFQ was posted as a combined synopsis solicitation a 1449 was not posted. The contract CLIN structure identified on page 1 is how the pricing should be submitted. Please make sure to provide pricing for each option year.

4. In regards to Section 2.8.1.1 “The fully-equipped aircraft staircase, loaded to its GVWR, shall maintain a speed of 45 miles per hour (mph) on a dry, level, paved road for at least 3 miles”

a. Question: Due to flightlines and airports requiring driving speeds of no more than 15

MPH or 25 KM/H will the USAF consider reducing this speed to 15 MPH?

Answer: No. USAF Staircase Trucks are required to drive outside of bases.

5. In regards to the sections below.

a. Section 2.8.2 “The aircraft staircase shall be designed to enter (approach), negotiate (up or down), and leave (depart) a solid surface ramp having a slope of 20 degrees.”

b. Section 2.8.4: “The parking brakes shall hold the aircraft staircase motionless on a 20-degree longitudinal grade in both upgrade and downgrade directions with the transmission in the neutral position.”

c. Section 2.9.5: “The engine lubrication system shall be designed so that the aircraft staircase can be operated on a 20-degree longitudinal slope facing both up and down and on an 8-degree side slope in each direction (right and left side facing up the slope).”

d. Section 2.9.7.5.2: “The tank shall be designed so that the aircraft staircase can be operated on a 20-degree longitudinal slope facing up and down and on an 8-degree side slope in each direction (right and left side facing up the slope).”

Question: Because the ramp angle of a C-17 is no greater than 12 degrees, will the USAF reduce the angle requirements to 12 degrees?

Answer: Government will reduce longitudinal angle requirement to 15 degrees for sections given below (2.8.2, 2.8.4, 2.9.5, 2.9.7.5.2). However, must ensure vehicle is designed IAW MIL-STD- 1791 in order to meet air transportability requirements within CID.

6. Question: On the First Article Requirements a. Item 9A--Test / Inspections -- The box is checked for Contractor Testing. Item 9G-Estimated cost of government testing/inspection evaluation—It has $600,000. Please clarify if the contractor is responsible for all 1st article testing.

Answer: Contractor is responsible for all testing/verification. The estimate has been removed from the First Article Requirements. See updated FAR (R1 20200415) in attachments to

RFQ.

8. Question: How many days after the award of contract would the 1st article be due?

Answer: CDRL for 1st article test report is 210 days. The 1st article test will have to be completed in time to allow for the 1st article test report to be submitted on time. There is no specific delivery. It’s up to the contractor to determine timeline.

9. Question: After approval of the 1st article, what is the expected delivery schedule for the balance of the units on the basic contract?

Answer: 1 each vehicle in 150 days after delivery order award, then 1 each every 30 days until completion of that delivery order.

10. Question: In the statement of work, 3.5.3 Disposition—The first article aircraft staircase shall be retained at the contractor’s facility, to serve as a manufacturing standard, until the last shipment.

a. When would we receive payment on the 1st article unit?

Answer: When the 1st article unit has been accepted by the government.

b. Does this mean we keep the unit for the Basic contract period or until the end of the 4 option years?

Answer: until the end of the Basic Contract Period.

11. 5. Due to unprecedented complications caused by COVID-19, this has caused delays in response time of our supply chain, as well as our purchasing and engineering departments. Would the government consider a 30-day extension to RFQ due date?

Answer: The Government will extend RFQ an additional 14 calendar days.