This solicitation is for the renovation of the Cadet Field House Phase 3 at the United States Air Force Academy in Colorado Springs, Colorado. The Field House provides athletic training facilities for over 4,000 cadets and supports the USAFA's commitment to NCAA Division I athletics. Phase 3 of the renovation will complete repairs to all major components inside and outside of the facility. The work must be completed in phases to maintain operations for physical education classes, intermurals, basketball and hockey games, and other events. The solicitation is seeking construction services to repair and renovate the Field House to support the USAFA's mission of developing leaders of character through academic and athletic training programs. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Omaha.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am-0004.pdf | ||
| Am-0003_Div00.pdf | ||
| Am-0003_Div01.pdf | ||
| Am-0002.pdf | ||
| Am-0001_Drawings (Reissued).pdf | ||
| Am-0001_Div00.pdf | ||
| Am-0001_Div01.pdf | ||
| DWGS-Vol-2_W9128F22R0018.pdf | ||
| Div 00_W9128F22R0018.pdf | ||
| DWGS-Vol-1_W9128F22R0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS FOR CONSTRUCTION
Solicitation No. W9128F22R0018
REPAIR CADET FIELDHOUSE
PHASE 3 (FY23)
US AIR FORCE ACADEMY, COLORADO
July 2022
US ARMY CORPS OF ENGINEERS
OMAHA DISTRICT
This page was intentionally left blank for duplex printing.
00 01 10 - 1 PROJECT TABLE OF CONTENTS
SPECIFICATIONS FOR CONSTRUCTION
OF
REPAIR CADET FIELDHOUSE, PHASE 3
FY23, PROJECT NO. XQPZ200015
USAF ACADEMY, COLORADO
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
01 30 00.24AT1 TRAILER DETAILS
01 30 00.24AT2 ASBESTOS AND LEAD REPORT
01 30 00.24AT3 BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST ACKNOWLEDGEMENT
01 30 00.24AT4 HIDTORICAL SCHEDULE
SIGNAT1 EXAMPLE USAFA PROJECT SIGN DETAIL
SIGNAT2 EXAMPLE PROJECT SIGN DETAIL FROM ECB 2020-1
AF103 BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST
USAFA13 USAFA FORM 13 - APPLICATION FOR UNITED STATES AIR FORCE ACADEMY
ACCESS CREDENTIAL
01 32 01.00 10 PROJECT SCHEDULE
DD1354 TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY FORM
01 33 00 SUBMITTAL PROCEDURES
REGISTER PROJECT SUBMITTAL REGISTER
E4025 ENG FORM 4025 TRANSMITTAL FORM
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.00 10AT SAMPLE QUALITY CONTROL REPORT
01 45 00.15 10 RESIDENTIAL MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 20.00 10AT USAFA ENVIRONMENTAL STANDARDS 2020
01 62 35 RECYCLED / RECOVERD MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 78 24.00 10AT1 AFCEC SMS PLAYBOOK
01 78 24.00 10AT2 BUILDER SYSTEMS COMPONENT LIST
01 78 36.00 24 WARRANTY OF CONSTRUCTION
01 78 39.00 24 AS-BUILT DRAWINGS
01 78 39.00 24AT MODIFICATIONS AND TITLE BLOCK EXAMPLES
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 30 00AT GEOTECHNICAL ENGINEERING REPORT – CADET FIELD HOUSE STICK AND
SHOOT ADDITION
00 01 10 - 2 PROJECT TABLE OF CONTENTS
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 51 33 METAL LADDERS
05 72 00 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 22 00 ROOF AND DECK INSULATION
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 56 15 PMMA FLUID APPLIED ROOFING
07 56 15AT1 DAILY PMMA MEMBRANE APPLICATION LOG
07 56 15AT2 ROOF INFORMATION CERTIFICATE
07 60 00 FLASHING AND SHEET METAL
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 00 EMERGENCY EGRESS GRILLES
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 71 00AT1 DOOR HARDWARE SETS
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
00 01 10 - 3 PROJECT TABLE OF CONTENTS
10 14 53 TRAFFIC SIGNAGE
DIVISION 10 – SPECIALTIES (CONTINUED)
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 51 11 CUSTOM WOOD AND STAINLESS STEEL LOCKERS
DIVISION 11 - EQUIPMENT
11 24 23 EXTERIOR BUILDING MAINTENANCE EQUIPMENT SUPPORTS
DIVISION 12 - FURNISHINGS
12 36 00 COUNTERTOPS
12 61 13 UPHOLSTERED AUDIENCE SEATING
DIVISION 13 - SPECIAL CONSTRUCTION
13 18 23.40 HYDRAULICALLY BANKED INDOOR TRACK & FIELD SYSTEM
13 18 23.40AT1 CADET FIELD HOUSE INDOOR TRACK COLOR DIAGRAM
DIVISION 14 - CONVEYING EQUIPMENT
14 24 13 HYDRAULIC FREIGHT ELEVATORS
14 24 13AT1 ELEVATOR MODERNIZATION PROPOSAL
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 21 23 HYDRONIC PUMPS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 56 63 ENHANCED ARENA LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
00 01 10 - 4 PROJECT TABLE OF CONTENTS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 05 33AT1 EROSION CONTROL VEGETATION AND TREE CARE STANDARDS
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 23 SODDING
-- End of Project Table of Contents --
Repair Cadet Fieldhouse, Ph 3, PNXQPZ200015 - USAFA, CO AA59
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
07/20
PART 1 GENERAL
1.1 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.2 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR
PAYROLLS
1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS
CONTRACTS
1.4 AWARD TO SUCCESSFUL OFFEROR
1.5 CONTRACTOR PERFORMANCE EVALUATIONS
1.6 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1.7 EXCEPTION TO COMPLETION TIME AND LIQUIDATED DAMAGES
1.8 COMPUTING COMPLETION DATES FOR NON-WORK PERIOD
1.9 ORDER OF WORK
1.10 MISSION DELAY DAYS
1.11 CONTRACT DRAWINGS AND SPECIFICATIONS
1.11.1 SETS FURNISHED
1.11.2 DISTRIBUTION
1.11.3 NOTIFICATION OF DISCREPANCIES
1.11.4 OMISSIONS
1.12 SUBMITTALS
1.13 CONCURRENT CONSTRUCTION
1.14 PAYMENT
1.14.1 PROMPT PAYMENT ACT
1.14.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE
1.14.3 CONTRACTOR PAYROLL RECORD
1.15 AVAILABILITY OF UTILITY SERVICES
1.16 UTILITY SERVICE INTERRUPTIONS
1.17 DIGGING PERMITS AND ROAD CLOSINGS
1.18 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.19 INSURANCE REQUIRED
1.20 SECURITY REQUIREMENTS
1.20.1 Contractor's Employee Identification
1.20.2 Entry Requirements
1.20.3 Access Procedures
1.21 CONTRACTOR QUALITY CONTROL (CQC)
1.22 NONDOMESTIC CONSTRUCTION MATERIALS
1.23 DAILY WORK SCHEDULES AND WEEKLY COORDINATION MEETINGS
1.24 AS-BUILT DRAWINGS
1.25 SIGN
1.26 EQUIPMENT ROOM DRAWINGS
1.27 CONTRACTOR FURNISHED EQUIPMENT DATA
1.28 CONTRACTOR STORAGE AREA REQUIREMENTS
1.29 Furniture Systems And Freestanding Casework
1.30 TEMPORARY PORTABLE BUILDING
1.31 GOVERNMENT FIELD OFFICE
SECTION 01 30 00.24 Page 1
1.32 ASBESTOS AND LEAD
1.33 PARTNERING
1.34 PROFIT
1.35 LABOR CONDITIONS APPLICABLE TO TEMPORARY FACILITIES
1.36 DRAWING SCALES
1.37 FEDERAL HOLIDAYS
1.38 BASE HOURS
PART 2 NOT USED
PART 3 NOT USED EXECUTION
3.1 APPENDIX A- CONTRACT DOCUMENT DISTRIBUTION LIST
ATTACHMENTS:
Appendix A - Contract Document Distribution List
Trailer Details
Asbestos and Lead Report
Example USAFA Project Sign Detail
Example Project Sign Detail From ECB 2020-1
AF103 - Base Civil Engineering Work Clearance Request
USAFA Form 13 - Application for United States Air Force Academy Access Credential
-- End of Section Table of Contents --
SECTION 01 30 00.24 Page 2
SECTION 01 30 00.24
OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS
07/20
PART 1 GENERAL
Attachments:
Appendix A - Contract Document Distribution List Trailer Details Asbestos and Lead Report Example USAFA Project Sign Detail Example Project Sign Detail From ECB 2020-1 AF103 - Base Civil Engineering Work Clearance Request USAFA Form 13 - Application for United States Air Force Academy Access Credential
1.1 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
In accordance with FAR 31.105(d)(2)(i)(b), for the predetermined schedule of construction equipment use rates, use Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule. Copies of each regional schedule may be obtained through the following internet site:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Pamphlets/ on pages 10 and 11 of 13.
1.2 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
CONSTRUCTION WAGE RATE REQUIREMENTS STATUTE CERTIFIED LABOR PAYROLLS
a. Use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.
b. Obtain and provide for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the Contractor to comply with the Wage Rate Requirements statute. Use the electronic payroll service to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract. The electronic payroll service must be capable of preserving these payrolls and related basic records for the required three years after contract completion. Obtain and provide electronic system access to the Government, as required to comply with the Wage Rate Requirements over the duration of the construction contract.
(c) The Contractor's provision and use of an electronic payroll processing system must meet the following basic functional criteria:
(1) commercially available;
(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the FAR;
SECTION 01 30 00.24 Page 3
(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract;
(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export into an Excel spreadsheet to be imported into the contractor's mode of Resident Management System 3.0;
(5) demonstrated security of data and data entry rights;
(6) ability to produce Contractor-certified electronic versions of weekly payroll data;
(7) ability to identify erroneous entries and track the data/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;
(8) capable of generating a durable record copy in a Compact Disc (CD) or Digital Versatile Disc (DVD) and Portable Document Format (PDF) file record of data from the system database at the end of the contract closeout. This durable record copy of data from the electronic payroll processing system must be provided to the Government during contract closeout.
d. All Contractor-incurred costs related to the Contractor's provision and use of an electronic payroll processing service must be included in the Contractor's price for the overall work under the contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services must not be a separately bid or reimbursed item under this contract.
1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
- U.S. Department of Labor Veterans’ Employment and Training Service
(VETS):
https://www.dol.gov/vets/
- Federal Veteran Employment Information: https://www.fedshirevets.gov/
- Veterans Opportunity to Work (VOW) Program:
https://www.benefits.va.gov/vow/
- U.S. Army Warrior Transition Command Employment Index:
https://wct.army.mil/modules/employers/index.html
- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes
1.4 AWARD TO SUCCESSFUL OFFEROR
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an
SECTION 01 30 00.24 Page 4 individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer. Proceeding with any work not authorized by the Contracting Officer will be at the Contractor's own risk.
1.5 CONTRACTOR PERFORMANCE EVALUATIONS
See Federal Acquisition Regulation (FAR) Subpart 42.1502(e) for the requirements on past performance evaluations for construction contracts.
For construction contracts valued at or above $750,000.00, including all modifications, the USACE will evaluate Contractor's performance using the web-based Contractors Performance Assessment Reporting System (CPARS).
After the USACE drafts an evaluation (interim or final), the Contractor will have the opportunity to access, review, comment and either concur or non-concur with the evaluation in the CPARS system for a period of 60 days. Access to the CPARS system requires either specific software called PKI certification (recommended method) or a username and password. The PKI certification is a Department of Defense recommendation and to provide security in electronic transactions. The certification software could cost approximately $110 - $125 per certificate per year and may be purchased from an External Certificate Authorities (ECA) vendor. Current information about the PKI certification process and contacting vendors can be found on the web site: https://www.cpars.gov .
1.6 ANTITERRORISM (AT)/OPERATIONS SECURITY (OPSEC) PROVISIONS
1. AT Level I Training
All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
2. Access and General Protection/Security Policy and Procedures
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
SECTION 01 30 00.24 Page 5
2b. for Contractors Who Do Not Require CAC, But Require Access To A Dod Facility Or Installation
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3. Not Used
4. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something)
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
5. Contractor Employees Who Require Access to Government Information Systems.
Not Applicable
6. OPSEC Standing Operating Procedure/Plan
Not Applicable
7. OPSEC Training
All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.
OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
8. Information Assurance (IA)/Information Technology (IT) Training
Not Applicable
9. Information Assurance (IA)/Information Technology (IT) Certification
Not Applicable
SECTION 01 30 00.24 Page 6
10. Not Used
11. Not Used
12. Handling or Access to Classified Information.
Not Applicable
13. Will be Escorted in Areas Where They May be Exposed to Classified and/or Sensitive Materials and/or Sensitive or Restricted Areas
If applicable, all contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
14. Contractor Company to Obtain a Facility Clearance and Individual Clearances at the Appropriate Level
The Prime Contractor Company must have (or will have) a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22-M and AR 380-49) prior to the start of the contract awarded period of performance.
Contractor personnel performing work under this contract must have the required security clearance, per AR 380-67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL.
15. Pre-Screen Candidates using E-Verify Program
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
16. Required Armed Security Guards
Not Applicable
17. Threat Awareness Reporting Program (TARP) Training
All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12 . The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized webbased TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474
1.7 EXCEPTION TO COMPLETION TIME AND LIQUIDATED DAMAGES
In case the Contracting Officer determines that seeding, sodding, and/or planting and/or the specified maintenance thereof is not feasible during
SECTION 01 30 00.24 Page 7 the construction period, such work will be exempt from the completion time and liquidated damages. Accomplish this work during the first seeding, sodding, and/or planting period and the specified maintenance period following the completion date.
1.8 COMPUTING COMPLETION DATES FOR NON-WORK PERIOD
The following is a general list of anticipated NO WORK DAYS. After award, specific dates for these events will be provided to the contractor. This time is included in the overall completion time stated.
- Football season 15 Aug - 30 Nov (Anticipate 6 home games, 6 days)
- NCLS (February, 4 days)
- Graduation (late May / early June, 7 days)
- Parent's Weekend, 4 days (usually in conjunction with Labor Day)
- CORONA Conference (in the Fall, 5 days)
- Cadet In-Processing (late June, 2 days)
- 5 additional days through the duration of the project for unscheduled and unexpected work stoppage.
1.9 ORDER OF WORK
Existing Conditions / Architectural Overview Architectural improvements in Phase 3 are generally limited to specific areas of remodel within the Multipurpose Area including installation of a new 200M hydraulic banked track, replacement of synthetic turf areas with polyurethane sports surfacing, replacement of select floor finishes, remodeling of the existing storage areas and portions of the mechanical rooms on the south side of the Multipurpose Area to provide new Track Team facilities, a new Training Room, accessible public Men's and Women's rest rooms, a new audio system, a new scoreboard and construction of new storage facilities along the interior of the east wall of the Multipurpose Area. Additional work includes major HVAC ductwork throughout the facility at catwalk level, repair of exterior concrete sidewalks and steel handrails on the south side of the building and installation of new xeriscape landscaping on the north side of the Field House. A complete replacement of the existing roofing system is part of the Phase 3 work and includes the addition of new roof anchors required to meet OSHA fall protection requirements and reconfiguration of the existing roof drain collection systems to separate the primary and overflow roof drains. Improvements are also included in Phase 3 to address ground water infiltration on the north wall of the Multipurpose Area.
Functional Requirements:
The following descriptions provide an overview of the program requirements and work associated with the component architectural projects included in Phase 3.
Hydraulic Banked 200 Meter Track will have the following defined characteristics: o The hydraulic banked track will be a 200m track with 6
- 42" wide lanes designed to comply with all NCAA and IAFF requirements o The 8 lane sprint straightaways will be incorporated into the north end of the 200m oval. The sprint lanes will not be placed in the infield o Three additional 36" wide jogging/warm-up lanes outside the banked track will be included, extending the length of the multipurpose space. The outside of lane will be set with 24" clear to the perimeter walls of the Multipurpose Area. The lanes will also be used for cadet Physical Fitness Testing (PFT). o The track configuration will leave space on the south side of the banked track for temporary rollaway bleachers. 5-row bleachers are preferred if there is enough space, but 4-row bleachers are acceptable. o The radius of the banked track will be adjusted to fit the available
SECTION 01 30 00.24 Page 8 space. Minimum radius is 17.2m but NCAA allows a range of dimensions. o The throwing area, two long jumps, pole vault, and high jump will be on the infield surface inside the 200m oval. o The long jump and pole vault runways will be structured (polyurethane surface over plywood on metal frame) and recessed into the concrete slab so the surface is flush with the infield surface. The existing structured runways should be reused if possible. o The throwing area on the infield will have safety netting around it using the existing throwing layout. o The track polyurethane surface color will be blue; infield and outfield areas will be gray. The jump runways will be blue. o The area east of the 200m track will continue to be used for cadet PFT exercises. The new sports floor surface will include markings on the poly surface for eight standing long jump lanes.
Track Storage Rooms at East End of Multipurpose Areas.
The storage units will be constructed with metal studs and high impact gypsum board. The tops will be sloped to prevent storage of material on top of the structure and protected by the new fire sprinkler system being installed in the Multipurpose Area with Phase 3.
Track Scoreboard and Audio System- Multipurpose Area Infrastructure for a new electronic scoreboard is provided in the Multipurpose Area with Phase 3 in support of the track and field activities. The scoreboard will be mounted on structural beam supports on the west wall of the Multipurpose Area and will consist of an approximately 15'-7" x 27'-11" LED video display.
The basis of design is Daktronics Model DVN-3000-5.9MN-1400-BR-MA-798x1428
(NOT IN CONTRACT - NIC).
Polyurethane Sports Surfacing and Re-surfacing of Stairs Multipurpose Area Sports Surfacing The existing southeast and southwest corners of the floor of Multipurpose Area and immediate approaches to the northeast and northwest exit doors are concrete and will remain in place with the Phase 3 work. The remainder of the existing Multipurpose Area floor is finished with either synthetic turf or the running track surface. The synthetic turf and running track are both placed over 4" of stabilized aggregate base course topped with a 1-1/2" bituminous binder course and a 1" bituminous surface course. With the Phase 3 project, the existing track surface and synthetic turf, and bituminous pavement will be completely removed, the subsurface leveled and prepped for a 6" concrete slab that will be poured over all of the Multipurpose Area except the existing sections of concrete and the recessed concrete foundation of the new banked hydraulic track. The entire floor surface of the Multipurpose Area will be finished with a liquid applied polyurethane surface placed over the new concrete slab. The surface of the hydraulic banked track will also be polyurethane, placed on the support panels of the track subfloor deck.
Stairs The rubber stair and landing floor coverings at the east and west stairs leading from the Multipurpose Level to the Spectator Level are to be replaced as part of the Phase 3 work. Additionally, the rubber pathways leading from the stairs to the track area will be replaced with new rubber flooring. The rubber flooring material that forms the stair tread covering and pathway to the track was identified in the environmental report as containing less than1% asbestos. While it does not meet the level of content to be considered Asbestos Containing Material (ACM), it still must be removed and disposed of in accordance with OSHA requirements.
New Restrooms and Repair of Existing Restrooms - Multipurpose Area Currently there are only two small rest rooms on the Multipurpose Level, each the equivalent of a single occupant facility, located beneath the east and west stairs. Participants in events must ascend to the Spectator Level to access additional facilities. The two existing rest rooms will be retained and upgraded with Phase 3. In addition, Phase 3 will construct
SECTION 01 30 00.24 Page 9
Men's and Women's Rest Rooms in the existing storage and mechanical space located on the south side of the Multipurpose Area with direct access from the track area. Construction of the new rest rooms will require infill of existing CMU openings in the south wall of the Multipurpose Area and cutting in new openings for the rest room access doors. The CMU wall is non-load bearing. The extensive new plumbing requirements require demolition of the existing concrete slab within the new restroom area.
Finishes will be consistent with the USAFA standard for the Cadet Area and the remainder of the Field House with ceramic tile floors and wall finishes, solid surface counter tops at the lavatories, and stainless-steel ceiling hung toilet partitions.
Track Team Room Renovations Equipment and Clothing Storage A joint Men's and Women's Equipment Supply Room is required for the Track Team. The space will primarily be used for shoe and clothing storage. An issuance counter with a coiling overhead counter window is provided in the north wall of the equipment storage directly accessing the Multipurpose Room.
Team Room Joint Men's&Women's Track Team Room is required for the Track Team. The floor is carpet, and the ceiling is suspended acoustical tile. Finishes are carpet, painted gypsum board and suspended ACT. A small counter with lower cabinets is provided along the entry wall and a clear wall area at the south side of the room will be used for installation of a large flat screen television (by others NIC).
Training Room - Multipurpose Area The new Training Room will occupy an area currently used for storage on the south side of the Multipurpose Room Roof Repair The entire Cadet Field House roof will be removed and replaced with Phase
3. The new roof system will consist of a 60-mil liquid applied Polymethyl Methacrylate Membrane (PMMA) installed over polyisocyanurate insulation on ½" gypsum underlayment with embedded glass mats. The insulation thickness will be a minimum of two layers of 2.6-inch polyisocyanurate insulation board to achieve a minimum R 30 thermal insulation rating. All flashings, counter flashings, and coping will be replaced with new. All materials will be Class A fire rated. Overall roof slope is determined by the slope of the top chord of the existing roof trusses. Tapered polyisocyanurate insulation board will be used to form crickets to direct water flow to roof drains. The existing primary roof drains and overflow drains converge into a single pipe conveyance system, a violation of existing codes. The roof repair will retain the primary roof drain connection to the current piping conveyance and isolate the overflow drains to flow to a new secondary piping system that will discharge through above grade lambs' tongues on the north, south, and northeast building elevations.
Roof Anchors Fall protection roof anchor tie-offs will be installed on the Cadet Field House to comply with OSHA 1926.502 as part of the overall roof system replacement in Phase 3.
South Plaza Site Improvements The south pedestrian plaza at the entry to the Cadet Field House is composed of a 4" concrete slab on grade reinforced with welded wire fabric. The slab abuts a concrete retaining wall on the south side. The pedestrian plaza is elevated approximately 4'-6" above the sidewalk at the base of the retaining wall. Pedestrian traffic from the south parking lot reaches the south entry of the Cadet Field House by ascending either of two concrete stairs located at the east and west ends of the south face of the plaza. Two concrete ramps are also provided along the south side of the plaza. The center ramp is original to the building but does not comply with ADA accessibility criteria. The ramp at the southeast corner of the plaza provides ADA compliant access to the plaza and the Cadet Field House. The concrete plaza is divided into a
SECTION 01 30 00.24 Page 10 geometric grid of individual panels by uniform network of control and expansion joints. Although much of the concrete plaza remains in good condition, portions of the concrete are severely deteriorated and have been patched with varying methods over the years. Phase 3 will replace designated sections of the deteriorated concrete with new poured-in-place concrete slabs. All damaged concrete will be removed as full panels as defined by perimeter control lines. The stair surfaces are in overall good condition and will be retained. Once the new concrete has been placed and cured, acrylic epoxy surfacing warranted against UV degradation will be applied to the entire south plaza including the stair risers and treads.
There will also be a few small areas of concrete patching along the east edge of the raised walkway at the Spectator Level due to degradation of the concrete in these areas. The original steel tube handrails and guard rails on the south pedestrian plaza and stairs are embedded directly into the concrete. The bases of the guard rail steel posts are set into the top of the concrete retaining wall and many have rusted almost completely through. The spacing of the vertical balusters exceeds the minimum 4" required by current codes. The steel guardrails and handrails will be replaced as part of Phase 3. The height and general configuration of the guardrails and handrails will be duplicated except that the vertical spacing of the balusters will be reduced to 4" to conform to current codes. The new guard rails will duplicate the member sizes and post spacing but will be powder coated to guard against degradation. The powder coating will be black to match the original. The existing vertical embedded posts will be cut off and the concrete removed by coring to a depth of approximate depth of 8". The new powder coated ember posts will be place in the cored holes, secured by non-shrink grout.
Cooling Tower Demolition The existing cooling towers on the east side of the building serving the ice rink will be removed upon completion of Phase
3. The steel panel screen wall and the approximate 30' x 30' concrete pad supporting the towers will be removed with the cooling towers. The disturbed landscape will be covered with rock to match the existing landscape treatment on the west and north sides of the cooling tower area.
The south side is bounded by the existing entry sidewalk. The rock will be extended to the east edge of the existing sod.
ABA/ADA Related New ADA seating platforms are being added to accommodate more accessible seating. In addition, the existing companion seats will be removed and replaced with foldable seats for consistency across all seating platforms.
The spectator seats will now be relocated and will replace older-style wood seating that is need of replacement. New seating platforms will be constructed to provide seating for wheelchairs and their companions.
Life Safety As such, the design documents reflect upgrading of the Catwalk to meet current code This work involves full replacement of the Catwalk railing to both meet OSHA standards as well as meet current code loading requirements, adding additional catwalk platforms on the Multipurpose side of the building to provide additional paths of travel and the addition of egress exits both to the roof as well as to the Press Box Level. In order to provide code compliance, a new fire-rated stair enclosure will be constructed at the West stair of the Multipurpose Room.
Freight Elevator Upgrade The existing freight elevator provides the only elevator access to the Multipurpose Level. Included is upgrading the freight elevator to ensure it is ABA/ADA compliant as well as moving the elevator equipment to a dedicated, code-compliant machine room. All existing equipment will be replaced and located in the new machine room.
Clune Arena Shutters The proposed shutter system is connected to the fire alarm system; in the
SECTION 01 30 00.24 Page 11 event of an emergency the shutter will open, providing a means of egress in case anyone is inside of the Arena at the time.
As part of the Phase 3 construction, the entire roofing system of the Cadet Field House will be replaced. The new roof will provide a minimum of 5.2" polyisocyanurate insulation over the entire roof, increasing the thermal insulation rating of the roof to R-30 +/-. There are also a series of operable metal louvers at the Catwalk level that will be removed and infilled with a liner system.
Interior Design and Finishes Phase 3 has limited interior architecture renovation. In general, the interior design portion of the work is limited to that associated with the reconfiguration of existing storage and mechanical rooms on the south side of the Multipurpose Area to create the new Track Team Room, Equipment Storage, Video Room, Training Room, and public rest rooms. Within the new Track Team support spaces, finishes are selected to comply with the USAFA Architectural Design Standards. Specific finishes are noted on the Interior Finishes drawings and schedules included in the construction drawings.
Temporary Facilities As part of the construction of Phase 3 the Contractor is required to provide temporary trailers to be used as swing space to house displaced occupants of the Cadet Field House during construction.
The trailers must be removed upon completion of Phase 3. The number of trailers required is anticipated to be 12'x50' units generally configured as 2 double-wide units housing office space and located on the south side of the Cadet Gym with an additional 4 trailers configured as 2 double-wide units in the small parking lot located at the southwest corner of the Holaday Athletic Center (HAC) building.
The infrastructure for the trailers was installed with Phase 1 and will remain in place through all three phases of construction. The trailers associated with Phase 2 are provided under the Phase 2 Contractor's contract and will be removed upon completion of Phase 2. The Contractor awarded Phase 3 must provide new trailers in the same locations and quantity as noted above for the duration of Phase 3 construction, anticipated to be two years.
No plumbing will be provided in the trailers. In addition to the office trailers, the Contractor for Phase 3 must provide a total of 8 - 8' x 40' Container Express (Conex) storage units for the two-year duration of Phase 3 construction. The Conex storage units will be located on the north side of the Cadet Field House in the Contractor Laydown Area noted on the Architectural Site Plan. The storage units will be used by the Athletic Department for storage of athletic equipment for the duration of construction.
As with the office trailers, the Contractor must remove the Conex storage units upon completion of Phase 3.
Schedule and Staging of Construction The Cadet Field House will remain occupied and continue to hold events throughout the entire course of construction of the Repair Cadet Field House Phase 3 Project. The specifications require the Contractor to phase construction in close coordination with the USACE COR and Athletic Department Representatives while maintaining safe access for all occupants. As part of the pre-construction requirements following project award, the Contractor must develop a Construction Phasing Schedule to be approved by the USACE COR and Athletic Department prior to commencement of work.
The Phasing Schedule must identify the periods of time that specific areas within the Cadet Field House will be unavailable for use by the Academy.
The intended phasing sequence is to focus the construction effort in specific areas during off-season periods when the spaces are least utilized. The Contractor must coordinate with the COR and Athletic
SECTION 01 30 00.24 Page 12
Department Representative to determine the specific dates in effect for the athletic seasons occurring during the actual period of construction.
In general, the critical event seasons associated with the primary spaces are as follows:
Hockey Arena The hockey season extends from October thru March. The USAF Academy also hosts youth hockey camps and the Wounded Warrior Games from the last week in May through mid-July. The ice rink must remain available to host events without exception during those periods.
Clune Arena (Basketball and Graduation Events) Basketball Season extends from September thru March. Clune Arena is also used for various Academy graduation activities during the month of May and hosts a number of local high school graduation ceremonies. The Clune Arena must remain available to host events without exception during the periods noted above.
The Multi-Purpose Area is used for a variety of activities throughout the year, most importantly for Track & Field events. It is recognized that the Multi-Purpose Area will provide the only access to the major mechanical room renovations and will be required for construction staging. It is recognized that due to the magnitude of construction associated with installation of the hydraulic track, new concrete slab, and polyurethane surface, the Multipurpose Area will not be available to host events or normally scheduled activities for approximately one year. The track team will use an alternate venue for one track season. Once the track and floor surfacing improvements in the Multipurpose Area access to the track and Multipurpose Area must be restored. Once activity access is restored the track and Multipurpose Area must remain available to host events from December thru March. During other periods the Athletic Department desires to have access to as great a portion of the Multi-Purpose Area as possible with the understanding that the Contractor will jointly occupy the space in a manner that permits construction related use while maintaining necessary security and safety standards for all occupants. The level of joint occupancy acceptable to both the Athletic Department (as coordinated through the COR) and the Contractor will be determined during coordination discussions necessary for the Contractor to develop the Phasing Schedule.
1.10 MISSION DELAY DAYS
Anticipate a work delay of one day per month during the contract period due to Using Service operations. The will provide notification one week in advance of these interruptions. This time is included in the overall completion time stated.
1.11 CONTRACT DRAWINGS AND SPECIFICATIONS
1.11.1 SETS FURNISHED
Utilize the bid drawings and specifications as amended in the performance of the work until CD/DVD-ROM or electronic copy containing the conformed specifications and contract drawings (i.e., bid drawings that have been posted with all amendment changes) are mailed or sent electronically to the Contractor. See Appendix A for Document Distribution list. See paragraph below for contract drawing distribution requirements. The work must conform to the contract drawings, set out in the drawing index, all of which form a part of these specifications. The work must also conform to any of the standard details bound or referenced herein.
SECTION 01 30 00.24 Page 13
1.11.2 DISTRIBUTION
The Government will process no progress payments prior to receipt of the legible contract drawings and conformed specification sets. After receipt and distribution of the legible drawing and conformed specification sets, the Government will provide the Contractor with editable CAD file drawings (format defined in Section 01 33 39.00 10 ADVANCED MODELING (BIM/CIM/GIS/CAD) REQUIREMENTS). Prepare final record or as-built drawings as defined in Section 01 78 39.00 24 AS-BUILT DRAWINGS.
1.11.3 NOTIFICATION OF DISCREPANCIES
Check all drawing files furnished by the government immediately upon their receipt and promptly notify the Contracting Officer of any discrepancies.
Follow dimensions marked on drawings in lieu of scale measurements.
Enlarged plans and details govern where the same work is shown at smaller scales. All scales shown are based on a standard drawing size of 24" x 36".
If any other size drawings are furnished or plotted adjust the scales accordingly. The Contractor must also advise his sub-contractors of the above. The Contractor must compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.
1.11.4 OMISSIONS
Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, does not relieve the Contractor from performing such omitted or misdescribed details of the work but work must be performed as if fully and correctly set forth and described in the drawings and specifications.
1.12 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit items below in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Equipment Room Drawings; G-RO.
1.13 CONCURRENT CONSTRUCTION
Construction work closely related to and/or located at the site of the work under a concurrent contract may be in progress simultaneously with work under this contract. Cooperate with others as necessary in the interest of timely completion of all work. In the event of interference, the notify the Contracting Officer (CO) immediately for resolution and the CO decision is final.
1.14 PAYMENT
1.14.1 PROMPT PAYMENT ACT
Pay requests authorized in GENERAL CONDITIONS (CONTRACT CLAUSES) clause:
"Payments Under Fixed-Price Construction Contracts", will be paid pursuant
SECTION 01 30 00.24 Page 14 to the clause, "Prompt Payment for Construction Contracts". Submit pay requests on ENG Form 93 and 93a, "Payment Estimate-Contract Performance" and "Continuation". All information and substantiation required by the identified contract clauses must be submitted with the ENG Form 93, and the required certification included on the last page of the ENG Form 93a, signed by an authorized contractor official and dated when signed. The designated billing office is the Office of the Area Engineer.
1.14.2 PAYMENT FOR MATERIALS DELIVERED OFFSITE
a. Pursuant to Federal Acquisition Regulation (FAR) 52.232-5, Payments Under Fixed Price Construction Contracts, materials delivered to the contractor at locations other than the site of the work may be taken into consideration in making payments, if included in payment estimates and if all the conditions of the General Provisions are fulfilled. Payment for items delivered to locations other than the work site are limited to:
(1) Materials required by the technical provisions; or
(2) Materials that have been fabricated to the point where they are identifiable to an item of work required under this contract; or
(3) Items specifically listed below in paragraph b.
b. Payment for materials delivered off-site must be made only after receipt of paid invoices listing the value of material and labor incorporated in the items along with a canceled check showing the prime contractor's title to the items delivered off site. Payment for materials delivered off-site must be limited to the following items: TBD.
1.14.3 CONTRACTOR PAYROLL RECORD
Log payrolls for all employees and subcontractors utilizing ENG Form 3180. Each subcontractor requires a separate ENG 3180 for their payrolls. Maintain the ENG 3180, along with the payrolls, on site and make available for review by the Contracting Officer's Representative.
Update the ENG 3180's weekly as payrolls are submitted. After making copies for their files, submit the originals of each week’s payrolls to the Resident Office. Before final payment, provide the completed ENG 3180’s to the Contracting Officer's Representatives. The payroll inventory produced by the electronic payroll system will satisfy the requirements in this paragraph and FAR 52.222-8, Payrolls and Basic Records.
1.15 AVAILABILITY OF UTILITY SERVICES
All reasonably required amounts of domestic water and electricity will be made available to the Contractor by the Government from existing system outlets and supplies. The Contractor is responsible to , at their own expense, make all temporary connections and install distribution lines.
Furnish to the Contracting Officer a complete system layout drawing showing type of materials to be used and method of installation for all temporary electrical…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .