This document outlines the technical specifications for renovating two electric traction passenger elevators at Wind Cave National Park in Hot Springs, South Dakota. The scope of work includes replacing elevator drive machines, controllers, governors, car structures, signal fixtures, and finishes. Key requirements include renovating the elevators to retain 2,500 lb capacity and 700 fpm speed while improving efficiency, controls, accessibility, and safety features. Bidders must have experience installing similar elevator systems. The successful contractor will provide a one-year warranty and 12 months of maintenance starting 30 days before construction.

View the file

Other files for this federal contract opportunity

Other files attached to WICA REHABILITATE ELEVATORS, newest first.
File Type Posted
Atch_3_Radon_Report_0003.pdf PDF
Atch_1_Questions_Answers_0003.pdf PDF
Atch_4_Asbestos_Report_0003.pdf PDF
Atch_2_Addendum_2-Specifications_0003.pdf PDF
Atch_6_Site_Visit_Sign_In_Sheet_0003.pdf PDF
Atch_5_ATS_Location_0003.pdf PDF
Sol_140P6323B0013_Amd_0003.pdf PDF
Sol_140P6323B0013_Amd_0002.pdf PDF
B09_Service_Wage_Determination_2006-0035_0002.pdf PDF
Sol_140P6323B0013_Amd_0001.pdf PDF
Service_Wages_2015-5367.pdf PDF
Drawings.pdf PDF
Limitations_Subcontracting.xlsx XLSX spreadsheet
Sol_140P6323B0013.pdf PDF
Construction_Wages_SD20230025.pdf PDF
Addendum_Specs.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WIND CAVE NATIONAL PARK

26611 US Highway 385 Hot Springs, SD 57747

REHABILITATE ELEVATORS

PMIS 304936

Drawing No: 80040

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

28 FEBRUARY 2023

REG

IS

TE

RE

D P

ROFESSIONA L A RCHITECT

SOUT H DA KOTA

14417

STEPHEN R. SMITH

REG. NO.

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SHORT FORM GENERAL REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

02 41 00 BUILDING DEMOLITION

DIVISION 05 – METALS

SEE SHEET S1

DIVISION 09 – FINISHES

09 06 90 COLOR SCHEDULE

09 90 00 PAINTING

DIVISION 14 - CONVEYING EQUIPMENT

14 21 00 ELECTRIC TRACTION ELEVATORS

DIVISION 26 – ELECTRICAL

26 04 00 COMMON REQUIREMENTS FOR ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING

26 05 29 HANGERS AND SUPPORTS

26 05 33.13 CONDUIT

26 05 33.16 BOXES

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 22 00 LOW-VOLTAGE TRANSFORMERS

26 27 26 WIRING DEVICES

26 28 13 FUSES

26 28 16.16 ENCLOSED SWITCHES

26 51 00 INTERIOR LIGHTING

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 COMMON WORK RESULTS FOR ELECTRONIC SECURITY

28 13 00 ELECTRONIC ACCESS CONTROL SYSTEM

DRAWINGS

APPENDIX A: DRAWINGS - 10 SHEETS

WICA – 304936 01 10 00 - 1

SECTION 01 10 00

SHORT FORM GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: The current elevators for the public access of the Wind Cave have reached the end of their lifespan. The existing shafts are in good condition and will be maintained. This contract is for replacement of those items listed below needing replacement to ensure the continued safe operation of the elevators.

1.2 Work Covered by the Contract Documents:

A. Project Location: Wind Cave National Park; Hot Springs, South Dakota

B. Work consists of: Project shall include but not limited to all repairs and construction as required to replace two obsolete elevators and motors with two (2) energy efficient electrical drive systems, install new elevator shaft and pit lighting, install new central control system which allows each elevator to operate independently. Two (2) new structural columns and three (3) beams will be added as replacements. Scope of work requires inspection and detailing repairs for existing structural elements, cabin components, safety mechanisms, rails, speed governors, and shafts. Items that do not require replacement shall not hinder the overall lifecycle of the final project. It is imperative the remaining existing elevator components are structurally sound, safe, and parallel the equivalent life cycle of the newly designed components. Each elevator shall be controlled and operate independently of the other with individual call controls for each cab at each landing, operating at a minimum speed of 700 feet per minute.

Will have card readers and keys to access the elevators from the lobbies. Will have two separate call buttons (one for each elevator). Will have one group controller with two elevators. Will have swing switch to allow the operators to run the elevators independently.

Will replace all phones.

The elevator cabin structure/frame will remain and the finishes will be replaced.

Heating Ventilation and Air Conditioning (HVAC) is provided by a central full building system.

Note full building HVAC replacement to be accomplished via separate project.

C. All work will be performed under a single contract.

D. Period of performance: Submittals, manufacturing, shipping to occur from Contract Award date to October 15, 2024. Contractor will be required to store equipment offsite until October

15, 2024. On-site work will be completed within the October 15, 2024 to March 31, 2025 time period.

WICA – 304936 01 10 00 - 2

ITEM 2 – PROTECTING EXISTING UTILITIES

2.1 Protecting Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative

(COR) and utility companies as required to request location services prior to and to coordinate demolition if within Scope of Work.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities on site or indoors. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.

2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:

A. Notify CO and COR not less than two business days in advance of proposed utility interruptions.

B. Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park

Service, and applicable park rules and regulations prescribed by the Park Superintendent.

Copies of the Superintendent’s Compendium are available at 26611 US Hwy 385, Hot Springs, SD 57747. It may also be found at https://www.nps.gov/wica/learn/management/superintendent-s-compendium.htm

A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting

Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the Park’s employees and their use of the site and to the public.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of

7 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.

WICA – 304936 01 10 00 - 3

The following Federal holidays are observed by the National Park Service:

New Year Day

Martin Luther King, Jr’s Birthday

Washington’s Birthday

Memorial Day

Juneteenth National Independence Day

Independence Day

Labor Day

Columbus Day

Veterans Day

Thanksgiving Day

Christmas Day

B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding

Friday; holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal

Holidays (opm.gov).

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan Do not disturb portions of Project site beyond areas in which the Work is indicated. Staging areas indicated on site plan.

B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

C. Define site disturbance area, including earthwork and clearing of vegetation to: N/A

D. Utilities

1. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.

2. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.

3. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022

WICA – 304936 01 10 00 - 4

4. Waste Operation:

a. Toilets: Restrooms in the building will be available for use by the contractor and subs.

Rooms must be maintained in a clean and operable condition. Contractor is responsible for returning use of the restrooms to the Park in same condition and operation as when work began.

b. Waste Removal / Recycling: Contractor is responsible for removing all waste created by the project. Contractor shall recycle to the highest degree possible and empty dumpsters as necessary to avoid debris on site. Locate at staging as shown on site plan.

E. Security and Protection facilities:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area.

Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

3. Tree and Plant Protection: N/A.

4. Pest Control: Follow best practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at project completion. Perform control operations lawfully, using environmentally safe materials.

5. Temporary Enclosures: Provide adequate safety barriers to prevent non-construction personnel and visitors from entering construction area.

6. Site Enclosure Fence: N/A

7. Security Enclosure and Lockup: N/A

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project staging area noted on the site plan. Specific storage and staging area’s may be discussed at the preconstruction briefing.

3.5 Preservation of Natural Features: No work is expected to take place inside the cave itself. Do not allow any workers to enter the cave area beyond the point of work.

3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.

WICA – 304936 01 10 00 - 5

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times.

1. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters

2. Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Elevators will not be utilized by NPS during the project construction period. Visitors will not be entering the elevator building. Cooperate with

Government during construction operations to minimize conflicts and facilitate

Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

3.9 Photo Documentation:

A. Contractor must provide existing condition, progress, and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via

CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

B. Existing Condition Images:

1. Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

WICA – 304936 01 10 00 - 6

C. Construction Progress Images:

1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)

2. Maintain organized index for photos with date, description, etc.

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

D. Completion Images:

1. Document all completed work within scope of work.

2. Maintain organized index for photos with date, description, etc.

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety:

A. As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite.

Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.

B. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction.

Provide adequate ventilation during use of volatile or noxious substances.

C. Store and handle hazardous materials in accordance with manufacturers and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov).

Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

1. Immediately report all spills of hazardous materials to the CO, COR, and park.

2. Maintain a spill emergency response kit.

3. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management N/A

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.

Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.

ITEM 6 - ABBREVIATIONS

https://www.osha.gov/laws-regs/regulations/standardnumber/1926

WICA – 304936 01 10 00 - 7

6.1 The list of abbreviations, standards and organizations which may be used in/referred within the

Construction Specifications or Special Provisions, may be found in the NPS Reference Standards

Section 01-42-00.

https://www.nps.gov/orgs/1671/upload/NPS-Reference_Standards-Sect-01-42-00.pdf

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.

7.2 Submittals:

A. Accident Prevention (Safety) Plan (APP): Submit a site-specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name and qualifications of responsible supervisor to carry out the program.

2. First aid and rescue procedures.

3. Training, both initial and continuing.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National

Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample

JHA template may be provided upon request.

5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and windstorms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

6. Contractor to identify nearest location of medical facility for emergencies

7. Recognition that works will be performed in remote areas with limited communication or cell phone coverage if applicable.

8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

https://www.nps.gov/orgs/1671/upload/NPS-Reference_Standards-Sect-01-42-00.pdf

WICA – 304936 01 10 00 - 8

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA

29CFR 1926 Subpart E.

B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

C. All PPE will be serviceable at all times. At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate, if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state, and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak, or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE

8.1 If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.

ITEM 9 - SUBMITTALS

9.1 General Contracting Submittal Procedures:

A. General: Prepare and submit submittals required by individual Technical Specification

Sections. Types of submittals are indicated in individual specific sections.

WICA – 304936 01 10 00 - 9

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting

Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR

B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.

C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to

Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the

Pre-Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention (Safety) Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Quality Control Plan.

8. Waste Management Plan.

9. Indoor Air Quality (IAQ) Management Plan.

10. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

9.2 Project Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet and a list of required submittals is included in each technical specification or attached at the end of this document.

A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.

WICA – 304936 01 10 00 - 10

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).

D. After approving submittals, Contracting Officer and/or COR will return one copy to the

Contractor. If submittals are not approved, Contracting Officer will return all copies to

Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.

Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Schedule of Values: Submit the Schedule of Values a minimum of one week prior to the

Preconstruction Conference for COR review. Schedule of Values shall include defined work line items with cost break downs including labor, material, and equipment for COR approval.

9.5 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application. Submit digital copy electronically (PDF preferred) of all required documents.

WICA – 304936 01 10 00 - 11

Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work. For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of

Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.

ITEM 10 – TEMPORARY SERVICES

10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this

Contract.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.

11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting

Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be complete following the final inspection with minor comments, the COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.

B. If the work is not determined to be complete following the final inspection, the Contracting

Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days, or a time directed by the

CO.

WICA – 304936 01 10 00 - 12

D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.

E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

F. Disposition of any permits and warranties required by the specifications in this section.

11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of

Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.

B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.

C. Information shall include operation and maintenance manuals for each warranted product.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

WICA - 304936 02 41 00-1

DIVISION 2 – EXISTING CONDITIONS

SECTION 02 41 00

BUILDING DEMOLITION

PART 1 - GENERAL

1.1 REQUIREMENTS OF REGULATORY AGENCIES

A. All demolition work shall be accomplished in accordance with all applicable local, state and federal requirements.

B. The Contractor shall be responsible for adhering to all requirements of NFPA 241 – Standard for Safeguarding Construction, Alteration, and Demolition Operations.

1.2 ASBESTOS-CONTAINING MATERIALS (ACM)

A. There are no known asbestos-containing materials (ACM) in the project work areas. If, during removal work, the Contractor discovers any additional material which he suspects may contain asbestos, he shall immediately notify the Government and cease work in close proximity to the suspected ACM. The Government will then arrange for the testing and removal of any ACM. If time delays are encountered because of required asbestos removal work, the schedule shall be adjusted accordingly by Change Order.

1.3 LEAD-BASED PAINT

A. There are no known materials in the project work areas that contain lead-based paint over the allowable threshold. All costs associated with lead paint testing, removal and precautions are the responsibility of the Contractor.

1.4 OWNERSHIP OF REMOVED MATERIALS

A. The Government reserves the right to remove any items from the building or site areas prior to the start of demolition by the Contractor and to retain such items as his property.

B. Any items still remaining when Contractor enters each particular work area to start demolition work shall be removed and disposed of at no additional expense to the Government. All other items scheduled to be removed shall become the property of the Contractor, and shall be removed from the site. Material shall not be stored on the site for sale, nor shall the Contractor conduct any sale on the site.

1.5 MATERIAL RECYCLING/REUSE

A. The following materials removed as part of this project shall be sent to a recycle/reuse facility in lieu of a landfill or other waste facility:

1. Cardboard

2. Paper

3. Plastic

4. Glass

5. Concrete

6. Reinforcing steel

7. Sheet metal flashing

8. Gypsum drywall

9. Carpet

10. Metal

11. Metal wall panels

12. Foam insulation

WICA - 304936 02 41 00-2

B. Several possible recycle/reuse sources:

1. Nationwide Foam, Inc. (888-820-2760, www.nationwidefoam.com)

2. Construction Materials Recycling Association (www.cdrecycling.org)

3. Building Materials Reuse Association (www.bmra.org)

4. American Recycling Center (989-725-5100, www.americanrecycling.com)

5. Habitat for Humanity ReStore

1.6 REVIEW OF DEMOLITION SCOPE BEFORE BIDDING

A. The Contractor shall be responsible for performing all work and providing all materials required to achieve the design intent shown on these Drawings. The Government will not be responsible for any additional expense to the Contractor if the conditions causing those expenses could have been discovered in an on-site inspection prior to bid submittal.

1.7 PROTECTION OF EXISTING BUILDINGS AND STRUCTURES

A. The Contractor shall guard against, and be responsible for, any movement, settlement, or collapse of adjacent buildings, structures, sidewalks, street passages, and underground utilities.

B. The Contractor shall repair damage done to Government property or any other property, on or off premises, by reason of required work.

C. Safety barricades and/or fences shall be provided as required during demolition operations and shall be left in place until sufficient replacement construction is completed.

D. Dustproof barriers shall be erected as required to prevent the spread of construction dust into adjacent areas outside the construction activity. This is especially important at cave entrances (levels ML and LL).

1.8 NOISE CONTROL

A. The Contractor shall use reasonable consideration in avoiding excessive or unnecessary noise during normal business hours.

1.9 SUBMITTALS

A. During the course of the demolition work, submit monthly reports to the Government indicating quantities of materials sent to recycling/reuse facilities (in lieu of landfills or other waste facilities).

PART 2 - PRODUCTS

2.1 MATERIALS

A. Barricade materials may consist of sound salvage materials, free of nails and sharp projections.

PART 3 - EXECUTION

3.1 REMOVALS

A. Locate demolition equipment throughout the structure and remove materials so as to not impose excessive loads to supporting structural framing.

B. Remove existing mechanical and electrical items and structures noted for removal.

C. Dispose of rubbish, debris and material resulting from demolition and removal operations to an offsite area within a maximum of one week from the date of the removal from its original installation.

WICA - 304936 09 06 90-1

DIVISION 09 - FINISHES

SECTION 09 06 90

COLOR SCHEDULE

PART 2 – PRODUCTS

2.1 REFERENCES TO MANUFACTURER’S NAMES

A. Where manufacturer’s names are mentioned herein, an equivalent product by another manufacturer may be submitted for approval. Manufacturers and products specified are not intended to limit the selection of equal products from other manufacturers.

2.2 MATERIALS LIST AND COLOR SCHEDULE

A. Paint per Section 09 90 00, PAINTING:

Manufacturer Color Name / Number P-1 Sherwin Williams Dover White SW-6385 – Match Existing P-2 Sherwin Williams Medium Grey - Match Existing P-3 Tnemec Medium Blue - Match Existing P-4 Tnemec Safety Yellow

B. COLOR PLACEMENT

1. The following lists of items requiring painting or staining contains the major areas of finish required. Contractor shall verify the color and type of finish with the Architect for any items which obviously require finish, but for which a paint or stain color is not listed hereinafter.

i.Interior Color Placement:

Elevator Machine Room Walls, Ceiling P-1 Floor P-2 4” stripe @ edge of elevated portions P-4 Steel P-3 Elevator Hoistway Pit Floor P-2

WICA - 304936 09 90 00-1

SECTION 09 90 00

PAINTING

PART 1 - GENERAL

1.1 RELATED WORK SPECIFIED ELSEWHERE

COLOR SCHEDULE Section 09 06 90

1.2 SCOPE

A. The scope and extent of painting and finishing shall be as designated by Specifications.

1.3 REFERENCES

A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)

ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and Biological Exposure Indices

THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC PA Guide 3 (1982; E 1995) Guide to Safety in Paint Application

1.4 WORK NOT INCLUDED

A. Concealed surfaces, including walls or ceilings in the following generally inaccessible spaces:

1. Ceiling plenums

2. Pipe spaces

3. Duct shafts

B. Metal surfaces of anodized aluminum, stainless steel, chromium plate, copper, bronze and similar finished materials will not require finish painting, unless otherwise indicated. See list of items later in this Section.

C. Moving parts of operating units, mechanical and electrical parts, such as valve and damper operations, linkages, sensing devices, motor and fan shafts will not require finish painting, unless otherwise indicated.

D. Do not paint over any code-required labels, such as Underwriters’ Laboratories and Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates.

E. Omit paint and/or field finishing for the following items:

1. Galvanized steel items, except as specifically noted.

2. Stainless steel items

3. Light fixtures

4. Security cameras

5. Elevator entrance doors and frames

6. Pre-finished sheet metal items

7. Finished mechanical and electrical equipment

8. Sprinkler heads

9. Data/comm./security/fire alarm cabling; coordinate coating schedule and cable installation schedule with the subcontractors. Protect cabling from direct coating schedule or over-spray.

Cables which have been painted are void of the manufacturer’s warranty and shall be replaced at no expense to the Government.

10. Prefinished or anodized aluminum doors and frames

WICA - 304936 09 90 00-2

1.5 REGULATORY REQUIREMENTS

A. Environmental Protection: In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify the Government of any coating specified herein which fails to conform.

B. Lead Content: Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.

C. Chromate Content: Do not use coatings containing zinc-chromate or strontium-chromate.

D. Asbestos Content: Materials shall not contain asbestos.

E. Mercury Content: Materials shall not contain mercury or mercury compounds.

F. Human Carcinogens: Materials shall not contain ACGIH 0100Doc confirmed human carcinogens (A1) or suspected human carcinogens (A2).

1.6 SUSTAINABILITY REQUIREMENTS

A. Flats VOC content shall be no greater than 50 g/L.

B. Non-flats and primers VOC content shall be no greater than 150 g/L.

C. Anti-corrosive paint applied to interior ferrous surfaces VOC content shall be no greater than 250 g/L.

1.7 QUALITY ASSURANCE

A. ACCEPTABLE MANUFACTURERS are as follows (or approved equal):

Benjamin Moore and Company Diamond Vogel Professional Paints and Coatings (PPC) ICI Dulux Paints Kwal Paint, a Sherwin-Williams Company Pittsburgh Paints, PPG Industries, Inc.

Sherwin-Williams Company Tnemec Co., Inc.

Valspar

B. Applicator shall have a minimum of five (5) years proven satisfactory experience, and shall show proof to the General Contractor before commencement of work that he will maintain a qualified crew of painters throughout the duration of the work.

1.8 REVIEW OF COATING SCOPE BEFORE BIDDING

A. The Painting Contractor shall be responsible for performing all work and providing all materials required to achieve the design intent shown on the Drawings. The Government will not be responsible for any additional expense to the Contractor if the conditions causing those expenses could have been discovered in an on-site inspection prior to bid submittal.

1.9 SUBMITTALS

A. Submit manufacturer’s product data for all primers, paints, stains, finishes, and related products. Include a detailed schedule that indicates the product that is proposed for each substrate.

B. Submit samples of each type of finish and color. Paint samples shall be submitted on 8 1/2-inch x 11-inch Mead Mark I cover paper, coated on one side, with paint sprayed or applied with a foam rubber roller. Back of samples shall show the manufacturer and the trade name of the proposed product.

WICA - 304936 09 90 00-3

C. Submit documentation indicating VOC content of coatings applied.

1.10 EXTRA STOCK

A. The Contractor shall furnish the Government with one gallon of each color or type of finish, sealed and unused, together with the mixing formula written on the cans. The Contractor shall also furnish two copies of this information to the Government in addition to the instructions attached to product containers.

1.11 DELIVERY, STORAGE AND PROTECTION

A. All materials shall be delivered in the original containers with seals unbroken and labels intact. Labels shall include manufacturer’s name and label and the following information:

1. Product name of title of material

2. Product description (generic classification of binder type)

3. Manufacturer’s stock number and date of manufacture

4. Contents by volume for pigment and vehicle constituents

5. Thinning instructions

6. Application instructions

7. Color name and number

8. VOC content

B. All materials used on the project shall be stored in a single well-ventilated place designated by the General Contractor at a minimum ambient temperature of 46 degrees F. Such storage place shall be kept neat and clean, and all damage thereto or to its surroundings shall be made good. Any oil, rags, waste, etc. shall be removed from the building every night, and every precaution taken to avoid the danger of fire.

1.12 JOB CONDITIONS

A. Surface temperature shall be maintained at the minimum temperature required by the coating manufacturer during application and drying of coatings. See manufacturer’s written instructions for more specific information.

B. Adjacent work, building finishes and surfaces shall be totally protected with masking tape, drop cloths or other suitable coverings.

1.13 SAFETY AND HEALTH

A. Safety Methods used During Coating Application: Comply with the requirements of SSPC PA Guide 3.

B. Toxic Materials: To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:

1. The applicable manufacturer’s Material Safety Data Sheets (MSDS) or local regulation.

2. 29 CFR 1910.1000.

1.14 ENVIRONMENTAL CONDITIONS

A. Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.

PART 2 - PRODUCTS

2.1 MATERIALS

A. The Contractor shall have the option of using materials and finishes manufactured by any one of the manufacturers previously listed (or approved equal). Materials used throughout shall be the products of one manufacturer only, and shall be first line and top-grade materials produced by the manufacturer selected. The mentioning of a specific brand name is done to establish a minimum acceptable standard or quality desired.

WICA - 304936 09 90 00-4

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for coating application. Proceed with coating application only after unsatisfactory conditions have been corrected and surfaces receiving coatings are thoroughly dry.

B. Start of coating will be construed as Applicator’s acceptance of surfaces and conditions within a particular area.

C. Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.

D. Notify General Contractor and Government about anticipated problems when using materials specified over substrates primed by Others.

3.2 PREPARATION

A. Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be coated. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and coating. After completing finishing operations in each space or area, reinstall items removed using workers skilled in the trades involved.

B. All surfaces to be finished shall be power-washed and/or scraped and wiped cleaned free of loose dirt and dust before finishing. After the first coat, putty holes, cracks, etc. with putty of a color to match that of finish. Bring putty flush to the adjoining surface.

C. Metal surfaces which are not galvanized or shop-coated shall be washed with mineral spirits to remove dirt and grease. Remove rust or scale by wire brushing or sandpapering clean.

D. Clean and treat galvanized metal chemically with a compound designed for this purpose, such as

"Lithoform", "Stibley", or "Solfo Metallic Coat", in accordance with the paint manufacturer's instructions.

E. Sand hard, glossy and previously-painted finishes to insure adhesion. Spot prime with primer specified for new surfaces where existing paint or primer has been partially removed by blistering, peeling, rupture, or cracking. Completely remove existing finish if 25 percent or more of the existing finish has failed or can be easily scraped off the surface.

3.3 APPLICATION

A. Apply all materials under adequate illumination.

B. Do not coat over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable coating film.

C. Provide finish coats that are compatible with primers used.

D. The term “exposed surfaces” includes areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.

E. Coat surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, coat surfaces behind permanently fixed equipment or furniture with prime coat only.

WICA - 304936 09 90 00-5

F. Sand lightly between each succeeding enamel or varnish coat.

G. Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for coating as soon as practicable after preparation and before subsequent surface deterioration.

H. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer’s instructions, sand between applications.

I. If undercoats, stains, or other conditions show through final finish coat, apply additional coats until final coat film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.

J. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until previous coat has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another finish coat does not cause undercoat to lift or lose adhesion.

K. Apply finish coatings by brush, roller, spray, or other applicators according to manufacturer’s instructions, and as follows:

1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being coated.

2. Rollers: Use rollers of carpet, velvet-back, or high-pile sheep’s wool as recommended by manufacturer for material and texture required.

3. Spray Equipment: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required.

L. Apply coating materials no thinner than manufacturer’s recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer.

M. Painting of mechanical and electrical work is limited to items exposed in occupied spaces. Mechanical items to be painted include, but are not limited to, the following:

1. Uninsulated metal and plastic piping

2. Pipe hangers and supports

3. Tanks that do not have factory-applied final finishes

4. Duct, equipment, and pipe insulation having “all-service jacket” or other paintable jacket material

5. Mechanical equipment that is indicated to have a factory-primed…