This solicitation is for elevator rehabilitation work at Wind Cave National Park in Hot Springs, South Dakota. The scope of work involves renovating two electric traction passenger elevators, including replacing major components such as the drive machines, controllers, doors, and car enclosures. The renovations must comply with all applicable codes and safety standards. The period of performance is to be negotiated, with an expected completion time of 12 months after notice to proceed. The solicitation was issued by the National Park Service Midwest Region on behalf of the Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_3_Radon_Report_0003.pdf | ||
| Atch_1_Questions_Answers_0003.pdf | ||
| Atch_4_Asbestos_Report_0003.pdf | ||
| Atch_6_Site_Visit_Sign_In_Sheet_0003.pdf | ||
| Atch_5_ATS_Location_0003.pdf | ||
| Sol_140P6323B0013_Amd_0003.pdf | ||
| Atch_2_Addendum_2-Specifications_0003.pdf | ||
| Sol_140P6323B0013_Amd_0002.pdf | ||
| B09_Service_Wage_Determination_2006-0035_0002.pdf | ||
| Sol_140P6323B0013_Amd_0001.pdf | ||
| Limitations_Subcontracting.xlsx | XLSX spreadsheet | |
| Sol_140P6323B0013.pdf | ||
| Construction_Wages_SD20230025.pdf | ||
| Specifications.pdf | ||
| Service_Wages_2015-5367.pdf | ||
| Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDM-1, Page 1
ADDENDUM NO. ADDM-01 National Park Service – Interior Regions 3, 4 5 Facilities, Planning and Infrastructure to the 601 Riverfront Drive Bidding Documents Omaha, NE 68102 for 25 July 2023
WIND CAVE NATIONAL PARK – REHABILITATE ELEVATORS
26611 US Highway 385 Hot Springs, SD 57747
PMIS 304936
Drawing No: 80040
NOTICE TO BIDDERS: The Specifications and Drawings for the above referenced project are hereby amended as follows:
SPECIFICATIONS – GENERAL
ITEM NO. G-1 SECTION 01 11 00 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1- DESCRIPTION OF WORK
1.2 Work Covered by the Contract Documents:
D. Period of Performance: Following issuance of the Notice to Proceed, the contractor is expected to prepare technical submittals, arrange for manufacturing, shipping and delivery of components, and work with subcontractors as required to ensure completion and final acceptance not later than the Period of Performance end date identified in the Notice to Proceed. The contractor is expected to efficiently schedule decommissioning, construction, installation, and new elevator system upgrades to minimize downtime once mobilized and onsite work commences. The government intends to keep current elevator systems in operation up to the point the contractor is ready to begin onsite work. The contractor shall provide the CO with 60 days of advance notice of plans to take current elevator systems offline.
DRAWINGS
ITEM NO. D-1 Sheet C1 SITE PLAN
Additional Contractor Staging Area available shown in yellow. Contractor responsible for providing storage and protection of items within space provided as required.
ADDM-1, Page 2
Partial Sheet C1
END OF ADDENDUM
WICA - 304936 09 06 90-1
DIVISION 09 - FINISHES
SECTION 09 06 90
COLOR SCHEDULE
PART 2 – PRODUCTS
2.1 REFERENCES TO MANUFACTURER’S NAMES
A. Where manufacturer’s names are mentioned herein, an equivalent product by another manufacturer may be submitted for approval. Manufacturers and products specified are not intended to limit the selection of equal products from other manufacturers.
2.2 MATERIALS LIST AND COLOR SCHEDULE
A. Paint per Section 09 90 00, PAINTING:
Manufacturer Color Name / Number
P-1 N/A Off White – Match Existing P-2 N/A Medium Grey - Match Existing P-3 N/A Medium Blue - Match Existing P-4 N/A Safety Yellow
B. COLOR PLACEMENT
1. The following lists of items requiring painting or staining contains the major areas of finish required. Contractor shall verify the color and type of finish with the Architect for any items which obviously require finish, but for which a paint or stain color is not listed hereinafter.
a. Interior Color Placement:
Elevator Machine Room
Walls, Ceiling P-1 Floor P-2 4” stripe @ edge of elevated portions P-4 Steel P-3
Elevator Hoistway Pit Floor P-2
END OF SECTION
WICA - 304936 09 90 00-1
SECTION 09 90 00
PAINTING
PART 1 - GENERAL
1.1 RELATED WORK SPECIFIED ELSEWHERE
COLOR SCHEDULE Section 09 06 90
1.2 SCOPE
A. The scope and extent of painting and finishing shall be as designated by Specifications.
1.3 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and Biological
Exposure Indices
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA Guide 3 (1982; E 1995) Guide to Safety in Paint Application
1.4 WORK NOT INCLUDED
A. Concealed surfaces, including walls or ceilings in the following generally inaccessible spaces:
1. Ceiling plenums
2. Pipe spaces
3. Duct shafts
B. Metal surfaces of anodized aluminum, stainless steel, chromium plate, copper, bronze and similar finished materials will not require finish painting, unless otherwise indicated. See list of items later in this Section.
C. Moving parts of operating units, mechanical and electrical parts, such as valve and damper operations, linkages, sensing devices, motor and fan shafts will not require finish painting, unless otherwise indicated.
D. Do not paint over any code-required labels, such as Underwriters’ Laboratories and Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates.
E. Omit paint and/or field finishing for the following items:
1. Galvanized steel items, except as specifically noted.
2. Stainless steel items
3. Light fixtures
4. Security cameras
5. Elevator entrance doors and frames
6. Pre-finished sheet metal items
7. Finished mechanical and electrical equipment
8. Sprinkler heads
9. Data/comm./security/fire alarm cabling; coordinate coating schedule and cable installation schedule with the subcontractors. Protect cabling from direct coating schedule or over-spray.
Cables which have been painted are void of the manufacturer’s warranty and shall be replaced at no expense to the Government.
10. Prefinished or anodized aluminum doors and frames
WICA - 304936 09 90 00-2
1.5 REGULATORY REQUIREMENTS
A. Environmental Protection: In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify the Government of any coating specified herein which fails to conform.
B. Lead Content: Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
C. Chromate Content: Do not use coatings containing zinc-chromate or strontium-chromate.
D. Asbestos Content: Materials shall not contain asbestos.
E. Mercury Content: Materials shall not contain mercury or mercury compounds.
F. Human Carcinogens: Materials shall not contain ACGIH 0100Doc confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.6 SUSTAINABILITY REQUIREMENTS
A. Flats VOC content shall be no greater than 50 g/L.
B. Non-flats and primers VOC content shall be no greater than 150 g/L.
C. Anti-corrosive paint applied to interior ferrous surfaces VOC content shall be no greater than 250 g/L.
1.7 QUALITY ASSURANCE
A. BASIS OF DESIGN coating systems and manufacturers:
1. The following coating systems are the basis for design and comparison in this Section:
b. Sherwin Williams Kem Bond HS, high solids, Phenolic Alkyd Primer, B50 Series
c. Sherwin Williams All Surface Enamel, Interior-Exterior Alkyd, A11 series.
d. Sherwin Williams Waterborne Acrylic Dryfall, Eg-Shel, B42W2
e. Sherwin Williams ProMar 200 Zero VOC Interior Latex, Eg-Shel, B20-2600 Series
f. Sherwin Williams ArmorSeal Tread-Plex 100% Acrylic Floor Coating
g. Sherwin Williams Acrolon100 WB Acrylic Urethane, Low VOC
h. Tnemec Enviro-Tread, Series 287 Waterborne Epoxy-Amine Adduct.
i. Tnemec Enviro-Glaze, Series 297 Ceramic-Modified Waterborne Aliphatic Polyurethane.
j. Tnemec Tneme-Glaze Modified Polyamine Epoxy
k. Tnemec Clear CRU, Series 295, Aliphatic Polyester Polyurethane
B. ACCEPTABLE MANUFACTURERS
Coating systems with comparable performance and conforming with the same standards and regulatory requirements are acceptable from other manufactures as follows (or approved equal):
Benjamin Moore and Company Diamond Vogel Professional Paints and Coatings (PPC) ICI Dulux Paints Kwal Paint, a Sherwin-Williams Company Pittsburgh Paints, PPG Industries, Inc.
Sherwin-Williams Company Tnemec Co., Inc.
Valspar
C. Applicator shall have a minimum of five (5) years proven satisfactory experience, and shall show proof to the General Contractor before commencement of work that he will maintain a qualified crew of painters throughout the duration of the work.
WICA - 304936 09 90 00-3
1.8 REVIEW OF COATING SCOPE BEFORE BIDDING
A. The Painting Contractor shall be responsible for performing all work and providing all materials required to achieve the design intent shown on the Drawings. The Government will not be responsible for any additional expense to the Contractor if the conditions causing those expenses could have been discovered in an on-site inspection prior to bid submittal.
1.9 SUBMITTALS
A. Submit manufacturer’s product data for all primers, paints, stains, finishes, and related products.
Include a detailed schedule that indicates the product that is proposed for each substrate.
B. Submit samples of each type of finish and color. Paint samples shall be submitted on 8 1/2-inch x 11-inch Mead Mark I cover paper, coated on one side, with paint sprayed or applied with a foam rubber roller. Back of samples shall show the manufacturer and the trade name of the proposed product.
C. Submit documentation indicating VOC content of coatings applied.
1.10 EXTRA STOCK
A. The Contractor shall furnish the Government with one gallon of each color or type of finish, sealed and unused, together with the mixing formula written on the cans. The Contractor shall also furnish two copies of this information to the Government in addition to the instructions attached to product containers.
1.11 DELIVERY, STORAGE AND PROTECTION
A. All materials shall be delivered in the original containers with seals unbroken and labels intact. Labels shall include manufacturer’s name and label and the following information:
1. Product name of title of material
2. Product description (generic classification of binder type)
3. Manufacturer’s stock number and date of manufacture
4. Contents by volume for pigment and vehicle constituents
5. Thinning instructions
6. Application instructions
7. Color name and number
8. VOC content
B. All materials used on the project shall be stored in a single well-ventilated place designated by the General Contractor at a minimum ambient temperature of 46 degrees F. Such storage place shall be kept neat and clean, and all damage thereto or to its surroundings shall be made good. Any oil, rags, waste, etc. shall be removed from the building every night, and every precaution taken to avoid the danger of fire.
1.12 JOB CONDITIONS
A. Surface temperature shall be maintained at the minimum temperature required by the coating manufacturer during application and drying of coatings. See manufacturer’s written instructions for more specific information.
B. Adjacent work, building finishes and surfaces shall be totally protected with masking tape, drop cloths or other suitable coverings.
1.13 SAFETY AND HEALTH
A. Safety Methods used During Coating Application: Comply with the requirements of SSPC PA Guide 3.
WICA - 304936 09 90 00-4
B. Toxic Materials: To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
1. The applicable manufacturer’s Material Safety Data Sheets (MSDS) or local regulation.
2. 29 CFR 1910.1000.
1.14 ENVIRONMENTAL CONDITIONS
A. Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.
PART 2 - PRODUCTS
2.1 MATERIALS
A. The Contractor shall have the option of using materials and finishes manufactured by any one of the manufacturers previously listed (or approved equal). Materials used throughout shall be the products of one manufacturer only, and shall be first line and top-grade materials produced by the manufacturer selected. The mentioning of a specific brand name is done to establish a minimum acceptable standard or quality desired.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for coating application. Proceed with coating application only after unsatisfactory conditions have been corrected and surfaces receiving coatings are thoroughly dry.
B. Start of coating will be construed as Applicator’s acceptance of surfaces and conditions within a particular area.
C. Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.
D. Notify General Contractor and Government about anticipated problems when using materials specified over substrates primed by Others.
3.2 PREPARATION
A. Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be coated. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and coating. After completing finishing operations in each space or area, reinstall items removed using workers skilled in the trades involved.
B. All surfaces to be finished shall be power-washed and/or scraped and wiped cleaned free of loose dirt and dust before finishing. After the first coat, putty holes, cracks, etc. with putty of a color to match that of finish. Bring putty flush to the adjoining surface.
C. Metal surfaces which are not galvanized or shop-coated shall be washed with mineral spirits to remove dirt and grease. Remove rust or scale by wire brushing or sandpapering clean.
D. Clean and treat galvanized metal chemically with a compound designed for this purpose, such as "Lithoform", "Stibley", or "Solfo Metallic Coat", in accordance with the paint manufacturer's instructions.
E. Sand hard, glossy and previously-painted finishes to insure adhesion. Spot prime with primer specified for new surfaces where existing paint or primer has been partially removed by blistering, peeling, rupture, or cracking. Completely remove existing finish if 25 percent or more of the existing finish has failed or can be easily scraped off the surface.
WICA - 304936 09 90 00-5
3.3 APPLICATION
A. Apply all materials under adequate illumination.
B. Do not coat over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable coating film.
C. Provide finish coats that are compatible with primers used.
D. The term “exposed surfaces” includes areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.
E. Coat surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, coat surfaces behind permanently fixed equipment or furniture with prime coat only.
F. Sand lightly between each succeeding enamel or varnish coat.
G. Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for coating as soon as practicable after preparation and before subsequent surface deterioration.
H. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer’s instructions, sand between applications.
I. If undercoats, stains, or other conditions show through final finish coat, apply additional coats until final coat film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.
J. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until previous coat has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another finish coat does not cause undercoat to lift or lose adhesion.
K. Apply finish coatings by brush, roller, spray, or other applicators according to manufacturer’s instructions, and as follows:
1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being coated.
2. Rollers: Use rollers of carpet, velvet-back, or high-pile sheep’s wool as recommended by manufacturer for material and texture required.
3. Spray Equipment: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required.
L. Apply coating materials no thinner than manufacturer’s recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer.
M. Painting of mechanical and electrical work is limited to items exposed in occupied spaces. Mechanical items to be painted include, but are not limited to, the following:
1. Uninsulated metal and plastic piping
2. Pipe hangers and supports
3. Tanks that do not have factory-applied final finishes
4. Duct, equipment, and pipe insulation having “all-service jacket” or other paintable jacket material
5. Mechanical equipment that is indicated to have a factory-primed finish for field painting
WICA - 304936 09 90 00-6
N. Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be coated or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears to ensure a finish coat with no burn-through or other defects due to insufficient sealing.
O. Pigmented (opaque) finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.
P. Match approved samples for color, texture, and coverage. Remove, finish, or recoat work not complying with requirements.
3.4 FIELD QUALITY CONTROL
A. The Government reserves the right to invoke the following test procedure at any time and as often as the Government deems necessary during the period when paint is being applied:
1. The Government may engage a qualified independent testing agency to sample paint material being used. Samples of material delivered to Project will be taken, identified, sealed, and certified in the presence of Contractor.
2. The Government may direct Contractor to stop painting if test results show material being used does not comply with specified requirements. Contractor shall remove noncomplying paint from Project site, pay for testing, and repaint surfaces previously coated with the noncomplying paint. If necessary, Contractor may be required to remove noncomplying paint from previously painted surfaces if, on repainting with specified paint, the two coatings are incompatible.
3.5 CLEANING
A. At the end of each workday, remove empty trash cans, rags, rubbish, and other discarded paint materials from Project site.
B. After completing painting, clean glass and coating-spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging adjacent finished surfaces.
3.6 PROTECTION
A. Protect work of other trades, whether being painted or not, against damage from coating work. Correct damage by cleaning, repairing or replacing, and recoating, as approved by the Government.
B. Provide “Wet Paint” signs to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work.
C. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces.
3.7 COATING SCHEDULE
A. See list of approved manufacturers of paint products earlier in this section. The paint materials listed below are given as a means of establishing the standard for the required coat materials.
B. Where manufacturer’s names are mentioned herein, an equivalent product by another manufacturer may be submitted for approval. Manufacturers and products specified are not intended to limit the selection of equal products from other manufacturers.
INTERIOR WORK
FERROUS METAL AND ALUMINUM ITEMS (I.E., METAL DOORS, METAL DOOR AND WINDOW FRAMES, SHOP-PRIMED STEEL, ETC., EXCEPT AS NOTED BELOW)
1 coat S-W Kem Bond HS Universal Metal Primer, B50 Series (4 mils wet, 1.2 mils dry)
WICA - 304936 09 90 00-1
SECTION 09 90 00
PAINTING
PART 1 - GENERAL
1.1 RELATED WORK SPECIFIED ELSEWHERE
COLOR SCHEDULE Section 09 06 90
1.2 SCOPE
A. The scope and extent of painting and finishing shall be as designated by Specifications.
1.3 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100Doc (2005) Documentation of the Threshold Limit Values and Biological
Exposure Indices
THE SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC PA Guide 3 (1982; E 1995) Guide to Safety in Paint Application
1.4 WORK NOT INCLUDED
A. Concealed surfaces, including walls or ceilings in the following generally inaccessible spaces:
1. Ceiling plenums
2. Pipe spaces
3. Duct shafts
B. Metal surfaces of anodized aluminum, stainless steel, chromium plate, copper, bronze and similar finished materials will not require finish painting, unless otherwise indicated. See list of items later in this Section.
C. Moving parts of operating units, mechanical and electrical parts, such as valve and damper operations, linkages, sensing devices, motor and fan shafts will not require finish painting, unless otherwise indicated.
D. Do not paint over any code-required labels, such as Underwriters’ Laboratories and Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates.
E. Omit paint and/or field finishing for the following items:
1. Galvanized steel items, except as specifically noted.
2. Stainless steel items
3. Light fixtures
4. Security cameras
5. Elevator entrance doors and frames
6. Pre-finished sheet metal items
7. Finished mechanical and electrical equipment
8. Sprinkler heads
9. Data/comm./security/fire alarm cabling; coordinate coating schedule and cable installation schedule with the subcontractors. Protect cabling from direct coating schedule or over-spray.
Cables which have been painted are void of the manufacturer’s warranty and shall be replaced at no expense to the Government.
10. Prefinished or anodized aluminum doors and frames
WICA - 304936 09 90 00-2
1.5 REGULATORY REQUIREMENTS
A. Environmental Protection: In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction. Notify the Government of any coating specified herein which fails to conform.
B. Lead Content: Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
C. Chromate Content: Do not use coatings containing zinc-chromate or strontium-chromate.
D. Asbestos Content: Materials shall not contain asbestos.
E. Mercury Content: Materials shall not contain mercury or mercury compounds.
F. Human Carcinogens: Materials shall not contain ACGIH 0100Doc confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.6 SUSTAINABILITY REQUIREMENTS
A. Flats VOC content shall be no greater than 50 g/L.
B. Non-flats and primers VOC content shall be no greater than 150 g/L.
C. Anti-corrosive paint applied to interior ferrous surfaces VOC content shall be no greater than 250 g/L.
1.7 QUALITY ASSURANCE
A. BASIS OF DESIGN coating systems and manufacturers:
1. The following coating systems are the basis for design and comparison in this Section:
b. Sherwin Williams Kem Bond HS, high solids, Phenolic Alkyd Primer, B50 Series
c. Sherwin Williams All Surface Enamel, Interior-Exterior Alkyd, A11 series.
d. Sherwin Williams Waterborne Acrylic Dryfall, Eg-Shel, B42W2
e. Sherwin Williams ProMar 200 Zero VOC Interior Latex, Eg-Shel, B20-2600 Series
f. Sherwin Williams ArmorSeal Tread-Plex 100% Acrylic Floor Coating
g. Sherwin Williams Acrolon100 WB Acrylic Urethane, Low VOC
h. Tnemec Enviro-Tread, Series 287 Waterborne Epoxy-Amine Adduct.
i. Tnemec Enviro-Glaze, Series 297 Ceramic-Modified Waterborne Aliphatic Polyurethane.
j. Tnemec Tneme-Glaze Modified Polyamine Epoxy
k. Tnemec Clear CRU, Series 295, Aliphatic Polyester Polyurethane
B. ACCEPTABLE MANUFACTURERS
Coating systems with comparable performance and conforming with the same standards and regulatory requirements are acceptable from other manufactures as follows (or approved equal):
Benjamin Moore and Company Diamond Vogel Professional Paints and Coatings (PPC) ICI Dulux Paints Kwal Paint, a Sherwin-Williams Company Pittsburgh Paints, PPG Industries, Inc.
Sherwin-Williams Company Tnemec Co., Inc.
Valspar
C. Applicator shall have a minimum of five (5) years proven satisfactory experience, and shall show proof to the General Contractor before commencement of work that he will maintain a qualified crew of painters throughout the duration of the work.
WICA - 304936 09 90 00-3
1.8 REVIEW OF COATING SCOPE BEFORE BIDDING
A. The Painting Contractor shall be responsible for performing all work and providing all materials required to achieve the design intent shown on the Drawings. The Government will not be responsible for any additional expense to the Contractor if the conditions causing those expenses could have been discovered in an on-site inspection prior to bid submittal.
1.9 SUBMITTALS
A. Submit manufacturer’s product data for all primers, paints, stains, finishes, and related products.
Include a detailed schedule that indicates the product that is proposed for each substrate.
B. Submit samples of each type of finish and color. Paint samples shall be submitted on 8 1/2-inch x 11-inch Mead Mark I cover paper, coated on one side, with paint sprayed or applied with a foam rubber roller. Back of samples shall show the manufacturer and the trade name of the proposed product.
C. Submit documentation indicating VOC content of coatings applied.
1.10 EXTRA STOCK
A. The Contractor shall furnish the Government with one gallon of each color or type of finish, sealed and unused, together with the mixing formula written on the cans. The Contractor shall also furnish two copies of this information to the Government in addition to the instructions attached to product containers.
1.11 DELIVERY, STORAGE AND PROTECTION
A. All materials shall be delivered in the original containers with seals unbroken and labels intact. Labels shall include manufacturer’s name and label and the following information:
1. Product name of title of material
2. Product description (generic classification of binder type)
3. Manufacturer’s stock number and date of manufacture
4. Contents by volume for pigment and vehicle constituents
5. Thinning instructions
6. Application instructions
7. Color name and number
8. VOC content
B. All materials used on the project shall be stored in a single well-ventilated place designated by the General Contractor at a minimum ambient temperature of 46 degrees F. Such storage place shall be kept neat and clean, and all damage thereto or to its surroundings shall be made good. Any oil, rags, waste, etc. shall be removed from the building every night, and every precaution taken to avoid the danger of fire.
1.12 JOB CONDITIONS
A. Surface temperature shall be maintained at the minimum temperature required by the coating manufacturer during application and drying of coatings. See manufacturer’s written instructions for more specific information.
B. Adjacent work, building finishes and surfaces shall be totally protected with masking tape, drop cloths or other suitable coverings.
1.13 SAFETY AND HEALTH
A. Safety Methods used During Coating Application: Comply with the requirements of SSPC PA Guide 3.
WICA - 304936 09 90 00-4
B. Toxic Materials: To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
1. The applicable manufacturer’s Material Safety Data Sheets (MSDS) or local regulation.
2. 29 CFR 1910.1000.
1.14 ENVIRONMENTAL CONDITIONS
A. Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.
PART 2 - PRODUCTS
2.1 MATERIALS
A. The Contractor shall have the option of using materials and finishes manufactured by any one of the manufacturers previously listed (or approved equal). Materials used throughout shall be the products of one manufacturer only, and shall be first line and top-grade materials produced by the manufacturer selected. The mentioning of a specific brand name is done to establish a minimum acceptable standard or quality desired.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for coating application. Proceed with coating application only after unsatisfactory conditions have been corrected and surfaces receiving coatings are thoroughly dry.
B. Start of coating will be construed as Applicator’s acceptance of surfaces and conditions within a particular area.
C. Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers.
D. Notify General Contractor and Government about anticipated problems when using materials specified over substrates primed by Others.
3.2 PREPARATION
A. Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be coated. If removal is impractical or impossible because of size or weight of the item, provide surface-applied protection before surface preparation and coating. After completing finishing operations in each space or area, reinstall items removed using workers skilled in the trades involved.
B. All surfaces to be finished shall be power-washed and/or scraped and wiped cleaned free of loose dirt and dust before finishing. After the first coat, putty holes, cracks, etc. with putty of a color to match that of finish. Bring putty flush to the adjoining surface.
C. Metal surfaces which are not galvanized or shop-coated shall be washed with mineral spirits to remove dirt and grease. Remove rust or scale by wire brushing or sandpapering clean.
D. Clean and treat galvanized metal chemically with a compound designed for this purpose, such as "Lithoform", "Stibley", or "Solfo Metallic Coat", in accordance with the paint manufacturer's instructions.
E. Sand hard, glossy and previously-painted finishes to insure adhesion. Spot prime with primer specified for new surfaces where existing paint or primer has been partially removed by blistering, peeling, rupture, or cracking. Completely remove existing finish if 25 percent or more of the existing finish has failed or can be easily scraped off the surface.
WICA - 304936 09 90 00-5
3.3 APPLICATION
A. Apply all materials under adequate illumination.
B. Do not coat over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable coating film.
C. Provide finish coats that are compatible with primers used.
D. The term “exposed surfaces” includes areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned-tube radiation, and similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection.
E. Coat surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, coat surfaces behind permanently fixed equipment or furniture with prime coat only.
F. Sand lightly between each succeeding enamel or varnish coat.
G. Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for coating as soon as practicable after preparation and before subsequent surface deterioration.
H. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer’s instructions, sand between applications.
I. If undercoats, stains, or other conditions show through final finish coat, apply additional coats until final coat film is of uniform finish, color, and appearance. Give special attention to ensure that edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces.
J. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until previous coat has dried to where it feels firm, and does not deform or feel sticky under moderate thumb pressure, and until application of another finish coat does not cause undercoat to lift or lose adhesion.
K. Apply finish coatings by brush, roller, spray, or other applicators according to manufacturer’s instructions, and as follows:
1. Brushes: Use brushes best suited for type of material applied. Use brush of appropriate size for surface or item being coated.
2. Rollers: Use rollers of carpet, velvet-back, or high-pile sheep’s wool as recommended by manufacturer for material and texture required.
3. Spray Equipment: Use airless spray equipment with orifice size as recommended by manufacturer for material and texture required.
L. Apply coating materials no thinner than manufacturer’s recommended spreading rate to achieve dry film thickness indicated. Provide total dry film thickness of the entire system as recommended by manufacturer.
M. Painting of mechanical and electrical work is limited to items exposed in occupied spaces. Mechanical items to be painted include, but are not limited to, the following:
1. Uninsulated metal and plastic piping
2. Pipe hangers and supports
3. Tanks that do not have factory-applied final finishes
4. Duct, equipment, and pipe insulation having “all-service jacket” or other paintable jacket material
5. Mechanical equipment that is indicated to have a factory-primed finish for field painting
WICA - 304936 09 90 00-6
N. Before applying finish coats, apply a prime coat, as recommended by manufacturer, to material that is required to be coated or finished and that has not been prime coated by others. Recoat primed and sealed surfaces where evidence of suction spots or unsealed areas in first coat appears to ensure a finish coat with no burn-through or other defects due to insufficient sealing.
O. Pigmented (opaque) finishes: Completely cover surfaces as necessary to provide a smooth, opaque surface of uniform finish, color, appearance, and coverage. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections will not be acceptable.
P. Match approved samples for color, texture, and coverage. Remove, finish, or recoat work not complying with requirements.
3.4 FIELD QUALITY CONTROL
A. The Government reserves the right to invoke the following test procedure at any time and as often as the Government deems necessary during the period when paint is being applied:
1. The Government may engage a qualified independent testing agency to sample paint material being used. Samples of material delivered to Project will be taken, identified, sealed, and certified in the presence of Contractor.
2. The Government may direct Contractor to stop painting if test results show material being used does not comply with specified requirements. Contractor shall remove noncomplying paint from Project site, pay for testing, and repaint surfaces previously coated with the noncomplying paint. If necessary, Contractor may be required to remove noncomplying paint from previously painted surfaces if, on repainting with specified paint, the two coatings are incompatible.
3.5 CLEANING
A. At the end of each workday, remove empty trash cans, rags, rubbish, and other discarded paint materials from Project site.
B. After completing painting, clean glass and coating-spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging adjacent finished surfaces.
3.6 PROTECTION
A. Protect work of other trades, whether being painted or not, against damage from coating work. Correct damage by cleaning, repairing or replacing, and recoating, as approved by the Government.
B. Provide “Wet Paint” signs to protect newly painted finishes. After completing painting operations, remove temporary protective wrappings provided by others to protect their work.
C. After work of other trades is complete, touch up and restore damaged or defaced painted surfaces.
3.7 COATING SCHEDULE
A. See list of approved manufacturers of paint products earlier in this section. The paint materials listed below are given as a means of establishing the standard for the required coat materials.
B. Where manufacturer’s names are mentioned herein, an equivalent product by another manufacturer may be submitted for approval. Manufacturers and products specified are not intended to limit the selection of equal products from other manufacturers.
INTERIOR WORK
FERROUS METAL AND ALUMINUM ITEMS (I.E., METAL DOORS, METAL DOOR AND WINDOW FRAMES, SHOP-PRIMED STEEL, ETC., EXCEPT AS NOTED BELOW)
1 coat S-W Kem Bond HS Universal Metal Primer, B50 Series (4 mils wet, 1.2 mils dry)
WICA - 304936 09 90 00-7
2 coats S-W All Surface Enamel Alkyd Eg-Shel, A11 Series (4 mils wet, 1.6 mils dry per coat)
EXPOSED SURFACES OF STEEL ROOF STRUCTURE, DECKING, DUCTWORK, CONDUITS, JUNCTION
BOXES, CABLE TRAY, PIPING, ETC.
1 coat 2-3.5 dry mils Tnemec Series 115 Uni-Bond DF Or 2 coats 2-4 dry mils S-W Waterborne Acrylic Dry Fall, Eg Shel, B42W2
EXISTING GWB AND PLASTER WALLS
2 coats S-W ProMar 200 Zero VOC Eg-Shel Interior Latex B20-2600 Series (4 mils wet, 1.5 mils dry)
EXISTING GWB AND PLASTER CEILINGS AND SOFFITS
2 coats S-W ProMar 200 Zero VOC Flat Interior Latex B20-2600 Series (4 mils wet, 1.5 mils dry per coat)
PREVIOUSLY-PAINTED CMU OR CONCRETE OR CLAY BLOCKS
2 coats S-W ProMar 200 Zero VOC Latex Interior Eg-Shel B20W-2600 Series (4 mils wet, 1.7 mils dry)
CONCRETE FLOORS; PREVIOUSLY PAINTED
Surface Preparation: Per 3.2 PREPARATION and 3.3 APPLICATION sections above and manufacturer’s instructions 1 coat 3-4 mils dry Tnemec Series 287 Enviro-Tread 1 coat 2.5-3.5 mils dry Tnemec Series 297 Enviro-Glaze Or 1 coat 2 mils dry S-W ArmorSeal FloorPlex 7100 Series 1 coat 4 mils dry S-W Acrolon 100 WB Urethane B65W721 Series
CONCRETE FLOOR STRIPING; PREVIOUSLY PAINTED
Surface Preparation: Per 3.2 PREPARATION and 3.3 APPLICATION sections above and manufacturer’s instructions 1 coat 20-35 mils dry Tnemec Series 280 Tnemec Glaze Color: Safety Yellow 1 coat 2-3 mils dry Tnemec Series 295 CRU Clear
PAINT AND STAIN LOCATION SCHEDULE
See Section 09 06 90, Color Schedule.
WICA - 304936 09 90 00-7
2 coats S-W All Surface Enamel Alkyd Eg-Shel, A11 Series (4 mils wet, 1.6 mils dry per coat)
EXPOSED SURFACES OF STEEL ROOF STRUCTURE, DECKING, DUCTWORK, CONDUITS, JUNCTION
BOXES, CABLE TRAY, PIPING, ETC.
1 coat 2-3.5 dry mils Tnemec Series 115 Uni-Bond DF Or 2 coats 2-4 dry mils S-W Waterborne Acrylic Dry Fall, Eg Shel, B42W2
EXISTING GWB AND PLASTER WALLS
2 coats S-W ProMar 200 Zero VOC Eg-Shel Interior Latex B20-2600 Series (4 mils wet, 1.5 mils dry)
EXISTING GWB AND PLASTER CEILINGS AND SOFFITS
2 coats S-W ProMar 200 Zero VOC Flat Interior Latex B20-2600 Series (4 mils wet, 1.5 mils dry per coat)
PREVIOUSLY-PAINTED CMU OR CONCRETE OR CLAY BLOCKS
2 coats S-W ProMar 200 Zero VOC Latex Interior Eg-Shel B20W-2600 Series (4 mils wet, 1.7 mils dry)
CONCRETE FLOORS; PREVIOUSLY PAINTED
Surface Preparation: Per 3.2 PREPARATION and 3.3 APPLICATION sections above and manufacturer’s instructions 1 coat 3-4 mils dry Tnemec Series 287 Enviro-Tread 1 coat 2.5-3.5 mils dry Tnemec Series 297 Enviro-Glaze Or 1 coat 2 mils dry S-W ArmorSeal FloorPlex 7100 Series 1 coat 4 mils dry S-W Acrolon 100 WB Urethane B65W721 Series
CONCRETE FLOOR STRIPING; PREVIOUSLY PAINTED
Surface Preparation: Per 3.2 PREPARATION and 3.3 APPLICATION sections above and manufacturer’s instructions 1 coat 20-35 mils dry Tnemec Series 280 Tnemec Glaze Color: Safety Yellow 1 coat 2-3 mils dry Tnemec Series 295 CRU Clear
PAINT AND STAIN LOCATION SCHEDULE
See Section 09 06 90, Color Schedule.
WICA – 304936 14 21 00 - 1
SECTION 14 21 00
DIVISION 14 ELECTRIC TRACTION PASSENGER ELEVATORS
PART 1 GENERAL
1.1 GENERAL NOTES
A. General Provisions of Contract, including general and supplementary conditions and Division l Specification sections, apply to work of this section.
B. Provide all labor, materials, services, and equipment necessary to complete the renovation of the elevators as specified herein.
C. Drawings and specifications are intended to show general arrangement, design and extent of work. As such they are not intended to be scaled for roughed in measurements or to serve as shop drawings.
D. Anything shown on drawings and not mentioned in these specifications or vice versa, as well as any work which is obviously necessary to complete the Project, within the limits established by the drawings, specifications and codes, although not shown on or described therein, shall be performed by the Contractor as part of his work.
1.2 DESCRIPTION OF WORK
A. Extent of work in this section is to renovate two (2) electric traction passenger elevator nos. 1- 2 in the Wind Cave National Park, Hot Springs, South Dakota, as noted in the elevator schedule. The schedule indicates elevators to be renovated, required performance, control, capacities, features, and finishes for the group of elevators.
B. Electric traction elevators are hereby defined to include elevators in which cars are hoisted by ropes over power driven traction sheaves, complete with components, equipment, machines, controls, and devices as indicated and as required for safely operating elevators at rated speed and capacity.
C. The elevators shall be renovated per the schedule as indicated in Division 1.
1.3 EQUIPMENT SUMMARY
Renovate Two (2) electric gearless passenger elevator nos. 1 & 2.
Capacity Retain 2,500 lbs.
Speed Retain 700 fpm.
Drive Provide new AC electronic motor drives. Drives shall be non-regenerative.
Operation Two (2) car group operation with computerized microprocessor logic control with additional features including:
1. Fireman’s Emergency Service.
2. Independent Service.
WICA – 304936 14 21 00 - 2
3. Auxiliary Power and Pre-Transfer Operation.
4. Hoistway Access Operation – Levels ★UL
& LL.
5. Security Card Reader, keypad, and key-switch Operation in hall.
6. Swing Car Operation with an Inconspicuous Riser.
Machines Replace existing gearless drive machine assemblies with new AC gearless drive machine assemblies with 1:1 roping, double wrap traction design. Provide new double-wrap deflector sheave mounted below machine beams. New drive machine assemblies to be provided with both main and auxiliary brake for unintended movement protection. Provide complete guarding of ropes and sheaves in machine room.
The guarding shall allow visual inspection without removal.
Governor Assemblies Provide new governor, rope, and tensioning sheave for each elevator.
Approximate Travel Retain 206′.
Approximate Inside Car Dimensions Retain existing:
Elevator No. 1 - 5′ 7″ wide x 4′ 6″ deep.
Elevator No. 2 - 5′ 2″ wide x 4′ 6″ deep.
Number of Stops & Openings Retain three (3) stops & openings at floors ★UL, ML & LL.
Entrance Size Retain existing 3′-6″ wide by 7′-0″ high.
Type of Car Entrance Retain existing side-opening, two-speed.
Hoistway Entrances Retain existing hoistway entrances and refurbish per entrance as specified.
Door Operation Provide new heavy-duty, closed loop, water resistant door operators, including clutches and mechanical door restrictors.
Door Protection Provide new, full infrared, screen detectors.
Guide Rails Retain existing steel tee guide rails and bracketry for the cars and counterweights.
Car Structures Retain existing car structures. Provide new spring-loaded, adjustable roller guide assemblies. Provide new, gradual wedge safeties with a NEMA 4X electrical switch.
Provide NEMA 4X top of car operating device.
Provide new stainless steel platform guards and top of car handrails.
WICA – 304936 14 21 00 - 3
Counterweight Structures Retain counterweight structures. Provide new spring-loaded roller assemblies for the counterweights. Add/delete weights for proper counterbalance. Retain compensating rope systems.
Buffers Provide new oil buffers rated for the speed and capacity indicated.
Car Enclosures Provide complete new, stainless-steel shells.
Provide car enclosures with interior finishes as specified.
Signal Fixtures
Car Control Stations Provide new NEMA 4X car control station panels with required buttons and switches. Each panel to have integral speakerphone, emergency light, and FES phase II panel.
Car Position Indicators Provide new NEMA 4X digital car position indicator with voice annunciation above each cab entrance.
Car Riding Lanterns Provide one (1) new NEMA 4X car riding lantern on the return jamb of each cab.
Hall Buttons Provide one (1) main riser of new NEMA 4X flush mounted hall stations in the lobby wall at all floors. Provide engraved fire evacuation pictograph and text on all faceplates. Provide an additional NEMA 4X inconspicuous riser adjacent to the main riser.
Hall Position Indicators Provide new hall NEMA 4X hall dial position indicators at each entrance.
Hoistway Access Switches Provide new, separate NEMA 4X hoistway access key switches at the terminal landing of each elevator.
Two-Way Communication Device Provide master station phone device in the elevator machine room that, in conjunction with the cab telephone device, will meet the requirements of Elevator Code.
New Installation Service & Warranty Provide new installations service on both Elevator Nos. 1 & 2 for a period of 12 months after completion of the elevator work on both elevators in the project. Provide warranty from completion of the elevator work on the first elevator through a period of 12 months after completion of the elevator work on both elevators in the project.
WICA – 304936 14 21 00 - 4
1.4 QUALITY ASSURANCE
A. Installer Qualification: The elevator manufacturer, or a licensee of the manufacturer, who has a record of successful experience with the installation of similar elevators. The contractors shall have, as a minimum, the following qualifications and documentation verifying these qualifications shall be submitted prior to award:
1. Minimum of five (5) years successful experience in installing and servicing similar elevator installations.
2. Installed at least ten (10) completed and accepted elevator systems of similar size, scope, logic control, and motion control required by this contract.
3. An existing in house administrative and technical organization staffed with competent personnel who are experienced in the elevator related work required to install and service the elevator systems as specified.
B. Elevator Code: Except for more stringent requirements as indicated or imposed by governing regulations (which must be complied with), comply with applicable alteration requirements of the 2019 ASME A17.1 Safety Code for Elevators and Escalators (hereinafter referred to as the “Elevator Code”) and the 2021 IBC Code.
C. NFPA Code: Comply with applicable NFPA Codes and specifically with sections relating to electrical work and elevators.
D. Fire Resistance of Entrances: When provided new, comply with NFPA No. 80 and provide units bearing appropriate UL labels. All hoistways are 2-hour fire rated construction.
E. Accessibility Standards: Comply with the 2017 ANSI A117.1 Accessible and Usable Buildings and Facilities. Comply with the 2010 ADA Standards for Accessible Design dated September 15, 2010.
F. Performance Requirements: Provide elevators which meet the following performance requirements:
1. Speed - +/- 2% of contract speed under any loading condition.
2. Capacity - Safely lower, stop, and hold up to 125% of rated load.
3. Stopping Accuracy – ¼ inch under any loading condition.
4. Door Close Time – 4.0 seconds.
5. Door Open Time – 3.0 seconds.
6. Door Open Dwell Time - 3.0 seconds car call dwell time. 7.0 seconds hall call dwell time.
Dwell time shall be eliminated upon initiation of any car floor button.
7. Nudging - 120 seconds.
8. Smooth acceleration and deceleration for comfort of ride.
1.5 SUBMITTALS
A. Refer to Division 1 for additional information regarding submittals, including submittal requirements, processing procedures, and limitations of review.
B. Pre-Construction Submittals: The following shall be submitted for review prior to manufacturing of equipment.
1. Product Data: Submit manufacturer's technical product data and instructions for each principal component or product. List and describe features of control system, performances, and operating characteristics. Submit brochures of all signal and operational fixtures, control and drive equipment, hoistway door equipment, door operator, and door protective device.
WICA – 304936 14 21 00 - 5
2. Shop Drawings: Shop drawings shall be prepared by skilled draftsmen and presented in a clear and thorough manner as follows:
a. Job-specific Elevator Layout Drawings: Drawings shall include dimensional layout drawings for the elevator, showing plans, elevations, sections, and large-scale details of hoistway and machine room indicating service at each landing, coordination with building structure, and relationships with other construction including, but not limited to, electrical and HVAC equipment. Indicate maximum dynamic and static loads imposed on building structure at points of support per the ASME A17.1 Safety Code for Elevators and Escalators. Indicate capacities, speeds, sizes, performances, operations, safety features, controls, finishes, and similar information on the layout drawings.
b. Fixture Drawings: Submit job-specific, straight line dimensional drawings of all signal and operational fixtures.
c. Car Enclosure: Submit job-specific plans, elevations, and details of car finishes.
d. Approval of shop drawings is for general arrangement only and does not include measurement, which is the contractor's responsibility, or approval of variations from the contract documents. The purpose of the shop drawing submittals by the contractor is to demonstrate to the owner the contractor understands the design concept and demonstrates an understanding of the equipment and materials to be furnished.
3.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .