Iraq_Solicitation_SPE605-18-R-0217.pdf

PDF 851 KB Posted

Attached to
JP8 AVIATION FUEL FOR IRAQ
Solicitation number
SPE605-18-R-0217
Issued by

About this file

IRAQ SOLICITATION SPE605-18-R-0217

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPE605-18-R-0217

COMBINED SYNOPSIS/SOLICITATION

ISSUED MAY 8, 2018

Part: U.S. Government Procurements

Subpart: Supplies, Equipment, and Materials

Class Code: 91 – Fuels, Lubricants, Oils and Waxes

Address of Contracting Office: Defense Logistics Agency, 8725 John J. Kingman Road, Suite 4950, Ft. Belvoir, Virginia 22060-6222, United States of America

Subject: Aviation Turbine Fuel (JP8) to KI (KIRKUK) and TAA AL QAIM, IRAQ

Solicitation Number: SPE605-18-R-0217

Reponses Due: May 16, 2018 1:00 PM local Ft. Belvoir time.

Points of Contact: Shelly Brayboy, Phone number: 571-767-9524, E-mail: Shelly.Brayboy@dla.mil;

Contracting Officer Point of Contact: Pamela Barber, Phone: 571-767-8481, E -mail:

Pamela.Barber@dla.mil.

Web Address: http://www.energy.dla.mil mailto:Shelly.Brayboy@dla.mil mailto:Pamela.Barber@dla.mil http://www.energy.dla.mil/

SP605-18-R-0217

TABLE OF CONTENTS

SECTION B – SUPPLIES/SERVICES AND PRICES/COSTS

B-0001 B1.05 SUPPLIES TO BE FURNISHED (OVERSEAS PC&S) (ALASKA/HAWAII) (DLA

ENERGY JAN 2012)

SECTION C – DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT

C-0001 C16.64-1 TURBINE FUEL, AVIATION (JP8) (INLAND EAST GULF/OFFSHORE)

(ROCKY MOUNTAIN /WEST) (WESTPAC) (ATL/EUR/MED) (PC&S) (DLA ENERGY JAN 2016). 10

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-2 -- INSPECTION OF SUPPLIES -- FIXED-PRICE (AUG 1996)

DFARS 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

DLAD 52.246-9029 INSPECTION AND ACCEPTANCE POINTS (APR 2010)

DLAD 52.246-9081 Certificate of Conformance (DLA Energy) (NOV 2011)

E-0001 E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY SEP 2013)

E-0002 ENERGY QAP E21.01 (JUN 2015) POINT OF INSPECTION

E-0003 E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY

JUL 2013) 19

E-0004 E22.01 QUALITY REPRESENTATIVE (DLA ENERGY JUL 1992)

E-0005 E33.07 MANUFACTURING AND FILLING POINTS (DLA ENERGY MAR 2006)

E-0006 E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

E-0007 E37 SOURCE RESTRICTION AND SOURCE INSPECTION (PC&S) (DLA ENERGY DEC

2011) 23

E-0008 E40.01 MATERIAL INSPECTION AND RECEIVING REPORT (MIRR)/WIDE AREA

WORKFLOW (WAWF) ENERGY RECEIVING REPORT (ERR) (BULK FUEL/DIRECT DELIVERY

AVIATION FUEL) (DLA ENERGY JUL 2014)

SECTION F – DELIVERIES AND PERFORMANCE

FAR 52.211-16 – VARIATION IN QUANTITY (APR 1984)

FAR 52.247-34 -- F.O.B. – DESTINATION (NOV 1991)

F-0001 F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND

TRAILERS, AND TANK WAGONS (DLA ENERGY JAN 2012)

F-0002 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

F-0003 F1.09-8 DETERMINATION OF INVOICE QUANTITY (PC&S) (MIDDLE EAST) (DLA

ENERGY SEP 2005)

F-0004 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY) (APR 2014) ... 29

F-0005 F3 TRANSPORT TRUCK AND/OR TRUCK AND TRAILER FREE TIME AND

DETENTION RATES (PC&S) (DLA ENERGY AUG 2005)

F-0006 F3.03 NOTIFICATION OF CHANGE IN TRANSPORTATION COMPANY (PC&S) (DLA

ENERGY APR 2005)

F-0007 F4 DELIVERY AND ORDERING PERIODS (DLA ENERGY JUN 2002)

F-0008 F30.01 ORDERING AND PAYING OFFICERS (OVERSEAS PC&S) (DLA ENERGY APR

1998) 32

F-0009 F51 SHIPMENT AND ROUTING (OVERSEAS) (DLA ENERGY NOV 2005)

SECTION G - CONTRACT ADMINISTRATION DATA

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

G-0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

G-0002 G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE

WIRE TRANSFER SYSTEM (DLA ENERGY JAN 2012)

SECTION I – CONTRACT CLAUSES

FAR 52.204-13 – SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)

FAR 52.204-18 - COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL

2016)

FAR 52.204-21 – BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (JUN 2016)

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS

(DOMESTIC/OVERSEAS/IRAQ PC&S) (PORTS INTERNET APPLICATION) (TAILORED) (DLA

ENERGY) (JUL 2013)

FAR 52.212-5 -- CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS -- COMMERCIAL ITEMS (JAN 2017)

FAR 52.216-18 – ORDERING (OCT 1995)

FAR 52.216-21 – REQUIREMENTS (OCT 1995)

FAR 52.217-8 - OPTION TO EXTEND SERVICES (NOV 1999)

FAR 52.222-56 – CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE

PLAN (MAR 2015)

FAR 52.229-6 -- TAXES -- FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)

FAR 52.232-17 – INTEREST (MAY 2014)

FAR 52.233-3 -- PROTEST AFTER AWARD (AUG 1996)

DFARS 252.204-7012 - SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER

INCIDENT REPORTING (OCT 2016)

DFARS 252.204-7015 - NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR

LITIGATION SUPPORT (MAY 2016)

DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED

BY THE GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT

2015)

DFARS 252.216-7006 - ORDERING (MAY 2011)

DFARS 252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE

CONTRACTORS OUTSIDE THE UNITED STATES (JUN 2015)

DFARS 252.225-7993 PROHIBITION ON PROVIDING FUNDS TO THE ENEMY (DEVIATION

2015-O0016) (SEP 2015)

DFARS 252.225-7994 ADDITIONAL ACCESS TO CONTRACTOR AND SUBCONTRACTOR

RECORDS IN THE UNITED STATES CENTRAL COMMAND THEATER OF OPERATIONS

(DEVIATION 2015-O0013)(MAR 2015)

DFARS 252.225-7995 CONTRACTOR PERSONNEL PERFORMING IN THE UNITED STATES

CENTRAL COMMAND AREA OF RESPONSIBILITY. (DEVIATION 2015-O0009) (JAN 2015)

C-JTSCC 5152.225-5907 MEDICAL SCREENING AND VACCINATION REQUIREMENTS FOR

CONTRACTOR EMPLOYEES OPERATING IN THE CENTCOM AREA OF RESPONSIBILITY

(AOR) (JUN 2015)

DFARS 252.232-7003 - ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING

REPORTS (JUN 2012)

DFARS 252.232-7010 - LEVIES ON CONTRACT PAYMENTS (DEC 2006)

DFARS 252.232-7011 - PAYMENTS IN SUPPORT OF EMERGENCIES AND CONTINGENCY

OPERATIONS (MAY 2013)

DFARS 252.233-7001 CHOICE OF LAW (OVERSEAS) (JUN 1997)

I-0001 I1.01 DEFINITIONS (DLA ENERGY JUN 2009)

I-0002 I1.20-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (DLA ENERGY

JAN 2012)

I-0003 .......... I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL

ITEMS (DLA ENERGY FEB 1996)

I-0004 I186 PROTECTION OF GOVERNMENT PROPERTY AND SPILL PREVENTION (DLA

ENERGY FEB 2009)

I-0005 I190.06 MATERIAL SAFETY DATA SHEETS -- COMMERCIAL ITEMS (DLA ENERGY

APR 2006)

I-0006 I385 NOTIFICATION OF CONTRACTING OFFICER IN THE EVENT OF DISCOVERY OF

EVIDENCE OF FRAUD UNDER THE CONTRACT (DLA ENERGY JUL 2008)

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

OR RESPONDENTS

DFARS 252.225-7020 TRADE AGREEMENTS CERTIFICATE (NOV 2014)

K-0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)

SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS 100

FAR 52.204-7 -- SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (PC&S) (TAILORED)

(DLA ENERGY) (JUL 2013)

FAR 52.214-34 -- SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

FAR 52.216-1 -- TYPE OF CONTRACT (APR 1984)

FAR 52.232-38 -- SUBMISSION OF ELECTRONIC FUNDS TRANSFER INFORMATION WITH

OFFER (JUL 2013)

DLAD 52.233-9000 AGENCY PROTESTS (NOV 2011)

DLAD 52.233-9001 DISPUTES AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION

(ADR) (NOV 2011)

L-0001 L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)

L-0002 L54 SITE VISIT (DLA ENERGY OCT 1992)

L-0003 L117 NOTIFICATION OF TRANSPORTATION COMPANY TO BE UTILIZED IN THE

DELIVERY OF PRODUCT (PC&S) (DLA ENERGY JAN 2012)

SECTION M – EVALUATION FACTORS FOR AWARD

FAR 52.212-2 -- EVALUATION -- COMMERCIAL ITEMS (Oct 2014)

M-0001 M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR

1997) ………………………………………………………………………………………………..111

ATTACHMENTS:

ATTACHMENT 1-ADDITIONAL SPECIAL NOTES

ATTACHMENT 2-LETTER OF COMMITMENT INSTRUCTIONS

SECTION B – SUPPLIES/SERVICES AND PRICES/COSTS

B-0001 B1.05 SUPPLIES TO BE FURNISHED (OVERSEAS PC&S) (ALASKA/HAWAII) (DLA ENERGY

JAN 2012)

(a) The supplies to be furnished during the period specified in the REQUIREMENTS clause, the delivery points, methods of delivery, and estimated quantities are shown below. The quantities shown are best estimates of required quantities only. The total quantity ordered and required to be delivered may be greater than or less than such quantities. The Government agrees to order from the Contractor and the Contractor shall, if ordered, deliver during the contract period all items awarded under this contract. The prices paid shall be the unit prices specified in subsequent price change modifications issued in accordance with the ECONOMIC PRICE ADJUSTMENT contract provision.

(b) In an emergency, oral orders may be issued and must be confirmed in writing by a Standard Form 1449 or DD Form 1155 within 24 hours.

(c) Offers shall not be submitted for quantities less than the estimated quantities specified below for each line item. Offers submitted for less than the estimated quantities will not be considered for award, except for items specifically designated as N/A-year requirements.

****If quoting on ITEMS 0001 and 0002. All two must be quoted.

SUPPLIES DELIVERY POINTS ESTIMATED OFFER

ITEMS AND METHOD OF DELIVERY QUANTITY (USG) PRICE ($/USG)

0001 Turbine Fuel, Aviation (JP8) 336,000 $___________ /USG

NSN: 9130-01-031-5816

Delivery Location: Kirkuk, Iraq Mode: Tank Truck w/pump and meter Storage capacity:

(1) 10,000 Above ground

(2) 1,920 Above ground

(1) 5,000 M969 Tanker Delivery Mode Notes: Tank Truck Delivery Hours: 24 HOURS DAILY MONDAY THRU SUNDAY Delivery Notes: POC 1LT Daniel Schoen cell 07502121035 daniel.s.schoen.mil@mail.mil POC William Bury william.p.bury.mil@mail.mil Delivery Ticket Notes: yes No partials offeror must quote entire quantity

0002 Turbine Fuel, Aviation (JP8) 420,000 $__________/USG

NSN: 9130-01-031-5816

Delivery Location: Taa Al Qaim, Iraq Period of Performance: 4/18/2018 to 6/30/2018 Method of Delivery: Tank Truck-TT with pump and meter.

Delivery Hours: 1100 TO 1200 Hours Storage capacity: (3) 2400 Above Ground Tank(s)

(2) 4800 Above Ground Tank(s)

(1) 750 Above Ground Tank(s) Additional Delivery Notes: POC: 1SG Joshua Ward Phone: 708 575 2490 SVOIP E-mail: joshua.w.ward.mil@mail.mil

By signing below, offeror agrees to all terms and conditions of this solicitation.

NAME OF SIGNATORY (TYPE OR PRINT):________________________________________________________________ mailto:joshua.w.ward.mil@mail.mil

OFFEROR SIGNATURE: __________________________________________ DATE: ______________________________

SPECIAL NOTES:

1. All products being procured under this solicitation must be sourced from a minimum of two refineries, one of which must be in Iraq. Multiple refinery sources avert any performance delays as a result of geopolitical shifts, political uprisings, poor weather and road conditions, refinery constraints or any other contingency that would prevent delivery from the primary source of supply.

2. Iraq is a volatile country and there are several routes that are not secure. Security of the ground lock to delivery locations is not guaranteed and is the responsibility of the vendor. If awarded a contract, contractor(s) must submit movement requests through the Prime Minister National Operations Center (PMNOC) and Iraqi Oil Police for approval to travel.

3. Close coordination with site personnel and DLA Energy Middle East Office is required prior to each delivery. Contractor shall have all necessary equipment to facilitate downloading fuel into storage apparatus for each line item.

4. Contractor shall provide the tank batch certificate of quality (COQs) represented for all fuel deliveries under the resultant contract/order to the DLA Energy Middle East Office at DESC-ME.quality.dla.mil for approval prior to any deliveries. In addition, provide certificate of quality (COQs) to the customer at the time of delivery. A DD250 is to be used as the bill of lading to which the following be included for all products: temperature, density, corrected density and corrected quantities (if required) on all shipment documents.

5. Line item numbers 0001-0002 are placeholders and may change upon award.

6. Offerors submitting electronic responses to this solicitation must limit email size to 10MB for a single email. Emails over 10MB may not be delivered because of server restriction on mail size for delivery.

7. Offerors note: The U.S. Government is tax exempt. DO NOT include any taxes in offered prices for which the U.S. is tax exempt.

8. Any violation of the Iran Sanctions Act is strictly forbidden. Contractor shall not source nor blend any portion of the fuel destined for DLA Energy with refined fuel products sourced from Iran. In accordance with FAR 52.212-3 -- OFFEROR REPRESENTATIONS AND CERTIFICATIONS -- COMMERCIAL ITEMS (MAR 2016), by submission of its offer, the offeror certifies that the offeror, or any person owned or controlled by the offeror, does not engage in any activities for which sanctions may be imposed under section 5 of the Iran Sanctions Act.

9. Exceptions: Any exceptions the offeror takes to the terms and conditions of the solicitation must be submitted with the offer.

Offerors shall submit all exceptions taken in list format. Only exceptions detailed in the offer will be treated as exceptions to the terms and conditions of the solicitation. Any exceptions taken by the offeror will be considered by the Government and either accepted or rejected. Exceptions that are accepted by the Government will be incorporated into any resultant contract; exceptions that are rejected by the Government must be withdrawn by the offeror or the offer will be rejected.

10. Offerors must submit pricing in unit price/per USG format: Example: ($0.000000/USG)

B-0002 B19.02 ECONOMIC PRICE ADJUSTMENT (OVERSEAS) (DLA ENERGY JAN 2012)

(a) WARRANTIES. The Contractor warrants that--

(1) The unit prices set forth in the Schedule do not include allowances for any portion of the contingency covered by this contract provision; and

(2) The prices to be invoiced hereunder shall be computed in accordance with the provisions of this contract.

(b) DEFINITIONS. As used throughout this contract provision, the term--

(1) Award price means the unit price offered by the Contractor and set forth opposite the item in the Schedule.

(2) Reference price means the market price, this is either published in an independent publication or supplied by the Contractor, with which the award price is to fluctuate. The reference price should be a market price for the same or similar product(s) as the item being purchased.

(3) Date of delivery means--

(i) FOR TANKER OR BARGE DELIVERIES.

(A) F.O.B. ORIGIN. The date and time vessel commences loading;

(B) F.O.B. DESTINATION. The date and time vessel commences discharging;

(ii) FOR PIPELINE DELIVERIES. The date and time product commences to move past the specified f.o.b. point;

and

(iii) FOR ALL OTHER TYPES OF DELIVERIES. The date product is received.

(c) ADJUSTMENTS. The prices payable under this contract shall be the award price increased or decreased by the amount, determined according to the following formula, that the reference price shall have increased or decreased, to and including the date of delivery.

(1) The amount of increase or decrease in the award price shall be based on the same number of cents, or fraction thereof, that the reference price increases or decreases per like unit of measure.

(2) The reference price with which the award price for the listed item is to fluctuate (and which is more fully defined in the Table below) is--

[ ] (i) The low price published in _________________________________________________________.

(name of publication)

[X] (ii) The average of the prices published in ____PLATTS_OILGRAM_____________________________.

[ ] (iii) The established price posted by ______________________________________________________ and (name of company) published in _________________________________________________________

(3) COMMERCIAL. For price adjustments utilizing commercial publications such as Platts Oilgram, etc., the reference price in effect on the date of delivery shall be that item’s reference price that is in effect for the dates in the Table below. If an effective date is not cited in a publication, then the date of publication shall apply. An increase or decrease in any reference price published in a trade price service or in a commercial journal shall apply only to deliveries made on or after the effective date of such trade price service or commercial journal. In the event of a holiday for which an effective date is not used, the latest effective price(s) prior to the effective date shall be used.

NOTE: Platts issues corrections to its published prices on a regular basis. Platts posts corrections to its website (www.platts.com) for its subscribers. If a correction to a reference price is found on the Platts website, all of the items that use that reference price will be corrected. DLA Energy will correct any other reference prices, as notice of the correction is received. DLA Energy will work with the pricing services to determine the appropriate price, whenever an offeror or contractor can show that the price referenced should be reviewed.

(4) NONCOMMERCIAL (NOTIFICATION). For price adjustments utilizing a reference price indicator other than commercial publications such as Platts Oilgram, the Contractor shall notify the Contracting Officer of any changes in the reference price in writing within 15 calendar days from the date thereof.

(i) INCREASES. Any increase in unit price as a result of an increase in reference price shall apply only to deliveries made on or after the date of receipt by the Contracting Officer of a written notification from the Contractor of such increase. However, the prices payable under this contract shall in no event exceed the Contractor’s posted or established selling price in effect on the date of delivery for the product supplied in the form of delivery made at the point of delivery. Also, no notification incorporating an increase in a contract unit price shall be executed pursuant to this contract provision until the increase has been verified by the Contracting Officer.

(ii) DECREASES. If the Contractor fails to notify the Contracting Officer of any decrease in the reference price, within the allotted 15 day period, such decrease shall apply to all deliveries made on or after the effective date of such decrease. However, if any overpayment is made to the Contractor as a result of the Contractor’s failure to give timely notice to the Contracting Officer of any decrease in the established price, the Contractor shall be charged interest on such overpayment from the date of the overpayment to the date of reimbursement by the Contractor for the overpayment in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERICAL ITEMS clause of this contract.

(5) Where the reference price is the Contractor’s established price (see (c)(2)(iii) above), the Contractor warrants that the product selected is one for which, except for modification required by the specifications of this contract, the Contractor has an established price. Such price is the net price after applying any applicable standard trade discounts offered by the Contractor for its catalog, list, or schedule price. The Contractor further warrants that, as of the current date, any differences between the unit prices of the line items identified in the Schedule and the Contractor's established price for like quantities of the nearest commercial equivalents of such contract items are due to compliance with contract specifications and to compliance with any requirements that this contract may contain for preservation, packaging, and packing beyond standard commercial practice.

(d) MODIFICATIONS. Any resultant price changes shall be provided via notification through contract modifications and/or postings to the DLA Energy web page at http://www.desc.dla.mil under the heading Vendor Resources and then Product Price Adjustments.

(e) FAILURE TO DELIVER. Notwithstanding any other conditions of this contract provision, no upward adjustment shall apply to product scheduled under the contract to be delivered before the effective date of the adjustment, unless the Contractor’s failure to http://www.platts.com/ http://www.desc.dla.mil/ deliver according to the delivery schedule results from causes beyond the Contractor’s control and without its fault or negligence, within the meaning of the Excusable Delays and Termination for Cause paragraphs of the CONTRACT TERMS AND CONDITONS – COMMERCIAL ITEMS clause of the this contract in which case the contract shall be amended to make an equitable extension of the delivery schedule.

(f) UPWARD CEILING ON ECONOMIC PRICE ADJUSTMENT. The Contractor agrees that the total increase in any contract unit price pursuant to these economic price adjustment provisions shall not exceed __375____ percent of the award price, except as provided hereafter:

(1) If at any time the Contractor has reason to believe that within the near future a price adjustment under the conditions of this contract provision will be required that will exceed the current contract ceiling price for any item, the Contractor shall promptly notify the Contracting Officer in writing of the expected increase. The notification shall include a revised ceiling the Contractor believes is sufficient to permit completion of remaining contract performance, along with appropriate explanation and documentation as required by the Contracting Officer.

(2) If an actual increase in the reference price would raise a contract unit price for an item above the current ceiling, the Contractor shall have no obligation under this contract to fill pending or future orders for such item, as of the effective date of the increase, unless the Contracting Officer issues a contract modification to raise the ceiling. If the contract ceiling will not be raised, the Contracting Officer shall so promptly notify the Contractor in writing.

(g) REVISION OF REFERENCE PRICE INDICATOR. In the event—

(1) Any applicable reference price is discontinued or its method of derivation is altered substantially;

(2) The reference price is an average of published or posted prices, and any one price ceases to be published or posted;

(3) The reference price is published in a trade price service or commercial journal and such publication ceases to publish said reference price or changes its method of quoting prices; or

(4) The Contracting Officer determines that the reference price consistently and substantially failed to reflect market conditions— the parties shall mutually agree upon an appropriate and comparable substitute for determining the price adjustment described hereunder. The contract shall be modified to reflect such substitute effective on the date the indicator was discontinued, altered, or began to consistently and substantially fail to reflect market conditions. If the parties fail to agree on an appropriate substitute, the matter shall be resolved in accordance with the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS clause of this contract.

(h) CONVERSION FACTORS. If this contract provision requires quantity conversion for economic price adjustment purposes, the conversion factors for applicable products, as specified in the CONVERSION FACTORS contract provision, apply unless otherwise specified in the Schedule.

(i) EXAMINATION OF RECORDS. The Contractor agrees that the Contracting Officer or designated representatives shall have the right to examine the Contractor’s books, records, documents, or other data the Contracting Officer deems necessary to verify Contractor adherence to the provisions of this contract provision.

(j) FINAL INVOICE. The Contractor shall include a statement on the final invoice that the amounts invoiced hereunder have applied all decreases required by this contract provision.

(k) TABLE.

I II III IV V VI VII

Name of Reference Maximum company/ If company - Method of price payable under publication If publication - delivery as of this contract (identify heading under applicable 1 May 2018 (includes any Item No. by number which reference Location where to the (exclude tax included (listed from (c)(2) price is published reference price reference all in the award items) above) and name of product is applicable price taxes) price .

0001 PLATTS JP8 FOB ARAB CARGO $1.987744 See Paragraph (f) above

GULF MONTHLY

(JET KERO)

0002 PLATTS JP8 FOB ARAB CARGO $1.987744 See Paragraph (f) above

GULF MONTHLY

(JET KERO)

NOTE: PLATTS’ product prices will escalate monthly based on the average of high and low assessments contained in the Platt’s publication of each month in which deliveries are made. Therefore, the effective price for the period of the 1st through the 30th /31st will be the average of the high and low assessments for the previous month’s assessments posted on the 1st of each month. Saturdays and Sundays shall be considered as Platt’s non-publication days. If assessments are not posted by Platts during the period that delivery was made due to a holiday or another occurrence, only the posted assessments for that period will be used in the calculation.

SECTION C – DESCRIPTION/SPECIFICATIONS/PERFORMANCE WORK STATEMENT

C-0001 C16.64-1 TURBINE FUEL, AVIATION (JP8) (INLAND EAST GULF/OFFSHORE) (ROCKY

MOUNTAIN /WEST) (WESTPAC) (ATL/EUR/MED) (PC&S) (DLA ENERGY JAN 2016)

(a) Nomenclature for Aviation Turbine Fuel (JP8) is shown below:

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE

9130-01-031-5816 Turbine Fuel, Aviation JP8

(b) INCIDENTAL CONTAMINANTS. Particulate Matter and Fatty Acid Methyl Ester (FAME) content shall not exceed the limits outlined in Table III of MIL-DTL-83133J dated December 16, 2015.

2. SPECIFICATION MODIFICATIONS. Aviation Turbine Fuel (JP8) shall conform to MIL-DTL-83133J modified as follows:

(a) TESTING

• FILTRATION TIME (FT) TESTING. For filtration time testing round upwards when reporting the filtration time, in minutes. For example, a filtration time of 10 minutes, 18 seconds, would be reported as 11 minutes.

• MICROSEPAROMETER (MSEP) RATING LIMITS.

• Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit will be met for the balance of the contract. If the Contractor introduces fuel system icing inhibitor (FSII), corrosion inhibitor/lubricity improver (CI/LI), and/or static dissipater additive (SDA) after verification of product conformance with the MSEP requirement, the product is not required to meet a fixed limit on subsequent MSEP tests.

• If the Contractor elects to verify conformance with the MSEP requirement on a sample of product that does not contain FSII and CI/LI, an additional MSEP test shall be performed on a hand blend containing aviation turbine fuel, FSII, CI/LI, and antioxidant (AO; AO only if required). The FSII shall be included in this hand blend at a concentration of

0.07 to 0.10 volume percent and the amount of the CI/LI included shall be within the concentration range specified in QPL-25017. The additional MSEP result of this hand blend is a REPORT ONLY requirement, and shall be recorded corresponding to item 750X on the Standardized Report Form (see Attachment ). This result shall be recorded with an asterisk next to it, and with a footnote below, stating, “*MSEP result is a ‘Report Only’ requirement. Original result of (fill in actual result) on product containing the following additives: (fill in combination of additives).”

• WORKMANSHIP. The workmanship criteria in MIL-DTL-83133J, paragraph 3.4, is revised to read, “At the custody transfer point, the finished fuel shall be clear and bright and visually free from undissolved water and particulate matter in accordance with Standard Test Method for Free Water and Particulate Contamination in Distillate Fuels, ASTM D4176, Procedure 2, with a result of Rating 1, maximum. If the sample fails ASTM D4176 only because it contains visible particulate matter, but meets the particulate matter requirements of 1.0 mg/L maximum as stated in MIL-DTL- 83133J, Table III, the workmanship criteria is met. In case of dispute as determined by sample results taken from the custody transfer point, the fuel shall be clear and bright at 21 degrees Celsius (70 degrees Fahrenheit) and shall contain no more than

1.0 mg/L of particulate matter. The sample in dispute shall be taken into an area where the sample is permitted to slowly equilibrate to 21 degrees Celsius (70 degrees Fahrenheit).

(b) SPECIAL LOCATION REQUIREMENTS

• Rocky Mountain/West. Aviation fuel movement via the Chevron Pipeline (Utah, Idaho, or Washington state entry points) shall be limited to total sulfur content of 0.15 mass percent, maximum.

• Alaska. For fuels refined in Alaska and delivered to Alaska locations, the total Acid number shall be relaxed to 0.020 mg

KOH/g maximum.

3. ADDITIVES. Additives are required for deliveries of JP8 per MIL-DTL-83133J, unless addition is excluded by specific solicitation line item, applicable contract clause, or other contractual requirement.

(a) The CI/LI additive(s) used shall be of the type and concentration cited in QPL-25017. To locate this information: (1) Go to the

Acquisition Streamlining and Standardization Information System (ASSIST) QuickSearch website (URL http://quicksearch.dla.mil/), (2) type "QPL-25017" in the Document ID field, press the Search button, (3) click the QPL- 25017 search result under Document ID, (4) click the "View QPD Data" link under Overview , and (5) click the “MIL-PRF- 25017 http://quicksearch.dla.mil/) http://quicksearch.dla.mil/)

CATEGORY 1” link under Govt Designation. The concentration range for each additive is listed under the “Source Notes” link under the far right column of the table.

(b) Metal deactivator additive shall not be used in JP8 unless the Contractor has obtained written consent from the Contracting Officer.

(c) The requirement for static dissipater additive (SDA) (see MIL-DTL-83133J, paragraph 3.3.3 and fuel electrical conductivity Table I) shall not apply unless stated otherwise in the Schedule.

4. Line injection of additives (FSII, CI/LI and SDA) from shipping tank to delivery conveyance is permitted under the following conditions:

(a) A laboratory hand blend containing the required additives and aviation turbine fuel must be tested to verify compliance with the specification.

(b) Additives must be proportionately injected throughout the entire loading process to ensure the additive is homogeneously blended into the product. The Contractor shall maintain records evidencing the homogeneous blending of all line injected additives. Such records shall include meter or tank gauge readings or test results taken at intervals to provide confidence in the injection process.

(c) When FSII is line injected, additive concentration must be verified based on a representative sample from each shipping conveyance.

(d) When SDA is line injected, and insufficient time is available for the fuel to reach equilibrium before departure of the shipping conveyance, the Contractor is not required to report or verify the conductivity level on a representative sample from the conveyance. This does not relieve the Contractor of the requirement to inject SDA homogeneously and in sufficient quantity to obtain a conductivity level which the Contractor would anticipate to be within the specification limits once the fuel is at equilibrium. The receiving activity will measure the conductivity and advise the Contractor if it does not meet the specification requirements and the Contractor shall adjust the SDA injection quantity accordingly.

5. SPECIAL LOCATION REQUIREMENTS (AEM ONLY)

(a) For deliveries to La Spezia, Italy, the CI/LI shall be 3.5 g/m3 above the minimum effective concentration as identified in QPL-25017. See paragraph (c)(1) above.

(b) When antioxidants (AO) are added to the hydrotreated portion of the finished product, the percentage of the blend that has been hydrotreated shall be reported.

(c) The requirement for static dissipater additive (SDA) (see MIL-DTL-83133J, paragraph

3.3.3 and fuel electrical conductivity requirement in Table I) shall not apply unless stated otherwise in the Schedule.

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-2 -- INSPECTION OF SUPPLIES -- FIXED-PRICE (AUG 1996)

(a) Definition. “Supplies,” as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor’s or subcontractor’s premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e) (1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either

(1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or

(2) terminate the contract for default.

Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)

(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time --

(i) When Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract;

and

(ii) When the supplies will be ready for Government inspection.

(2) The Government’s request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor’s plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract.

Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor

(1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor’s plant at the Contracting Officer’s election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or

(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor’s plant and return to the original point when that point is not the Contractor’s plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the

Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

DFARS 252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.

(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.

DLAD 52.246-9029 INSPECTION AND ACCEPTANCE POINTS (APR 2010)

(a) Inspection and acceptance are:

Inspection point: [X] Destination [ ] Origin [ ] Elsewhere Acceptance point: [X] Destination [ ] Origin

DLAD 52.246-9081 Certificate of Conformance (DLA Energy) (NOV 2011)

(a) When authorized in writing by the cognizant contract administration office (CAO), the Contractor shall ship with a certificate of conformance any supplies for which the Contract would otherwise require inspection at source. In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the certificate of conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.

(b) The Contractor's signed certificate shall be attached to or included on the top copy of the material inspection and receiving report (Department of Defense (DD) Form 250) or other authorized document that is distributed to the payment office (Block 12 of the DD Form 250). A copy shall also be sent with the shipment and to the CAO (Block 10 of the DD Form 250); however, the CAO copy shall only be sent if specifically requested by the Contracting Officer.

(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.

(d) The certificate shall read as follows:

"I certify that on [Date], [Contractor's name] furnished the supplies or services called for by [contract number] via [carrier] on [bill of lading or other shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document."

[Date of Execution]

[Signature]

[Title]

E-0001 E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY SEP 2013)

(a) This contract provision applies to:

(1) All aviation fuel, lubricating oil, and additive shipments.

(2) All Bulk and Posts, Camps, and Stations non-aviation fuel shipments via pipeline or waterborne transport.

(b) QUALITY CONTROL PLAN.

(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control

Plan (QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.

(2) The Contractor shall require subcontractors to provide and maintain inspection systems adhere to all the requirements in this contract provision.

(3) The QCP shall include the identification of key operational positions, a schematic diagram of plant facilities pertinent to the inspection system, indicating all inspection points, and a description of the following operations related to the supplies or services to be furnished under the contract:

(i) RECEIVING, BLENDING AND COMPOUNDING. Procedures used to ensure the quality of additives blended into product supplied under this contract. Procedures to identify and ensure the quality of component base stocks used to produce finished product. Procedures to be used for adding, prior to batching, all required additives at all locations. When procedures for in-line blending of non-aviation products in accordance with the IN-LINE BLENDING OF NON-AVIATION PETROLEUM PRODUCTS contract provision are used, the QCP will provide for establishing blend ratios, and identify the responsible personnel within the Contractor's organization authorized to establish the blend ratios. When line injection of additives is required by the contract, the QCP will provide procedures for proportionately injecting additives throughout the entire loading process to ensure the additive is homogeneously blended into the product, as well as procedures for maintaining records evidencing the homogeneous blending of all line injected additives. In addition to the testing in (iii) below, a laboratory hand blend of jet fuel with all additives required by the contract shall be tested, prior to shipment, to verify compliance with the specification;

(ii) SAMPLING. Procedures for sampling additives, blend tanks, shipping tanks, lines, and conveyances/containers in accordance with API Manual of Petroleum Measurement Standards (MPMS), Chapter 8, Section 1, (ASTM D 4057) Manual Sampling of Petroleum and Petroleum Products, and/or Section 2, (ASTM D 4177) Automatic Sampling of Liquid Petroleum and Petroleum Products.

Procedures include sample location, frequency, quantity, and retention. For all tanker, barge, and pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable provided that they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table II of this contract provision. See Table I, Minimum Sampling and Testing Requirements, and Table II, Sample Retention;

(iii) TESTING. Types of test series and individual test methods/procedures to be performed on samples taken from each location identified in (ii) above. See Table I, Minimum Sampling and Testing Requirements, and Table III, Definitions of Test Series;

(iv) CALIBRATION. Program for testing and measuring equipment in accordance with ISO 10012, Measurement Management Systems – Requirements for Measurement Processes and Measuring Equipment, or equivalent local regulation, as appropriate;

and, a program for meters used to determine quantity complying with the API MPMS, Chapters 4, 5, and 6, or equivalent foreign standard.

For items not covered by API, ASTM, or IP publications, the applicable manufacturer's recommended calibration method(s), outlined in the applicable industry publication, shall be used if acceptable to the Government;

(v) STORAGE AND HANDLING. Procedures for quality/quantity determination. Includes a description of storage and handling equipment, such as tanks, lines, valves, and manifolds; identification of dedicated/common product systems, including description of line segregation and controls to assure capability for proper gauging, sampling, draining of water, filtration, circulation, and drying; and identification of any other process/system used in maintaining product integrity during storage and handling;

(vi) LOADING AND SHIPPING – GENERAL. Procedures for product movement and related quality/quantity checks from shipping tank(s) to custody transfer point (CTP). Description of transfer system from shipping tank to CTP. A dedicated system, including lines, pumps, loading arms, and hoses, is preferred, but an isolated common system incorporating blind flanges, spectacle plates, or double valves between systems is acceptable. An isolated common system using single valves designed to ensure positive isolation, such as twin seal single valves, are also acceptable. Systems with single valve (other than twin seal) isolation require specific procedures be included in the QCP to ensure product integrity prior to the CTP. When single valves (other than twin seal) are present in the system, the Contractor shall provide their quality control procedures, from the first single valve to the CTP, at time of bid to the Contracting Officer for a determination of acceptability. Procedures for conditioning and testing of isolated systems that last carried a product other than that intended for movement under this contract. For in-line blending of non-aviation products, where approved in this contract, requirements must comply with the IN-LINE BLENDING OF NONAVIATION PETROLEUM PRODUCTS contract provision;

(vii) LOADING AND SHIPPING – TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS. For direct deliveries using Contractor-supplied tank cars and tank trucks in dedicated same grade aviation fuel service, refer to the section of API 1595 entitled “Loading of Road/Rail Cars” for loading and shipping procedures. All other tank car, tank truck, and intermodal container loadings shall be in accordance with the following procedures: Confirm all compartments have been prepared in accordance with Table IV, Conversion Chart for Tank Cars, Tank Trucks, and Intermodal Containers, below. Whenever possible, ensure the same preparation procedures used for compartments are applied to hoses, manifolds, etc. Ensure that conveyances carrying lubricating oil are dry and free from loose rust, scale, and dirt. Provide for investigation of discrepancies in either recorded quality or quantity. When required by the contract, seal conveyance and record seal numbers on the shipping document.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.