SPE600-14-R-0410_Amendment_0007.pdf

PDF 751 KB Posted

Attached to
PJM Large 2014 - SPE600-14-R-0410
Solicitation number
SPE600-14-R-0410
Issued by

About this file

Amendment P0007 The following documents have been revised and are embedded as attachments within the Amendment document. All changes are highlighted in yellow -Solicitation -Installation Data Sheet -Attachment III Argonne Pricing Sheet

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE600 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60014R0410

X

2014 JUL 25

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

8725 JOHN J KINGMAN RD STE 4950

FT BELVOIR VA 22060-6222

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

(X)

CHECK ONE

PAGE OF PAGES

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

The Government intends to re-price the following Line Items tomorrow, November 18, 2015 at 12:00 PM EST:

See Attached Continuation Sheet(s)

12/10/2014

SPE600-14-R-0410 Amendment 0007 PJM Large 2014 Page 2 of 2

Solicitation

1. The Standard Form 1449 is hereby amended to reduce the total estimated quantity by 306,079,286 kWh from 3,772,230,137 kWh to 3,466,150,851 kWh.

2. Clause B1.08 – Supplies to Be Furnished, Paragraph (c) has been amended to update the Total Delivery Period Quantity of Line Item 0006 – Argonne National Laboratory to reflect a change in delivery period from 24 months to 12 months.

3. Clause B1.08 – Supplies to Be Furnished, Paragraph (d) has been amended to revise the delivery period for Line Item 0006 – Argonne National Laboratory from 24 to 12 months, from the meter read date occurring in January 2015 to the meter read date occurring in January 2016.

Attachment III – Argonne Pricing Sheet

4. Attachment III has been revised to reflect the change in delivery period for Line Item 0006 – Argonne National Laboratory from 24 to 12 months.

Installation Data Sheet

5. The Installation Data Sheet has been amended to reflect the change in delivery period for Line Item 0006 – Argonne National Laboratory from 24 to 12 months.

Summary

Amendment 0007

LINE ITEM INSTALLATION 12 MONTH CONSUMPTION (kWh) Delivery Period (Months) Total Delivery Period Quantity (kWh) NUMBER OF ACCOUNTS NOTES

0001 Marine Barracks 10,493,731 24 20,987,462 3 Account 0251083010 on peak kWh data revised under Amendment 0004.

0002 Building 6000, JB Anacostia - Bolling 62,286,510 24 124,573,020 1

0003 JB Myer-Henderson Hall (Myer) 39,200,000 24 78,400,000 1 Account is located in Virginia (Dominion)

0004 JB Myer-Henderson Hall (McNair) 24,099,944 24 48,199,888 3

0005 Walter Reed Army Medical Center 19,120,567 6 9,560,284 1 6 Month Delivery Period (Dec '14 - Jun '15)

0006 Argonne National Laboratory 306,079,286 12 306,079,286 1 12 Month Delivery Period (Jan '15 - Jan '17)

0007 DC Naval Research Laboratory 120,798,394 24 241,596,788 1

0008 US Army Corps of Engineers 149,653,344 24 299,306,688 17 12 Month consumption on summary page revised to properly reflect account usage. No change to account level data.

0009 National Agricultural Library 4,731,320 24 9,462,640 1

0010 Site 6910 32,455,500 24 64,911,000 1

0011 National Institutes of Health 14,725,282 24 29,450,564 4 First Energy account number updated as of Amendment 001 - Account 11 00 84 6290 4 4 total kWh correctly calculated as of Amendment 0004 - Accounts 2011268857 and 2018394110 have been removed as of Amendment 0005

0012 Fort Detrick - Forest Glen 1,571,244 24 3,142,488 3 Consumption data updated as of Amendment 0004

0013 Fort Detrick 193,461,798 24 386,923,596 3 Line Item #'s updated as of Amendment 001 - Historical Data updated as of Amendment 0004

0014 Fort Meade 109,965,927 24 219,931,854 277 # of Accounts and historical usage updated as of Amendment 0002

0015 VA MD Healthcare 21,673,400 24 43,346,800 1

0016 Loch Raven 3,545,883 24 7,091,766 5

0017 MD Naval Research Laboratory 10,246,950 24 20,493,900 1

0018 Maryland Procurement Office 472,512,050 24 945,024,100 3

0019 Johns Hopkins Applied Physics Laboratory 5,635,400 24 11,270,800 1

0020 CSSG 11,925,200 24 23,850,400 1

0021 DLA Installation Support Columbus 55,279,501 24 110,559,002 1

0022 Carlisle Barracks 29,562,500 24 59,125,000 2

0023 DLA Distribution Susquehanna 71,799,803 24 143,599,606 3 Information updated as of Amendment 0001

0024 Bettis Atomic Power Laboratory 49,878,704 24 99,757,408 2

0025 Tobyhanna Army Depot 62,690,000 24 125,380,000 1

0026 Department of Defense 4,194,300 24 8,388,600 1

0027 Catoctin Mt. Park 12,868,956 24 25,737,912 1 Line Item added by Amendment 0002

TOTAL: 1,900,455,494 3,466,150,851 340

Note: This sheet is a summary of the historical usage of all installation accounts under this solicitation.

Account specific information can be found under each installation's respective tab.

PJM Large 2014

Summary PageInstallation Data Sheet
SPE600-14-R-0410&P of &N

Marine Barracks

Solicitation Item Number 0001

Marine Barracks

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1100r 0250391000 PEPCO May-13 100,800 30,000 28,200 42,600 246.0 270.0 228.0

Jun-13 135,600 39,000 36,000 60,600 312.0 318.0 276.0

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 171,000 46,800 42,000 82,200 378.0 366.0 318.0

Rate Code: DMGT3 Aug-13 147,000 43,800 40,200 63,000 348.0 330.0 276.0

Sep-13 151,800 40,200 37,200 74,400 348.0 318.0 276.0

Capacity PLC: 324.87 Oct-13 106,800 30,000 27,600 49,200 276.0 270.0 228.0

Tramission PLC: 327.42 Nov-13 91,200 25,800 24,000 41,400 216.0 216.0 198.0

Dec-13 103,200 27,000 25,800 50,400 210.0 228.0 204.0

Jan-14 99,600 25,200 24,600 49,800 216.0 222.0 210.0

Feb-14 95,400 25,200 24,000 46,200 222.0 234.0 222.0

Mar-14 106,800 28,800 28,200 49,800 240.0 240.0 234.0

Apr-14 93,600 27,000 25,800 40,800 228.0 240.0 222.0

Total 1,402,800 388,800 363,600 650,400

Marine Barracks

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1100s 0251083010 PEPCO May-13 317,823 82,089 76,668 159,066 640.3 620.6 587.3

Jun-13 399,303 99,719 94,357 205,227 661.1 640.3 627.9

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 480,588 111,642 106,588 262,358 912.7 627.9 826.1

Rate Code: DMGT1 Aug-13 424,391 108,305 103,941 212,145 744.5 648.4 762.8

Sep-13 420,974 100,814 95,840 224,320 686.6 661.1 655.1

Capacity PLC: 874.44 Oct-13 322,640 80,140 76,384 166,116 534.2 826.1 523.2

Tramission PLC: 886.59 Nov-13 233,335 56,769 53,955 122,611 413.8 922.3 404.8

Dec-13 249,113 58,666 56,128 134,319 403.0 912.7 363.8

This Account currently has 208 kW enrolled in a Demand Response Program Jan-14 241,104 56,199 53,684 131,221 407.0 762.8 389.9

Feb-14 232,515 55,471 52,710 124,334 422.1 762.5 409.0

Mar-14 253,755 61,132 58,122 134,501 411.5 744.5 391.9

Apr-14 226,390 57,321 54,447 114,622 403.0 655.1 404.2

Total 3,801,931 928,267 882,824 1,990,840

Marine Barracks

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1100u 0113631006 PEPCO May-13 0 0 0 0 0.0 0.0 0.0

Jun-13 2,760,000 744,000 687,600 1,328,400 6,408.0 0.0 6,408.0

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 600,600 152,400 146,400 301,800 720.0 696.0 696.0

Rate Code: DMGT1 Aug-13 280,800 70,200 67,200 143,400 720.0 696.0 696.0

Sep-13 299,400 75,000 71,400 153,000 768.0 744.0 744.0

Capacity PLC: 671.63 Oct-13 154,800 49,800 50,400 54,600 582.0 606.0 300.0

Tramission PLC: 664.17 Nov-13 138,000 34,200 34,800 69,000 582.0 582.0 582.0

Dec-13 263,400 67,200 60,600 135,600 432.0 444.0 462.0

Jan-14 195,600 46,200 45,600 103,800 426.0 450.0 384.0

Feb-14 186,000 46,200 45,000 94,800 360.0 354.0 366.0

Mar-14 208,800 52,200 49,200 107,400 426.0 444.0 390.0

Apr-14 201,600 52,800 51,600 97,200 426.0 426.0 426.0

Total 5,289,000 1,390,200 1,309,800 2,589,000

Line Item 0001Installation Data Sheet
SPE600-14-R-0410&P of &N

Building 6000, Bolling AFB

Solicitation Item Number 0002

Building 6000, Bolling AFB

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1105a 01009-06916 PEPCO Jun-13 5,409,941 1,403,730 1,307,984 2,698,227 9868.3 9826.6 9101.5

Jul-13 6,546,148 1,619,489 1,525,564 3,401,095 10247.8 10370.5 9477.7

Svc Address: Will be provided to offerors who submit a technical proposal. Aug-13 5,151,695 1,383,803 1,293,793 2,474,099 10045.1 10081.1 9316.4

Rate Code: DCHV Sep-13 5,940,485 1,507,067 1,401,163 3,032,255 10128.6 10041.8 9085.0

Oct-13 4,947,763 1,258,815 1,176,677 2,512,271 9109.1 9222.8 8411.8

Capacity PLC: 10084.41 Nov-13 4,777,806 1,209,445 1,147,602 2,420,759 8642.5 8487.4 8200.8

Tramission PLC: 10100.89 Dec-13 5,239,328 1,263,835 1,218,291 2,757,202 8354.5 8326.1 7575.1

Jan-14 5,482,245 1,238,112 1,200,852 3,043,281 8058.6 8024.0 7620.8

This Account currently has 3613 kW enrolled in a Demand Response Program Feb-14 4,487,736 1,104,974 1,054,234 2,328,528 8497.1 8438.0 7833.6

Mar-14 4,840,134 1,284,186 1,225,203 2,330,745 8176.0 8091.7 7686.7

Apr-14 4,533,438 1,194,856 1,126,598 2,211,984 8951.0 8449.2 7952.0

May-14 4,929,791 1,328,505 1,240,207 2,361,079 9630.7 9562.3 8354.5

Total 62,286,510 15,796,817 14,918,168 31,571,525

Line Item 0002Installation Data Sheet
SPE600-14-R-0410&P of &N

JB Myer-Henderson Hall (Myer)

Solicitation Item Number 0003

JB Myer - Henderson Hall

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

5150a 6086377501 Dominion 04/29/14 2,436,000 1,168,104 1,267,896 1,422

03/28/14 2,240,000 1,112,132 1,127,868 1,260

Svc Address: Will be provided to offerors who submit a technical proposal. 02/27/14 2,324,000 1,126,440 1,197,560 1,228

Rate Code: GS4 01/29/14 2,352,000 1,175,468 1,176,532 1,357

12/30/13 2,688,000 1,295,952 1,392,048 1,487

Capacity PLC: 11/26/13 2,660,000 1,254,148 1,405,852 1,681

Tramission PLC: 10/25/13 2,576,000 1,236,144 1,339,856 2,489

09/26/13 3,136,000 1,308,916 1,827,084 3,039

08/27/13 3,388,000 1,360,996 2,027,004 3,168

07/29/13 4,088,000 1,549,464 2,538,536 3,491

06/27/13 3,332,000 1,398,936 1,933,064 3,136

05/29/13 2,744,000 1,357,188 1,386,812 2,877

04/29/13 2,772,000 1,322,552 1,449,448 2,295

03/28/13 2,464,000 1,217,104 1,246,896 1,907

Total 39,200,000 17,883,544 0 21,316,456

Line Item 0003Installation Data Sheet
SPE600-14-R-0410&P of &N

JB Myer-Henderson Hall (McNair)

Solicitation Item Number 0004

JB Myer - Henderson Hall

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

1110c 130862717 Pepco 11/13/14 982,453 243,480 221,003 517,970

10/13/14 1,177,704 316,899 282,813 577,992

Svc Address: Will be provided to offerors who submit a technical proposal. 9/13/14 1,127,568 302,335 272,927 552,306

Rate Code: DCHV 8/13/14 1,495,969 379,263 342,482 774,224

7/13/14 1,155,028 322,520 283,215 549,293

Capacity PLC: 2239.79 6/13/14 897,571 250,411 218,501 428,659

Tramission PLC: 2248.28 5/13/14 892,709 236,566 212,125 444,018

4/13/14 842,974 235,058 213,987 393,929

3/13/14 850,050 230,802 205,603 413,645

2/13/14 825,378 213,221 188,981 423,176

1/13/14 952,863 241,596 222,350 488,917

12/12/14 918,400 221,235 204,433 492,732

Total 12,118,667 3,193,386 2,868,420 6,056,861

JB Myer - Henderson Hall (Fort McNair)

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

1110a 108817412 Pepco 11/13/14 389,933 105,696 97,089 187,148

10/13/14 365,756 89,444 82,628 193,684

Svc Address: Will be provided to offerors who submit a technical proposal. 9/13/14 327,996 87,308 79,725 160,963

Rate Code: DCHV 8/13/14 393,439 101,522 93,390 198,527

7/13/14 347,151 95,802 89,297 162,052

Capacity PLC: 829.48 6/13/14 329,735 93,385 85,116 151,234

Tramission PLC: 859.67 5/13/14 382,916 103,741 94,172 185,003

4/13/14 423,580 107,982 99,265 216,333

3/13/14 388,708 106,474 98,849 183,385

2/13/14 419,689 108,414 99,956 211,319

1/13/14 352,650 92,148 85,152 175,350

12/12/14 336,782 90,947 84,131 161,704

Total 4,458,335 1,182,863 1,088,770 2,186,702

JB Myer - Henderson Hall (Fort McNair)

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

1110b 251096012 Pepco 11/13/14 332,223 87,179 84,508 160,536

10/13/14 352,256 82,137 80,374 189,745

Svc Address: Will be provided to offerors who submit a technical proposal. 9/13/14 484,963 126,553 120,343 238,067

Rate Code: DCHV 8/13/14 604,465 152,336 143,509 308,620

7/13/14 531,269 146,369 135,953 248,947

Capacity PLC: 1998.63 6/13/14 571,389 163,939 147,317 260,133

Tramission PLC: 1930.96 5/13/14 728,809 202,199 177,667 348,943

4/13/14 924,809 234,151 210,880 479,778

3/13/14 900,752 252,041 225,129 423,582

2/13/14 937,372 248,376 218,096 470,900

1/13/14 672,041 182,680 163,524 325,837

12/12/14 482,594 127,827 117,565 237,202

Total 7,522,942 2,005,787 1,824,865 3,692,290

Line Item 0004Installation Data Sheet
SPE600-14-R-0410&P of &N

Walter Reed Army Medical Center

Solicitation Item Number 0005

Walter Reed Army Medical Center

Delivery Period: meter read in December 2014 through meter read in June 2015

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1115c 0130806227 Pepco Jun-13 1,804,081 386,592 397,041 1,020,448 2408.1 2472.3 2508.5

Jul-13 1,636,243 386,942 397,386 851,915 2408.1 2472.3 2508.2

Svc Address: Will be provided to offerors who submit a technical proposal. Aug-13 2,278,018 536,718 533,089 1,208,211 3852.2 3864.1 3749.9

Rate Code: DCHV Sep-13 2,399,250 544,637 544,054 1,310,559 3852.2 3864.2 3750.0

Oct-13 2,320,513 549,737 548,849 1,221,927 3599.2 3793.2 3637.9

Capacity PLC: 94.82 Nov-13 1,781,904 405,536 408,597 967,771 2945.3 2919.8 2922.0

Tramission PLC: 103.86 Dec-13 1,443,620 305,801 310,961 826,858 2387.9 2377.0 2401.8

Jan-14 1,497,389 323,854 328,395 845,140 2008.2 2004.7 2037.0

Feb-14 1,171,235 252,789 256,682 661,764 1825.3 1820.1 1836.2

Mar-14 1,175,833 266,486 272,216 637,131 1834.6 1850.1 1836.9

Apr-14 930,931 221,480 230,578 478,873 1748.0 1750.8 1779.8

May-14 681,550 146,429 155,130 379,991 1199.5 1102.1 1184.0

Total 19,120,567 4,327,001 4,382,978 10,410,588 1,200 1,102 1,184

Line Item 0005Installation Data Sheet
SPE600-14-R-0410&P of &N

Argonne National Laboratory

Solicitation Item Number 0006

Argonne National Laboratory

Delivery Period: meter read in January 2015 through meter read in January 2017

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1705a 0556224009 ComEd 25-Apr-14 24,392,180 9,650,089 14,742,091 39002.72

27-Mar-14 25,512,017 10,169,700 15,342,317 40517.28

Svc Address: Will be provided to offerors who submit a technical proposal. 26-Feb-14 25,946,140 10,270,026 15,676,114 40479.36

Rate Code: R67 28-Jan-14 23,915,377 8,921,895 14,993,482 40973.6

26-Dec-13 25,499,199 9,588,560 15,910,639 40445.28

Capacity PLC: 45811.3289 25-Nov-13 28,887,884 11,025,895 17,861,989 40683.36

Tramission PLC: 40084.8088 23-Oct-13 24,661,183 9,635,643 15,025,540 45468.96

26-Sep-13 22,163,068 8,841,835 13,321,233 43454.56

27-Aug-13 28,877,537 11,300,676 17,576,861 45150.72

25-Jul-13 28,417,046 11,070,636 17,346,410 47584.48

25-Jun-13 28,529,736 10,451,190 18,078,546 44773.44

24-May-13 19,277,919 7,988,222 11,289,697 39415.68

Total 306,079,286 118,914,367 187,164,919

Line Item 0006Installation Data Sheet
SPE600-14-R-0410&P of &N

DC Naval Research Laboratory

Solicitation Item Number 0007

DC Naval Research Laboratory

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW) Intern Demand (KW) Off Peak Demand (KW)

1120a 0251105011 PEPCO 5/1/13 9,098,058 2,395,797 2,280,668 4,421,593 16,804.80 16,234.60 14,970.20

6/1/13 10,711,539 2,710,958 2,577,568 5,423,013 18,086.40 18,028.80 16,634.90

Svc Address: Will be provided to offerors who submit a technical proposal. 7/1/13 13,172,180 3,201,540 3,062,048 6,908,592 19,748.20 19,252.80 17,424.00

Rate Code: DCHV 8/1/13 9,759,329 2,445,517 2,347,691 4,966,121 18,555.80 18,544.30 16,853.80

9/1/13 12,064,824 2,890,610 2,758,428 6,415,786 19,526.40 19,103.00 16,911.40

Capacity PLC: 19649.95 10/1/13 9,554,629 2,355,526 2,244,721 4,954,382 17,481.60 17,282.90 15,678.70

Tramission PLC: 19609.1 11/1/13 8,973,773 2,201,894 2,117,547 4,654,332 15,785.30 15,537.60 14,863.70

12/1/13 9,981,041 2,340,109 2,271,352 5,369,580 15,027.80 14,699.50 14,400.00

1/1/14 9,419,268 2,177,855 2,131,466 5,109,947 14,590.10 14,716.80 13,760.60

2/1/14 9,306,512 2,126,320 2,066,414 5,113,778 14,497.90 14,480.60 13,311.40

3/1/14 8,690,708 2,211,559 2,152,296 4,326,853 14,250.20 14,207.00 13,230.70

4/1/14 0 0 0 0 0.00 0.00 0.00

Total 110,731,861 27,057,685 26,010,199 57,663,977

Line Item 0007Installation Data Sheet
SPE600-14-R-0410&P of &N

USACE

Solicitation Item Number 0008

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403aa Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 400,600 97,561 73,095 229,944 815

02/13/14 420,100 112,635 81,085 226,380 825

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 385,700 108,429 79,232 198,039 953

Rate Code: Interval GL 12/13/13 348,400 106,733 79,904 161,763 892

11/13/13 346,200 105,486 84,775 155,939 808

Capacity PLC: 1057.782226 6/1/14 10/15/13 179,206 51,145 40,755 87,306 819

Tramission PLC: 1032.690313 1/1/14 09/30/13 199,294 80,289 39,959 79,046 0

09/16/13 484,700 180,609 89,599 214,492 1,077

08/14/13 435,000 175,575 86,888 172,537 1,075

07/16/13 474,200 173,532 86,567 214,101 1,047

06/14/13 184,322 71,286 35,938 77,098 972

05/31/13 251,778 77,369 63,155 111,254 0

05/14/13 392,100 115,745 93,797 182,558 825

04/12/13 351,200 102,537 80,132 168,531 867

Total 4,852,800 1,558,931 1,014,881 2,278,988

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ac Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 3,612,000 821,505 613,758 2,176,737 5,778

02/13/14 3,790,500 920,940 685,150 2,184,410 5,947

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 4,329,500 924,272 688,911 2,716,317 6,030

Rate Code: Interval P 34KV 12/13/13 3,955,000 925,923 692,122 2,336,955 5,824

11/13/13 3,699,500 915,427 690,287 2,093,786 5,710

Capacity PLC: 5947.037972 6/1/14 10/15/13 1,845,346 439,484 329,883 1,075,979 5,849

Tramission PLC: 6090.943115 1/1/14 09/30/13 1,983,654 611,636 365,728 1,006,290 -

09/16/13 4,396,000 1,235,525 737,169 2,423,306 5,925

08/14/13 3,902,500 1,195,119 711,707 1,995,674 6,056

07/16/13 4,315,500 1,193,412 710,102 2,411,986 5,990

06/14/13 1,761,433 513,088 304,923 943,422 5,950

05/31/13 2,379,067 579,131 438,507 1,361,429 -

05/14/13 4,158,000 960,812 726,937 2,470,251 5,930

04/12/13 3,748,500 865,123 652,774 2,230,603 5,872

Total 47,876,500 12,101,397 8,347,958 27,427,145

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ad Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 46,213 12,400 9,921 23,892 165

02/13/14 51,260 13,575 9,687 27,998 165

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 55,472 13,455 10,233 31,784 158

Rate Code: 12/13/13 49,024 12,763 10,275 25,986 162

11/13/13 45,404 13,346 10,768 21,290 153

Capacity PLC: 105.582157 6/1/14 10/15/13 22,763 7,344 5,083 10,336 140

Tramission PLC: 104.691702 1/1/14 09/30/13 23,092 8,750 4,215 10,127 -

09/16/13 62,782 19,738 10,826 32,218 128

08/14/13 58,686 19,647 10,684 28,355 129

07/16/13 65,345 20,398 10,880 34,067 125

06/14/13 28,380 9,046 4,975 14,359 119

05/31/13 29,839 8,368 6,896 14,575 -

05/14/13 43,806 12,600 10,247 20,959 134

04/15/13 49,500 13,300 10,500 25,700 155

Total 631,566 184,730 125,190 321,646

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ae Will be provided to offerors who submit a technical proposal. BG&E 03/12/14 133,800 30,400 23,500 79,900 240

02/12/14 148,900 36,600 27,400 84,900 257

Svc Address: Will be provided to offerors who submit a technical proposal. 01/13/14 157,200 33,800 25,700 97,700 260

Rate Code: GL 12/11/14 137,800 31,800 24,600 81,400 252

11/11/13 130,300 32,300 27,200 70,800 252

Capacity PLC: 256.865521 6/1/14 10/14/13 64,500 15,400 12,600 36,500 329

Tramission PLC: 254.705817 1/1/14 09/30/13 92,400 31,700 15,600 45,100 -

09/11/13 129,200 44,600 22,300 62,300 282

08/13/13 146,800 51,600 25,100 70,100 312

07/12/13 137,700 48,400 23,600 65,700 309

06/12/13 48,200 14,500 7,700 26,000 283

05/31/13 92,300 23,000 20,700 48,600 -

05/10/13 123,700 31,900 28,100 63,700 266

04/10/13 123,100 29,500 24,300 69,300 245

Total 1,665,900 455,500 308,400 902,000

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403af Will be provided to offerors who submit a technical proposal. BG&E 06/13/14 42,149 13,807 8,009 20,333 192

05/31/14 61,651 14,011 10,962 36,678 -

Svc Address: Will be provided to offerors who submit a technical proposal. 05/14/14 101,100 24,036 18,800 58,264 191

Rate Code: INTERVAL GL 04/14/14 111,600 26,407 20,180 65,013 181

03/13/14 90,300 20,885 16,100 53,315 182

Capacity PLC: 175.712464 6/1/14 02/13/14 91,500 22,529 17,285 51,686 168

Tramission PLC: 173.638999 1/1/14 01/15/14 102,600 22,469 17,158 62,973 174

12/13/13 95,400 22,753 17,413 55,234 173

11/13/13 93,600 23,043 17,876 52,681 182

10/15/13 45,340 10,882 8,452 26,006 178

09/30/13 48,860 15,793 8,989 24,078 -

09/16/13 111,600 33,233 18,722 59,645 199

08/14/13 98,700 31,774 18,000 48,926 204

07/16/13 106,800 31,032 17,609 58,159 197

Total 1,201,200 312,654 215,555 672,991

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ag Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 509,700 116,258 86,457 306,985 950

02/13/14 556,200 136,940 99,445 319,815 1,003

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 596,400 129,148 94,894 372,358 1,019

Rate Code: Interval GL 12/13/13 546,600 128,420 96,015 322,165 909

11/13/13 500,700 121,948 93,990 284,762 850

Capacity PLC: 978.267477 6/1/14 10/15/13 252,127 60,050 46,106 145,971 862

Tramission PLC: 974.712825 1/1/14 09/30/13 263,573 83,790 47,910 131,873 -

09/16/13 617,400 182,447 103,891 331,062 966

08/14/13 559,800 178,207 102,132 279,461 993

07/16/13 621,300 179,611 102,755 338,934 955

06/14/13 243,310 73,801 42,202 127,307 938

05/31/13 328,490 82,933 64,565 180,992 -

05/14/13 555,000 129,094 100,908 324,998 851

04/12/13 523,200 122,679 92,989 307,532 870

Total 6,673,800 1,725,326 1,174,259 3,774,215

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ah Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 19,368 4,805 2,604 11,959 54

02/13/14 25,093 6,303 3,726 15,064 61

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 23,327 5,185 2,978 15,164 55

Rate Code: GL 12/13/13 18,898 4,474 2,363 12,061 54

11/13/13 12,620 3,159 1,452 8,009 41

Capacity PLC: 17.490456 6/1/14 10/15/13 5,438 1,334 741 3,363 32

Tramission PLC: 17.340668 1/1/14 09/30/13 4,605 1,046 923 2,636 -

9*16/13 11,408 2,810 2,034 6,564 27

08/14/13 10,440 2,654 1,998 5,788 27

07/16/13 10,582 2,487 1,804 6,291 24

06/14/13 4,437 1,075 779 2,583 25

05/31/13 5,689 1,158 787 3,744 -

05/14/13 11,770 2,506 1,330 7,934 55

04/12/13 12,800 2,500 1,500 8,800 55

03/14/13 21,100 5,200 2,800 13,100 52

Total 197,575 46,696 27,819 123,060

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ai Will be provided to offerors who submit a technical proposal. BG&E 03/06/14 178,300 43,100 33,800 101,400 380

02/06/14 193,300 47,500 37,200 108,600 352

Svc Address: Will be provided to offerors who submit a technical proposal. 01/07/14 193,700 41,200 32,400 120,100 393

Rate Code: GL 12/06/13 182,300 44,100 36,100 102,100 340

11/05/13 158,500 40,100 33,600 84,800 329

Capacity PLC: 320.258614 6/1/14 10/08/13 49,700 12,700 9,900 27,100 390

Tramission PLC: 317.565907 1/1/14 09/30/13 159,800 54,900 27,500 77,400 0

09/05/13 187,000 63,100 32,600 91,300 382

08/07/13 189,900 66,400 34,200 89,300 389

07/08/13 118,800 45,700 18,100 55,000 330

06/07/13 26,800 10,300 4,100 12,400 533

05/31/13 189,800 49,100 40,900 99,800 0

05/06/13 135,700 32,900 28,400 74,400 271

4/4/13 120,600 30,100 24,600 65,900 264

Total 2,084,200 581,200 393,400 1,109,600

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403aj Will be provided to offerors who submit a technical proposal. BG&E 06/13/14 110,921 37,831 21,645 51,445 487

05/31/14 150,979 38,032 30,174 82,773 -

Svc Address: Will be provided to offerors who submit a technical proposal. 05/14/14 245,700 60,255 48,410 137,035 461

Rate Code: INTERVAL GL 04/13/14 256,278 61,532 47,053 147,693 436

03/13/14 222,597 52,845 39,311 130,441 480

Capacity PLC: 502.055322 6/1/14 02/13/14 228,267 58,025 40,905 129,337 514

Tramission PLC: 493.654554 1/1/14 01/15/14 258,900 25,774 18,445 214,681 602

12/13/13 240,000 57,741 43,318 138,941 454

11/13/13 236,700 42,935 35,080 158,685 443

10/15/13 117,764 29,235 22,185 66,344 447

09/30/13 126,436 43,380 23,250 59,806 -

09/16/13 286,800 90,003 49,093 147,704 500

08/14/13 254,700 86,572 46,604 121,524 512

07/16/13 270,300 85,250 45,680 139,370 499

Total 3,006,342 769,410 511,153 1,725,779

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403ak Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 117,052 27,725 20,950 68,377 194

02/13/14 122,543 28,477 21,321 72,745 195

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 127,632 26,014 19,597 82,021 190

Rate Code: GL 12/13/13 110,687 24,665 18,408 67,614 197

11/13/13 110,630 26,810 20,292 63,528 203

Capacity PLC: 164.996717 6/1/14 10/15/13 66,227 15,798 11,986 38,443 203

Tramission PLC: 163.596472 1/1/14 09/30/13 57,152 16,215 10,220 30,717 -

09/16/13 143,362 40,217 23,895 79,250 203

08/14/13 124,613 37,592 22,362 64,659 205

07/16/13 132,473 36,012 21,552 74,909 188

06/14/13 55,552 16,335 9,316 29,901 195

05/31/13 66,491 16,347 11,564 38,580 -

05/14/13 108,345 26,852 20,465 61,028 183

04/15/13 119,700 26,100 20,400 73,200 195

Total 1,462,459 365,159 252,328 844,972

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403al Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 61,934 16,572 13,492 31,870 162

02/13/14 70,505 18,856 14,483 37,166 168

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 77,930 19,095 15,227 43,608 182

Rate Code: GL 12/13/13 70,409 18,117 15,276 37,016 162

11/13/13 61,491 16,722 15,309 29,460 154

Capacity PLC: 153.707257 6/1/14 10/15/13 29,152 8,790 6,777 13,585 200

Tramission PLC: 152.421042 1/1/14 09/30/13 30,431 12,891 6,064 11,476 0

09/16/13 71,090 30,287 13,036 27,767 204

08/14/13 66,411 30,002 12,739 23,670 197

07/16/13 71,906 30,545 12,927 28,434 194

06/14/13 31,183 12,410 5,706 13,067 206

05/31/13 35,902 10,140 10,079 15,683 0

05/14/13 59,158 16,781 15,869 26,508 149

04/15/13 69,800 17,100 15,100 37,600 161

Total 807,302 258,308 172,084 376,910

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403d Will be provided to offerors who submit a technical proposal. BG&E 03/06/14 257,400 62,323 49,812 145,265 474

02/06/14 287,100 73,572 57,647 155,881 469

Svc Address: Will be provided to offerors who submit a technical proposal. 01/07/14 303,000 66,097 51,771 185,132 470

Rate Code: Interval GL 12/06/13 288,900 70,526 56,098 162,276 501

11/06/13 292,500 74,318 60,482 157,700 514

Capacity PLC: 628.131048 6/1/14 10/07/13 39,796 8,838 6,953 24,005 591

Tramission PLC: 626.658891 1/1/14 09/30/13 262,604 84,008 44,482 134,114 -

09/06/13 340,500 113,083 60,559 166,858 572

08/06/13 328,800 111,891 59,910 156,999 620

07/08/13 346,500 105,355 56,307 184,838 603

06/07/13 66,695 20,529 11,017 35,149 603

05/31/13 275,305 71,323 58,939 145,043 -

05/06/13 313,500 76,684 63,465 173,351 569

04/04/13 269,100 64,601 52,147 152,352 474

Total 3,671,700 1,003,148 689,589 1,978,963

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403r Will be provided to offerors who submit a technical proposal. BG&E 03/13/14 66,800 17,274 11,780 37,746 164

02/13/14 78,500 21,225 13,929 43,346 191

Svc Address: Will be provided to offerors who submit a technical proposal. 01/15/14 78,800 9,016 6,363 63,421 179

Rate Code: Interval GL 12/13/13 69,300 17,910 13,230 38,160 150

11/13/13 55,000 10,621 9,338 35,041 129

Capacity PLC: 155.489651 6/1/14 10/15/13 22,160 6,088 5,090 10,982 164

Tramission PLC: 151.816104 1/1/14 09/30/13 26,340 11,397 4,975 9,968 -

09/16/13 61,600 25,003 10,452 26,145 168

08/14/13 56,500 24,543 10,387 21,570 172

07/16/13 60,200 24,275 10,549 25,376 178

06/14/13 23,242 9,869 4,340 9,033 161

05/31/13 39,058 10,950 9,409 18,699 -

05/14/13 75,700 18,295 14,571 42,834 141

04/12/13 62,300 16,581 12,608 33,111 253

Total 775,500 223,047 137,021 415,432

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Demand (KW)

2403v Will be provided to offerors who submit a technical proposal. BG&E 03/04/14 4,120,200 934,579 698,015 2,487,606 6,586

02/04/14 4,678,800 1,080,611 802,283 2,795,906 6,505

Svc Address: Will be provided to offerors who submit a technical proposal. 01/03/14 4,376,400 975,945 724,338 2,676,117 6,381

Rate Code: Interval P 13KV 12/04/13 4,431,000 1,037,937 775,971 2,617,092 6,568

11/04/13 4,825,800 1,107,621 826,327 2,891,852 6,898

Capacity PLC: 6892.467354 6/1/14 10/03/13 314,237 104,056 78,443 131,738 6,747

Tramission PLC: 7066.802383 1/1/14 09/30/13 4,062,163 1,198,158 717,210 2,146,795 -

09/04/13 5,119,800 1,429,794 856,948 2,833,058 7,073

08/02/13 4,779,600 1,395,338 839,470 2,544,792 7,112

07/03/13 4,397,400 1,299,870 783,777 2,313,753 7,134

06/05/13 633,636 130,040 78,312 425,284 6,940

05/31/13 4,523,964 1,061,289 796,574 2,666,101 -

05/02/13 4,611,600 1,129,563 833,141 2,648,896 6,982

04/02/13 4,380,600 1,008,238 749,442 2,622,920 6,774

Total 55,255,200 13,893,039 9,560,251 31,801,910

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403z Will be provided to offerors who submit a technical proposal. BG&E 02/25/14 353,100 83,383 67,080 202,637 649

01/28/14 410,100 95,652 76,130 238,318 671

Svc Address: Will be provided to offerors who submit a technical proposal. 12/26/13 398,100 93,993 75,009 229,098 670

Rate Code: Interval GL 11/25/13 374,400 93,117 76,555 204,728 709

10/28/13 371,432 90,644 75,373 205,415 766

Capacity PLC: 841.393539 6/1/14 09/30/13 80,668 25,344 13,956 41,368 -

Tramission PLC: 823.566999 1/1/14 09/25/13 412,800 133,301 72,237 207,262 822

08/27/13 455,100 147,679 80,488 226,933 784

07/26/13 465,300 155,181 83,558 226,561 832

06/25/13 327,584 101,580 55,379 170,625 786

05/31/13 57,616 19,686 16,733 21,197 -

05/28/13 437,100 104,583 87,141 245,376 770

04/24/13 359,700 87,068 72,739 199,893 731

03/26/13 344,100 86,640 69,976 187,484 600

Total 4,847,100 1,317,851 922,354 2,606,895

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403am Will be provided to offerors who submit a technical proposal. BG&E 04/24/14 329,400 80,168 63,648 185,584 629

03/25/14 309,900 76,670 60,112 173,118 586

Svc Address: Will be provided to offerors who submit a technical proposal. 02/25/14 311,700 73,469 58,219 180,012 599

Rate Code: Interval GL 01/28/14 354,300 81,880 63,210 209,210 556

12/26/13 340,500 81,994 63,140 195,366 573

Capacity PLC: 703.353976 6/1/14 11/25/13 303,300 76,032 60,209 167,059 612

Tramission PLC: 699.076307 1/1/14 10/28/13 302,021 74,283 57,859 169,879 627

09/30/13 64,879 20,358 11,246 33,275 -

09/25/13 337,200 110,932 58,466 167,802 823

08/27/13 386,400 130,018 68,039 188,343 703

07/26/13 402,900 135,290 73,228 194,382 700

06/25/13 286,935 90,601 48,647 147,687 729

05/31/13 51,765 17,926 15,731 18,108 -

05/28/13 375,600 90,267 74,450 210,883 726

Total 4,156,800 1,139,888 776,204 2,240,708

United States Army Corps of Engineers

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2403an Will be provided to offerors who submit a technical proposal. BG&E 04/21/14 871,500 199,397 152,029 520,074 1,611

03/20/14 822,150 207,825 150,034 464,291 1,743

Svc Address: Will be provided to offerors who submit a technical proposal. 02/20/14 894,600 211,437 150,357 532,806 1,794

Rate Code: Interval P 13KV 01/23/14 1,047,900 237,415 169,482 641,003 1,758

12/20/13 918,750 222,586 161,379 534,785 1,659

Capacity PLC: 1516.727911 6/1/14 11/20/13 778,050 200,804 151,765 425,481 1,510

Tramission PLC: 1517.442698 1/1/14 10/22/13 520,636 130,676 103,450 286,510 1,500

09/30/13 247,964 69,867 39,249 138,848 -

09/21/13 861,000 287,914 157,406 415,680 1,631

08/21/13 799,050 275,049 149,787 374,214 1,534

07/23/13 922,950 293,156 157,740 472,054 1,712

06/21/13 596,751 192,297 107,517 296,937 1,600

05/31/13 294,699 75,434 60,384 158,881 -

05/22/13 911,400 226,332 182,033 503,035 1,514

Total 10,487,400 2,830,189 1,892,612 5,764,599

Line Item 0008Installation Data Sheet
SPE600-14-R-0410&P of &N

National Agricultural Library

Solicitation Item Number 0009

MD National Agricultural Library

Delivery Period: meter read in December 2014 through meter read in December 2016 Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand

Line Item Account Utility kWh kWh kWh kWh

2404a 5000 1620 07 PEPCO Jun-13 453,354 114,757 106,705 231,892 878.4 858.5 885.3

Jul-13 488,582 127,192 116,873 244,517 1031.9 1014.1 939.2

Svc Address: Will be provided to offerors who submit a technical proposal. Aug-13 517,609 130,024 120,087 267,498 1032.3 1027.3 921.3

Rate Code: Interval GT Sep-13 454,153 117,721 109,224 227,208 1000.1 818.0 740.9

Oct-13 437,143 117,150 110,312 209,681 967.9 873.8 761.4

Capacity PLC: 1285.37 Nov-13 389,060 89,480 85,938 213,642 731.3 693.2 661.7

Tramission PLC: 1285.22 Dec-13 342,034 85,819 81,582 174,633 708.9 717.6 628.2

Jan-14 374,311 87,231 84,271 202,809 694.8 697.8 641.9

Feb-14 315,015 79,673 75,670 159,672 667.1 575.8 573.7

Mar-14 295,774 73,622 70,262 151,890 692.0 696.2 507.0

Apr-14 350,895 90,744 85,249 174,902 754.8 674.8 553.1

May-14 313,390 82,107 78,279 153,004 728.4 697.6 636.6

Total 4,731,320 1,195,520 1,124,452 2,411,348

Line Item 0009Installation Data Sheet
SPE600-14-R-0410&P of &N

Site 6910

Solicitation Item Number 0010

Site 6910

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Supplier Choice ID Utility Meter Read Date Total kWh Usage kWh On Peak kWh Intern Peak kWh Off Peak Peak Demand (KW)

2406a Will be provided to offerors who submit a technical proposal. BG&E 03/20/14 2,394,000 610,230 479,357 1,304,413 4,473

02/20/14 2,366,000 572,859 445,901 1,347,240 4,443

Svc Address: Will be provided to offerors who submit a technical proposal. 01/23/14 2,845,500 654,116 506,631 1,684,753 4,385

Rate Code: Interval P 34KV 12/20/13 2,492,000 621,878 485,713 1,384,409 4,488

11/20/13 2,464,000 629,645 503,836 1,330,519 4,508

Capacity PLC: 5259.201041 6/1/14 10/22/13 1,883,582 475,173 384,057 1,024,352 4,816

Tramission PLC: 5414.610446 1/1/14 09/30/13 870,918 246,625 134,314 489,979 -

09/21/13 2,964,500 983,252 532,481 1,448,767 5,867

08/21/13 2,796,500 944,080 516,104 1,336,316 5,615

07/23/13 3,195,500 1,013,833 536,961 1,644,706 6,056

06/21/13 1,910,504 623,102 337,088 950,314 5,617

05/31/13 938,496 241,711 194,827 501,958 -

05/22/13 2,898,000 724,154 588,714 1,585,132 4,896

04/19/13 2,436,000 606,849 493,888 1,335,263 5,035

Total 32,455,500 8,947,507 6,139,872 17,368,121

Line Item 0010Installation Data Sheet
SPE600-14-R-0410&P of &N

NIH

Solicitation Item Number 0011

National Institute of Health

Delivery Period: meter read in December 2014 through meter read in December 2016 Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand

Line Item Account Utility kWh kWh kWh kWh

2410q 2009385259 PEPCO May-13 205,144 56,224 48,967 99,953 569.6 546.2 470.3

Jun-13 266,615 77,154 58,420 131,041 677.6 689.7 641.0

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 332,073 85,236 69,272 177,565 735.1 718.8 689.4

Rate Code: 2A6 Aug-13 252,606 74,462 57,568 120,576 629.4 642.9 623.2

Sep-13 280,589 73,110 59,391 148,088 646.4 617.8 634.4

Capacity PLC: 742.04 Oct-13 120,217 29,706 28,069 62,442 363.3 361.9 380.9

Tramission PLC: 736.05 Nov-13 137,436 27,600 33,265 76,571 349.6 380.9 511.2

Dec-13 130,156 30,523 31,290 68,343 267.1 253.2 249.0

Jan-14 127,527 27,216 28,690 71,621 243.5 253.2 267.1

Feb-14 104,241 23,282 25,173 55,786 243.5 253.2 267.1

Mar-14 141,268 30,624 32,311 78,333 222.6 232.1 228.3

Apr-14 0 0 0 0 0.0 0.0 0.0

Total 2,097,872 535,137 472,416 1,090,319

National Institute of Health

Delivery Period: meter read in December 2014 through meter read in December 2016 Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand

Line Item Account Utility kWh kWh kWh kWh

2410r 2009385333 PEPCO May-13 261,669 85,241 65,176 111,252 694.4 693.6 576.5

Jun-13 271,646 79,235 64,635 127,776 759.6 731.7 545.0

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 368,396 95,829 82,471 190,096 707.2 702.4 688.4

Rate Code: 2A6 Aug-13 258,875 72,438 60,776 125,661 593.5 582.0 590.5

Sep-13 295,782 77,446 64,359 153,977 628.9 622.2 577.8

Capacity PLC: 741.86 Oct-13 100,029 23,755 22,833 53,441 300.2 294.9 308.7

Tramission PLC: 732.13 Nov-13 89,140 21,189 21,369 46,582 226.4 226.6 223.2

Dec-13 105,394 23,426 23,920 58,048 187.3 187.7 189.6

Jan-14 92,683 20,014 20,737 51,932 141.9 143.9 146.0

Feb-14 99,343 22,020 22,504 54,819 218.9 248.2 240.0

Mar-14 94,554 21,213 21,713 51,628 167.2 169.0 169.0

Apr-14 74,411 17,215 18,224 38,972 162.5 163.2 163.0

Total 2,111,922 559,021 488,717 1,064,184

National Institute of Health

Delivery Period: meter read in December 2014 through meter read in December 2016 Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand

Line Item Account Utility kWh kWh kWh kWh

2410w 2024 2092 11 PEPCO May-13 168,371 57,821 44,875 65,675 555.1 562.5 624.3

Jun-13 149,330 50,277 38,692 60,361 417.1 437.1 399.5

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 160,094 53,032 40,175 66,887 557.9 543.6 491.8

Rate Code: 2A6 Aug-13 144,336 50,687 39,264 54,385 562.2 604.9 570.5

Sep-13 163,741 55,024 41,118 67,599 510.3 445.7 486.0

Capacity PLC: 406.3 Oct-13 168,242 56,495 41,587 70,160 532.8 579.5 579.9

Tramission PLC: 406.43 Nov-13 172,748 49,418 43,441 79,889 579.9 607.0 618.3

Dec-13 279,996 85,346 67,562 127,088 619.4 675.3 679.5

Jan-14 284,329 69,301 64,508 150,520 679.5 659.0 631.8

Feb-14 226,597 59,413 54,668 112,516 679.5 658.5 629.2

Mar-14 342,752 89,833 87,171 165,748 663.1 697.3 721.9

Apr-14 0 0 0 0 0.0 0.0 0.0

Total 2,260,536 676,647 563,061 1,020,828

National Institute of Health

Delivery Period: meter read in December 2014 through meter read in December 2016 Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand

Line Item Account Utility kWh kWh kWh kWh

2410z 11 00 84 6290 4 4 First Energy May-13 1,067,896 2113.6 1622.2

Customer Number: 0843734745000474943 Jun-13 1,178,134 2517.5 1926.7

Svc Address: Will be provided to offerors who submit a technical proposal. Jul-13 1,574,732 2539.1 2093.0

Rate Code: PE-PH#D Aug-13 1,219,580 2778.8 2519.6

Sep-13 1,201,951 2493.7 2277.7

Capacity PLC: Oct-13 1,119,796 2616.8 2409.5

Tramission PLC: Nov-13 935,365 2128.7 2115.7

Dec-13 752,598 1760.4 1488.2

Jan-14 885,044 1528.2 1612.4

Feb-14 907,814 1608.1 1469.9

Mar-14 937,850 1514.2 1438.6

Apr-14 860,023 1509.8 1414.8

Total 8,254,952 0 0 0

Line Item 0011Installation Data Sheet
SPE600-14-R-0410&P of &N

Ft Detrick - Forest Glen

Solicitation Item Number 0012

Forest Glen

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility

2425a 2017943719 PEPCO Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand kWh kWh kWh kWh

Svc Address: Will be provided to offerors who submit a technical proposal. May-13 5,079 1,315 1,386 2,378 - - -

Rate Code: 2A6 Jun-13 5,831 1,585 1,482 2,764 - - -

Jul-13 4,781 1,248 1,112 2,421 - - -

Capacity PLC: 15.15 Aug-13 0 - - - - - -

Tramission PLC: 15.1 Sep-13 10,879 2,976 2,917 4,986 - - -

Oct-13 5,168 1,355 1,247 2,566 - - -

Nov-13 5,168 1,294 1,323 2,551 - - -

Dec-13 7,501 1,364 1,542 4,595 - - -

Jan-14 10,159 2,080 2,711 5,368 - - -

Feb-14 9,721 2,278 2,485 4,958 - - -

Mar-14 8,988 1,774 2,186 5,028 - - -

Apr-14 6,209 1,336 1,772 3,101 - - -

Total 79,484 535,137 472,416 1,090,319

Forest Glen

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility

2425f 2017943719 PEPCO Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand kWh kWh kWh kWh

Svc Address: Will be provided to offerors who submit a technical proposal. May-13 94,240 20,640 22,560 51,040 214.40 196.80 193.60

Rate Code: 2A6 Jun-13 90,400 20,800 21,280 48,320 156.80 182.40 188.80

Jul-13 97,920 22,880 22,240 52,800 166.40 160.00 150.40

Aug-13 87,680 22,560 21,920 43,200 172.80 163.20 152.00

Capacity PLC: 15.15 Sep-13 80,000 20,000 19,200 40,800 166.40 156.80 131.20

Tramission PLC: 15.1 Oct-13 86,240 20,160 21,120 44,960 153.60 148.80 153.60

Nov-13 96,320 20,960 22,560 52,800 201.60 244.80 206.40

Dec-13 134,560 27,040 28,320 79,200 224.00 249.60 241.60

Jan-14 149,920 34,880 36,160 78,880 296.00 339.20 326.40

Feb-14 125,440 27,840 29,920 67,680 259.20 315.20 300.80

Mar-14 138,720 29,440 30,880 78,400 238.40 267.20 283.20

Apr-14 100,640 22,720 25,440 52,480 216.00 256.00 217.60

Total 1,282,080 289,920 301,600 690,560

Forest Glen

Delivery Period: meter read in December 2014 through meter read in December 2016

Line Item Account Utility

2425g 2028473805 PEPCO Meter Read Date Total On Peak Interm Peak Off Peak On Peak Demand Interm Peak Demand Off Peak Demand kWh kWh kWh kWh

Svc Address: Will be provided to offerors who submit a technical proposal. May-13 15,840 4,480 4,080 7,280 40.80 40.80 37.60

Rate Code: MMGTL Jun-13 20,240 5,200 4,560 10,480 39.20 40.80 40.00

Jul-13 23,360 5,840 5,760 11,760 42.40 41.60 41.60

Aug-13 20,800 6,080 5,280 9,440 42.40 40.80 39.20

Capacity PLC: 44.1 Sep-13 21,840 5,760 5,040 11,040 41.60 49.60 40.00

Tramission PLC: 43.71 Oct-13 16,480 4,560 3,920 8,000 41.60 39.20 42.40

Nov-13 15,280 3,680 3,520 8,080 34.40 35.20 35.20

Dec-13 21,200 4,960 4,720 11,520 35.20 34.40 35.20

Jan-14 13,680 3,280 3,120 7,280 27.20 25.60 25.60

Feb-14 14,320 3,360 3,360 7,600 28.80 34.40 26.40

Mar-14 12,480 3,280 3,120 6,080 31.20 32.80 34.40

Apr-14 14,160 3,840 3,440 6,880 36.80 36.80 37.60

Total 209,680 54,320 49,920 105,440

Line Item 0012Installation Data Sheet
SPE600-14-R-0410&P of &N

Ft Detrick

Solicitation Item Number 0013

Fort Detrick

Delivery Period: meter read in December 2014 through meter read in December 2016

Meter 1 Meter 2 Account Total

Line Item Account Utility Meter Read Date Total kWh Usage Peak Demand (KW) Off Peak Demand (KW) Total kWh Usage Peak Demand (KW) Off Peak Demand (KW) Total kWh Usage Billed Demand (KW)

2430a 110084721460 Potomac Edison 8/4/14 10,489,872 19,470.20 17,019.80 9,744,144 15,610.10 13,926.00 20,234,016 35,052.00

Customer Number: 08043871615000477431 7/2/14 9,345,408 19,957.90 16,330.10 8,539,728 15,970.10 13,866.00 17,885,136 35,928.00

Svc Address: Will be provided to offerors who submit a technical proposal. 6/3/14 8,418,336 17,108.20 14,026.10 8,613,312 14,472.00 12,138.00 17,031,648 33,750.00

Capacity PLC: 5/2/14 6,652,368 12,198.00 12,010.10 7,540,512 13,220.20 11,390.40 14,192,880 33,750.00

Tramission PLC: 4/2/14 6,126,288 11,259.80 9,850.10 7,242,864 11,980.80 11,160.00 13,369,152 33,750.00

3/4/14 6,697,056 10,741.90 10,080.00 7,994,496 12,139.20 11,707.20 14,691,552 33,750.00

1/31/14 6,331,296 11,060.20 10,309.90 7,282,056 12,139.20 11,635.20 13,613,352 33,750.00

1/2/14 6,607,920 12,181.90 11,463.80 7,539,000 12,427.20 10,684.80 14,146,920 33,750.00

12/2/13…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .