SPD 2249 SPD PWS Maintenance and Emergency Repair of Fixed Generators 191212.docx

DOCX document 44 KB Posted

Attached to
Generator Annual PM & R AMD 0002
Solicitation number
W911S6-20-Q-0028
Issued by

View the file

Other files

File Type Posted
AMENDMENT_00002.docx DOCX document
AMENDMENT_00001.docx DOCX document
Simple Pricing Format Cost Breakdown.xlsx XLSX spreadsheet
W911S620Q0028.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

SPD Maintenance and Repair of Fixed Generators

Part 1

General Information

The Special Programs Division of the West Desert Test Center currently owns 4 emergency generators that are not maintained nor repaired under the BASEOPS support contract. The generators are located at the Granite Bio Test Facility (Georgia Facility), two at the Wig Test Complex (Mustang Village and Wyoming Facility), and one in the Ditto area. The Special Programs requires a non-personal services contract which provides personnel, equipment, supplies, tools, materials, supervision, and other items to perform annual fixed site generator maintenance. Repair personnel will be US Citizens capable of being granted access to Dugway Proving Ground (no active warrants, no foreign nationals etc). Repair personnel will provide the government with a detailed report of repair tasks conducted and any issues that may impact the normal function of the generators.

1. GENERAL: This is a non-personnel services contract to provide SPD Maintenance of Fixed Generators. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform SPD Maintenance of Fixed Generators as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: The contractor shall maintain and repair if required the following generators IAW manufacturer’s specifications:

1) MTU 1500RXC6DT2

2) MTU 500RXS6DT2

3) Cummins DFEG-7539815

4) Cummins DFEG-5634000

1.3 Objectives: Provide a once annual preventative maintenance and checks service (PMCS) for four generators located at three different locations on Dugway Proving Ground

1.4 Scope: Deliverables

1) Check oil and change IAW manufacturer’s recommendations

2) Inspect generator for oil, coolant leaks and repair leak as necessary

3) Inspect all belts and replace as necessary

4) Check unit cables and connections for corrosion and proper torque clean or tighten as necessary

5) Operate generator measuring voltage and frequency making any necessary adjustments to optimize generator efficiency

6) Ensure coolant level is appropriate IAW manufacturer’s recommendations and test coolant for proper mixture

7) Inspect generator for any loose equipment and repair or tighten as necessary

8) Inspect oil filter and change IAW manufacture’s recommendations

9) Drain water from the fuel line separator if equipped with one

10) Inspect air filter and replace IAW manufacturer’s recommendations

11) Check engine valve clearance and adjust as necessary

12) Test the engine and transfer switch safety devices and repair or adjust as necessary

13) Initiate an automatic start and transfer to the site load and run under load for at least an hour looking for leaks, loose connections, and or abnormal operating conditions

14) Provide written documentation or report of work performed and deficiencies found and corrected

1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 5 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base Year01/01/2021 – 05/31/2021
Option Year I06/01/2021 – 05/31/2022
Option Year II06/01/2022 – 05/31/2023
Option Year III06/01/2023 – 05/31/2024
Option Year IV06/01/2024 – 05/31/2025

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The contractor shall deliver with their proposal a quality control plan. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Recognized Holidays: The contractor shall not be required to perform the work stated herein on the following holidays:

New Year’s DayLabor Day
Martin Luther King Jr.’s BirthdayColumbus Day
President’s DayVeteran’s Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800-1600 Monday thru Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at three different government accessed locations on Dugway proving Ground.

1.6.6 Type of Contract: The government will award a Firm Fixed Price (FFP) type contract.

1.6.7 Security Requirements: Contractor personnel performing work under this contract does not require any security clearance at time of the proposal submission.

1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use if performing in a government facility. At the close of each work period government facilities, equipment, and materials shall be secured.

1.6.7.2 Key Control. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.3 Lock Combinations. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.8 Special Qualifications: N/A

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0700-1730, Monday thru Thursday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are identical to standard commercial practices.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor issued badges are REQUIRED

1.6.13 Contractor Travel (If applicable): All work will be conducted on Dugway Proving Ground. No OCONUS travel is required.

1.6.14 Other Direct Costs (If applicable): No other direct costs

1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.17 PHASE IN /PHASE OUT PERIOD (If applicable): Not applicable

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
ARArmy Regulation
CCEContracting Center of Excellence
CFRCode of Federal Regulations
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTRContracting Officer's Technical Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DD250Department of Defense Form 250 (Receiving Report)
DD254Department of Defense Contract Security Requirement List
DFARSDefense Federal Acquisition Regulation Supplement
DMDCDefense Manpower Data Center
DODDepartment of Defense
FARFederal Acquisition Regulation
HIPAAHealth Insurance Portability and Accountability Act of 1996
KOContracting Officer
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
PIPOPhase In/Phase Out
PMCSPreventative Maintenance and Checks Service
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
TETechnical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services (If applicable): Not Applicable

3.2 Facilities (If applicable): Not Applicable

3.3 Utilities (If applicable): The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment (If applicable): Not Applicable

3.5 Materials (If applicable): Not Applicable

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General (If applicable): The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance (If applicable): Not Applicable

4.3. Materials (If applicable). The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.

4.4. Equipment (If applicable). The Contractor shall furnish any equipment to meet the requirements under this PWS.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1. Basic Services. The contractor shall provide services for:

1) Check oil and change IAW manufacturer’s recommendations

2) Inspect generator for oil, coolant leaks and repair leak as necessary

3) Inspect all belts and replace as necessary

4) Check unit cables and connections for corrosion and proper torque clean or tighten as necessary

5) Operate generator measuring voltage and frequency making any necessary adjustments to optimize generator efficiency

6) Ensure coolant level is appropriate IAW manufacturer’s recommendations and test coolant for proper mixture

7) Inspect generator for any loose equipment and repair or tighten as necessary

8) Inspect oil filter and change IAW manufacture’s recommendations

9) Drain water from the fuel line separator if equipped with one

10) Inspect air filter and replace IAW manufacturer’s recommendations

11) Check engine valve clearance and adjust as necessary

12) Test the engine and transfer switch safety devices and repair or adjust as necessary

13) Initiate an automatic start and transfer to the site load and run under load for at least an hour looking for leaks, loose connections, and or abnormal operating conditions

14) Provide written documentation or report of work performed and deficiencies found and corrected

5.2. Task Heading.

5.3. CONTRACTOR MANAGEMENT REPORTING (CMR) (Only applies to Army Customers): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative (COTR) or also know as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachment/Technical Exhibit List:

7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2. Attachment 2/Technical Exhibit 2 – Deliverables Schedule

7.3 Attachment 3/Technical Exhibit 3 – Estimated Workload Data

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard
Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 1.

The contractor shall (for the generators listed in 1.2): Check oil and change IAW manufacturer’s recommendations.

Oil is changed

Zero deviation from standard
Contractor shall demonstrate oil levels and waste oil recovered

PRS # 2

The contractor shall (for the generators listed in 1.2): Inspect generator for oil, coolant leaks and repair leak as necessary

Zero oil or coolant leaks Zero deviation from standard

Contractor shall demonstrate no leaks

PRS # 3

The contractor shall (for the generators listed in 1.2): Inspect all belts and replace as necessary

Belts are checked and replaced as necessary

Zero deviation from standard
Contractor shall demonstrate belt integrity

PRS # 4

The contractor shall (for the generators listed in 1.2):Check unit cables and connections for corrosion and proper torque clean or tighten as necessary

Unit cables and connections are checked for corrosion and proper torque, cleaned and tightened as necessary

Zero deviation from standard
Contractor shall demonstrate absence of corrosion on cable and connections, and secure connections.

PRS # 5

The contractor shall (for the generators listed in 1.2): Operate generator measuring voltage and frequency making any necessary adjustments to optimize generator efficiency

Voltage and frequency are measured, generator efficiency is optimized
See manufacturer’s suggested settings
Contractor shall demonstrate settings match manufacturer’s suggestions

PRS # 6

The contractor shall (for the generators listed in 1.2): Ensure coolant level is appropriate IAW manufacturer’s recommendations and test coolant for proper mixture

coolant level and mixture is IAW manufacturer’s recommendations
See manufacturer’s suggested settings
Contractor shall demonstrate settings match manufacturer’s suggestions

PRS # 7

The contractor shall (for the generators listed in 1.2): Inspect generator for any loose equipment and repair or tighten as necessary

loose equipment is tightened and repaired
Zero deviation from standard
Contractor shall indicate equipment that was tightened or repaired

PRS # 8

The contractor shall (for the generators listed in 1.2): Inspect oil filter and change IAW manufacture’s recommendations

oil filter is changed
Zero deviation from standard
Contractor shall demonstrate oil filter has been changed

PRS # 9

The contractor shall (for the generators listed in 1.2): Drain water from the fuel line separator if equipped with one

water from the fuel line separator is drained
Zero deviation from standard
Contractor shall demonstrate fuel line separator is drained

PRS # 10

The contractor shall (for the generators listed in 1.2): Inspect air filter and replace IAW manufacturer’s recommendations

air filter is changed
Zero deviation from standard
Contractor shall demonstrate air filter has been changed

PRS # 11

The contractor shall (for the generators listed in 1.2): Check engine valve clearance and adjust as necessary

engine valve clearance is adjusted
See manufacturer’s suggested settings
Contractor shall demonstrate settings match manufacturer’s suggestions

PRS # 12

The contractor shall (for the generators listed in 1.2): Test the engine and transfer switch safety devices and repair or adjust as necessary

engine and transfer switch safety devices function as intended
See manufacturer’s suggested settings
Contractor shall demonstrate settings match manufacturer’s suggestions

PRS # 13

The contractor shall (for the generators listed in 1.2): Initiate an automatic start and transfer to the site load and run under load for at least an hour looking for leaks, loose connections, and or abnormal operating conditions

Generator engine starts, load is transferred to site for 1 hour. No leaks, loose connections, and abnormal operating conditions are observed
See manufacturer’s suggested settings
Contractor shall demonstrate Generator engine starts, load is transferred to site for 1 hour. No leaks, loose connections, and abnormal operating conditions are observed

PRS # 14

The contractor shall (for the generators listed in 1.2): Provide written documentation or report of work performed and deficiencies found and corrected

A written report of work performed and deficiencies found and corrected is provided to the government within 15 days following work conducted
Zero deviation from standard
Government POC receives report

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable
Frequency
# of Copies
Medium/Format
Submit To
All deliverable tasks listed in 5.1
1 per year

one per generator listed in 1.2

Report shall be provided via email as a PDF

Provide report to:

Brian.l.mcentire.civ@mail.mil

TECHNICAL EXHIBIT 3

ESTIMATED WORKLOAD DATA

ITEM

NAME

ESTIMATED QUANTITY

1
Project Management
1
20hrs
2
Administrative
1
20 hrs
3
Laborer(s)
1
80 hrs
4
Engineering Tech
1
80 hrs

File details come from the government source that posted it. Updated .