Spanaway_Lake_Fishing_Pier_Replacement_Design_(Addendum_#2_Revision).pdf
PDF 308 KB Posted
- Attached to
- Spanaway Lake Fishing Pier Replacement Design
- Solicitation number
- 2026-RFQ-127
- Issued by
- Pierce County, Tacoma City, Washington
About this file
This is an addendum document issued by Pierce County, Washington, pertaining to the Spanaway Lake Fishing Pier Replacement Design project located at 14905 Bresemann Boulevard South, Spanaway, Washington 98387. The addendum clarifies and revises specifications for the pier design services being procured through this contract opportunity. The document serves as an official modification to the original solicitation and bidding documents, providing updated requirements and technical specifications that bidders must incorporate into their proposals. Specific response dates, submission deadlines, and any site visit or bidders' conference information contained within the addendum establish the timeline and procedures for interested firms to submit their qualifications and design proposals for this municipal infrastructure project.
The addendum addresses technical requirements, clarifications to the scope of work, and potentially adjusts specifications related to the design deliverables for the fishing pier replacement. Any pricing adjustments, funding sources, or modifications to contract terms resulting from this addendum revision supersede the original solicitation documents. Bidders are required to acknowledge receipt of this addendum and incorporate all revisions into their submitted proposals to ensure compliance with the updated project requirements and procurement procedures established by Pierce County.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sample_Professional_Service_Agreement.pdf | ||
| Procurement_of_Goods_and_Services-Intake_Form_-_Jud_Youell.msg | MSG file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATION
2026-RFQ-127
SPANAWAY LAKE FISHING PIER REPLACEMENT DESIGN
Pierce County
1501 Market St, Suite 420
Tacoma, WA 98402
RELEASE DATE: May 29, 2026
DEADLINE FOR QUESTIONS: June 10, 2026
RESPONSE DEADLINE: June 22, 2026, 1:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/piercecountywa https://procurement.opengov.com/portal/%7bproject.government.code%7d
Pierce County
REQUEST FOR QUALIFICATION
Spanaway Lake Fishing Pier Replacement Design
1. Introduction
2. Scope of Work
3. Submittal Criteria
4. Evaluation and Award Process
5. Evaluation
6. RFQ General Terms and Condition
7. Vendor Questionnaire
Attachments:
A - Sample Professional Service Agreement
Request For Qualification #2026-RFQ-127 Title: Spanaway Lake Fishing Pier Replacement Design
1. Introduction
1.1. Summary
Pierce County is intending to hire a firm to complete pier design for the Spanaway Lake Park Fishing Pier.
Located at 14905 Bresemann Blvd S, Spanaway, WA 98387.
1.2. Background
Spanaway Park spans 135 acres and offers year-round fun with scenic waterfront views with two swim beaches, a boat launch, and a fishing pier. The pier had reached its end-of-life and was damaged by watercraft in 2021. A subsequent structural analysis determined that the pier and support pilings should be replaced. Preliminary design work is complete and permits are in process.
1.3. Contact Information
Stephanie Browning
Procurement and Contract Specialist 2
1501 Market
Suite #420
Tacoma, WA 98402
Email: stephanie.browning@piercecountywa.gov
Phone: (253) 798-7796
Department:
Procurement and Contract Services
Department Head:
Bert Kalalau
County Purchasing Agent
1.4. Timeline
Release Project Date May 29, 2026
Question Submission Deadline June 10, 2026, 4:30pm
Proposal Submission Deadline June 22, 2026, 1:00pm
Proposal Evaluation Approximately three weeks after proposal submission deadline, proposals will be evaluated and interviews may be held if multiple proposers are deemed capable of meeting the requirements.
mailto:stephanie.browning@piercecountywa.gov tel:(253)798-7796
Estimated Notice of Intention to Negotiate a Contract
Approximately six weeks after proposal submission deadline.
Estimated Date of Contract Execution Approximately eight weeks After proposal submission deadline.
2. Scope of Work
2.1. Scope of Work
Consultant will complete construction design documents for a new fishing Pier at Spanaway Lake Park.
The consultant completing the work will have experience and expertise on similar projects with the following items and deliverables but not limited to;
• Complete pier design
• Construction drawings
• Specification preparation
• Cost Estimating
• Bid assistance
• Permitting o Assist with permit o Regulatory submittals o Permit Questions
• Construction administration services
• Construction administration specific to a new pier.
• Other tasks as required to construct a new pier.
Note that this may include Cultural Resource construction site monitoring and other activities required by permitting agencies.
2.2. Minimum Requirements
5-years' minimum experience designing in water piers; in-water and shoreline permitting requirements and processing including Shoreline and critical areas for local, state, tribal and federal agencies;
Cultural Resource Assessments including archaeological field investigations and construction site monitoring.
3. Submittal Criteria
2026-RFQ-127, Spanaway Lake Fishing Pier Replacement Design
3.1. Submittal Checklist
For proposals to be considered the following must be included in your submittal:
• A letter of interest from the prime consultant/contractor, signed by the principal professional intended to lead the project effort. The letter needs to include contact information, number of years the consultant/contractor has been in business under current or previous names or additional assumed business names. Provide similar information concerning each subcontracted contractor.
• Provide a comprehensive organizational chart with key personnel for your firm and potential subconsultants, clearly identifying the estimated participation of Minority, Women, and Veteran owned (MWV) businesses and estimated percentage of total work anticipated to be performed by each sub-tier partner.
• Your approach to this type of work and explain how you have the experience, qualifications, size, and resources to provide the services listed in the scope of work.
• The name and brief resume of the key individual(s) who would be assigned to this project and an individual assigned to back up the key person in their absences, together with similar information for each individual to be provided under any subcontract.
• A proposal that outlines your firm approach to the work, capacity and availability, as well as any additional services or procedures of benefit to the County not specifically required by this
Request for Qualifications, which the Consultant offers to provide.
• The name and title of the person authorized to execute a contract on behalf of the firm.
• The caption, cause number, Court, Counsel, and general summary of any litigation pending, or judgment rendered within the past three (3) years involving the firm. (if applicable)
• A statement outlining any proposed exceptions to the County’s requirements or requested clarifications to the requirements, including any exceptions to the terms of the County’s standard Services Agreement, a sample of which is attached hereto as “Attachment A.” Firms should understand, however, that the County is typically unwilling to change the terms of its standard Services Agreement and a firm’s inability to agree to those standard terms may be a basis for the County to instead negotiate with one or more other firms.
• References listing customers with contracts for similar services.
• Acknowledgement (via the County's eProcurement Portal) of each addendum issued. (if applicable)
Before you submit, please ensure your company profile in OpenGov and MRSC are up-to-date with your current business designations. Use the provided links below for instructions on updating your profiles.
OpenGov: Updating User Profile, Company Profile, Email Address, Adding an Additional User
MRSC Log In: Public Agency Membership - MRSC Rosters
By submitting a proposal, proposer agrees that all documents, reports, proposals, submittals, working papers, or other materials prepared by the Contractor pursuant to this proposal shall become the sole and exclusive property of the County, and the public domain, and not property of the Contractor. The
Contractor shall not copyright, or cause to be copyrighted, any portion of said items submitted to the
County because of this solicitation.
Only electronic submittal via the County's eProcurement Portal shall be accepted. No hard copies, emails or fax submittals are acceptable.
3.2. Submittal Format
Please use the following as a guideline to format your qualifications:
• Font Size: Please fonts no smaller than 11 points
• Format: In order for Pierce County to adequately compare and evaluate qualification objectively, each response to specific requests and criteria should be clearly labeled.
• Page Count: Maximum qualifications length should not excess 20 pages - NOT including title page, letter of interest (cover letter), table of contents, resumes and required forms.)
These requirements are in addition to any other requirements identified herein.
3.3. Procurement Documents & RFQ's Holder List
BIDDERS WHO REGISTER AND DOWNLOAD BID DOCUMENTS will be automatically added to the
FOLLOWER'S list in the County's eProcurement Portal. Notifications for bid updates, addendum and other bid information will be sent to all bidders who register on the Pierce County eProcurement Portal.
3.4. Procurement Questions
All questions must be submitted within the County's eProcurement Portal, under the Questions and Answer Section not later than 4:30 pm on Wednesday, June 10, 2026. Bidders must be registered in the eProcurement Portal software in order to submit questions, receive addenda, notifications and ultimately submit a proposal.
Proposals must be received by the Procurement & Contract Services and the Finance
Department before 1:00 pm on Monday, June 22, 2026. The proposer is responsible for https://opengov.wistia.com/medias/vvpsufzgl0 https://mrscrosters.org/public-agencies/public-agencies-membership/ https://procurement.opengov.com/portal/piercecountywa submission of proposal before the deadline. The County shall not be responsible for late submittals.
3.5. Expected Term of Resulting Agreement
The initial contract period is anticipated to be for 24 months The County has the option of renewing for an additional three years after initial contract is executed. The actual schedule will be negotiated with the selected firm based on consultant and agency stafNO VALUEf availability and finalized scope of work.
Estimated Value of Resulting Contract: $150,000.00
4. Evaluation and Award Process
An evaluation team will review the SOQ and evaluate all responses received based upon the criteria listed herein. The County may request clarifications or additional information, if needed.
A selection may be made based on the Firms and initial evaluation criteria alone or the firms determined to be most qualified through the initial evaluation phase may be interviewed and the final determination will also consider reference checks and interviews.
The County intends to select the Consultant who represents the most qualified team (or teams, as determined by the evaluation team) to Pierce County and begin the negotiation and award process based on the evaluated scores.
Selected Consultant will be invited to enter contract negotiations with the County. Should the
County and the selected consultant not reach a mutual agreement, the County will terminate negotiations and move to the next highest ranked consultant and proceed with negotiations. A
Consultant’s inability to agree to the terms of the County’s Professional Service Agreement
"Attachment A" may be a basis for the County to terminate negotiations and begin negotiating with one or more other Consultant.
Selected Consultant(s) may be asked to provide the following for negotiation
A. Per Employee Direct Labor Rates
B. Provide the most recent audit of the firm received from WSDOT or a State or Federal agency that can establish the overhead rate.
C. Subcontractors (if used) fully burdened, per-employee labor rates direct labor rates (if available). If subcontractors are on an ad hoc basis no rates needed.
The County reserves the right to accept or reject any or all submitted SOQs, and to waive as informalities any irregularities, and to contract as the best interest of the County may require.
The County also may reject SOQs that are non-responsive or that are submitted by non-responsible firms
5. Evaluation
Phase 1
No. Evaluation Criteria Scoring Method Weight (Points)
1. Experience and Qualifications
In a narrative, identify the team (to include working titles, degrees, certificates, and licenses), describe the roles and responsibility of each team member, and how each team member will contribute to the successful completion of the scope of work of the overall contract.
Describe the team’s experience and capacity for providing the services being requested. Describe how team members meet or exceed the preferred experience being requested in this RFQ.
• Provide an organizational chart demonstrating the relationships and hierarchy of the team described above. Identify individuals by name, position, discipline, and contractor.
Identify key backup personnel.
• Resumes of the team members may be included as an appendix. Resumes are to be limited to one single-sided, letter-size page for each team member. Resumes exceeding this limit will not be reviewed.
Points Based 40 (40% of Total)
2. Project Approach Narrative
Describe the team’s general approach, methodology and goals for accomplishing the various services outlined in the Scope of
Services section for providing the requested services. Approach should include information on:
• General information for supporting the services at
Pierce County as outlined in the Scope of Services.
• Innovative offerings and
Service offered
• Communication Plan:
Describe the flow of information and project communications with team members, the County’s project manager, and various stakeholders.
• QC/QA: Explain the Quality
Control and Quality
Assurance program for the requested services.
Points Based 30 (30% of Total)
3. Capacity and Availability
The firm has the size, resources, and commitment to provide timely services based on the County’s needs. Please outline your team organization for this account.
Points Based 15 (15% of Total)
4. Past Performance
• Include a list of, at a minimum, three (3) recent contracts/projects in the last five years, to include a point of contact, contact information (phone and email), and brief description, for services relevant to the items listed in the Scope of Services as performed by the team members. Only projects completed by team members of the project team will be considered.
Supplemental project information may be included as part of the appendix.
Points Based 10 (10% of Total)
5. Accuracy and Completeness of the Statement of Qualification (SOQ)
Statement of Qualification will be evaluated on the following criteria:
• Formatting and layout.
• Spelling and grammatical accuracy.
• Coherent and logical flow of written responses.
• Completeness
Points Based 5 (5% of Total)
Phase 2
No. Evaluation Criteria Scoring Method Weight (Points)
1. Interviews (if applicable)
Pierce County may interview the top ranked from the evaluation list. If interviews are conducted, rankings of the firms shall be determined by Pierce County using the combined results of interviews and proposal submittals
Pass / Fail 100 (100% of Total)
6. RFQ General Terms and Condition
6.1. Pierce County expressly reserves the following rights
A. To waive any and/or all irregularities in the proposals submitted.
B. To reject any or all proposals or portions thereof.
C. To base awards with due regard to quality of services, experience, compliance with specifications, and other such factors as may be necessary in the circumstances.
D. To make the award to any vendor or combination of vendors whose proposal(s), in the opinion of the County, is in the best interest of the County.
Pierce County will not accept late proposals. Pierce County may return unopened any proposal or modification received after the hour and date specified.
6.2. Reimbursement
The County will not reimburse proposers for any costs involved in the preparation and submission of responses to this RFQ or in the preparation for and attendance at subsequent interviews.
6.3. Title VI Compliance
Pierce County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to
2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of
Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
6.4. Cooperative Purchasing
The Washington State Interlocal Cooperation Act, Ch. 39.34 RCW, authorizes public agencies to cooperatively purchase goods and services if all parties agree. By responding to this RFQ, Consultants agree that other public agencies may purchase goods and services under this solicitation or contract at their own cost and without Pierce County incurring any financial or legal liability for such purchases.
Pierce County agrees to allow other public agencies to purchase goods and services under this solicitation or contract, provided that Pierce County is not held financially or legally liable for purchases and that any public agency purchasing under such solicitation or contract file a copy of this invitation and such contract in accordance with RCW 39.34.040.
6.5. Public Records and Proprietary Material
Proposals submitted under this Solicitation will be considered public documents and, with limited exceptions, will become public information and may be reviewed by appointment by anyone requesting to do so following the conclusion of the evaluation, negotiation, and award process. This process is concluded when a signed contract is completed between the Pierce County and the Proposer. If a firm considers any portion of its response to be protected under the law, the vendor shall clearly identify each such portion with words such as “CONFIDENTIAL,” “PROPRIETARY” or “TRADE SECRET” on each page for which the protection is sought. If a request is made for disclosure of such portion, Pierce
County will notify the vendor of the request.
6.6. Contract Compliance For Professional, Technical, Supply or Services
It is the policy of Pierce County to foster an environment that encourages economic growth and diversification, business development and retention, increases competition and reduces unemployment.
In support of that policy, Pierce County reaffirms its commitment to maximize opportunities in public contracting for all contractors including minority and women owned business enterprises.
Proposers are encouraged to utilize qualified, local businesses in Pierce County and Washington State where cost effectiveness is deemed competitive. In addition, Proposers are encouraged to subcontract with firms certified by the Washington State Office of Minority and Women’s Business Enterprises
(MWBE).
A. MWBE DIRECTORY ASSISTANCE
1. A directory of MWBE firms is published quarterly by the Washington State Office of Minority and Women’s Business Enterprises (OMWBE). Copies of the directory are available from the
State OMWBE (360-753-9693) or may be viewed at the Public Works Department, 2702 S
42nd St Suite 201, Tacoma 98409, and the Tacoma Public Library, 1102 Tacoma Avenue
South, Tacoma, 98402. Contact the Contract Compliance Office for additional information at
(253) 798-7250.
7. Vendor Questionnaire
1. Proposal * Upload Proposal
*Response required
| 1. Introduction |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. Scope of Work |
| 2.1. Scope of Work |
| 2.2. Minimum Requirements |
| 3. Submittal Criteria |
| 3.1. Submittal Checklist |
| 3.2. Submittal Format |
| 3.3. Procurement Documents & RFQ's Holder List |
| 3.4. Procurement Questions |
| 3.5. Expected Term of Resulting Agreement |
| 4. Evaluation and Award Process |
| 5. Evaluation |
| Phase 1 |
| Phase 2 |
| 6. RFQ General Terms and Condition |
| 6.1. Pierce County expressly reserves the following rights |
| 6.2. Reimbursement |
| 6.3. Title VI Compliance |
| 6.4. Cooperative Purchasing |
| 6.5. Public Records and Proprietary Material |
| 6.6. Contract Compliance For Professional, Technical, Supply or Services |
| 7. Vendor Questionnaire |
| 1. Proposal * |