SP4702-23-Q-0018 Amendment 001.pdf

PDF 165 KB Posted

Attached to
CSC-23306 Replace Fire Pump, Building 21 Federal contract opportunity
Solicitation number
SP4702-23-Q-0018
Issued by
Defense Logistics Agency

View the file

Other files for this federal contract opportunity

Other files attached to CSC-23306 Replace Fire Pump, Building 21, newest first.
File Type Posted
SP4702-23-Q-0018 Amendment 002.pdf PDF
DSCC Site Visit Map 308.pdf PDF
DSCC Site Map.pdf PDF
SP4702-23-Q-0018.pdf PDF
Attachment 04 DSCC Excavation Permit.pdf PDF
Attachment 07 Davis-Bacon Wage Determination.pdf PDF
Attachment 10 SECTION C.pdf PDF
Attachment 12 SECTION K.pdf PDF
Attachment 08 CSC-23306 DRAWING SET 4-485.pdf PDF
Attachment 01 Security Safety and Fire Provisions.pdf PDF
Attachment 11 SECTION I (Clauses).pdf PDF
Attachment 13 SECTION L - M.pdf PDF
Attachment 02 General Conditions.pdf PDF
Attachment 03 Engeneering Form 93.pdf PDF
Attachment 05 Engeneering Form 4025-R.pdf PDF
Attachment 06 Contractor Access and Badge Request.xlsx XLSX spreadsheet
Attachment 09 CSC-23306 Combined Specifications.pdf PDF
Attachment 14 Submittal Register.xlsx XLSX spreadsheet
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO.

CSC-23306

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SP4702 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SP470223Q0018

X

2023 MAY 17

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DCSO COLUMBUS-DIVISION-1

PO BOX 3990

COLUMBUS OH 43218-3990

USA

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

X

CONTINUATION SHEET

CONTINUED ON NEXT PAGE

PAGE 2 OF 3 PAGESREFERENCE NO. OF DOCUMENT BEING CONTINUED:

SP470223Q0018 - 001

Solicitation Amendment 001 is being issued to Accomplish the following:

1.Answer questions received during the question period. Please see the attached document.

2.Extend the solicitation close date to June 06, 2023 at 11:59 PM EST.

All other aspects of the original solicitation remain unchanged.

CONTINUATION SHEET PAGE 3 OF 3 PAGESREFERENCE NO. OF DOCUMENT BEING CONTINUED:

SP470223R0004 - 001

SECTION J - LIST OF ATTACHMENTS

List of Attachments

Description File Name ATTACH_CSC_23302_Qu estions_and_Answers Questions.xlsx

DSCC Building 21 Fire Pump Questions

1) What are the building access procedures for access and working hours in this building? 0700-1500 M-F. After hours and weekends are not permitted. Contractor shall obtain background checks for badging so they can gain access. The badging process shall start immediately after award to prevent delays.

2) Does this contract require QFPE for the Sprinkler Design and execution of the work.

Designer Requirements / Installation Technicians.

No

3) What is the load rating on the existing computer floor system? See email attachment from Richard Lee.

4) Will ¾ plywood placed on the floor be adequate to roll old pump out and new pump in?

Yes

5) Do the first control valves on the inlet side of the pump and the by-pass get replaced?

Yes

6) Is the outside curb box shut off located and operational if needed?

Yes

7) What Fire watch procedures are required during Fire Pump Outage? I assume the government will provide necessary fire watches. Perhaps we need something that says they shall work continuously to get the system back online so they don’t tear out 1 day and return 90 days later to finish. All parts shall be received before any work can start.

8) Is existing pump pad going to be replaced, or new pump set on existing pad and properly grouted? Use existing and modify to meet installation requirements.

9) Existing Fire Pump has Backflow preventer located on the discharge side of the pump is this acceptable.

yes

10) Is the discharge pressure regulating valve scheduled to be replaced.

yes

11) What is the expected completion date for this project Fire Pump Controllers have been experiencing long lead times. reference #7, all parts have to be received before work start.

12) Are the design drawings reviewed and approved locally or sent out for review.

Locally

13) Does this project meet the Government threshold to be considered a Major project that requires full time PM? I don’t think we would need a QC for this, just a foreman would be fine and definitely need the foreman to be a single point of contact.

14) I have requested Quotes and lead time durations from Industrial Sales project bid date may need to be extended based on the quote request response.