Attachment 08 CSC-23306 DRAWING SET 4-485.pdf

PDF 5 MB Posted

Attached to
CSC-23306 Replace Fire Pump, Building 21 Federal contract opportunity
Solicitation number
SP4702-23-Q-0018
Issued by
Defense Logistics Agency

View the file

Other files for this federal contract opportunity

Other files attached to CSC-23306 Replace Fire Pump, Building 21, newest first.
File Type Posted
SP4702-23-Q-0018 Amendment 002.pdf PDF
SP4702-23-Q-0018 Amendment 001.pdf PDF
DSCC Site Visit Map 308.pdf PDF
DSCC Site Map.pdf PDF
Attachment 02 General Conditions.pdf PDF
Attachment 03 Engeneering Form 93.pdf PDF
Attachment 05 Engeneering Form 4025-R.pdf PDF
Attachment 06 Contractor Access and Badge Request.xlsx XLSX spreadsheet
Attachment 09 CSC-23306 Combined Specifications.pdf PDF
Attachment 14 Submittal Register.xlsx XLSX spreadsheet
SP4702-23-Q-0018.pdf PDF
Attachment 04 DSCC Excavation Permit.pdf PDF
Attachment 07 Davis-Bacon Wage Determination.pdf PDF
Attachment 10 SECTION C.pdf PDF
Attachment 12 SECTION K.pdf PDF
Attachment 01 Security Safety and Fire Provisions.pdf PDF
Attachment 11 SECTION I (Clauses).pdf PDF
Attachment 13 SECTION L - M.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COLUMBUS

O W

N

S H

IG

H

ST

IN

D

IA

N

O

LA

A

VE

TH

S

T

N C

AS

SA

D Y

AV

E

HA

RR

IS

BU

RG

P

IK

E

SU

N

BU

R

Y R

D

SU

N

BU

R

Y R

D d

C

LE

VN

HARD RD

E DUBLIN

JOHN GLENN

W 5TH AVE

COLUMBUS

WHITEHALL

COLUMBUS INT'L

AIRPORT

RD

HA

RR

IS

B

EL

AN

D

AV

E

URG

PIK

E

E BROAD ST

REFUGEE RD

GRANVILLE RD

- LANCASTER RD

JO

HNST

R

IVER

SID

E D

R

C

LE

VE

LA

N D

A

VE

S H

AM

IL

TO

N

R D

ST

EL

ZE

R

R D

JA

M

ES

R

D

YE

AR

LI

N

G R

D

DSCC

OSU AIRPORT

MAIN STREET

MAIN STREET

Gtypegroupnamepreferencedescription

Gtypegroupnamepreferencedescription

G

G

RV STORAGE

"A"

RV STORAGE

"B"

DRMO

STORAGE

INDEX OF DRAWINGS

SHEET NO. SHEET TITLE

G-001 COVER SHEET

F-001 FIRE PROTECTION GENERAL NOTES

F-101 BUILDING 21 SITE PLAN

F-401 BUILDING 21 ROOM 0005 - ENGLARGED PLAN VIEW / ELEVATION

F-601 EQUIPMENT SCHEDULE

F-701 BUILDING 21 ROOM B005 PICTURES

F-702 BUILDING 21 ROOM B005 FIRE PUMP AS-BUILT

PROJECT SIGNATURE BLOCK

DESIGN ENGINEER

(DM-FCIE)

FACILITY ENGINEER /

SUPERVISORY ENGINEER

(DM-FCI)

YEARLING ROAD GATE:

401 N YEARLING RD,

WHITEHALL, OH 43213

JAMES ROAD GATE (TRUCK

ENTRANCE):

200 JAMES ROAD

COLUMBUS, OH 43218

FACILITY ENGINEERING: BUILDING 308

CENTRAL RECEIVING: BUILDING 17

PASS & ID: BUILDING 61

DEFESE SUPPLY CENTER COLUMBUS

PROJECT NUMBER: CSC-23306

PROJECT TITLE:

REPLACE FIRE PUMP, BUILDING 21

DSCC SITE LOCATION

COLUMBUS VICINITY

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

N O

N E

-J an -2

"X

N O

N E

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

G-001 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

R

EP

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

C O

VE

R

S H

EE

T

WORK LOCATION:

BUILDING 21

AutoCAD SHX Text

AutoCAD SHX Text

RIM= 789.94'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text "A"

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text "B"

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text "C"

AutoCAD SHX Text

OHIO ARMY NATIONAL

AutoCAD SHX Text

GUARD CENTER

AutoCAD SHX Text

U.S. ARMY

AutoCAD SHX Text

RESERVE CENTER

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

OHIO ARMY

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

COMBINED

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

ARMY FORCES

AutoCAD SHX Text

RESERVE CENTER

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

BLDG.

AutoCAD SHX Text

AutoCAD SHX Text

OHIO ARMY

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

COMBINED

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

OHIO ARMY

AutoCAD SHX Text

NATIONAL GUARD

AutoCAD SHX Text

COMBINED

AutoCAD SHX Text

SUPPORT

AutoCAD SHX Text

MAINTENANCE

AutoCAD SHX Text

SHOP

AutoCAD SHX Text

STORAGE AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TENNIS

AutoCAD SHX Text

COURTS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text

RETENTION

AutoCAD SHX Text

POND

AutoCAD SHX Text 21A

AutoCAD SHX Text 20A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CREDIT

AutoCAD SHX Text

UNION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 45A

AutoCAD SHX Text 45C

AutoCAD SHX Text 45B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VPC

AutoCAD SHX Text

ARMY FORCES

AutoCAD SHX Text

RESERVE CENTER

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1'

'-0

-J an -2

"X

1'

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

F-001 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

R

EP

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

FI

R

E

PR

O

TE

C

TI

O N

G

EN

ER

AL

N O

TE

S

APPLICABLE REFERENCES:

1. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS (CURRENT EDITION)

2. NFPA 20: STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE PROTECTION (CURRENT EDITION)

3. NFPA 24: STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES

4. NFPA 25: STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS

(CURRENT EDITION)

5. NFPA 72: NATIONAL FIRE ALARM CODE(CURRENT EDITION)

6. NFPA 241: STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS(CURRENT EDITION)

7. UFC 3-600-01: FIRE PROTECTION ENGINEERING FOR FACILITIES (CURRENT EDITION)

8. UFC 3-601-02 : FIR E PROTECTION SYSTEMS INSPECTION, TESTING, AND MAINTENANCE (CURRENT EDITION)

FIRE PROTECTION GENERAL NOTES:

1. ALL FINAL FIRE PROTECTION DRAWINGS SHALL BE SUBMITTED FOR FINAL APPROVAL INCLUDING EQUIPMENT LAYOUT WITH PIPE SIZE, TYPE OF EQUIPMENT, RISER DETAIL, AND HYDRAULIC CALCULATIONS THAT MEET THE WATER FLOW DEMAND.

CONTRACTOR SHALL NOT INSTALL ANY SYSTEM COMPONENTS UNTIL THE DRAWINGS AND CALCULATIONS ARE REVIEWED AND APPROVED BY DLA COLUMBUS FIRE AND EMERGENCY SERVICES AND DLA HQ AHJ. ONCE APPROVED, HALF SIZE DRAWINGS SHALL BE PROVIDED TO THE DLA FIRE PROTECTION ENGINEER AND DLA COLUMBUS FIRE AND EMERGENCY SERVICES AND MUST

BE SIGNED BY A QUALIFIED FIRE PROTECTION ENGINEER AS REQUIRED BY UFC 3-600-01.

2. SYSTEM INSTALLATION SHALL BE PERFORMED BY A QUALIFIED SPRINKLER CONTRACTOR LICENSED TO INSTALL SPRINKLER SYSTEMS IN THE STATE OF OHIO, WITH A MINIMUM OF TWO OR MORE YEARS EXPERIENCE IN THE SPRINKLER INSTALLATION

FIELD.

3. PERFORM A CERTIFIED ACCEPTANCE TEST IN ACCORDANCE WITH NFPA 25 (CURRENT EDITION) ACCEPTANCE TEST SHALL BE

WITNESSED BY THE DSCC FIRE DEPARTMENT.

4. ENSURE FIRE ALARM NOTIFICATION AND MASS NOTIFICATION SYSTEMS APPLIANCES ARE INSTALLED IN ACCORDANCE WITH

NFPA 72 & UFC 3-600-01 (CURRENT EDITION) AND ACCEPTANCE TESTING IS COMPLETE.

5. COMPLY WITH ALL APPLICABLE SECTIONS OF UFC 3-600-01 (CURRENT EDITION) AND NFPA 241 (CURRENT EDITION)

SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS.

6. PENETRATIONS BY PLASTIC PIPE OR CONDUIT THROUGH FIRE-RATED WALLS, PARTITIONS, SHAFTS, AND FLOORS MUST BE FIRE-STOPPED BY AN APPROVED LISTED METHOD IN ACCORDANCE WITH ASTM E814, STANDARD TEST METHOD FOR FIRE TESTS OF THROUGH-PENETRATION FIRE STOPS OR UL 1479, FIRE TESTS OF THROUGH-PENETRATION FIRESTOPS.

7. TO REMOVE EXISTING PIPING , EQUIPMENT AND FITTINGS THE CONTRACTOR SHALL SHUT OFF THE WATER TO THE FIRE PUMP ROOM AND DRAIN THE SYSTEM. THE CONTRACTOR SHALL COORDINATE THE PERIOD OF CLOSURE, OF THE FIRE PROTECTION

SYSTEM WITH THE DSCC FIRE DEPARTMENT.

GENERAL SCOPE OF WORK:

1. THE SCOPE OF THE PROJECT IS TO REPLACE THE EXISTING FIRE PUMP AND JOCKEY PUMP IN BUILDING 21, ALARM VALVES, CHECK VALVES, OS&Y GATE VALVES WITH TAMPER SWITCHES, PRESSURE SUSTAINING VALVES, DOUBLE CHECK VALVE DETECTOR ASSEMBLY, BYPASS PIPING, DRAIN PIPING, PUMP SUCTION PIPING, PUMP DISCHARGE PIPING AND ALL JOCKEY PUMP VALVES AND PIPING. THE PROJECT SHALL ALSO INCLUDE REPLACEMENT OF PUMP CONTROL PANEL WITH AUTOMATIC TRANSFER SWITCH, JOCKEY PUMP CONTROL PANEL, LOW SUCTION PRESSURE SENSOR AND ALARM PANEL CONTROLLER. ALL

ITEMS ARE LOCATED IN ROOM B005, ON THE BASEMENT LEVEL OF BUILDING 21.

2. CONTRACTOR SHALL PROVIDE ALL NECESSARY COMPONENTS TO MAKE FULLY OPERATIONAL SYSTEMS, INCLUDING EQUIPMENT, MOUNTING PADS, ELECTRIC SERVICE AND CONTROL SYSTEM CHANGES. NEW WORK SHALL BE FULLY COMPATIBLE WITH EXISTING SIMPLEX FIRE ALARM SYSTEM. CONTRACTOR SHALL REMOVE THE EXISTING PUMPS AND ALL ASSOCIATED PIPES, CONDUITS, CONTROLS, AND ASSOCIATED DEVICES. ALL REMOVED EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR, WHO SHALL BE RESPONSIBLE FOR THE SAFE AND LEGAL REMOVAL OF THE ITEMS FROM GOVERNMENT

PROPERTY.

3. CONTRACTORS SHALL PROVIDE EQUIPMENT SIMILAR IN PERFORMANCE TO THE DESIGN BASIS EQUIPMENT LISTED WITHIN THE PLANS AND SPECIFICATIONS. IF A DIFFERENT VENDOR AND/OR MODEL IS PROVIDED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING NEW OR ADJUSTING ALL EXISTING CONCRETE BASES, MOUNTINGS, CONNECTIONS, CONDUITS, CONTROLS, AND OTHER DEVICES TO ALLOW FULL INTEGRATION OF THE NEW EQUIPMENT WITH THE EXISTING SYSTEMS.

SEQUENCE OF CONSTRUCTION:

1. THE GOVERNMENT SHALL OPERATE THE BUILDING 21 FIRE PROTECTION WATER SYSTEM UNTIL THE CONTRACTOR IS READY TO PERFORM ALL ON-SITE SYSTEM WORK. THE CONTRACTOR SHALL DELIVER ALL PUMPS, PIPING, CONTROLLERS, VALVES, AND ASSOCIATED ITEMS, AND SHALL PLACE THEM ON THE BASEMENT LEVEL OF BUILDING 21 BEFORE STARTING ANY WORK WHICH

WOULD DISABLE THE BUILDING FIRE PROTECTION WATER SYSTEM.

2. THE CONTRACTOR SHALL PLAN AND PERFORM THEIR WORK IN SUCH A MANNER THAT THE FIRE PROTECTION SYSTEMS OF THE BUILDING SHALL ALWAYS BE FULLY OPERATIONAL AFTER THE CONTRACTOR HAS COMPLETED THEIR DAILY WORK. THE CONTRACTOR SHALL REPLACE THE BYPASS HEADER FIRST, AND RETURN THE BYPASS LINE TO OPERATION BEFORE REMOVING

AND REPLACING THE EXISTING FIRE PUMP AND ITS ASSOCIATED PIPES AND VALVES.

F

BASEMENT FLOOR PLAN

8''FP 8''FPPIV

6''W 6''W

DOUBLE DETECTOR

CHECK VALVE

& VAULT

x1

0x

TA

PP

IN

G

SL

EE

VE

A

N D

V

AL

VE

W

/C

TB

x1

0x

TA

PP

IN

G

SL

EE

VE

A

N D

V

AL

VE

W

/C

TB

''W

N 9442.45

N 9433.30

8''FP

6''W

N 9495.00

" W

TH

B

LV

D

M

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

1/

'-0

-J an -2

"X

1/

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

F-101 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

BU

IL

D

IN

G

SI

TE

P

LA

N

8" FIRE LINE

FIRE

PUMP

ROOM

B005

WORK

AREA

N O

R

TH

BUILDING 21 SITE UTLITY PLAN

SCALE: 1/32" = 1'-0"

SCALE: 1/32" = 1'-0"

BUILDING 21 BASEMENT FLOOR PLAN

NORTH

SHEET NOTES:

1. NOT ALL UTILITIES SHOWN ON UTILITY PLAN DUE TO CLARITY. A

COMPLETE UTILITY PLAN IS AVAILABLE UPON REQUEST.

2. WORK LOCATED IN FIRE PUMP ROOM B005.

FIRE

PUMP

ROOM

WORK

AREA

B005

8" FIRE LINE

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text F

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

3/

'-0

-D ec -2

"X

3/ 8"

'-0

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

F-401 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

BU

IL

D

IN

G

R

O O

M B

- E N

G

LA

R G

ED

P

LA

N

V

IE

W

EL

EV

AT

IO

N

EXISTING FIRE PUMP ROOM MATERIAL LIST:

1. FIRE PUMP:

PEERLESS MODEL 5AEF11G

1000 GPM @ 115 PSI, 100 HP, 3550 RPM

HORIZONTAL SPLIT CASE, 460V, 3Ø

2. JOCKEY PUMP:

GRUNDFOS VERTICAL MULTISTAGE, CR3-10A-B-A-E-HQQE

15 GPM @ 231', 460V, 3Ø

3. 8" OS&Y GATE VALVE WITH TAMPER SWITCH.

4. AMES 3000SS DOUBLE CHECK VALVE ASSEMBLY

5. WATTS 116FM 300CL 6" PRESSURE SUSTAINING VALVE

6. 6" OS&Y GATE VALVE WITH TAMPER SWITCH

7. CENTRAL MODEL G FIRE ALARM CHECK VALVE

8. VITAULIC FIRELOCK S/717 CHECK VALVE

9. FIRETROL JOCKEY PUMP CONTROLLER

10. FIRETROL FTA200E ALARM PANEL

11. FIRETROL FTA1900-AE100B WITH POWER TRANSFER SWITCH

FIRE PUMP GENERAL NOTES:

1. NOT ALL FITTINGS, PIPING, ETC SHOWN ON DRAWING FOR CLARITY. CONTRACTOR SHALL FIELD VERIFY

EXISTING CONDITIONS.

2. FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ALL ELECTRICAL FIRE PROTECTION DEVICES AND EQUIPMENT (PUMP, PANELS, TAMPER SWITCHES, ETC.) AND COORDINATE WIRING WITH THE

ELECTRICAL CONTRACTOR.

3. TO REMOVE EXISTING PIPING , EQUIPMENT AND FITTINGS THE CONTRACTOR SHALL SHUT OFF THE WATER TO THE FIRE PUMP ROOM AND DRAIN THE SYSTEM. THE CONTRACTOR SHALL COORDINATE THE PERIOD

OF CLOSURE, OF THE FIRE PROTECTION SYSTEM WITH THE DSCC FIRE DEPARTMENT.

6 1

35 4

6"Ø

8"Ø

6"Ø

8" Ø

8" Ø

8" Ø

8"Ø

6" Ø

8" Ø

8" Ø 6"

Ø

8"Ø

6" Ø

1-1/4"Ø

1-1/4"Ø

1-1/4"Ø

JOCKEY

PUMP

CONNECTION

1-1/4"Ø

JOCKEY

PUMP

CONNECTION

EXISTING FIRE PUMP ROOM NORTH ELEVATION

SCALE: 3/8" = 1'-0"

A1

FIRE PUMP ROOM SCOPE OF WORK:

1. PUMPS: REMOVE AND REPLACE EXISTING FIRE PUMP, JOCKEY PUMP AND ALL ASSOCIATED

APPURTENANCES. SEE NEW FIRE PUMP AND NEW JOCKEY PUMP SCHEDULES SHEET F-601.

2. CONTROLLERS: REMOVE AND REPLACE EXISTING FIRETROL PUMP CONTROLLER, JOCKEY CONTROLLER

AND ALARM PANEL.

a. NEW FIRE PUMP CONTROLLER SHALL BE SOLID STATE SOFT START REDUCED VOLTAGE START FIRE

PUMP CONTROL PANEL WITH EMERGENCY POWER AUTOMATIC TRANSFER SWITCH. RATED 100 HP,

460-480v/3P/60, 100,000 AMP WITHSTAND RATING. SERVICE ENTRANCE RATED PANEL. FIRETROL

FTA1930-AM100B-TSA OR APPROVED EQUAL.

b. NEW JOCKEY PUMP CONTROLLER SHALL BE FACTORY ASSEMBLED, WIRED, AND TESTED AND SPECIFICALLY DESIGNED FOR THIS TYPE OF SERVICE. THIS CONTROLLER SHALL BE OF THE SAME MANUFACTURER AS THE MAIN FIRE PUMP CONTROLLER. THE JOCKEY PUMP CONTROLLER SHALL BE

FULL VOLTAGE STARTING. THE CONTROLLER SHALL INCORPORATE A CIRCUIT BREAKER AND

HORSEPOWER RATED MOTOR STARTER, CONTROL CIRCUIT TRANSFORMER WITH 24VAC SECONDARY

AND 200-600V MULTI-TAP PRIMARY, MAIN DISCONNECT SWITCH, AND A 0-600 PSI (0-42 BAR) SOLID

STATE PRESSURE TRANSDUCER. FIRETROL FTA560F OR APPROVED EQUAL

c. NEW ALARM PANEL SHALL HAVE INDIVIDUAL LED LIGHTS TO INDICATE ITS ALARM CONDITION WHICH SHALL REMAIN LIGHTED UNTIL THE ALARM CONDITION HAS BEEN CORRECTED. THE ALARM PANEL SHALL ALSO HAVE AN AUDIBLE ALARM WHICH WILL SOUND WHEN THE ALARM CONDITIONS OCCUR AND MAY BE SILENCED BY PRESSING A SILENCE ALARM PUSH-BUTTON. EACH ALARM INITIATION SHALL

BE SUBSEQUENT TO ANY AND ALL PREVIOUS ALARM CONDITIONS SO THAT THE SILENCE

PUSH-BUTTON ACKNOWLEDGMENT OF ANY ONE ALARM WILL NOT PREVENT THE AUDIBLE ALARM

FROM SOUNDING ON SUCCESSIVE ALARM CONDITIONS. THE ALARM PANEL SHALL HAVE A

PUSH-TO-TEST PUSH-BUTTON FOR MANUALLY TESTING ALL LED LIGHTS, AUDIBLE ALARMS AND

OUTPUT CIRCUITS. THE ALARM PANEL SHALL BE A FIRETROL MODEL FTA200-A OR APPROVED EQUAL

FOR USE WITH ELECTRIC FIRE PUMP CONTROLLERS

3. PIPE: REMOVE ALL EXISTING PIPING (FIRE PUMP PIPING, DRAIN PIPE, PRESSURE SENSING PIPE AND JOCKEY PUMP PIPING) AND REPLACE WITH SCHEDULE 40 STEEL PIPE WITH WELDED-ON FLANGES, WITH THE EXCEPTION OF JOCKEY PUMP PIPING (1-1/4"Ø) WHICH MAY BE THREADED, AND DRAIN LINES WHICH MAY BE THREADED STEEL PIPE. ALL FIRE PIPES EXCEPT DRAIN PIPES TO BE PAINTED WITH 2 COATS OF RED ENAMEL PAINT. PROVIDE NEW PIPE HANGERS FOR ALL NEW PIPING. ALL NEW CONNECTIONS TO BE IN

ACCORDANCE WITH NFPA 13 STANDARDS.

4. FITTINGS: REMOVE ALL EXISTING FITTINGS AND REPLACE AS NEW FOR A COMPLETE OPERATING

SYSTEM. ALL FITTINGS ON DISCHARGE SIDE OF PUMP SHALL BE 250 PSI RATED.

SCOPE OF REPLACEMENT:

1. REMOVE AND REPLACE ALL PIPE, FITTINGS AND EQUIPMENT IN THE MATERIAL LIST BELOW FROM THE FLANGE ON THE 8" PIPE COMING INTO ROOM B005 FROM THE EAST TO THE 6" PIPE VITAULIC COUPLING

AND 8" PIPE VITAULIC COUPLING AS SHOWN.

LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

LIMIT OF WORK

SCALE: 3/8" = 1'-0"

BUILDING 21 ROOM B005 - EXISTING FIRE PUMP ROOM PLAN

AutoCAD SHX Text A1

AutoCAD SHX Text F-401

NORTH

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

N O

N E

-D ec -2

"X

N O

N E

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

F-601 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

EQ

U

IP

M

EN

T

SC

H

ED

U

LE

S

PUMP SCHEDULE

MARK TYPE SYSTEM GPM

WATER P.D.

(PSI)

MOTOR

HP RPM VOLTS PHASE HERTZ MANUFACTURERS MODEL #

OR APPROVED EQUAL REMARKS

FIRE PUMP SPLIT CASE

HORIZONTAL

FIRE

SUPPRESSION 1000 115 100 1760 460 3 60 PEERLESS

MODEL 5AEF11G

JOCKEY PUMP

VERTICAL

MULTIPLE

STAGE

FIRE

SUPPRESSION 10 120 2 3500 460 3 60 GRUNDFOS

MODEL CR3-10

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

N O

N E

-J an -2

"X

N O

N E

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

F-701 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

R

EP

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

BU

IL

D

IN

G

R

O O

M B

PI

C

TU

R

ES

FIRE PUMP ROOM FACING SOUTH

SCALE: NONE

FIRE PUMP ROOM FACING SOUTH

SCALE: NONE

FIRE PUMP ROOM FACING SOUTH

SCALE: NONE

FIRE PUMP ROOM FACING SOUTH

SCALE: NONE

JOCKEY PUMP CONTROLLER AND ALARM PANEL

SCALE: NONE

FIRE PUMP CONTROLLER W/ ATS

SCALE: NONE

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K D

AT

E

D R

AW

N

B Y:

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A SHEET ID

DLA INSTALLATION MANAGEMENT

D E

F E

N S

E

L O

G I S T

I C

S

A G

E N

C Y

PR

O

JE

C

T N

O

D

EF

EN

SE

L O

G

IS

TI

C

S

AG

EN

C

Y D

EF

EN

SE

S

U

PP

LY

C

EN

TE

R C

O

LU

M

BU

S C

O

LU

M

BU

S, O

H

IO

-3

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T D

IV

IS

IO

N

D

LA

IN

ST

AL

LA

TI

O

N M

AN

AG

EM

EN

T

BU

IL

D

IN

G

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

FU

LL

S C

AL

E:

D

AT

E:

C H

EC

KE

D B

Y:

C H

EC

KE

D B

Y:

AP

PR

O

VE

D B

Y:

H

AL

F

SC

AL

E:

"X

N O

N E

-J an -2

"X

N O

N E

FA

C

IL

IT

Y

EN

G

IN

EE

R

D

EP

U

TY

F

AC

IL

IT

Y

EN

G

IN

EE

R

C U

ST

O

M

ER

D

LA

L &M

(S

AF

ET

Y)

D M

-F C

S(

SE

C U

R

IT

Y

EM

ER

G

EN

C Y

SE

R

VI

C

ES

D M

-F C

E(

EN

VI

R

O N

M

EN

TA

L)

F-702 4-585

KE

N

T

KL

IN

G

LE

R

KE

N

T

KL

IN

G

LE

R

C

SC

-2

LA

C

E

FI

R E

PU

M

P, B

U

IL

D

IN

G

BU

IL

D

IN

G

R

O O

M B

AS

-B

U

IL

T

FIRE PUMP ROOM AS BUILT - FOR REFERENCE ONLY

SCALE: NONE

Sheets and Views
4-585 G-001 COVER SHEET-ANSI D - COVER
4-585 FP-001 THRU FP-701-F-001 FIREPROTECTION GENERAL NOTES
4-585 FP-001 THRU FP-701-F-101 BLDG 21 BASEMENT SITE PLAN
4-585 FP-001 THRU FP-701-F-401 PUMP ROOM B005 WORK
4-585 FP-001 THRU FP-701-F-601 EQUIPMENT SCHEDULES
4-585 FP-001 THRU FP-701-F-701 PUMP ROOM PICTURES
4-585 FP-001 THRU FP-701-F-702 PUMP ROOM AS BUILT
2023-01-24T12:30:11-0500
KLINGLER.KENT.E.1295794883
2023-01-24T16:15:26-0500
CEA.ANTHONY.E.1230260148