Attachment 09 CSC-23306 Combined Specifications.pdf
PDF 798 KB Posted
- Attached to
- CSC-23306 Replace Fire Pump, Building 21 Federal contract opportunity
- Solicitation number
- SP4702-23-Q-0018
- Issued by
- Defense Logistics Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP4702-23-Q-0018 Amendment 002.pdf | ||
| SP4702-23-Q-0018 Amendment 001.pdf | ||
| DSCC Site Visit Map 308.pdf | ||
| DSCC Site Map.pdf | ||
| SP4702-23-Q-0018.pdf | ||
| Attachment 04 DSCC Excavation Permit.pdf | ||
| Attachment 07 Davis-Bacon Wage Determination.pdf | ||
| Attachment 10 SECTION C.pdf | ||
| Attachment 12 SECTION K.pdf | ||
| Attachment 08 CSC-23306 DRAWING SET 4-485.pdf | ||
| Attachment 02 General Conditions.pdf | ||
| Attachment 03 Engeneering Form 93.pdf | ||
| Attachment 05 Engeneering Form 4025-R.pdf | ||
| Attachment 06 Contractor Access and Badge Request.xlsx | XLSX spreadsheet | |
| Attachment 14 Submittal Register.xlsx | XLSX spreadsheet | |
| Attachment 01 Security Safety and Fire Provisions.pdf | ||
| Attachment 11 SECTION I (Clauses).pdf | ||
| Attachment 13 SECTION L - M.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION
07 84 00
07 - THERMAL AND MOISTURE PROTECTION
05/10, CHG 1: 08/13 FIRESTOPPING
09 90 00
09 - FINISHES
02/21 PAINTS AND COATINGS
21 30 00
21 - FIRE SUPPRESSION
04/08, CHG 1: 08/13 FIRE PUMPS
26 20 00
26 - ELECTRICAL
08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION
SYSTEM
-- End of Project Table of Contents --
REPLACE FIRE PUMP BLDG 21 BLDG21FIREPUMP
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15, CHG 2: 08/21
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The scope of the project is to replace the existing fire pump, jockey pump, alarm valves, check valves, os&y gate valves with tamper switches, pressure sustaining valves, double check valve detector assembly, bypass piping, drain piping, pump suction piping, pump discharge piping and all jockey pump valves and piping. The project shall also include replacement of pump control panel with automatic transfer switch, jockey pump control panel, low suction pressure sensor, alarm panel controller and incidental related work.
1.2.2 Contract Drawings
G-001 COVER SHEET
F-001 FIRE PROTECTION GENERAL NOTES
F-101 BUILDING 21 SITE PLAN
F-401 BUILDING 21 ROOM 0005 - ENGLARGED PLAN VIEW / ELEVATION
F-601 EQUIPMENT SCHEDULE
F-701 BUILDING 21 ROOM B005 PICTURES
F-702 BUILDING 21 ROOM B005 FIRE PUMP AS-BUILT
1.2.3 Location
The work is located at the Defense Supply Center Columbus, Building 21, Room B005 on the basement level.
1.3 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
file://orgeast.dir.ad.dla.mil/LND_MARTM/InstSvcs/WB/WBC/WBC's%20End%20Users%20Personal%20Files/Klingler/Projects(1)/FY23/BUILDING%2021%20FIRE%20PUMP/PROJECT%20DOCUMENTS/SPECIFICATIONS/01%2033%2000.docx
Section 01 11 00 Page 2
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
-- End of Section --
Section 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
11/22
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 CONTRACTOR ACCESS AND USE OF PREMISES
1.2.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.
1.2.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.2.1.2 Installation Access
Obtain access to Defense Supply Center Columbus through participation in the Defense Biometrics Identification System (DBIDS). . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for Temporary Passes at the Base Visitor Control Office to access the installation.
1.2.1.2.1 Registration for DBIDS
Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF
1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
Section 01 14 00 Page 2
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed DSCC Form 2310 to thecontracting officer representative to obtain a background check.
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.2.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.
1.2.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting
Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.2.1.2.4 Temporary Passes (Up to 1 Week)
All contractor personnel to DSCC that do not possess a Department of Defense (DoD) identification card must be processed through the Visitor Control Center.
Visitors will be registered in the Defense Biometric Identification System Pre-Enrollment website and the Visitor Notification System (VNS). Any CAC or Uniformed Services ID holder can sponsor a visitor for access.
Unescorted visitors must use the DBIDS pre-enrollment website and enter their information. Each individual must print or download the confirmation which contains a six-digit number and send a copy of the confirmation to the
Section 01 14 00 Page 3 sponsor (DoD CAC hodler) and have it in their possession upon entering the installation.
Sponsors will then register the visitors they sponsor by using the VNS enrollment module (CAC enabled).
Visitors must present a valid state photo ID at time of entry. After verifying that the visitor is sponsored and a police records check is favorably completed, the visitor will be issued a DBIDS visitor pass. This pass is to be retained by the visitor at all time while on DSCC. At the end of your visit, visitors may destroy the visitor pass. It is not necessary to return it to the Visitors Control Center.
DBIDS Pre-enrollment site: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/
Contractor personnel applying for temporary passes are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining temporary passes.
1.2.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.2.2 Working Hours
Regular working hours will consist of an period established by the Contracting Officer, between 6 a.m. and 5 p.m., ,Monday through Friday , excluding Government holidays.
1.2.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.
1.2.4 Occupied Buildings
The Contractor shall be working in or around existing buildings which are occupied. Do not enter the buildings without prior approval of the
The existing buildings and their contents must be kept secure at all times.
Provide temporary closures as required to maintain security as directed by
Section 01 14 00 Page 4 the Contracting Officer. Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the work area during the construction period. Relocate movable furniture as required to perform the work, protect the furniture, and replace the furniture in their original locations upon completion of the work. Leave attached equipment in place, and protect them against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.
1.2.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and telecommunications are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 8 hours. This time limit includes time for deactivation and reactivation.
d. Connection to Existing Sanitary Sewer Line: Provide positive verification that the existing line conveys sanitary sewer; verify line is not incorrectly connected to a storm drain. Obtain Installation's Sanitary Sewer Connection Permit 2 weeks prior to connection.
1.2.6 Health Conditions
Contractors must be aware that health protection procedures may change due to changes in the local Health Protection Condition (HPCON) level.
If the installation is in elevated HPCON level Contractors may be required to wear masks while on site and may be required to complete attestation forms for vaccination statuses for all employees with a DBIDS card or a visitor pass. If contractors are not fully vaccinated or decline to disclose their vaccination statuses, they may be required to provide proof of a negative infection testing from a doctor's office, pharmacy or health department. Those who are non-compliant will be denied entry.
1.3 SECURITY REQUIREMENTS
All contractors must abide by all security/force protection policies in effect on the DSCC Installation. Security/force protection procedures on the installation may include, but are not limited to, personnel screening, installation access and ID procedures, vehicle search requirements, restricted area access, and parking restrictions. Contractors must be aware that security/force protection procedures may change due to changes in the local Force Protection Condition level.
Contractor personnel working on the Defense Supply Center Columbus installation will be subject to screening as dictated by current security regulations. Contractor personnel shall provide information requested to
Section 01 14 00 Page 5 accomplish the required screening process. Levels of screening will be dictated by the sensitivity of the position the contractor will occupy and the access they require to DSCC and its facilities.
The contracting officer will coordinate with Security and Emergency Services personnel prior to the start of the contract performance to ensure all required security/force protection security measures are in place. The contracting officer will coordinate with Security and Emergency Services personnel at the end of the contract to ensure all government issued IDs have been accounted for.
1.3.1 Vehicle Operation
1.3.1.1 Driving on Center
Contractor shall obey all speed limits and traffic signs. Speed limit on Center is 25 MPH unless otherwise posted. Radar is used on Center.
Disobeying traffic regulations may include a monetary fine, court appearance, or loss of driving privileges.
1.3.1.2 Parking
Contractor vehicles will be parked only in lots or areas designated by the Contracting Officer or designee. These areas will be discussed at the post award conference. The Contracting Officer or designee shall also determine if it is necessary for such vehicles to be in other than designated locations, and then make necessary arrangements for additional parking.
Vehicles left on Center overnight must be coordinated with the Contracting Officer or designee. Any vehicle left unattended on Center that contains working materials, tools, and personal items of value must be locked at all times. The Government will not be liable for any lost, stolen or damaged vehicles or items.
1.3.2 Use of Alcohol and Illegal Drugs
The use of illegal drugs is prohibited on Federal property. Violators will be prosecuted
1.3.3 Weapons on Center
No weapon, either on one's person or placed inside a privately-owned vehicle is allowed. If a weapon of any type is found, it will be confiscated and held as evidence. Having unauthorized weapons on Federal property is a felony, and violators will be prosecuted
1.3.4 Accidents, Theft, Damage to Government or Private Property
No weapon, either on one's person or placed inside a privately-owned vehicle is allowed. If a weapon of any type is found, it will be confiscated and held as evidence. Having unauthorized weapons on Federal property is a felony, and violators will be prosecuted.
1.4 MATERIAL DELIVERY AND RELEASE
All commercial vehicles will enter and exit the Center through the James Road Gate access control point (ACP). Commercial vehicles include, but are not limited to, semi-trucks, box trucks, passenger busses, cargo vans, dump
Section 01 14 00 Page 6 trucks and walk-in vans. All such vehicles entering the gate will be processed through an entrance security inspection point before continuing onto Center. Hours of operation are from 0530-1630 M-F, excluding holidays.
The names of Contractor personnel responsible for the receipt of Contractor's material and equipment delivered to this Center and telephone numbers or location where they can be reached shall be made available to the Contracting Officer or designee who will ensure the delivery is entered into the Visitor Notification System (VNS). All receipts and shipments shall be handled through the James Road Gate. It is the responsibility of the Contractor to provide the personnel and equipment required to unload incoming materials, tools and equipment. Personal deliveries to DSCC Associates, tenant activities or contractors, i.e. pizza, flowers, are not authorized. Foreign national delivery truck operators must be processed in accordance with the same procedure as outlined in paragraph Installation Access . Contract Officials will ensure that all vendors are provided ample notice of the requirements and restrictions in this enclosure to minimize conflicts when commercial vehicles or vendors arrive on Center. They will also ensure all contracts comply with the stipulations outlined in policy guidance. If procedural requirements have not been met then the driver will not gain access and be turned away
All contractor deliveries shall initially be taken to Building 17, Section 3 for off-loading and screening. The Government will visually inspect and screen the materials. The contractor is then responsible for loading the materials onto their vehicles and delivering the materials to their destination. The Contractor shall be responsible for the loading, transporting and unloading of all equipment, materials and supplies to be used in performance of this contract. Materials delivered to the site shall be inspected for damage, unloaded, and stored with a minimum of handling.
Properly marked Contractor vehicles will be allowed to carry tools and equipment normally carried in or on the vehicle. All vehicles are subject to security inspection at any time to determine if materials and tools being used or carried are authorized. Loading of materials onto the vehicles is the responsibility of the Contractor.
1.5 FIRE PROVISIONS
The following fire provisions are only general in nature and will not excuse a Contractor from following other fire prevention practices as established.
In the event or suspicion of fire, immediately call the DSCC ESCC (Emergency Telephone: 911 from Center telephone system 614-692-2111 from cellular telephones) to report the conditions.
1.5.1 Fire Prevention
a. Gasoline and other flammable liquids will be stored in approved safety cans with spring loaded, self-closing lids. Gasoline dispensing tanks shall be properly grounded, surrounded by a sand dike at least 12 inches high and located at least 50 feet from any structure. Location is to be specified by the DSCC Installation Fire Inspector, 614-692- 2921.
b. Tools and equipment used in buildings where flammable materials are stored or where flammable liquids are being used shall be of spark proof construction.
Section 01 14 00 Page 7
c. Equipment shall not be refueled with the engine running. Refueling shall be accomplished at least 20 feet from any structure. No smoking will be allowed while refueling.
d. Before entering any building, each powered vehicle shall have a securely mounted fire extinguisher of the type designated by the DSCC Fire Protection Office. The entering must be approved by the Contracting Officer or designee.
e. Each engine driven unit, such as compressors, must have a securely mounted fire extinguisher of the type designated by the DSCC Installation Environmental, Safety & Health Occupational Health Office.
f. The use of all fire hydrants will be controlled by the DSCC
Installation Fire Department. No unauthorized use of fire hydrants will be permitted. Fifteen feet clearance is required around all fire hydrants at all times. DSCC Form 2312 (copy provided at the end of this section), Hydrant Permit, shall be issued by the DSCC Installation Fire Department prior to using fire hydrants. The contractor shall submit the form to the Contracting Officer or designee, who will coordinate with the DSCC ESCC. Water refill station set up located in Bldg 314 is the suggested means of water use vs a fire hydrant. The use of the refill station at Bldg 314 is a safety measure to ensure no contamination of DSCC water supply.
g. Paper and other combustible material shall be placed in covered containers. Oily rags and other waste subject to spontaneous combustion shall be placed in approved self-closing covered containers.
At the end of each day, these containers shall be stored outside of the building.
h. Fire aisles, building entrances and building exits shall be kept clear of obstructions at all times. A 36-inch clearance shall be maintained in these areas at all times.
i. Tar kettles must be approved by the DSCC Installation Fire Inspector and shall be operated only when the proper type fire extinguisher is available for use. These kettles shall not be located closer than 20 feet to any building.
1.5.2 Flame Cutting and Welding Processes
Welding, cutting or use of flame devices require prior approval of the DSCC Installation Fire Prevention Office and shall be performed in accordance with NFPA 51B. Contractor shall coordinate approval through the Contracting Officer or designee. All non-emergency hot work permit requests shall be coordinated with the DSCC Fire Prevention Office at least twenty-four hours in advance by calling 614-692-2921 during normal business hours, or at 614- 692-5900 on weekends, holidays or after normal business hours. Should no one answer 614-692-2921, the contractor will leave a voicemail describing the work to be completed, the time frame it will be conducted, the time the contractor would like to pick up the hot work permit, as well as a name and call back number. No work for which a hot work permit is required can be conducted without an issued hot work permit.
1.5.3 Fire Alarm/Mass Notification System (MNS) Procedures
Section 01 14 00 Page 8
This section covers all actions required on the DSCC installation if interaction with the installation fire alarm and/or mass notifications systems occurs.
1.5.3.1 Purpose
Only registered, licensed, or certified personnel are allowed to access, design, maintain, modify, install, inspect and test the fire alarm and mass notification systems.
1.5.3.2 Procedure
a. UFC 3-600-01, NFPA 72 and all other pertinent government and National
Fire Code documents are mandatory requirements for all contractors and subcontractors. All contractors shall provide evidence (licenses, certifications) that personnel performing aforementioned work have the appropriate training. A copy shall be submitted to the Contracting Officer or designee.
b. All materials used on site shall be addressable, and directly and fully compatible with the existing base fire alarms systems. Manufacturers of the fire protection systems at the DSCC installation are Simplex- Grinnell (base-wide), Siemens (Bldg. 20), and ADT (Bldg.23).
c. By-Pass procedures shall be posted by Simplex, Siemens, or ADT at the main panel for each building to ensure the proper steps are followed by personnel prior to performing work on the system. UNDER NO
CIRCUMSTANCES SHALL A CONTRACTOR PLACE A FIRE CENTRAL PANEL INTO OR OUT
OF A BY-PASS CONDITION WITHOUT NOTIFICATION TO AND AUTHORIZATION BY THE
EMERGENCY SERVICES COMMUNICATION CENTER (ESCC) (692-2111).
d.
e. The Government maintains a log of all fire suppression system and alarm system work being accomplished at the ESCC. The log shall be filled out, and shall include the date of work, the time in, time out, the name of the individual and company, a contact phone number, and the reason for visit. All contractors working on these systems shall also notify the Contracting Officer or designee before and after performing
f. If a defect or malfunction is not corrected at the conclusion of system work, or if the condition requiring the system to be placed into the by-pass remains, the contractor shall notify the ESCC and government representatives before departing from the base.
1.6 GENERATORS AND PROCESS EQUIPMENT
1.6.1 Generators
All generators above 50 horse power must be permitted. Contractor will provide the following information: The manufacturer's engine output rating in horsepower (HP) or Kilowatts, the company identification or name of unit, and type of fuel burned, indicate all that apply ( Natural gas, Propane/LPG, Gasoline, Distillate oil (less than 0.5% wt. sulfur) BEFORE the generator is installed. All generators must be SPCC (Spill Prevention, Control and Countermeasure) compliant if the liquid fuel capacity is 55 gallons or greater.
Section 01 14 00 Page 9
1.6.2 Process Equipment
Process equipment (e.g. transformers, hydraulic oil reservoirs, etc.)
containing oil or hazardous substances greater than or equal to 55 gallons which is being installed on the installation requires COR notification.
Contractors shall inform the office of the quantity of the oil or hazardous substance and location of the equipment.
Not Used
Section 01 20 00 Page 1
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
11/20, CHG 2: 08/21
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for
Schedule of Prices; G
1.2 SCHEDULE OF PRICES
Within 14 calendar days of notice to proceed, prepare and deliver to the Contracting Officer a Schedule of Values (construction contract) as directed by the Contracting Officer. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items
1.2.1 Payment Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.
1.3 CONTRACT COST BREAKDOWN
The Contractor must furnish within 30 days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This Contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the EP 1110-1-8.
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
Section 01 20 00 Page 2
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on ENG Form 93, showing in summary form, the basis for arriving at the amount of the invoice. ENG Form 93 shall include certification by Quality Control (QC) Manager as required by the contract. This form may be provided upon request or is available at the USACE Publications website:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerForm s/Eng_Form_93_2014Mar.pdf
c. The Payment Estimate for Contract Performance showing in detail: the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract
d. Monthly Work-hour report.
e. Updated Construction Progress Schedule and tabular reports required by the contract.
f. Materials on Site.
g. Updated submittal register.
h. Solid Waste Disposal Report.
i. Certified payrolls.
k. Other supporting documents as requested.
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.
1.5.3 Final Invoice
Section 01 20 00 Page 3
a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's
Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR FAR
32.103 Progress Payments Under Construction Contracts:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this Contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress
Section 01 20 00 Page 4 payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this Contract.
Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the
g. Materials in transit to the job site or storage site are not acceptable for payment.
Section 01 32 16.00 20 Page 1
SECTION 01 32 16.00 20
SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
08/18, CHG 1: 08/20
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for
Baseline Construction Schedule; G
SD-07 Certificates
Monthly Updates
1.2 PRE-CONSTRUCTION SCHEDULE REQUIREMENT
Within 30 calendar days after contract award and Prior to the start of work, prepare and submit to the Contracting Officer a Baseline Construction Schedule in the form of a Bar Chart Schedule in accordance with the terms in Contract Clause FAR 52.236-15 Schedules for Construction Contracts, except as modified in this contract. The approval of a Baseline Construction Schedule is a condition precedent to:
a. The Contractor starting demolition work or construction stage(s) of the contract.
b. Processing Contractor's invoice(s) for construction activities/items of
c. Review of any schedule updates.
Submittal of the Baseline Construction Schedule, and subsequent schedule updates, is understood to be the Contractor's certification that the submitted schedule meets the requirements of the Contract Documents, represents the Contractor's plan on how the work will be accomplished, and accurately reflects the work that has been accomplished and how it was sequenced (as-built logic).
1.3 SCHEDULE FORMAT
1.3.1 Schedule Submittals and Procedures
Submit Schedules and updates in hard copy and on electronic media that is acceptable to the Contracting Officer. Submit an electronic back-up of the project schedule in an import format compatible with the Government's scheduling program.
Section 01 32 16.00 20 Page 2
1.4 SCHEDULE MONTHLY UPDATES
Update the Construction Schedule at monthly intervals or when the schedule has been revised. Keep the updated schedule current, reflecting actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed by the
a. Narrative Report: Identify and justify the following:
(1) Progress made in each area of the project;
(2) Longest Path: Include printed copy on 11 by 17 inch paper, landscape setting;
(3) Date/time constraint(s), other than those required by the contract;
(4) Listing of changes made between the previous schedule and current updated schedule including: added or removed activities, original and remaining durations for activities that have not started, logic (sequence, constraint, lag/lead), milestones, planned sequence of operations, longest path, calendars or calendar assignments, and cost loading.
(5) Any decrease in previously reported activity Earned Amount;
(6) Pending items and status thereof, including permits, changes orders, and time extensions;
(7) Status of Contract Completion Date and interim milestones;
(8) Current and anticipated delays (describe cause of delay and corrective actions(s) and mitigation measures to minimize);
(9) Description of current and future schedule problem areas.
For each entry in the narrative report, cite the respective Activity ID and Activity Name, the date and reason for the change, and description of the change.
1.5 CORRESPONDENCE AND TEST REPORTS:
Correspondence (e.g., letters, Requests for Information (RFIs), e-mails, meeting minute items, Production and QC Daily Reports, material delivery tickets, photographs) must reference Schedule Activities that are being addressed. Test reports (e.g., concrete, soil compaction, weld, pressure) must reference Schedule Activities that are being addressed.
1.6 ADDITIONAL SCHEDULING REQUIREMENTS
Any references to additional scheduling requirements, including systems to be inspected, tested and commissioned, that are located throughout the remainder of the Contract Documents, are subject to all requirements of this section.
Section 01 32 16.00 20 Page 3
Section 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
08/18, CHG 4: 02/21
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
1.1.2 Project Type
1.1.3 Submission of Submittals
Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
Submittals that are required prior to or at the start of construction (work) or the next major phase of the construction on a multiphase contract.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates Of Insurance
Surety Bonds
List Of Proposed Subcontractors
List Of Proposed Products
Section 01 33 00 Page 2
Construction Progress Schedule
Submittal Register
Schedule Of Prices Or Earned Value Report
Accident Prevention Plan
Work Plan
Quality Control (QC) plan
Environmental Protection Plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards ensuring work can be judged. Includes assemblies or portions of assemblies that are to be incorporated into the project and those that will be removed at conclusion of the work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Section 01 33 00 Page 3
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
Data required by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Data incorporated in an operations and maintenance manual or control system.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract.
For example, Record Drawings and as-built drawings. Also, submittal
Section 01 33 00 Page 4 requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.2.2 Approving Authority
Office or designated person authorized to approve the submittal.
1.2.3 Work
As used in this section, on-site and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction. In exception, excludes work to produce SD-01 submittals.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or “S” classification are for
Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, variations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Government.
Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, submittals are considered to be "shop drawings."
1.4.2 For Information Only
Submittals not requiring Government approval will be for information only.
Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are not considered to be "shop drawings."
1.4.3 Sustainability Reporting Submittals (S)
Submittals for Guiding Principle Validation (GPV) or Third Party Certification (TPC) are indicated with an "S" designation. These submittals are for information only and for use as specified in Section 01 33 29
SUSTAINABILITY REPORTING.
Schedule submittals for these items throughout the course of construction as provided; do not wait until closeout.
1.5 PREPARATION
1.5.1 Transmittal Form
Section 01 33 00 Page 5
Use the ENG Form 4025-R transmittal form for submitting both Government-approved and information-only submittals. Submit in accordance with the instructions on the reverse side of the form. These forms or similar forms will be furnished to the Contractor. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted.
Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.5.2 Submittal Format
1.5.2.1 Format of SD-01 Preconstruction Submittals
When the submittal includes a document that is to be used in the project, or is to become part of the project record, other than as a submittal, do not apply the Contractor's approval stamp to the document itself, but to a separate sheet accompanying the document.
Provide data in the unit of measure used in the contract documents.
1.5.2.2 Format for SD-02 Shop Drawings
Provide shop drawings not less than 8 1/2 by 11 inches nor more than 30 by 42 inches, except for full-size patterns or templates. Prepare drawings to accurate size, with scale indicated, unless another form is required.
Ensure drawings are suitable for reproduction and of a quality to produce clear, distinct lines and letters, with dark lines on a white background.
a. Include the nameplate data, size, and capacity on drawings. Also include applicable federal, military, industry, and technical society publication references.
b. Dimension drawings, except diagrams and schematic drawings. Prepare drawings demonstrating interface with other trades to scale. Use the same unit of measure for shop drawings as indicated on the contract drawings. Identify materials and products for work shown.
Present shop drawings sized 8 1/2 by 11 inches as part of the bound volume for submittals. Present larger drawings in sets. Submit an electronic copy of drawings in PDF format.
1.5.2.2.1 Drawing Identification
Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph
IDENTIFYING SUBMITTALS.
Number drawings in a logical sequence. Each drawing is to bear the number of the submittal in a uniform location next to the title block. Place the Government contract number in the margin, immediately below the title block, for each drawing.
1.5.2.3 Format of SD-03 Product Data
Present product data submittals for each section as a complete, bound volume. Include a table of contents, listing the page and catalog item numbers for product data.
Section 01 33 00 Page 6
Indicate, by prominent notation, each product that is being submitted;
indicate the specification section number and paragraph number to which it pertains.
1.5.2.3.1 Product Information
Supplement product data with material prepared for the project to satisfy the submittal requirements where product data does not exist. Identify this material as developed specifically for the project, with information and format as required for submission of SD-07 Certificates.
Provide product data in units used in the Contract documents. Where product data are included in preprinted catalogs with another unit, submit the dimensions in contract document units, on a separate sheet.
1.5.2.3.2 Standards
Where equipment or materials are specified to conform to industry or technical-society reference standards of such organizations as the American National Standards Institute (ANSI), ASTM International (ASTM), National Electrical Manufacturer's Association (NEMA), Underwriters Laboratories (UL), or Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. State on the certificate that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard.
1.5.2.3.3 Data Submission
Collect required data submittals for each specific material, product, unit of work, or system into a single submittal that is marked for choices, options, and portions applicable to the submittal. Mark each copy of the product data identically. Partial submittals will be accepted for expedition of the construction effort.
Submit the manufacturer's instructions before installation.
1.5.2.4 Format of SD-04 Samples
1.5.2.4.1 Sample Characteristics
Furnish samples in the following sizes, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately the same size as specified:
a. Sample of Equipment or Device: Full size.
b. Sample of Materials Less Than 2 by 3 inches: Built up to 8 1/2 by 11 inches.
c. Sample of…