This document is a set of Questions and Answers related to Solicitation SP330024Q0162 for the procurement of Air Compressors for the DLA Distribution Warner Robins, GA (DDWG) facility.

The key details are:

  • The solicitation requests information on the compressor room dimensions and piping, but there is no dedicated compressor room - the area is approximately 25' x 10'. Photos of the existing 2" diameter plastic coated aluminum piping have been provided.
  • Bidders have expressed concerns about connecting to the existing proprietary piping, and have requested a site visit, but the agency has indicated that site visits are no longer possible during the bid process.
  • The agency has stated that if the existing piping is not compatible with the bidder's compressors, it is the responsibility of the contractor to replace the piping and integrate it with the building's main feed line.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Is there a picture of the compressor room?

A: attached

1. Can you provide dimensions and/or floor plan of the compressor room?

A: There is no room. The area is approximately 25’ x10 ‘. See the attached picture.

1. On the Q&A document #3, we are not confident we would be able to connect to the existing piping since Ingersoll Rand has utilized proletary piping which is challenging to connect; our experience has shown the connections are obsolete. Could you provide a close up picture of piping including connections?

A: Refer to the attached picture. The piping is 2” diameter plastic coated aluminum. If this piping will not work with your compressors, it is the responsibility of the contractor to replace the piping and integrate into the building main fee line to the equipment.

1. Any possibility a site visit could be scheduled? It would be particularly helpful to address the piping question above.

A: It is too late to make a site visit in the bid process.