Question and Answers SP330024Q0162.docx
DOCX document 15 KB Posted
- Solicitation number
- SP330024Q0162
- Issued by
-
Defense Logistics Agency Distribution
About this file
This document contains Questions and Answers related to the federal contract opportunity for AIR COMPRESSORS FOR DLA DISTRIBUTION WARNER ROBINS, GA (DDWG), Solicitation Number SP330024Q0162.
The key details are:
- The existing electrical disconnects are 100 amp, 480 Volt, 3 phase with fuses. The existing pipe is 2" but the manufacturer is unknown. There is an existing oil water separator that needs to be replaced as it is over 30 years old. The contractor is not responsible for hauling off the old units, only for palletizing them for turn-in to DLA Disposition per the Statement of Work. No forklift will be provided on-site, and the contractor must provide their own.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DDWG Bldg. 351Compressors (002).jpg | JPG image | |
| Amendment 0005 SF30 SP330024Q0162.pdf | ||
| Question and Answers SP330024Q0162 round 2.docx | DOCX document | |
| Amendment 0004 SF30 SP330024Q0162.pdf | ||
| 20240523_140659_001.jpg | JPG image | |
| C6 - Schedule of Supplies - updated 3June2024.xlsx | XLSX spreadsheet | |
| DDWG Bldg. 351 Air Compressor SOW Revised 31 May 24.docx | DOCX document | |
| Amendment 0003 SF30 SP330024Q0162.pdf | ||
| DDWG Bldg. 351 Air Compressor SOW Revised 28 May 24.docx | DOCX document | |
| Amendment 0002 SF30 SP330024Q0162.pdf | ||
| C6 - Schedule of Supplies - updated 15May2024.xlsx | XLSX spreadsheet | |
| DDWG Bldg. 351 Air Compressor SOW Revised 15 May 24.docx | DOCX document | |
| Amendment 0001 SF30 SP330024Q0162.pdf | ||
| A3 - DDWG Bldg. 351 Air Compressor Layout.pdf | ||
| C6 - Combined Syn Sol 24Q0162 Air Compressors.pdf | ||
| C6 - Schedule of Supplies.xlsx | XLSX spreadsheet | |
| A3 - DDWG Bldg. 351 Air Compressor SOW 23 Apr 24.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Electrical sizing:
Are the existing disconnects at least 60A (460V/3-Phase) and fusible?
Are the existing whips long enough to hook up to our new units or will we be responsible for replacing the whips with new ones?
A: The disconnects are both 100 amp , 480 Volt, 3 phase equipped with fuses.
1. Forklift:
Will the site have a forklift available for use to remove and set the new units?
A: No. This is to be contractor provided.
1. Pipe sizing:
Is the existing pipe 2” pipe, if so, what is the manufacturer of the pipe? A lot of aluminum pipe vendors have slight dimension differences.
A: The pipe is 2”. The manufacturer is unknown.
1. Drain lines:
Is there an existing oil water separator on site, for removal of oil in the condensation before drains.
A: There is an existing oil water separator but this needs replaced because the existing unit is over 30 years old. See revised paragraph 2.2
1. Hauling off units:
Will we be responsible for hauling off the old units?
Previous jobs on this air force base have kept the units on site for proper disposal, we are capable of this as well.
A: No. The responsibility of the contractor is to just palletize the old equipment for turn into DLA Disposition. Refer to SOW paragraph 3 I.