CDRL_A004_-_SSDRP.pdf

PDF 286 KB Posted

Attached to
Distribution and Warehouse Services Federal contract opportunity
Solicitation number
SP3300-18-R-5004
Issued by
Defense Logistics Agency Distribution

About this file

CDRL A004

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehouse Services, newest first.
File Type Posted
RFP_SP3300-18-R-5004_Sections_B_-_M_(2-14-18)_TRACKED.docx DOCX document
Attachment J.37, TE 5.12N Air TCSP Customer Listing.pdf PDF
Attachment J.6, TE 3.4 GE-MHE —
A013 - Monthly Cost Report for Material Support CLIN.pdf PDF
Attachment J.8, TE 3.6 GE-Office Equipment DOC document
A010 - Cost Report for CLIN X001.pdf PDF
Attachment J.2, DDGM Site Specific DOC document
A015 - Monthly Cost Report for Special Projects and SS CLIN.pdf PDF
Attachment_J.3,_Wage_Determination.pdf PDF
CDRL_A020_-_Shipment_to_Restricted_Country_-_Approval_Necessary.pdf PDF
CDRL_A030_-_Phase-Out_Plan.pdf PDF
Attachment_J.20,_TE_4.3_MHE_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.15,_TE_3.1_Government_Facilities.doc DOC document
Attachment_J.5,_CLIN_X006_Labor_Rate_Table.xlsx XLSX spreadsheet
CDRL_A036_-_MPC_Cargo_On_Hand_Report.pdf PDF
Attachment_J.10,_Past_Performance_Questionnaire.docx DOCX document
CDRL_A016_-_Open_and_Unconfirmed_Material_Release_Orders.pdf PDF
CDRL_A031_-_MHE_Corrosion_Control_Program.pdf PDF
Attachment_J.24,_TE_5.1_DDGM_Historical_Workload_Through_September_2017.xls XLS spreadsheet
CDRL_A011_-_Cost_Report_for_Equip_Maint_CLIN.pdf PDF
Attachment_J.8,_GE_-_Office_Equipment.doc DOC document
Attachment_J.7,_GE_-_Miscellaneous.docx DOCX document
Attachment_J.22,_TE_4.5_Other_Equipment_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.26,_TE_5.11_Transshipment_of_Hazardous_Assets.doc DOC document
CDRL_A002_-_SOH_Plan_and_Reporting.pdf PDF
CDRL_A001_-_Transition_Plan_and_Weekly_Reports.pdf PDF
Attachment_J.32,_TE_5.8N_Leak_Monitoring_Detection_and_Transfer_Procdures.docx DOCX document
CDRL_A033_-_ODS_Leak_Detection_Report.pdf PDF
CDRL_A013_-_Cost_Report_for_Material_Support_CLIN.pdf PDF
Attachment_J.6,_GE_-_Material_Handling_Equipment.doc DOC document
CDRL_A019_-_Storage_Space_Management_Report.pdf PDF
CDRL_A012_-_Cost_Report_for_Non-Capital_Equip_Replacement_CLIN.pdf PDF
Attachment_J.29,_TE_6.1_Government_Forms.docx DOCX document
Attachment_J.34_Proposed_Training_Hours_(3-31-17).xlsx XLSX spreadsheet
Attachment_J.4,_DD254.pdf PDF
CDRL_A032_-_Hazardous_Materials_Standard_Operating_Procedures.pdf PDF
Attachment_J.3,_Collective_Bargaining_Agreement.pdf PDF
Attachment_J.29,_TE_6.1_Government_Forms.docx DOCX document
Attachment_J.31,_TE_5.7N_Local_Delivery.doc DOC document
Attachment_J.28,_TE_5.9_DSS_Load_and_Maintain.docx DOCX document
Attachment_J.23,_TE_5.0_Acceptable_Performance_Levels.doc DOC document
Attachment_J.17,_TE_3.3_Government_Data_Systems.doc DOC document
J.11_-_CDRLs.zip ZIP file
Attachment_J.1,_Section_C_-_PWS_(12-21-17)_.docx DOCX document
Attachment_J.34_Proposed_Training_Hours_(3-31-17).xlsx XLSX spreadsheet
Attachment_J.26,_TE_5.11_Transshipment_of_Hazardous_Assets.doc DOC document
Attachment_J.16,_TE_3.2_Government_Training.docx DOCX document
Attachment_J.7,_GE_-_Miscellaneous.docx DOCX document
Attachment_J.30,_TE_5.6N_MPC_Homeported_Ships.docx DOCX document
Attachment_J.33_Proposed_Productive_Hours.xlsx XLSX spreadsheet
Show all 50

Distribution and Warehouse Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

DD FORM 1423-1, FEB 2001 Page 2of 2

The Contractor’s SSDRP shall address at a minimum the following:

1. Potential impacts caused by each type of adverse situation.

2. Primary issues.

3. Strategy for response.

4. Primary and alternate points of contact.

5. Communication and coordination with the Government.

6. Process to achieve recovery and resumption of full service.

7. Approach to recruitment and hiring of personnel (i.e., temporary labor) on short notice.

8. Assessment of the local labor market and the Contractor’s ability to hire qualified personnel.

9. Process to be used to hire personnel to include timing of offers, length the offer remains open, any contingencies and start dates. Critical skills and transactional systems knowledge required to maintain performance and contingency for immediate loss of skills and knowledge.

10. Development of a contingent workforce (both management and labor) that has the requisite knowledge, skills, abilities, and applicable licenses and qualifications to perform the workload.

11. Strategy for maintaining a trained workforce in Distribution Operations, DSS and all other transactional data systems required for contingency operations.

12. Strategy for ensuring the contingent workforce is familiar and shall address the Contractor's methodology and processes for assessing the situation, determining the appropriate response, achieving recovery, and meeting performance standards when there is a disruption in normal workload I.A.W.

PWS Paragraph C-1.9.2

1_DATA_ITEM_NO: A004
2_TITLE_OF_DATA_ITEM: Surge, Sustainment, and Disaster Recovery Plan (SSDRP)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.1, Paragraph C-1.9.2
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: B
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS:

Tailored to permit contractor's format. Submit electronically

The SSDRP shall be submitted NLT 30 days prior start of full performance and be complimentary to the distribution sites Continuity of Operations (COOP) and Emergency Action (EAP) Plans.

Submit the information identified in the table on page 2 as changes occur to the COOP and EAP or at minimum on a annual basis.

Subsequent submissions shall be submitted when the Contractor updates or revises the SSDRP within 30 calendar days of the change.

Block 7 - Inspection and acceptance requirements:

The KO will review and accept the SSDRP and updates after coordination with COR and J-3 Depot Operations review and comments.

Block 14 - Distribution - Contractor to submit original to Contract Specialist and copy to the COR.

Block I - Approved By - Signature of Government official accepting the Contractor's reporting requirements of this CDRL will be the the KO.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X007
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 2
Reset:
2017-12-01T13:46:01-0500
CRUSEY.SHANE.M.1287981151
2017-12-04T12:57:46-0500
FLICK.CLIFFORD.C.1032268311

File details come from the government source that posted it.