ATTACHMENT_03_-_Digital_Signage_Locations_List_9-13-17.pdf
PDF 87 KB Posted
- Attached to
- Digital Signage System Federal contract opportunity
- Solicitation number
- SP3300-17-Q-0091
- Issued by
- Defense Logistics Agency Distribution
About this file
Revised Attachment 03
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Rev-ATTACHMENT_02_-_SOW_(12_Sept_17).docx | DOCX document | |
| ATTACHMENT_01_-_Schedule_of_Supplies(12_Sept_17).pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| ATTACHMENT_01_-_Schedule_of_Supplies.pdf | ||
| ATTACHMENT_07_-_Brand_Name_Memo.pdf | ||
| Amendment_0001.pdf | ||
| ATTACHMENT_02_-_SOW.pdf | ||
| ATTACHMENT_01_-_Schedule_of_Supplies.pdf | ||
| Synopsis_(Combined)_-_SP3300-17-Q-0091.pdf | ||
| ATTACHMENT_05_-_Digital_Signage_Location_Pictures.pdf | ||
| ATTACHMENT_03_-_Digital_Signage_Locations_List_7-11-17.pdf | ||
| ATTACHMENT_06_-_Section_508_GPAT,_Software_Development_Services.pdf | ||
| ATTACHMENT_04_-_Signage_Locations_Map.pdf | ||
| ATTACHMENT_02_-_SOW.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Warehouse Location Mount Height TV size
1 29-1 Breakroom South wall 8' 42" 2 29-3 Warehouse West Wall 15' 70" 3 29-4 Base Supply Breakroom North wall 8' 42" 4 30-1 CCP Breakroom South Wall 8' 42"
5 30-1 CCP ALOC
On pole, looking East, 2nd center I-beam 18' 70"
6 30-1 CCP ALOC
On pole, looking East, 2nd I-beam from south end 18' 70"
7 30-1 CCP by Out Loading Cubicle South Wall 18' 70" 8 30-2 UGR Breakroom South Wall 8' 42" 9 30-2 UGR Line North Wall 18' 70" 10 Bldg. 31 Truck Control Breakroom North West Corner 8' 42"
11 6-2 Distribution Services On pole, 4th Collumn South of Row 27 10' 70'
12 13-3 Bubble Breakroom East wall 8' 42" 13 14-3 Bubble Breakroom West Wall 8' 42" 14 17-3 Bubble Breakroom South Wall 8' 42" 15 20-2 Bubble Breakroom South Wall 8' 42" 16 56-3 Breakroom East Wall 8' 42" 17 56-3 Bulk Pack Station North wall 18' 70" 18 56-4 Breakroom East Wall 7' 42" 19 57-1 Warehouse North wall 20' 70" 20 57- 2 Bubble Breakroom North East Corner 8' 55" 21 58-2 Breakroom North-West Corner 8' 42"
22 59- breakroom East wall 8' 55" 23 16 Cafeteria North West wall 10' 55"
24 16 Mezz (on corner near VTC CR) North West Corner, east of Conference Rm 12' 55"
25 16-A1 Bin room South wall on bins 15' 55"
26 16-B3 Breakroom 1 South west wall, between 2 windows 8' 42"
27 16-B3 Breakroom 2 West Wall, between 2 windows 8' 42"
28 16-B5 Bin Packing On pole between Workstations 18' 70"
29 16-A5 Break Room North wall 8' 42" 30 19-3 Bubble Big Breakroom West wall 8' 42" 31 19-3 Bubble Small Breakroom West wall 8' 42" 32 21-2 Warehouse North wall 12' 70" 33 21-5 NRFI West Wall 12' 55" 34 22-1 Box Shop East Wall 8' 70" 35 22-3 Breakroom 1 North wall 8' 42" 36 15-3 Breakroom South west wall corner 8' 42" 37 28 Hazardous Breakroom South wall 8' 55"
ATTACHMENT 3_Digital Signage Locations
38 Bldg. 201 AMHS Conference Room, West wall 8' 42"
39 Bldg. 231 Union Hall Union main lobby 8' 42"
40 Bldg. 235 Public Safety Main breakroom East side, on north wall by cabinets 8' 55"
41 Bldg. 100 Cafeteria North wall by kitchen entrance and exit 10' 55"
42 Bldg. 100, Room 2 Wall right of PAO office 8' 42"
43 Bldg. 100, Main Lobby North Wall 6' 42"
44 Bldg. 100, Classroom 51 North-West Wall 6' 42" 45 Bldg. 18-3 Breakroom East Wall 7' 42"
Use For Contract
File details come from the government source that posted it. Updated .