Attachment_2_Schedual_of_Supplies.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
MHE Maintenance for DDRT Federal contract opportunity
Solicitation number
SP3300-15-Q-0084
Issued by
Defense Logistics Agency Distribution

About this file

Schedule of Supplies (ExCell Fill In)

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BaseYear

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 0001 BaseYear - September 24, 2015 - September 23, 2016
FIRM FIXED PRICE
CLIN 0001AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work12MO$0.00

FIRM FIXED PRICE-PM SERVICES

CLIN 0001AB Semi-Annual PM
Warehouse sweeper, riding1EA$0.00
Turret truck, wire-guided3EA$0.00
Trailer semi 20 ton stake2EA$0.00
Tractor, warehouse gas prt 75001EA$0.00
Stock selector wire-guided8EA$0.00
Stock selector 168-218"3EA$0.00
Truck, aircraft k-loader1EA$0.00
Scooter, 3 or 4 wheel20EA$0.00
Ramp loading3EA$0.00
Forklift, gas prt 6k 180-189"13EA$0.00
Forklift, dsl prt 6k 100-189"6EA$0.00
Forklift, dsl 15k 144-210"1EA$0.00
Forklift, dsl prt 10k side1EA$0.00
Forklift, gas prt 4k 180-187"2EA$0.00
Forklift, dsl 6k prtswmst1EA$0.00
Forklift, elec 4k 36v 144-168"2EA$0.00
Forklift, elec fr/s 5/4/3 217"1EA$0.00
Forklift, gas srt 4k 180"1EA$0.00
Pallet jack, elec srt 4k wk1EA$0.00
Pallet jack5EA$0.00
Generator portable 5-9 kw4EA$0.00
Crane, 1/2 ton6EA$0.00
Crane, 1 ton1EA$0.00
Crane, 2 ton1EA$0.00
Utility truck1EA$0.00
CLIN 0001AC Annual PM
Warehouse trailer114EA$0.00
Warehouse sweeper-riding1EA$0.00
Turret truck, wire-guided3EA$0.00
Trailer semi 20 ton stake2EA$0.00
Tractor, warehouse gas prt 75001EA$0.00
Stock selector wire-guided8EA$0.00
Stock selector 168-218"3EA$0.00
Truck, aircraft k-loader1EA$0.00
Scooter, 3 or 4 wheel20EA$0.00
Ramp loading3EA$0.00
Forklift, gas prt 6k 180-189"13EA$0.00
Forklift, dsl prt 6k 100-189"6EA$0.00
Forklift, dsl 15k 144-210"1EA$0.00
Forklift, dsl prt 10k side1EA$0.00
Forklift, gas prt 4k 180-187"2EA$0.00
Forklift, dsl 6k prtswmst1EA$0.00
Forklift, elec 4k 36v 144-168"2EA$0.00
Forklift, elec fr/s 5/4/3 217"1EA$0.00
Forklift, gas srt 4k 180"1EA$0.00
Pallet jack, elec srt 4k wk1EA$0.00
Pallet jack5EA$0.00
Generator portable 5-9 kw4EA$0.00
Crane, 1/2 ton6EA$0.00
Crane, 1 ton1EA$0.00
Crane, 2 ton1EA$0.00
Battery charger30EA$0.00
Utility truck1EA$0.00
TOTAL FIRM FIXED PRICE FOR PM SERVICES$0.00
FIRM FIXED PRICE
CLIN 0001AD Contractor Manpower Reporting1YR$0.00
TIME AND MATERIALS
Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi TexasCEILING PRICE
CLIN 0001AE Labor Hours performed during the Principal Period of Maintenance3625HR$0.00
CLIN 0001AF Labor Hours performed outisde the Principal Period of Maintenance100HR$0.00

CLIN 0001AG Replacement Parts for Remedial Maintenance (Actual Costs) NTE $100,000.00

CLIN 0001 AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$0.00
TOTAL TIME AND MATERIALS$100,000.00

TOTAL BASE YEAR CEILING PRICE $100,000.00

Total Costs for Base Year with 2 Options $300,000.00

&"Arial,Bold"&12IGCE-MHE MAINTENANCE SERVICE &D

Source selection information See far 2.101and 3.104

OptionYear1

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 1001 OptionYear1 - September 24, 2016 - September 23, 2017
FIRM FIXED PRICE
CLIN 1001AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work12MO$0.00

FIRM FIXED PRICE-PM SERVICES

CLIN 1001AB Semi-Annual PM
Warehouse sweeper, riding1EA$0.00
Turret truck, wire-guided3EA$0.00
Trailer semi 20 ton stake2EA$0.00
Tractor, warehouse gas prt 75001EA$0.00
Stock selector wire-guided8EA$0.00
Stock selector 168-218"3EA$0.00
Truck, aircraft k-loader1EA$0.00
Scooter, 3 or 4 wheel20EA$0.00
Ramp loading3EA$0.00
Forklift, gas prt 6k 180-189"13EA$0.00
Forklift, dsl prt 6k 100-189"6EA$0.00
Forklift, dsl 15k 144-210"1EA$0.00
Forklift, dsl prt 10k side1EA$0.00
Forklift, gas prt 4k 180-187"2EA$0.00
Forklift, dsl 6k prtswmst1EA$0.00
Forklift, elec 4k 36v 144-168"2EA$0.00
Forklift, elec fr/s 5/4/3 217"1EA$0.00
Forklift, gas srt 4k 180"1EA$0.00
Pallet jack, elec srt 4k wk1EA$0.00
Pallet jack5EA$0.00
Generator portable 5-9 kw4EA$0.00
Crane, 1/2 ton6EA$0.00
Crane, 1 ton1EA$0.00
Crane, 2 ton1EA$0.00
Utility truck1EA$0.00
CLIN 1001AC Annual PM
Warehouse trailer114EA$0.00
Warehouse sweeper-riding1EA$0.00
Turret truck, wire-guided3EA$0.00
Trailer semi 20 ton stake2EA$0.00
Tractor, warehouse gas prt 75001EA$0.00
Stock selector wire-guided8EA$0.00
Stock selector 168-218"3EA$0.00
Truck, aircraft k-loader1EA$0.00
Scooter, 3 or 4 wheel20EA$0.00
Ramp loading3EA$0.00
Forklift, gas prt 6k 180-189"13EA$0.00
Forklift, dsl prt 6k 100-189"6EA$0.00
Forklift, dsl 15k 144-210"1EA$0.00
Forklift, dsl prt 10k side1EA$0.00
Forklift, gas prt 4k 180-187"2EA$0.00
Forklift, dsl 6k prtswmst1EA$0.00
Forklift, elec 4k 36v 144-168"2EA$0.00
Forklift, elec fr/s 5/4/3 217"1EA$0.00
Forklift, gas srt 4k 180"1EA$0.00
Pallet jack, elec srt 4k wk1EA$0.00
Pallet jack5EA$0.00
Generator portable 5-9 kw4EA$0.00
Crane, 1/2 ton6EA$0.00
Crane, 1 ton1EA$0.00
Crane, 2 ton1EA$0.00
Battery charger30EA$0.00
Utility truck1EA$0.00
TOTAL FIRM FIXED PRICE FOR PM SERVICES$0.00
FIRM FIXED PRICE
CLIN 1001AD Contractor Manpower Reporting1YR$0.00
TIME AND MATERIALS
Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi TexasCEILING PRICE
CLIN 1001AE Labor Hours performed during the Principal Period of Maintenance3625HR$0.00
CLIN 1001AF Labor Hours performed outside the Principal Period of Maintenance100HR$0.00

CLIN 1001AG Replacement Parts for Remedial Maintenance (Actual Costs) NTE $100,000.00

CLIN 1001AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$0.00
TOTAL TIME AND MATERIALS$100,000.00

TOTAL OPTION YEAR 1 CEILING PRICE $100,000.00

&"Arial,Bold"&12IGCE-MHE MAINTENANCE SERVICE

OptionYear2

DESCRIPTIONQTYU/IUNIT PRICETOTAL PRICE
CLIN 2001 OptionYear2 - September 24, 2017 - September 23, 2018
FIRM FIXED PRICE
CLIN 2001 AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work12MO$0.00

FIRM FIXED PRICE-PM SERVICES

CLIN 2001AB Semi-Annual PM
Warehouse sweeper, riding1EA$0.00
Turret truck, wire-guided3EA$0.00
Trailer semi 20 ton stake2EA$0.00
Tractor, warehouse gas prt 75001EA$0.00
Stock selector wire-guided8EA$0.00
Stock selector 168-218"3EA$0.00
Truck, aircraft k-loader1EA$0.00
Scooter, 3 or 4 wheel20EA$0.00
Ramp loading3EA$0.00
Forklift, gas prt 6k 180-189"13EA$0.00
Forklift, dsl prt 6k 100-189"6EA$0.00
Forklift, dsl 15k 144-210"1EA$0.00
Forklift, dsl prt 10k side1EA$0.00
Forklift, gas prt 4k 180-187"2EA$0.00
Forklift, dsl 6k prtswmst1EA$0.00
Forklift, elec 4k 36v 144-168"2EA$0.00
Forklift, elec fr/s 5/4/3 217"1EA$0.00
Forklift, gas srt 4k 180"1EA$0.00
Pallet jack, elec srt 4k wk1EA$0.00
Pallet jack5EA$0.00
Generator portable 5-9 kw4EA$0.00
Crane, 1/2 ton6EA$0.00
Crane, 1 ton1EA$0.00
Crane, 2 ton1EA$0.00
Utility truck1EA$0.00
CLIN 2001AC Annual PM
Warehouse trailer114EA$0.00
Warehouse sweeper-riding1EA$0.00
Turret truck, wire-guided3EA$0.00
Trailer semi 20 ton stake2EA$0.00
Tractor, warehouse gas prt 75001EA$0.00
Stock selector wire-guided8EA$0.00
Stock selector 168-218"3EA$0.00
Truck, aircraft k-loader1EA$0.00
Scooter, 3 or 4 wheel20EA$0.00
Ramp loading3EA$0.00
Forklift, gas prt 6k 180-189"13EA$0.00
Forklift, dsl prt 6k 100-189"6EA$0.00
Forklift, dsl 15k 144-210"1EA$0.00
Forklift, dsl prt 10k side1EA$0.00
Forklift, gas prt 4k 180-187"2EA$0.00
Forklift, dsl 6k prtswmst1EA$0.00
Forklift, elec 4k 36v 144-168"2EA$0.00
Forklift, elec fr/s 5/4/3 217"1EA$0.00
Forklift, gas srt 4k 180"1EA$0.00
Pallet jack, elec srt 4k wk1EA$0.00
Pallet jack5EA$0.00
Generator portable 5-9 kw4EA$0.00
Crane, 1/2 ton6EA$0.00
Crane, 1 ton1EA$0.00
Crane, 2 ton1EA$0.00
Battery charger30EA$0.00
Utility truck1EA$0.00
TOTAL FIRM FIXED PRICE FOR PM SERVICES$0.00
FIRM FIXED PRICE
CLIN 2001AD Contractor Manpower Reporting1YR$0.00
TIME AND MATERIALS
Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi TexasCEILING PRICE
CLIN 2001AE Labor Hours performed during the Principal Period of Maintenance3625HR$0.00
CLIN 2001AF Labor Hours performed outside the Principal Period of Maintenance100HR$0.00

CLIN 2001AG Replacement Parts for Remedial Maintenance (Actual Costs) NTE $100,000.00

CLIN 2001AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.$0.00
TOTAL TIME AND MATERIALS$100,000.00

TOTAL OPTION YEAR 2 CEILING PRICE $100,000.00

&"Arial,Bold"&12IGCE-MHE MAINTENANCE SERVICE

&P

File details come from the government source that posted it. Updated .