Attachment_2_Schedual_of_Supplies.xlsx
XLSX spreadsheet 45 KB Posted
- Attached to
- MHE Maintenance for DDRT Federal contract opportunity
- Solicitation number
- SP3300-15-Q-0084
- Issued by
- Defense Logistics Agency Distribution
About this file
Schedule of Supplies (ExCell Fill In)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_18_SF1449.pdf | ||
| Amendment_00001.pdf | ||
| Attachment_6_Evaluation_Factors_for_Award.pdf | ||
| Attachment_3_SOW.pdf | ||
| Attachment_17_Blank_EMAC.pdf | ||
| Attachment_14_CDRL_A029_for_CAC_Procedures.pdf | ||
| Attachment_1_Schedule_of_Supplies.pdf | ||
| Attachment_7_Offer_Submission_Instructions.pdf | ||
| Attachment_16_Wage_Det.pdf | ||
| Attachment_5_CERTIFICATION_OF_OFFEROR.pdf | ||
| Attachment_4_Equipment_List.pdf | ||
| Attachment_15_DLA_SOP_J72.001.pdf | ||
| Attachment_10_Tech_Insp_Form.pdf | ||
| Attachment_11_Sample_Maintenance_Workorder.pdf | ||
| Attachment_13_TE_1.2_CAC_Procedures.pdf | ||
| Attachment_8_Past_Performance_Eval.pdf | ||
| Attachment_12_TE_1.1__Contractor_Personnel_Security_.pdf | ||
| Attachment_9_Maintenance_Task_List.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BaseYear
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 0001 BaseYear - September 24, 2015 - September 23, 2016 |
| FIRM FIXED PRICE | |||
| CLIN 0001AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work | 12 | MO | $0.00 |
FIRM FIXED PRICE-PM SERVICES
| CLIN 0001AB Semi-Annual PM | |||
| Warehouse sweeper, riding | 1 | EA | $0.00 |
| Turret truck, wire-guided | 3 | EA | $0.00 |
| Trailer semi 20 ton stake | 2 | EA | $0.00 |
| Tractor, warehouse gas prt 7500 | 1 | EA | $0.00 |
| Stock selector wire-guided | 8 | EA | $0.00 |
| Stock selector 168-218" | 3 | EA | $0.00 |
| Truck, aircraft k-loader | 1 | EA | $0.00 |
| Scooter, 3 or 4 wheel | 20 | EA | $0.00 |
| Ramp loading | 3 | EA | $0.00 |
| Forklift, gas prt 6k 180-189" | 13 | EA | $0.00 |
| Forklift, dsl prt 6k 100-189" | 6 | EA | $0.00 |
| Forklift, dsl 15k 144-210" | 1 | EA | $0.00 |
| Forklift, dsl prt 10k side | 1 | EA | $0.00 |
| Forklift, gas prt 4k 180-187" | 2 | EA | $0.00 |
| Forklift, dsl 6k prtswmst | 1 | EA | $0.00 |
| Forklift, elec 4k 36v 144-168" | 2 | EA | $0.00 |
| Forklift, elec fr/s 5/4/3 217" | 1 | EA | $0.00 |
| Forklift, gas srt 4k 180" | 1 | EA | $0.00 |
| Pallet jack, elec srt 4k wk | 1 | EA | $0.00 |
| Pallet jack | 5 | EA | $0.00 |
| Generator portable 5-9 kw | 4 | EA | $0.00 |
| Crane, 1/2 ton | 6 | EA | $0.00 |
| Crane, 1 ton | 1 | EA | $0.00 |
| Crane, 2 ton | 1 | EA | $0.00 |
| Utility truck | 1 | EA | $0.00 |
| CLIN 0001AC Annual PM | |||
| Warehouse trailer | 114 | EA | $0.00 |
| Warehouse sweeper-riding | 1 | EA | $0.00 |
| Turret truck, wire-guided | 3 | EA | $0.00 |
| Trailer semi 20 ton stake | 2 | EA | $0.00 |
| Tractor, warehouse gas prt 7500 | 1 | EA | $0.00 |
| Stock selector wire-guided | 8 | EA | $0.00 |
| Stock selector 168-218" | 3 | EA | $0.00 |
| Truck, aircraft k-loader | 1 | EA | $0.00 |
| Scooter, 3 or 4 wheel | 20 | EA | $0.00 |
| Ramp loading | 3 | EA | $0.00 |
| Forklift, gas prt 6k 180-189" | 13 | EA | $0.00 |
| Forklift, dsl prt 6k 100-189" | 6 | EA | $0.00 |
| Forklift, dsl 15k 144-210" | 1 | EA | $0.00 |
| Forklift, dsl prt 10k side | 1 | EA | $0.00 |
| Forklift, gas prt 4k 180-187" | 2 | EA | $0.00 |
| Forklift, dsl 6k prtswmst | 1 | EA | $0.00 |
| Forklift, elec 4k 36v 144-168" | 2 | EA | $0.00 |
| Forklift, elec fr/s 5/4/3 217" | 1 | EA | $0.00 |
| Forklift, gas srt 4k 180" | 1 | EA | $0.00 |
| Pallet jack, elec srt 4k wk | 1 | EA | $0.00 |
| Pallet jack | 5 | EA | $0.00 |
| Generator portable 5-9 kw | 4 | EA | $0.00 |
| Crane, 1/2 ton | 6 | EA | $0.00 |
| Crane, 1 ton | 1 | EA | $0.00 |
| Crane, 2 ton | 1 | EA | $0.00 |
| Battery charger | 30 | EA | $0.00 |
| Utility truck | 1 | EA | $0.00 |
| TOTAL FIRM FIXED PRICE FOR PM SERVICES | $0.00 |
| FIRM FIXED PRICE | |||
| CLIN 0001AD Contractor Manpower Reporting | 1 | YR | $0.00 |
| TIME AND MATERIALS | |||
| Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi Texas | CEILING PRICE | ||
| CLIN 0001AE Labor Hours performed during the Principal Period of Maintenance | 3625 | HR | $0.00 |
| CLIN 0001AF Labor Hours performed outisde the Principal Period of Maintenance | 100 | HR | $0.00 |
CLIN 0001AG Replacement Parts for Remedial Maintenance (Actual Costs) NTE $100,000.00
| CLIN 0001 AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work. | $0.00 |
| TOTAL TIME AND MATERIALS | $100,000.00 |
TOTAL BASE YEAR CEILING PRICE $100,000.00
Total Costs for Base Year with 2 Options $300,000.00
&"Arial,Bold"&12IGCE-MHE MAINTENANCE SERVICE &D
Source selection information See far 2.101and 3.104
OptionYear1
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 1001 OptionYear1 - September 24, 2016 - September 23, 2017 |
| FIRM FIXED PRICE | |||
| CLIN 1001AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work | 12 | MO | $0.00 |
FIRM FIXED PRICE-PM SERVICES
| CLIN 1001AB Semi-Annual PM | |||
| Warehouse sweeper, riding | 1 | EA | $0.00 |
| Turret truck, wire-guided | 3 | EA | $0.00 |
| Trailer semi 20 ton stake | 2 | EA | $0.00 |
| Tractor, warehouse gas prt 7500 | 1 | EA | $0.00 |
| Stock selector wire-guided | 8 | EA | $0.00 |
| Stock selector 168-218" | 3 | EA | $0.00 |
| Truck, aircraft k-loader | 1 | EA | $0.00 |
| Scooter, 3 or 4 wheel | 20 | EA | $0.00 |
| Ramp loading | 3 | EA | $0.00 |
| Forklift, gas prt 6k 180-189" | 13 | EA | $0.00 |
| Forklift, dsl prt 6k 100-189" | 6 | EA | $0.00 |
| Forklift, dsl 15k 144-210" | 1 | EA | $0.00 |
| Forklift, dsl prt 10k side | 1 | EA | $0.00 |
| Forklift, gas prt 4k 180-187" | 2 | EA | $0.00 |
| Forklift, dsl 6k prtswmst | 1 | EA | $0.00 |
| Forklift, elec 4k 36v 144-168" | 2 | EA | $0.00 |
| Forklift, elec fr/s 5/4/3 217" | 1 | EA | $0.00 |
| Forklift, gas srt 4k 180" | 1 | EA | $0.00 |
| Pallet jack, elec srt 4k wk | 1 | EA | $0.00 |
| Pallet jack | 5 | EA | $0.00 |
| Generator portable 5-9 kw | 4 | EA | $0.00 |
| Crane, 1/2 ton | 6 | EA | $0.00 |
| Crane, 1 ton | 1 | EA | $0.00 |
| Crane, 2 ton | 1 | EA | $0.00 |
| Utility truck | 1 | EA | $0.00 |
| CLIN 1001AC Annual PM | |||
| Warehouse trailer | 114 | EA | $0.00 |
| Warehouse sweeper-riding | 1 | EA | $0.00 |
| Turret truck, wire-guided | 3 | EA | $0.00 |
| Trailer semi 20 ton stake | 2 | EA | $0.00 |
| Tractor, warehouse gas prt 7500 | 1 | EA | $0.00 |
| Stock selector wire-guided | 8 | EA | $0.00 |
| Stock selector 168-218" | 3 | EA | $0.00 |
| Truck, aircraft k-loader | 1 | EA | $0.00 |
| Scooter, 3 or 4 wheel | 20 | EA | $0.00 |
| Ramp loading | 3 | EA | $0.00 |
| Forklift, gas prt 6k 180-189" | 13 | EA | $0.00 |
| Forklift, dsl prt 6k 100-189" | 6 | EA | $0.00 |
| Forklift, dsl 15k 144-210" | 1 | EA | $0.00 |
| Forklift, dsl prt 10k side | 1 | EA | $0.00 |
| Forklift, gas prt 4k 180-187" | 2 | EA | $0.00 |
| Forklift, dsl 6k prtswmst | 1 | EA | $0.00 |
| Forklift, elec 4k 36v 144-168" | 2 | EA | $0.00 |
| Forklift, elec fr/s 5/4/3 217" | 1 | EA | $0.00 |
| Forklift, gas srt 4k 180" | 1 | EA | $0.00 |
| Pallet jack, elec srt 4k wk | 1 | EA | $0.00 |
| Pallet jack | 5 | EA | $0.00 |
| Generator portable 5-9 kw | 4 | EA | $0.00 |
| Crane, 1/2 ton | 6 | EA | $0.00 |
| Crane, 1 ton | 1 | EA | $0.00 |
| Crane, 2 ton | 1 | EA | $0.00 |
| Battery charger | 30 | EA | $0.00 |
| Utility truck | 1 | EA | $0.00 |
| TOTAL FIRM FIXED PRICE FOR PM SERVICES | $0.00 |
| FIRM FIXED PRICE | |||
| CLIN 1001AD Contractor Manpower Reporting | 1 | YR | $0.00 |
| TIME AND MATERIALS | |||
| Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi Texas | CEILING PRICE | ||
| CLIN 1001AE Labor Hours performed during the Principal Period of Maintenance | 3625 | HR | $0.00 |
| CLIN 1001AF Labor Hours performed outside the Principal Period of Maintenance | 100 | HR | $0.00 |
CLIN 1001AG Replacement Parts for Remedial Maintenance (Actual Costs) NTE $100,000.00
| CLIN 1001AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work. | $0.00 |
| TOTAL TIME AND MATERIALS | $100,000.00 |
TOTAL OPTION YEAR 1 CEILING PRICE $100,000.00
&"Arial,Bold"&12IGCE-MHE MAINTENANCE SERVICE
OptionYear2
| DESCRIPTION | QTY | U/I | UNIT PRICE | TOTAL PRICE |
| CLIN 2001 OptionYear2 - September 24, 2017 - September 23, 2018 |
| FIRM FIXED PRICE | |||
| CLIN 2001 AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work | 12 | MO | $0.00 |
FIRM FIXED PRICE-PM SERVICES
| CLIN 2001AB Semi-Annual PM | |||
| Warehouse sweeper, riding | 1 | EA | $0.00 |
| Turret truck, wire-guided | 3 | EA | $0.00 |
| Trailer semi 20 ton stake | 2 | EA | $0.00 |
| Tractor, warehouse gas prt 7500 | 1 | EA | $0.00 |
| Stock selector wire-guided | 8 | EA | $0.00 |
| Stock selector 168-218" | 3 | EA | $0.00 |
| Truck, aircraft k-loader | 1 | EA | $0.00 |
| Scooter, 3 or 4 wheel | 20 | EA | $0.00 |
| Ramp loading | 3 | EA | $0.00 |
| Forklift, gas prt 6k 180-189" | 13 | EA | $0.00 |
| Forklift, dsl prt 6k 100-189" | 6 | EA | $0.00 |
| Forklift, dsl 15k 144-210" | 1 | EA | $0.00 |
| Forklift, dsl prt 10k side | 1 | EA | $0.00 |
| Forklift, gas prt 4k 180-187" | 2 | EA | $0.00 |
| Forklift, dsl 6k prtswmst | 1 | EA | $0.00 |
| Forklift, elec 4k 36v 144-168" | 2 | EA | $0.00 |
| Forklift, elec fr/s 5/4/3 217" | 1 | EA | $0.00 |
| Forklift, gas srt 4k 180" | 1 | EA | $0.00 |
| Pallet jack, elec srt 4k wk | 1 | EA | $0.00 |
| Pallet jack | 5 | EA | $0.00 |
| Generator portable 5-9 kw | 4 | EA | $0.00 |
| Crane, 1/2 ton | 6 | EA | $0.00 |
| Crane, 1 ton | 1 | EA | $0.00 |
| Crane, 2 ton | 1 | EA | $0.00 |
| Utility truck | 1 | EA | $0.00 |
| CLIN 2001AC Annual PM | |||
| Warehouse trailer | 114 | EA | $0.00 |
| Warehouse sweeper-riding | 1 | EA | $0.00 |
| Turret truck, wire-guided | 3 | EA | $0.00 |
| Trailer semi 20 ton stake | 2 | EA | $0.00 |
| Tractor, warehouse gas prt 7500 | 1 | EA | $0.00 |
| Stock selector wire-guided | 8 | EA | $0.00 |
| Stock selector 168-218" | 3 | EA | $0.00 |
| Truck, aircraft k-loader | 1 | EA | $0.00 |
| Scooter, 3 or 4 wheel | 20 | EA | $0.00 |
| Ramp loading | 3 | EA | $0.00 |
| Forklift, gas prt 6k 180-189" | 13 | EA | $0.00 |
| Forklift, dsl prt 6k 100-189" | 6 | EA | $0.00 |
| Forklift, dsl 15k 144-210" | 1 | EA | $0.00 |
| Forklift, dsl prt 10k side | 1 | EA | $0.00 |
| Forklift, gas prt 4k 180-187" | 2 | EA | $0.00 |
| Forklift, dsl 6k prtswmst | 1 | EA | $0.00 |
| Forklift, elec 4k 36v 144-168" | 2 | EA | $0.00 |
| Forklift, elec fr/s 5/4/3 217" | 1 | EA | $0.00 |
| Forklift, gas srt 4k 180" | 1 | EA | $0.00 |
| Pallet jack, elec srt 4k wk | 1 | EA | $0.00 |
| Pallet jack | 5 | EA | $0.00 |
| Generator portable 5-9 kw | 4 | EA | $0.00 |
| Crane, 1/2 ton | 6 | EA | $0.00 |
| Crane, 1 ton | 1 | EA | $0.00 |
| Crane, 2 ton | 1 | EA | $0.00 |
| Battery charger | 30 | EA | $0.00 |
| Utility truck | 1 | EA | $0.00 |
| TOTAL FIRM FIXED PRICE FOR PM SERVICES | $0.00 |
| FIRM FIXED PRICE | |||
| CLIN 2001AD Contractor Manpower Reporting | 1 | YR | $0.00 |
| TIME AND MATERIALS | |||
| Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi Texas | CEILING PRICE | ||
| CLIN 2001AE Labor Hours performed during the Principal Period of Maintenance | 3625 | HR | $0.00 |
| CLIN 2001AF Labor Hours performed outside the Principal Period of Maintenance | 100 | HR | $0.00 |
CLIN 2001AG Replacement Parts for Remedial Maintenance (Actual Costs) NTE $100,000.00
| CLIN 2001AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work. | $0.00 |
| TOTAL TIME AND MATERIALS | $100,000.00 |
TOTAL OPTION YEAR 2 CEILING PRICE $100,000.00