Attachment_1_Schedule_of_Supplies.pdf

PDF 97 KB Posted

Attached to
MHE Maintenance for DDRT Federal contract opportunity
Solicitation number
SP3300-15-Q-0084
Issued by
Defense Logistics Agency Distribution

About this file

Schedule of Supplies (PDF)

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGCE-MHE MAINTENANCE SERVICE 6/1/2015

DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

FIRM FIXED PRICE

CLIN 0001AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work

12 MO

FIRM FIXED PRICE-PM SERVICES

CLIN 0001AB Semi-Annual PM Warehouse sweeper, riding 1 EA Turret truck, wire-guided 3 EA Trailer semi 20 ton stake 2 EA Tractor, warehouse gas prt 7500 1 EA Stock selector wire-guided 8 EA Stock selector 168-218" 3 EA Truck, aircraft k-loader 1 EA Scooter, 3 or 4 wheel 20 EA Ramp loading 3 EA Forklift, gas prt 6k 180-189" 13 EA Forklift, dsl prt 6k 100-189" 6 EA Forklift, dsl 15k 144-210" 1 EA Forklift, dsl prt 10k side 1 EA Forklift, gas prt 4k 180-187" 2 EA Forklift, dsl 6k prtswmst 1 EA Forklift, elec 4k 36v 144-168" 2 EA Forklift, elec fr/s 5/4/3 217" 1 EA Forklift, gas srt 4k 180" 1 EA Pallet jack, elec srt 4k wk 1 EA Pallet jack 5 EA Generator portable 5-9 kw 4 EA Crane, 1/2 ton 6 EA Crane, 1 ton 1 EA Crane, 2 ton 1 EA Utility truck 1 EA

CLIN 0001AC Annual PM Warehouse trailer 114 EA Warehouse sweeper-riding 1 EA Turret truck, wire-guided 3 EA Trailer semi 20 ton stake 2 EA Tractor, warehouse gas prt 7500 1 EA Stock selector wire-guided 8 EA Stock selector 168-218" 3 EA

CLIN 0001 BaseYear - September 24, 2015 - September 23, 2016

Attachment 1

Source selection information See far 2.101and 3.104

IGCE-MHE MAINTENANCE SERVICE 6/1/2015

DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

Truck, aircraft k-loader 1 EA Scooter, 3 or 4 wheel 20 EA Ramp loading 3 EA Forklift, gas prt 6k 180-189" 13 EA Forklift, dsl prt 6k 100-189" 6 EA Forklift, dsl 15k 144-210" 1 EA Forklift, dsl prt 10k side 1 EA Forklift, gas prt 4k 180-187" 2 EA Forklift, dsl 6k prtswmst 1 EA Forklift, elec 4k 36v 144-168" 2 EA Forklift, elec fr/s 5/4/3 217" 1 EA Forklift, gas srt 4k 180" 1 EA Pallet jack, elec srt 4k wk 1 EA Pallet jack 5 EA Generator portable 5-9 kw 4 EA Crane, 1/2 ton 6 EA Crane, 1 ton 1 EA Crane, 2 ton 1 EA Battery charger 30 EA Utility truck 1 EA

TOTAL FIRM FIXED PRICE FOR PM SERVICES

FIRM FIXED PRICE

CLIN 0001AD Contractor Manpower Reporting 1 YR

TIME AND MATERIALS

Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi Texas

CEILING PRICE

CLIN 0001AE Labor Hours performed during the Principal Period of Maintenance 3625 HR CLIN 0001AF Labor Hours performed outisde the Principal Period of Maintenance 100 HR

CLIN 0001AG Replacement Parts for Remedial Maintenance (Actual Costs)

NTE $100,000.00

CLIN 0001 AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.

TOTAL TIME AND MATERIALS

TOTAL BASE YEAR CEILING PRICE

Total Costs for Base Year with 2 Options

IGCE-MHE MAINTENANCE SERVICE

DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

FIRM FIXED PRICE

CLIN 1001AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work

12 MO

FIRM FIXED PRICE-PM SERVICES

CLIN 1001AB Semi-Annual PM Warehouse sweeper, riding 1 EA Turret truck, wire-guided 3 EA Trailer semi 20 ton stake 2 EA Tractor, warehouse gas prt 7500 1 EA Stock selector wire-guided 8 EA Stock selector 168-218" 3 EA Truck, aircraft k-loader 1 EA Scooter, 3 or 4 wheel 20 EA Ramp loading 3 EA Forklift, gas prt 6k 180-189" 13 EA Forklift, dsl prt 6k 100-189" 6 EA Forklift, dsl 15k 144-210" 1 EA Forklift, dsl prt 10k side 1 EA Forklift, gas prt 4k 180-187" 2 EA Forklift, dsl 6k prtswmst 1 EA Forklift, elec 4k 36v 144-168" 2 EA Forklift, elec fr/s 5/4/3 217" 1 EA Forklift, gas srt 4k 180" 1 EA Pallet jack, elec srt 4k wk 1 EA Pallet jack 5 EA Generator portable 5-9 kw 4 EA Crane, 1/2 ton 6 EA Crane, 1 ton 1 EA Crane, 2 ton 1 EA Utility truck 1 EA

CLIN 1001AC Annual PM Warehouse trailer 114 EA Warehouse sweeper-riding 1 EA Turret truck, wire-guided 3 EA Trailer semi 20 ton stake 2 EA Tractor, warehouse gas prt 7500 1 EA Stock selector wire-guided 8 EA Stock selector 168-218" 3 EA

CLIN 1001 OptionYear1 - September 24, 2016 - September 23, 2017

Truck, aircraft k-loader 1 EA Scooter, 3 or 4 wheel 20 EA Ramp loading 3 EA Forklift, gas prt 6k 180-189" 13 EA Forklift, dsl prt 6k 100-189" 6 EA Forklift, dsl 15k 144-210" 1 EA Forklift, dsl prt 10k side 1 EA Forklift, gas prt 4k 180-187" 2 EA Forklift, dsl 6k prtswmst 1 EA Forklift, elec 4k 36v 144-168" 2 EA Forklift, elec fr/s 5/4/3 217" 1 EA Forklift, gas srt 4k 180" 1 EA Pallet jack, elec srt 4k wk 1 EA Pallet jack 5 EA Generator portable 5-9 kw 4 EA Crane, 1/2 ton 6 EA Crane, 1 ton 1 EA Crane, 2 ton 1 EA Battery charger 30 EA Utility truck 1 EA

TOTAL FIRM FIXED PRICE FOR PM SERVICES

FIRM FIXED PRICE

CLIN 1001AD Contractor Manpower Reporting 1 YR

TIME AND MATERIALS

Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi Texas

CEILING PRICE

CLIN 1001AE Labor Hours performed during the Principal Period of Maintenance 3625 HR CLIN 1001AF Labor Hours performed outside the Principal Period of Maintenance 100 HR

CLIN 1001AG Replacement Parts for Remedial Maintenance (Actual Costs)

NTE $100,000.00

CLIN 1001AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.

TOTAL TIME AND MATERIALS

TOTAL OPTION YEAR 1 CEILING PRICE

DESCRIPTION QTY U/I UNIT PRICE TOTAL PRICE

FIRM FIXED PRICE

CLIN 2001 AA Monthly Battery Preventive Maintenance Services in accordance with paragraph 3.0 in the Statement of Work

12 MO

FIRM FIXED PRICE-PM SERVICES

CLIN 2001AB Semi-Annual PM Warehouse sweeper, riding 1 EA Turret truck, wire-guided 3 EA Trailer semi 20 ton stake 2 EA Tractor, warehouse gas prt 7500 1 EA Stock selector wire-guided 8 EA Stock selector 168-218" 3 EA Truck, aircraft k-loader 1 EA Scooter, 3 or 4 wheel 20 EA Ramp loading 3 EA Forklift, gas prt 6k 180-189" 13 EA Forklift, dsl prt 6k 100-189" 6 EA Forklift, dsl 15k 144-210" 1 EA Forklift, dsl prt 10k side 1 EA Forklift, gas prt 4k 180-187" 2 EA Forklift, dsl 6k prtswmst 1 EA Forklift, elec 4k 36v 144-168" 2 EA Forklift, elec fr/s 5/4/3 217" 1 EA Forklift, gas srt 4k 180" 1 EA Pallet jack, elec srt 4k wk 1 EA Pallet jack 5 EA Generator portable 5-9 kw 4 EA Crane, 1/2 ton 6 EA Crane, 1 ton 1 EA Crane, 2 ton 1 EA Utility truck 1 EA

CLIN 2001AC Annual PM Warehouse trailer 114 EA Warehouse sweeper-riding 1 EA Turret truck, wire-guided 3 EA Trailer semi 20 ton stake 2 EA Tractor, warehouse gas prt 7500 1 EA Stock selector wire-guided 8 EA Stock selector 168-218" 3 EA

CLIN 2001 OptionYear2 - September 24, 2017 - September 23, 2018

Truck, aircraft k-loader 1 EA Scooter, 3 or 4 wheel 20 EA Ramp loading 3 EA Forklift, gas prt 6k 180-189" 13 EA Forklift, dsl prt 6k 100-189" 6 EA Forklift, dsl 15k 144-210" 1 EA Forklift, dsl prt 10k side 1 EA Forklift, gas prt 4k 180-187" 2 EA Forklift, dsl 6k prtswmst 1 EA Forklift, elec 4k 36v 144-168" 2 EA Forklift, elec fr/s 5/4/3 217" 1 EA Forklift, gas srt 4k 180" 1 EA Pallet jack, elec srt 4k wk 1 EA Pallet jack 5 EA Generator portable 5-9 kw 4 EA Crane, 1/2 ton 6 EA Crane, 1 ton 1 EA Crane, 2 ton 1 EA Battery charger 30 EA Utility truck 1 EA

TOTAL FIRM FIXED PRICE FOR PM SERVICES

FIRM FIXED PRICE

CLIN 2001AD Contractor Manpower Reporting 1 YR

TIME AND MATERIALS

Time and Materials to perform Remedial Maintenance Services in accordance with SOW for DLA Distribution Corpus Christi Texas

CLIN 2001AE Labor Hours performed during the Principal Period of Maintenance 3625 HR CLIN 2001AF Labor Hours performed outside the Principal Period of Maintenance 100 HR

CLIN 2001AG Replacement Parts for Remedial Maintenance (Actual Costs)

NTE $100,000.00

CLIN 2001AH Off-Site Transportation for major repairs of equipment in accordance with paragraph 2.1 in the Statement of Work.

TOTAL TIME AND MATERIALS

TOTAL OPTION YEAR 2 CEILING PRICE

BaseYear
OptionYear1
OptionYear2

File details come from the government source that posted it. Updated .