SB3300-15-B-0003.pdf
PDF 322 KB Posted
- Attached to
- Replace Site Primary Electrical Pathway, DLA Distribution Susquehanna, PA Federal contract opportunity
- Solicitation number
- SP3300-15-B-0003
- Issued by
- Defense Logistics Agency Distribution
About this file
SP3300-15-B-0003 Invitation for Bid
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003_23_July_2015.pdf | ||
| Amendment_0002.pdf | ||
| Site_Visit_Attendance_Sheet.pdf | ||
| Site_Visit_Notes.docx | DOCX document | |
| Amendment_0001.pdf | ||
| (5)_Attachment_E_Deliv_Notification_Form.docm | DOCM document | |
| (2)_Attachment_B_Short_Form_Badge_Request.pdf | ||
| (7)_Attachment_G_SF24_-_Bid_Bond.pdf | ||
| (1)_Attachment_A_New_Personnel_Notification_Form.docm | DOCM document | |
| (8)_Attachment_H_SF25_(Performance_Bond).pdf | ||
| (11)_Attachment_K_Project_Specifications.pdf | ||
| (6)_Attachment_F_DLA_SP_Camera_Pass_Request_Form.pdf | ||
| (10)_Attachment_J_Wage_Determinations.pdf | ||
| (13)_Attachment_M_Submittal_Registers.pdf | ||
| (3)_Attachment_C_Long_Form_Badge_Request.pdf | ||
| (9)_Attachment_I_SF25A_(Payment_Bond).pdf | ||
| (12)_Attachment_L_Drawings.pdf | ||
| (4)_Attachment_D_Badge_Renewal.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. TYPE OF SOLICITATION
NEGOTIATED (RFP)
3. DATE ISSUED1. SOLICITATION NO.
SOLICITATION, OFFER,
AND AWARD
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
6. PROJECT NO.5. REQUISITION/PURCHASE REQUEST NO.4. CONTRACT NO.
8. ADDRESS OFFER TO 7. ISSUED BY CODE
9. FOR INFORMATION
CALL:
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)a. NAME
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
11. The contractor shall begin performance calendar days and complete it within calendar days after receiving
(See ).notice to proceed. This performance period isaward, mandatory negotiable.
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by
NOYES
(hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes
b. An offer guarantee
STANDARD FORM 1442 (REV 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
NSN 7540-01-155-3212
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date) is, is not required.
SEALED BID (IFB)
SP3300-15-B-0003 2015 JUL 06
See Schedule
SP3300
DLA DISTRIBUTION
OFFICE OF PROCUREMENT - EBS
2001 MISSION DRIVE
NEW CUMBERLAND PA 17070-5000
USA
DLA DISTRIBUTION
OFFICE OF PROCUREMENT - EBS
2001 MISSION DRIVE
NEW CUMBERLAND PA 17070-5000
USA
Joshua Woodworth YRE4562 717-770-4192
See Continuation Page(s)
0 270
SEE SECTION F
1 02:00 PM
2015 AUG 05
(Construction, Alteration, or Repair)
PAGE OF PAGES
FACILITY CODECODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirementby the Government in writing within
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print) 20b. SIGNATURE 20c OFFER DATE.
AWARD (To be completed by Government)
22. AMOUNT
21. ITEMS ACCEPTED:
23. ACCOUNTING AND APPROPRIATION DATA
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
)10 U.S.C.2304(c) ( )41 U.S.C.253(c) (
27. PAYMENT WILL BE MADE BY26. ADMINISTERED BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 1442 (REV 4-85) BACK
31b. UNITED STATES OF AMERICA 31c. DATE
BY
30b. SIGNATURE 30c. DATE
(4 copies unless otherwise specified)
CONTINUED ON NEXT PAGE
GENERAL OVERVIEW
This acquisition is 100% set-aside for small businesses in accordance with FAR 52.219-6. The resulting contract will be a firm fixed-price contract.
ELECTRONIC SOLICITATION
This solicitation, including all attachments, and any amendments, is only available electronically at the Federal Business Opportunities website www.fbo.gov. Bidders are cautioned that it is their responsibility to access the website for any amendments that may be issued under the solicitation. There will be no advance notification of amendment issuance. Bidders are advised to consult the website frequently to check for any amendments since an amendment may be issued up until the bid opening date and time. Failure to acknowledge amendments may render our bid non-responsive and ineligible for award.
MAGNITUDE OF CONSTRUCTION
The estimated magnitude of construction is between $1,000,000 and $5,000,000.
SITE VISIT DATE, TIME AND LOCATION
Reference Section L, FAR Provision 52.236-27 for specific date, time and location. Due to security measures currently in place on this installation, anyone planning to attend the site visit needs to provide the following information to Donna Kautz at Donna.Kautz@dla.mil.
This information must be submitted at least two (2) working days prior to the site visit date. Failure to submit this information in the timeframe requested above may result in delays upon your arrival at the installation.
Company Name Employee Name Employee Date of Birth Employee Driver’s License Number and State of Driver’s License
On the date of the site visit, employee will need to present at least one form of photo identification, i.e., valid driver’s license. The employee will also need to present current vehicle registration and insurance for each vehicle entering the installation.
BID SUBMISSION.
BIDS MUST BE SUBMITTED IN HARD COPY ONLY. ELECTRONICALLY SUBMITTED BIDS INCLUDING FACSIMILE AND TELEGRAPH WILL NOT BE ACCEPTED. BID SHALL BE SEALED IN AN ENVELOPE CLEARLY MARKED WITH THE BID SOLICITATION NUMBER, THE
BID OPENING DATE AND TIME. ALL BIDS SHALL BE SUBMITTED TO:
DLA Distribution Acquisition Operations Attn: Joshua Woodworth 5404 J Avenue, Building 404 New Cumberland PA 17070
BID OPENING DATE, TIME AND LOCATION
Bid Opening will be held on August 5, 2015 at 2:00PM local time.
Bid Opening will be held at DLA Distribution, J Avenue, Building 404, New Cumberland, PA 17070.
ACCESS TO THE INSTALLATION FOR THE BID OPENING
Due to security measures in place on this installation, anyone planning to hand carry their bid to the bid opening must abide by the same procedures as set forth to gain access for the site visit. Failure to follow these procedures may result in you and your bid being late and therefore ineligible for award.
BIDS
Bidders must complete Blocks 14 through 20c on the Standard Form (SF) 1442. Bidders must provide all
PAGE 3 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-15-B-0003
information requested in Section K Representations, Certifications, and Other Statements of Offerors.
BID BOND
A bid bond is required. Failure to provide a bid bond for an adequate amount shall result in rejection of bid. Required amount for bid bond is twenty percent (20%). Reference Section L, FAR Provision 52.228-1.
PERFORMANCE AND PAYMENT BONDS
The successful bidder shall be required to furnish performance and payment bonds to the Contracting Officer as follows: (Reference Section I, FAR Clause 52.228-15)
(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
INSURANCE
Reference FAR Clause 52.228-5 Insurance-Work on a Government Installation located in this solicitation.
SARAA – Susquehanna Area Regional Airport Authority
The minimum amount/kind of insurance required is shown below:
1. Workers Compensation and Employers Liability: in the State in which the work is to be performed and elsewhere as may be required and shall include, where applicable, U.S. Longshoremen's and Harbor Workers Coverage.
a) Workers Compensation Coverage: Statutory Requirements
b) Employers Liability Limits not less than:
Bodily Injury by Accident: $100,000 Each Accident Bodily Injury by Disease: $100,000 Each Employee Bodily Injury by Disease: $500,000 Policy Limit
c) Including Waiver of Right to Recover from Others Endorsement(WC 00 0313) where permitted by state law, naming SARAA.
2. Commercial General Liability: (including Premises - Operations,Independent Contractors, Products/Completed Operations, Personal Injury, Broad Form Property Damage, and Explosion, Collapse and Underground Coverages).
a) Occurrence Form with the following limits:
(1)General Aggregate:$2,000,000 (2)Products/Completed Operations Aggregate:$1,000,000 (3)Each Occurrence: $1,000,000 (4)Personal and Advertising Injury:$1,000,000 (b)Products/Completed Operations Coverage must be maintained for a period of at least two (2) years after final payment.
(c)The General Aggregate Limit must apply on a Per Location basis.
(d) Contractual Liability (including Liability for Employee Injury assumed under a Contract) provided by the Standard ISO Policy Form CG 00 01.Policy does NOT include the restrictive Endorsement CG 24 26 (Amendment of Insured Contract Definition) or any other provision excluding coverage for SARAA's Sole Negligence assumed by Contract.
PAGE 4 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
3. Automobile Liability:
(a) Coverage to include:
(1) All Owned, Hired and Non-Owned Vehicles (Any Auto)
(2) Contractual Liability Coverage (including Liability for Employee Injury assumed under a Contract), (b)Per Accident Combined Single Limit: $1,000,000
4. Commercial Umbrella Liability:
a) Occurrence Limit: $2,000,000
b) Aggregate Limit (where applicable): $2,000,000
c) Policy to apply excess of the Commercial General Liability(following form Per Location Aggregate Limit), Commercial Automobile Liability and Employers Liability Coverages.
5. To the fullest extent permitted by law, SARAA and any other Party whom (including its agents, employees, representatives, officers, directors, stockholders, members and managers), shall be added/included as Additional Insureds even for claims regarding their sole negligence on the above General Liability coverage (by the use of ISO Additional Insured Endorsements CG 2010 10 01 and CG 2037 10 01) and the Umbrella Liability described above. In the event the above ISO Additional Insured Endorsements are not available from Contractor's insurance carrier, Contractor may substitute other endorsements which achieve the same effective result and attach a copy of the endorsement with Contractor's Certificate of Insurance. The coverage offered to the ADDITIONAL INSUREDS on Contractor's liability policies shall be primary coverage to any other coverage maintained by the ADDITIONAL INSUREDS and shall not permit or require such other coverage to contribute to the payment of any loss. In addition, the ADDITIONAL INSUREDS shall also be provided the same Completed Operations Coverage detailed under the Commercial General Liability Coverage Requirements.
When requested by the Contracting Officer, the Contractor shall provide a copy of all subcontractors’ proofs of required insurance no later than five (5) days before each subcontractor commences work on the Government installation.
CLAUSES AND PROVISIONS
Clauses and provisions from the Federal Acquisition Regulation (FAR), the Department of Defense (DOD) FAR Supplement (DFARS), and the Defense Logistics Agency Directive (DLAD) are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
NOTICE TO ALL PROSPECTIVE BIDDERS
To receive an award resulting from this solicitation, your company must be registered in the System for Award Management (SAM) Database. Reference FAR clause 52.204-7. SAM website is https://www.sam.gov.
INVOICING
The Contractor shall submit payment requests and receiving reports using Wide Area Work Flow (WAWF).
Instructions are found in Section G of this solicitation under DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions (MAY 2013)
SCHEDULE OF SUPPLIES/SERVICES
Note: The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work.
PAGE 5 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PROJECT DESCRIPTION:
Contractor to provide the necessary labor, material and/or equipment to perform all work associated with performing the following tasks:
•Demolition of existing equipment is to include, but not be limited to, the removal of multiple existing power utility poles and all associated hardware; the removal of existing 15KV feeder conductors and 600V neutral/ground conductors as indicated; and the removal of existing underground conduits/duct bank as indicated.
•New installation is to include, but not be limited to, (2) new power utility poles and all associated hardware, re-routing of existing aerial 15KV conductors to the new utility poles, new pad mounted switchgear, new concrete encased duct bank, new electrical manholes, and new precast concrete utility trench.
•Project is to be coordinated so as to minimize power disruptions associated with the existing and/or new 15KV “Blue” and “Red” feeders.
All work shall be performed complete and in accordance with the specifications and drawings.
HOURS OF WORK
The majority of the work to be performed shall be during regular working hours which consist of an 8½ hour period established by the Contracting Officer, Monday through Friday, normally 0730 to 1630, excluding Government holidays.
Davis Bacon Wage Determinations No: PA150131 Modification 7 dated June 5, 2015 and No. PA 150014 Modification 9 dated June 5, 2015 applies.
PERIOD OF PEFORMANCE ESTIMATES
The period of performance is estimated to be 1 September 2015 to 27 June 2016, however actual period of performance will be determined at time of award.
QUESTIONS
To avoid a delay in the procurement process, all questions regarding this IFB must be received by 11:00 a.m.
eastern local time on 23 July 2015. Questions received after this date and time will not receive a response.
PAGE 6 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION B
SUPPLIES/SERVICES: Z2LB-V00008022
ITEM DESCRIPTION:
Replace Site Primary Electrical Pathway including the necessary labor, material and/or equipment to perform all work associated with the following items:
Furnish and install new 15KV pad mounted switchgear, associated precast foundations, and associated 15KV terminations at the new switchgear, as indicated by the drawings and specifications.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 Z2LB-V00008022 1.000 JB $ ________________ $ ________________
Hwys,Rds,Strts ,Brdgs,Railwys inc resurfc
PREP FOR DELIVERY:
PERIOD OF PERFORMANCE: 09/01/2015 - 06/27/2016
SUPPLIES/SERVICES: Z2LB-V00008022
ITEM DESCRIPTION:
Replace Site Primary Electrical Pathway including the necessary labor, material and/or equipment to perform all work associated with the following items:
Perform the balance of work as indicated by the drawings and specifications which includes, but is not limited to, the following: Furnish and install new site primary electrical pathway (wood utility poles, precast concrete utility trench, precast concrete electrical manholes, and concrete encased electrical duct bank). Re-route existing 15KV aerial conductors. Install Government-Furnished 15KV cable in new primary electrical pathway, Furnish and install all remaining 15KV and 600V cable. Furnish and install all remaining terminations. Repair/Restore all applicable surfaces.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0002 Z2LB-V00008022 1.000 JB $ ________________ $ ________________
Hwys,Rds,Strts ,Brdgs,Railwys inc resurfc
PAGE 7 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION B
SUPPLY/SERVICE: Z2LB-V00008022 CONT'D
PREP FOR DELIVERY:
PERIOD OF PERFORMANCE: 09/01/2015 - 06/27/2016
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 0058697767 0001 N/A N/A Z222V00008022 05/22/2015 0002 0058697766 0001 N/A N/A Z222V00008022 05/22/2015
PAGE 8 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
Section C - SPECIFICATIONS The following document is provided as part of the solicitation package and shall be used in the execution of work under this contract:
Replace Site Primary Electrical Pathway
Project Specifications
June 2015
DLA Distribution Susquehanna, PA New Cumberland, PA 17070
LOCATED AT SECTION J OF THIS SOLICITATION ATTACHMENT K
(END OF SECTION C)
SECTION D - PACKAGING AND MARKING
This section is not used.
(END OF SECTION D)
SECTION E - INSPECTION AND ACCEPTANCE
FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(END OF SECTION E)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.242-14 SUSPENSION OF WORK (APR 1984)
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) (DEVIATION) The Contractor shall be required to commence work under this contract upon receipt of the notice to proceed (NTP) according to the following schedule:
Complete the entire work ready for use within 270 calendar days after receipt of Notice to Proceed.
A pre-construction meeting will be scheduled no later than ten (10) days after the Notice to Proceed is issued. The Contractor shall provide all Pre-Construction submittal items indicated as "SD-01 Pre- Construction Submittals" in Section 01 33 00 of the Technical Specifications and on the Submittal Register (Form 4288) for this Section. All submittals not delivered to the Pre-Con Meeting shall be shown in the Form 4288 with scheduled dates of delivery. Exceptions to this Submittal delivery requirement may be granted for Shop Drawings that have a long lead-time, e.g., mechanical system, structural, sprinkler etc. All submittals for any specific definable feature of work shall be received and approved before any work related to that feature of work may commence. All manufacturer installation instruction manuals shall be included in the initial submittal package as well as in the close out O&Ms.
1. Special Note regarding submission of Pre-Construction Submittals:
The Contractor shall provide the COR with written documentation of the Construction Progress Schedule that will be adhered to to ensure that all Pre-Construction Submittals not provided during the Pre-Construction Meeting are submitted in a timely fashion.
The Construction Progress Schedule shall include activities and durations for submittal review (14/21 calendar day review time allotted by the spec), utility interruption requests, progress/coordination meetings, etc., as well as all definable features of work.
If the Construction Progress Schedule is revised so shall the submittal register 01 33 00, paragraph 1.9.
Final Submittals:
PAGE 9 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
Contractor shall provide the following submittal items, as applicable, within 30 calendar days after completion of the work and prior to Final Payment:
As-Built Drawings per Section 01 78 00 Closeout.
Operation and Maintenance Manuals Warranties / Guaranties All Testing and Inspection Reports
(End of Clause)
(END OF SECTION F)
Section G – CONTRACT ADMINISTRATION DATA
DFARS 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) Definition. “Contracting officer's representative” means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.
(End of Clause)
(Revised January 29, 2015)
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (JUN 2012)
(a) Definitions. As used in this clause—
(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(4) “Receiving report” means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment;
(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party
PAGE 10 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-15-B-0003
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252246.htm https://wawf.eb.mil/ payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);
(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or
(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
(End of Clause)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
2 in 1 invoice type
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
PAGE 11 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
SP3300-15-B-0003
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/
N/A
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC SL4701
Issue By DoDAAC SP3300
Admin DoDAAC SP3300
Inspect By DoDAAC SB3300
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) SB3300
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Will be identified in the contract documents.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
N/A
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(END OF SECTION G)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
DEPOT REGULATIONS. Illegal drugs, guns or other contraband are not authorized on this Federal installation. It is the contractor's responsibility to ensure that its employees working on-site at this installation are U.S.
citizens or legal aliens with no outstanding warrants. This installation is manned by a DoD Police Force who
PAGE 12 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
possesses apprehension authority, which includes holding suspects for local authorities. These officers can and will charge individuals with an established court appearance via the Federal Magistrate. This agency processes illegal aliens in accordance with INS instructions.
SECURITY PROCEDURES FOR CONSTRUCTION CONTRACTORS WORKING AT DLA DISTRIBUTION SUSQUEHANNA (DDSP), EMPLOYEES/PERSONNEL AND VISITORS
All persons, with the exception of delivery truck drivers, entering the installation must obtain an Identification Badge from DDSP Security, Pass and ID. All visitors and personnel expected to be on site for less than 90 days will receive a temporary badge. Personnel expected to be on site for longer than 90 days will be provided a permanent badge. The construction contractor shall follow the procedures below to obtain and renew Identification Badges for all direct hire and subcontractor employees and visitors:
1) Complete the attached New PERSONNEL NOTIFICATION form (Attachment “A”).
2) Complete the attached Identification Badge request form for each employee. Use the short form (Attachment “B”) for personnel expected to be on site less than 90 days. Use the long form (Attachment “C”) for personnel expected to be on site more than 90 days. (Note: Only employees with permanent badges will be permitted to escort delivery vehicles and new employees.)
3) Email NEW PERSONNEL NOTIFICATION form and Identification Badge request forms to the (COR) identified in the task order the day prior to arrival (day prior is the minimum, may be sent up to one week prior to arrival).
4) When new personnel arrive at Post 3 (DDSP entrance gate nearest the Eastern Distribution Center, Building 2001) security will notify the escort designated on the NEW PERSONNEL NOTIFICATION form. The escort will be required to meet the new personnel at Post 3 and escort same to Pass and ID for processing. If the contractor has completed step 3 in a timely manner, badge information will be entered into DDSP system prior to arrival and will be an aid to expedite processing.
5) When new personnel arrive at Pass and ID, they will be required to provide a valid photo identification card (Driver’s License preferred) and registration and proof of insurance for any vehicles that they will be driving on the installation. New personnel will then receive a DDSP photo ID badge and a “paper” temporary vehicle pass.
The prime contractor will be responsible for providing a weekly updated list of all badges issued by Pass and ID to the COR. Badge listing shall identify Project Name, Prime contractor name and any subcontractor names. This listing shall provide the employee’s/visitor’s name, badge number (only 90 day + duration badges are assigned a number), employer, date issued and date returned to Pass and ID. Failure to return all badges issued, including temporary and/or expired badges may delay progress and/or final contract payments. The COR will forward a copy to the DDSP Pass and ID section by fax for weekly reconciliation.
BADGE RENEWAL OF EXPIRED OR EXPIRING BADGES
Complete a new long form badge application (Attachment “D”) and email to the COR identified in the task order 24 hours in advance of renewal application.
ENTRANCE INTO DDSP
Entrance of Contractor personnel with DDSP ID badges is determined by the type of vehicle they are driving:
Contractor with sedan Enter via Post 3 (EDC Gate) Contractor with empty pick-up truck Enter via Post 3 (EDC Gate) Contractor with pick-up containing tools or Enter via Post 4 (Truck Gate) Job site equipment or having a cap Contractor with utility vehicle or van Enter via Post 4 (Truck Gate)
DELIVERIES
All contractor deliveries shall enter the installation through Post 4 (DDSP Truck Gate).
To help avoid delays at the entrance, all deliveries should be scheduled after 8:00AM whenever possible. The construction contractor shall follow the following procedure for all deliveries (including pick-ups at the construction site):
1) Complete the attached CONTRACTOR’S DELIVERY NOTIFICATION form (Attachment “E”).
2) Email the completed CONTRACTOR’S DELIVERY NOTIFICATION form to the COR identified in the task order a minimum of one day prior to delivery.
3) When the delivery truck arrives at Post 4, DDSP will contact the delivery POC identified on the notification form. The POC will be required to escort the delivery truck from Post 4 to the construction site.
4) After delivery is completed, the delivery truck must be escorted from the construction site back to Post 4.
PAGE 13 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PHOTOGRAPHS
Cameras may be possessed and operated by authorized persons only. To obtain a Camera Authorization Pass, the COR will provide the request (Attachment “F”) to Pass and ID. The contractor’s name and length of time the camera pass is required will be included in the request. Camera Passes will be issued upon approval at the time the contractor picks up his/her badge at Pass and ID. Authorization will be for prime contractor personnel only. A Camera Pass must be in possession of the person taking the photographs when challenged. Failure to maintain, or loss of this pass will be reported to the COR for action and security will be notified as necessary. Personnel found to be in the possession of photographic equipment without the proper documentation will have their equipment confiscated and returned upon their departure from the installation or other arrangements will be made.
THREAT CONDITIONS
Contractors are allowed to enter the installation when threat conditions are at:
ALPHA
BRAVO
CHARLIE
Contractors will not be allowed to enter the installation when the threat condition is at:
DELTA
To determine the threat level and any other restrictions concerning restrictions or delays to enter DDSP, contractors need to call the DDSP information line:
717-770-2866 (local calling area) 1-877-639-2012 (outside local area) Section DDSP – Option #2
CONTACTS
DDSP Security Desk Phone: 717-770-6270 Fax: 717-770-5480
DDSP Pass and ID Section Phone: 717-770-7111 Fax: 717-770-8146
DDSP Emergency Phone: 717-770-7777
DDSP Information Line Phone: 717-770-2866
DDSP Facilities Engineering Contracting Officer Representative (COR)
-will be determined at time of award
(END OF SECTION H)
SECTION I – CONTRACT CLAUSES
FAR 52.202-1 DEFINITIONS (NOV 2013)
FAR 52.203-3 GRATUITIES (APR 1984)
FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
FAR 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
FAR 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)
FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)
FAR 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)
PAGE 14 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
FAR 52.204-2 ALT II SECURITY REQUIREMENTS (AUG 1996)
FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (JUL 2013)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)
FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (AUG 2013)
FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
FAR 52.214-26 AUDIT AND RECORDS—SEALED BIDDING (OCT 2010)
FAR 52.214-29 ORDER OF PRECEDENCE – SEALED BIDDING (JAN 1986)
FAR 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)
FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
FAR 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
FAR 52.222-3 CONVICT LABOR (JUN 2003)
FAR 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT – OVERTIME COMPRENSATION (MAY 2014)
FAR 52.222-6 DAVIS BACON ACT (MAY 2014)
FAR 52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
FAR 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)
FAR 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
FAR 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
FAR 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
FAR 52.222-12 CONTRACT TERMINATION-DEBARMENT (MAY 2014)
FAR 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (MAY 2014)
FAR 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
FAR 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
FAR 52.222-26 EQUAL OPPORTUNITY (MAR 2007)
FAR 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)
FAR 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE
VETERANS (JUL 2014)
FAR 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUL 2014)
FAR 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE
VETERANS (JUL 2014)
PAGE 15 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)
FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
FAR 52.223-3 HAZARDOUS MATERIAL IDENITIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
FAR 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
FAR 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
FAR 52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)
FAR 52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS (MAY 1995)
FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)
FAR 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)
FAR 52.224-2 PRIVACY ACT (APR 1984)
FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (May 2014)
FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008)
FAR 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
FAR 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
(DEC 2007)
FAR 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007)
FAR 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
FAR 52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
FAR 52.228-11 PLEDGES OF ASSETS (JAN 2012)
FAR 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
FAR 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
FAR 52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (OCT 2010)
FAR 52.229-3 FEDERAL, STATE AND LOCAL TAXES (FEB 2013)
FAR 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
FAR 52.232-17 INTEREST (MAY 2014)
FAR 52.232-23 Alt I ASSIGNMENT OF CLAIMS (MAY 2014) ALTERNATE I (APR 1984)
FAR 52.232.27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)
FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
FAR 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
PAGE 16 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
FAR 52.233-1 DISPUTES (MAY 2014)
FAR 52.233-3 PROTEST AFTER AWARD (AUG 1996)
FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
FAR 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
FAR 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
FAR 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
FAR 52.236-8 OTHER CONTRACTS (APR 1984)
FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
FAR 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
FAR 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
FAR 52.236-12 CLEANING UP (APR 1984)
FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991)
FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
FAR 52.236-17 LAYOUT OF WORK (APR 1984)
FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
ALTERNATE I (APR 1984)
FAR 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
FAR 52.242-13 BANKRUPTCY (JUL 1995)
FAR 52.243-4 CHANGES (JUN 2007)
FAR 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)
FAR 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAR 2015)
FAR 52.245-1 GOVERNMENT PROPERTY (APR 2012)
FAR 52.245-9 USE AND CHARGES (APR 2012)
FAR 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
FAR 52.248-3 VALUE ENGINEERING – CONSTRUCTION (OCT 2010)
FAR 52.249-2 Alt I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012) ALTERNATE I (SEP 1996)
FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
FAR 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
DFARS 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT-RELATED FELONIES (DEC
2008)
DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
PAGE 17 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
(SEP 2013)
DFARS 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)
DFARS 252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013)
DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
DFARS 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)
DFARS 252.204-7005 ORAL ATTESTATION OF SECURITY RESPONSIBILITIES (NOV 2001)
DFARS 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE GOVERNMENT OF A TERRORIST
COUNTRY (DEC 2014)
DFARS 252.223-7004 DRUG-FREE WORK FORCE (SEP 1988)
DFARS 252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS MATERIALS (SEP 2014)
DFARS 252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)
DFARS 252.225-7031 SECONDARY ARAB BOYCOTT OF ISRAEL (JUN 2005)
DFARS 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC ENTERPRISES, AND NATIVE
HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)
DFARS 252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
DFARS 252.236-7000 MODIFICATION PROPOSALS-PRICE BREAKDOWN (DEC 1991)
DFARS 252.236-7005 AIRFIELD SAFETY PRECAUTIONS (DEC 1991)
DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)
DLAD 52.249-9000 ADMINISTRATIVE COSTS OF REPROCUREMENT AFTER DEFAULT (MAY 1988)
FAR 52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
(a) Definitions. As used in this clause--
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a
PAGE 18 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged.
In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/services/contractingopportunities/sizestandardstopics/ .
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Online Representations and Certifications Application and its data in the Central Contractor Registration, as necessary, to ensure they reflect the Contractor’s current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in ORCA, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ______________ assigned to contract number ______________.[Contractor to sign and date and insert authorized signer's name and title].
FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Products (May 2008)
(a) Definitions. As used in this clause—
PAGE 19 OF 36 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
http://www.sba.gov/services/contractingopportunities/sizestandardstopics/
“Postconsumer material” means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to Defense Distribution Center, Acquisition Operations, Attn: Donna Kautz, J Avenue, Building 404, New Cumberland PA 17070-5001.
(End of Clause)
FAR 52.225-11 BUY AMERICAN ACT-CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)
(a) Definitions. As used in this clause--
“Caribbean Basin country construction material” means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .