SP20171300_RevB 2-1-22_CUI.pdf

PDF 178 KB Posted

Attached to
Air Force Packaging Technology and Engineering Facility Multi Purpose Storage Containers
Solicitation number
FA868422R2050
Issued by

About this file

This solicitation requests proposals for the production of aluminum shipping and storage containers. The Air Force Packaging Technology and Engineering Facility requires CNU-766/E and CNU-776/E containers, which are reusable and provide environmental protection for Project Cobra assets during transportation and storage. The projected period of performance is March 2022 through March 2025, including a 12-month base period and two 12-month option periods. Delivery schedules and destinations for all three years are included in the attached statement of work. This is a small business set-aside solicitation under NAICS code 332439 to be awarded on a firm-fixed-price basis. Questions are due by February 10th, with award timing dependent on available funds, as the solicitation notes that no award will be made until funding is received.

View the file

Other files

File Type Posted
Instructions to Offerors and Evaluation Criteria.pdf PDF
DL20191800_CUI.pdf PDF
Cobra Container SOW.pdf PDF
DL20191700_CUI.pdf PDF
DL20171300_CUI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI SP20171300 Rev. B 02/01/2022

CUI

DISTRIBUTION: D

DEPARTMENT OF DEFENSE AND

U.S. DoD CONTRACTORS ONLY

PRIME ITEM PRODUCT FABRICATION SPECIFICATION

FOR

SHIPPING AND STORAGE CONTAINER, MULTI-PURPOSE

CNU-757/E, CNU-758/E, CNU-766/E, CNU-776/E

AFLCMC/EZPAA

AIR FORCE PACKAGING TECHNOLOGY

AND ENGINEERING FACILITY

WRIGHT PATTERSON AFB, OH 45433-5540

Distribution Statement D. Distribution Authorized to the Department of Defense and U.S. DoD Contractors Only;

Administrative / Operational Use; 19 Dec 2016. Other requests shall be referred to the Air Force Packaging Technology & Engineering Facility, Dayton, OH 45433.

DESTRUCTION NOTICE – Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401, et seq. Violation of these export-control laws is subject to severe criminal penalties.

Dissemination of this document is controlled under DoD Directive 5230.25.

Controlled By: USAF Controlled By: AFMC AFLCMC/EZPAA CUI Category: CTI Distribution: D POC: michael.harff@us.af.mil mailto:michael.harff@us.af.mil

CUI

AIR FORCE PACKAGING TECHNOLOGY

AND ENGINEERING FACILITY

PRIME ITEM PRODUCT FABRICATION SPECIFICATION

FOR

SHIPPING AND STORAGE CONTAINER, MULTI-PURPOSE

CNU-757/E, CNU-758/E, CNU-766/E, CNU-776/E

1. SCOPE.

1.1. Scope. This specification establishes the requirements for manufacture and acceptance of the Shipping and Storage Containers, CNU-757/E, CNU-758/E, CNU-766/E, CNU-776/E, (prime item) hereinafter referred to as the container.

2. APPLICABLE DOCUMENTS.

2.1. Issue of documents. The following documents of the issue in effect on the date of Request For Proposal, form a part of this specification to the extent specified herein:

MILITARY STANDARDS

MIL-STD-129 - Military Marking for Shipment and Storage

MIL-STD-648 - Department of Defense Design Criteria for

Specialized Shipping Containers

AIR FORCE DRAWINGS CAGE CODE 0B275

DL20171300 - Shipping and Storage Container, Multi-Purpose

DL20171330 - Shipping and Storage Container, Multi-Purpose, CNU-757/E

DL20171460 - Shipping and Storage Container, Multi-Purpose, CNU-758/E

DL20191700 - Shipping and Storage Container, Miscellaneous Equipment, CNU-766/E

DL20191800 - Shipping and Storage Container, Miscellaneous

Equipment, CNU-776/E

2.2. Other publications.

AWS D1.2-2014 - Welding Code, Structural Aluminum, Standard

CUI

Specification for

49 CFR - Code of Federal Regulation

2.3. Conflicting requirements. Conflicting requirements arising between this specification and any specification, publication or drawing listed herein shall be referred in writing to the Procurement Contracting Officer for interpretation, clarification, and correction.

3. REQUIREMENTS.

3.1. Item definition. The item is a fully-reusable, long-life, controlled breathing, integral barrier (reference MIL-STD-648) container used to provide physical and environmental protection for various items. The cover and base assembly are interfaced with a sealing gasket and joined together with cam-under-center latches. Pressure within the sealed environment is controlled using a pressure equalizing valve. Container handling provisions consist of forklift/pallet jack openings and eight hand lift/carrying handles.

3.2. Characteristics.

3.2.1. Performance. The containers shall meet the following performance requirements.

3.2.1.1. Inspection. The containers, when examined in accordance with 4.1.1 and 4.3.1, shall comply with the fabrication and assembly requirements of each design’s data list (DL), and associated drawings within the specified tolerances and specifications listed thereon, respectively.

3.2.1.2. Leakage. The container shall be capable of maintaining pressure when tested in accordance with 4.1.2 and 4.3.2.

3.3. Design and construction.

3.3.1. Production drawings. The containers shall be fabricated and assembled in accordance with all applicable drawings, parts lists, and other documents listed on each design’s DL, respectively.

3.3.2. Standards of manufacture. The detailed requirements for materials, design, and construction of containers to be manufactured in accordance with this specification are provided by the DL of the drawing packages, specifications and standards listed thereon. The standard of workmanship and manufacturing exhibited in approved first article samples shall be the standard of workmanship for all production containers.

CUI

3.3.3. Workmanship. Workmanship shall be of sufficiently high quality to ensure that containers will comply with all requirements of this specification.

Particular attention shall be paid to bonding, welding, marking and freedom of parts from burrs, chips, cracks, sharp edges, dirt, grease, corrosion, and other foreign matter. The assembled containers shall be thoroughly cleaned of all dirt, chips and other foreign matter. Cleaning methods shall be non-damaging to any of the parts or assemblies, nor shall the cleaning agent contaminate the parts.

3.3.4. Welder qualification. Welder operators shall be qualified in accordance with

ANSI/AWS D1.2-2014.

3.3.5. UN performance oriented packaging (POP) tests. Unless otherwise specified in the contract or purchase order, the containers shall be subjected to the design qualification testing prescribed by 49 CFR, Subpart M, 178.600. Unless otherwise specified in the contract or purchase order, the test sample specified by the appropriate test section of 49 CFR Subpart M shall be supplied to the Air Force Packaging Technology and Engineering Facility (AFPTEF) and subjected to performance testing as called out in 4.2. Periodic retesting shall be completed every 24 months in accordance with 49 CFR, Subpart M, 178.601(e). AFPTEF shall prepare a written report at the completion of testing.

4. QUALITY ASSURANCE PROVISIONS.

4.1. First article (FA). Unless the first article is waived or otherwise specified in the contract or purchase order, one preproduction sample (of each container type), hereinafter referred to as first article, shall be inspected and tested prior to regular production. The first article shall be fully representative of those proposed for production and demonstrate the adequacy and suitability of the contractor’s processes and procedures in complying with the requirements set forth by this specification. Unless otherwise specified, all tests shall be performed at ambient temperature of 70° ± 20° Fahrenheit with ambient humidity.

4.1.1. Inspection. Prior to all tests, the first article containers shall be physically examined for compliance with documents listed on the containers drawing package. Approval shall consist of a visual inspection of the characteristics and measurement of the component parts and complete container to ensure compliance with the drawings. Measuring instruments sufficient to verify drawing tolerances shall be used. Approval shall include the examination of inspection records, material certifications and the comparison of these documents with the item(s) they describe. The Government reserves the right to terminate the inspection and reject the first article sample upon failure of any component, assembly, or test specimen in the preproduction sample to comply with any requirement defined in this specification.

CUI

4.1.2. Leak Test.

4.1.2.1. Pneumatic pressure technique. The air in the container is pressurized and then the container is observed to detect leaks. A leak is defined as any opening in a container that allows air to escape or permits air to enter.

When a container is found to leak, submersion in water, a portable ultra-sonic leak detector, or application of soapy water may be used to locate the leak(s). If leaks are detected the container shall be repaired to eliminate the leaks and then re-tested for verification.

4.1.2.2. Apparatus. A supply of compressed air, pressure gage and fittings, and either a vessel in which the specimen can be submerged in water, a quantity of bubble-supporting liquid, or ultra-sonic leak detector are required to perform this test. Pressure measurement devices may include a water manometer or digital manometer with an accuracy not less than ±0.005 psig. The digital manometer, when used, shall be calibrated and certified.

4.1.2.3. Conditioning. No special conditioning of the containers is required; the test shall be performed at ambient conditions (70° ± 20° F). The pressure test is very sensitive to heat and cold fluctuations; the temperature shall not be allowed to fluctuate more than 2° during the test.

4.1.2.4. Procedure. The container shall be prepared for the test by sealing all breathing devices and inserting suitable pressurizing fittings and gages. The fittings and gages shall not cause adverse effects on the serviceability of the container. The container shall be closed and sealed, as it would be in service. The test shall be conducted by raising the internal pressure so that the desired pressure differential of 1.0 +0.25/-0.0 psig is obtained. After pressurization, the container shall be left undisturbed for not less than 15 minutes for temperature and pressure stabilization. The pressure shall be monitored for not less than 30 minutes after stabilization. Pressure leakage of more than 0.05 psig in 60 minutes shall be cause for rejection. If there is pressure loss of less than 0.025 psig within 30 minutes the test may be terminated as successful. The container shall meet the requirements of 3.2.1.2.

4.1.3. Item fit test. Each container will be fit checked. Each container shall be loaded with generic asset representative items (furnished by the government).

The items shall be loaded into the container isolation system. The cover shall be placed on the base assembly and latched securely to verify fit.

4.2. UN performance oriented packaging (POP) testing. Unless exempted per paragraph 3.3.5, at the start of each new production contract, the container shall successfully pass the drop test, stacking test, and vibration test in accordance with the procedures of 49 CFR 178.603, 178.606, and 178.608, respectively. The

CUI

contractor shall be responsible for the delivery of the designated container(s) to be POP tested to:

Air Force Packaging Technology and Engineering Facility

AFLCMC/EZPAA

5215 Thurlow Street Ste. 5, Bldg. 70, Area A Wright-Patterson AFB, OH 45433-5540

4.3. Production quality conformance inspection test.

4.3.1. Inspection. The contractor's inspection system shall be sufficient to ensure that parts and materials submitted conform to the requirements of each design’s DL. The contractor is responsible for furnishing articles that meet all the requirements of drawings and specifications included in this specification.

Production shall be performed under controlled conditions. The procedures used for process control and inspection are at the option of the contractor, provided objective, documented evidence is maintained and made available upon request by the Government. The contract designated government QAR shall inspect and accept production units.

4.3.2. Leak test. Each container (100%) shall be subjected to the test of 4.1.2.

5. PREPARATION FOR DELIVERY.

5.1. Preservation and packing. Containers must be stored in an indoor area prior to delivery. Containers shall be palletized and shrink wrapped for delivery. All conveyances shall be loaded, blocked and braced to ensure containers are protected during typical handling and transport procedures. It is recommended that the humidity indicator litmus paper (if contract or purchase order specifies replacement of drum plugs with humidity indicators) not be placed in the container until ready for delivery.

5.2. Marking. Container marking shall be IAW the drawing packages, contract or order. Marking for final delivery shipment shall be IAW best commercial practice. Any marking or labels required for final delivery shipment shall not be placed on the containers themselves.

5.2.1. UN certification marking. Place respective marking only after requirements outlined in paragraph 3.3.5 have been met.

Marking for CNU-757/E, CNU-758/E:

Note: ** is year of manufacture

4B/Y90.4/S/**/USA/DOD

u n

CUI

Marking for CNU-766/E:

Marking for CNU-776/E:

4B/Y73.2/S/**/USA/DOD

n

4B/Y80.9/S/**/USA/DOD

n

PRIME ITEM PRODUCT FABRICATION SPECIFICATION
PRIME ITEM PRODUCT FABRICATION SPECIFICATION

File details come from the government source that posted it. Updated .