A0004 - DFSP San Pedro PWS List of Changes.pdf

PDF 99 KB Posted

Attached to
DFSP San Pedro GOCO Services Federal contract opportunity
Solicitation number
SP060012R0517
Issued by
Defense Logistics Agency Energy

About this file

A0004 - List of PWS Changes

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DFSP San Pedro, CA PWS List of Changes

1. Page 2 Table of Contents C-2.7 DFSP Unarmed Watch/Guard

2. Page 5 C-1.4 reference to clause L201 deleted.

3. Pages 6-7 C-1.5 Contractor Detailed Plans – word changed “to” to “by”. Example “…Plan shall be submitted by the contracted activity within 60 days after contract award.”

4. Page 8 changed 33CFR, Part 154.560.

5. Page 16 C-1.9.4.1 Computer Operator last bullet statement “Monitor and operate the automate fuels handling equipment (AFHE)” deleted.

6. Page 20 C-2.1.2 refers to historical receipt data in Appendix E. Reference to historical data is deleted.

7. Page 21-22 C-2.1.3, C-2.2.3, and C-2.3.3 Minimum Performance Requirements – Last bullet states “….tolerance defined in Appendix C.”, PWS amended to “Appendix D”.

8. Page 25 C-2.6 Environmental Protection, 4th bullet statement “contracting” changed to

“contractor”.

9. Page 26 C-2.7 DFSP Unarmed Watch/Guard - all references to “security” have been changed to

“unarmed watch/guard”.

10. Page 26 C-2.7.1 The Contractor shall be responsible for the main terminal unarmed watch/guard duties throughout the DFSP to include DLA Energy AMW building 100 (exterior only).

11. Page 27 C-2.7.1.3 The Contractor shall provide one unarmed watch/guard at the main entrance to the terminal 24 hours, 7 days per week.

12. Page 27 C-2.7.1.4 The Contractor shall provide one roving unarmed watch/guard for the main terminal property from 4:00 PM to 8:00 AM, Monday to Friday, and 24 hours on weekends and holidays.

13. Page 27 C-2.7.1.5 last sentence reference commercial vehicle inspections deleted.

14. Page 27 C-2.7.1.6 and C-2.7.1.7 deleted

15. Page 27 C-2.7.1.9 The Contractor shall establish and maintain, during the lifetime of this contract, a detailed unarmed watch/guard plan in accordance with the unarmed watch/guard requirements and all applicable federal, state and local laws and regulations. The Contractor shall submit the unarmed watch/guard plan for Contracting Officer review 60 days after contract award.

16. Page 27-28 C-2.7.1.9 and C-2.7.2 “30 days” changed to “60 days”.

17. Page 29 C-2.8 changed first paragraph last sentence to “The surveillance checks are to be performed by operations personnel and unarmed watch/guard personnel.”

18. Page 31 C-3.2 Maintenance – General - reference to contract clause I114 deleted.

19. Page 45 C-5.2.2 clause updated.