SOW147.pdf

PDF 131 KB Posted

Attached to
Pierce St IRA - Driveway Replacement
Solicitation number
2124538
Issued by
Monroe County, New York

About this file

This document is a Project Scope for a Driveway Replacement project issued by the New York State Office for People With Developmental Disabilities (OPWDD), specifically for the Finger Lakes Developmental Disabilities Service Office (DDSO) located at 30 Pierce St, Webster, NY. The project involves complete replacement of the existing driveway using architectural and engineered drawings from Patriot Design #3024-4056, dated 6/11/2025. The work is to be completed within 90 days of award, with a mandatory site visit scheduled for Monday, August 4, 2025 at 10:00am. The project is classified as a NYS Public Works project requiring prevailing wages, and work is to be performed between 8am and 4pm, Monday through Friday.

The bid price must include all materials, labor, disposal fees, and site clean-up, with final acceptance provided by the Maintenance Supervisor. The project has specific requirements including continuous work, immediate reporting of unforeseen conditions, strict safety protocols, and careful coordination with the facility's operations. Contractors must take precautions to protect the occupied residence, safeguard residents and staff, secure tools and materials daily, and ensure no lawn or property damage occurs during the project. Environmental testing documentation will be provided to the contractor prior to work commencement, and all work must adhere to NYS Codes and NYS Office of General Services (OGS) specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

DESCRIPTION:

Driveway Replacement. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Driveway Replacement, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

SCOPE OF WORK includes, but is not necessarily limited to the following:

1. Furnish Materials and Labor to complete the Driveway replacement per Architectural, and Engineered Drawings by Patriot Design #3024-4056, Dated: 6/11/2025.

2. Follow all NYS Codes and NYS OGS specifications.

GENERAL REQUIREMENTS:

1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.

Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

2. Work is to be done between the hours of 8am and 4pm, Monday through Friday.

Contractor is advised that this is an occupied home and may be occupied during these times.

3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.

4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.

5. Smoking is prohibited by contractors at all residential and program sites owned by

OPWDD.

6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.

7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

Facility:

Finger Lakes DDSO

Facility Address:

30 Pierce St, Webster, NY 14580

Point of Contact:

James Robinson PSB

Contact Phone Number:

518-948-0397

Project Title:

Driveway Replacement

Summary of Work:

Replace driveway with new per design drawings.

8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

A site visit is mandatory. The site visit date is scheduled for Monday, August 4, 2025 @ 10:00am at the project site. All prospective bidders are encouraged to attend.

A. Lawn Damage/Property Damage

• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

• Personal vehicles are not to be parked on the grass.

• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

• Once the job has begun, it is to be worked on continuously until completed.

• If there are any delays, even if due to inclement weather, a Work Control Representative

MUST be contacted.

• Work must be completed within 90 days of receiving the purchase order.

C. House Safety

• The residence will be occupied during the job.

• The contractor must take all reasonable care to safeguard the residents and the staff.

• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.

• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.

• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.

SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Furnish Materials and Labor to complete the Driveway replacement per Architectural, and Engineered Drawings by Patriot Design #3024-4056, Dated: 6/11/2025.
2. Follow all NYS Codes and NYS OGS specifications.
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of 8am and 4pm, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT