30_PIERCE_ST - STAMPED_25_06_11.pdf
PDF 3 MB Posted
- Attached to
- Pierce St IRA - Driveway Replacement
- Solicitation number
- 2124538
- Issued by
- Monroe County, New York
About this file
The document is a set of design and construction drawings for a driveway and parking lot renovation project at 30 Pierce Street in Webster, New York, prepared by Patriot Design & Consulting for the New York State Office for People with Developmental Disabilities (OPWDD). The project involves demolishing existing asphalt pavement, removing gravel and topsoil, excavating to subbase elevation, and constructing a new parking lot with proper grading, erosion control, and surface restoration. The project is dated June 11, 2025, with project identification number 3024-4056, and includes detailed specifications for earthwork, asphalt paving, seeding, and tree removal.
The drawings provide comprehensive technical specifications including requirements for subbase material (NYSDOT Type 2), asphalt mix designs (9.5 top course and 25.0 binder course), compaction standards (95% density), and erosion control measures using compost filter socks. The project emphasizes careful site preparation, matching existing grades, ensuring proper drainage with 1-2% cross slopes, and maintaining access for facility residents and staff during construction. The specifications include detailed requirements for material quality, placement techniques, testing protocols, and restoration of disturbed areas, with a focus on minimizing environmental impact and maintaining the existing landscape's integrity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW147.pdf | ||
| Bid Tab284.pdf | ||
| RFQ169.pdf | ||
| CP-FL-H340-20250620_Design_for_driveway_replacement_amp_expansion__30_PIERCE_STREET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
VE
R
S H
EE
T
ABBREVIATIONSSYMBOLS
LOCATION MAP N
DRAWING LIST
DRIVEWAY AND PARKING LOT DESIGN
30 PIERCE ST, WEBSTER, NY 14580
620 WESTFALL ROAD
ROCHESTER, NY 14620GI-001 COVER SHEET
GI-002 GENERAL NOTES AND SPECIFICATIONS
GI-003 SPECIFICATIONS
CD-101 DEMOLITION
CG-101 GRADING, EROSION & SEDIMENT CONTROL
CS-101 SITE PLAN AP
PR
O
VE
D
CH
EC
KE
D B
Y:
D
R
AW
N B
Y:
SC
AL
E:
PR
O
JE
CT
ID
EN
TI
FI
CA
TI
O N
N O
D
AT
E:
N
UM
BE
R
SH
EE
T
SH
EE
T
TI
TL
E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL
AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P T
R
IO
T S
T
IL
L S
E R
V
IN
G D
E
SI
G N
C
O N
SU
L
T
IN
G
C
AN
AL
V
IE
W
B
LV
D . S
U
IT
E
R
O C
H
ES
TE
R
, N Y
5.
8.
W
W W
.P
AT
R
IO
T- D
C .C
O M
AS
IN
D
IC
AT
ED
D R
IV
EW
AY
A
N D
P
AR
KI
N
G L
O T
D
ES
IG
N
P
IE
R
C E
ST
W
EB
ST
ER
, N
Y
G I-0
J U
N
C R
B
AW
M
FS
W
-4
R
EV
IS
IO
N
D
AT
E
BY
C O
VE
R
S H
EE
T
ABAN ABANDON
ADA AMERICANS WITH
DISABILITIES ACT
ALT ALTERNATE OR ALTITUDE
APPROX APPROXIMATE
ASCE AMERICAN SOCIETY OF
CIVIL ENGINEERS
AWWA AMERICAN WATER WORKS
ASSOCIATION
BDRY BOUNDARY
BLDG BUILDING
BM BENCHMARK
C/C CENTER TO CENTER
CB CATCH BASIN
CJ CONSTRUCTION JOINT OR
CONTROL JOINT
CL CENTER LINE
DEMO DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DIP DUCTILE IRON PIPE
DS DOWNSPOUT
E EAST
ELEV ELEVATION
EOP EDGE OF PAVEMENT
EW EACH WAY
FF FINISH FLOOR ELEVATION
HMA HOT MIX ASPHALT
INV INVERT
LF LINEAR FEET (FOOT)
MAX MAXIMUM
MIN MINIMUM
N NORTH
NOM NOMINAL
NTS NOT TO SCALE
NYSDOT NEW YORK STATE
DEPARTMENT OF
TRANSPORTATION
OC ON CENTER
PL PROPERTY LINE
PVC POLYVINYL CHLORIDE
R RADIUS
RFI REQUEST FOR
INFORMATION
ROW RIGHT OF WAY
S SOUTH
SCH SCHEDULE
SF SQUARE FOOT (FEET)
SHLDR SHOULDER
SPEC SPECIFICATION
ST STORM SEWER
TEMP TEMPORARY
TOPO TOPOGRAPHY
TYP TYPICAL
CENTERLINE
STORM SEWER
OVERHEAD ELECTRIC
CONTOUR LINE
CONTROL POINT
POST
LIGHT POLE
UTILITY POLE
CATCH BASIN
MAIL BOX
CONIFEROUS TREE
SHRUB
U=2 14A
U=2 14A
U=214AU=214AU=214A
U=214A U=214A
U=214A U=214A U=214AU=214A U=214A U=214A
U=2 14A
U=2 14A
U=214AU=214AU=214A
U=214A U=214A
PROJECT LOCATION
VE
R
S H
EE
T
AP
PR
O
VE
D
CH
EC
KE
D
B Y:
D R
AW
N
B Y:
SC
AL
E:
PR
O
JE
CT
ID
EN
TI
FI
CA
TI
O N
N O
D
AT
E:
N
UM
BE
R
SH
EE
T
SH
EE
T
TI
TL
E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL
AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P T
R
IO
T S
T
IL
L S
E R
V
IN
G D
E
SI
G N
C
O N
SU
L
T
IN
G
C
AN
AL
V
IE
W
B
LV
D . S
U
IT
E
R
O C
H
ES
TE
R
, N Y
5.
8.
W
W W
.P
AT
R
IO
T- D
C .C
O M
AS
IN
D
IC
AT
ED
D R
IV
EW
AY
A
N D
P
AR
KI
N
G L
O T
D
ES
IG
N
P
IE
R
C E
ST
W
EB
ST
ER
, N
Y
G I-0
J U
N
C R
B
AW
M
FS
W
-4
R
EV
IS
IO
N
D
AT
E
BY
G
EN
ER
AL
N O
TE
S
AN
D
SP
EC
IF
IC
AT
IO
N S
GENERAL NOTES:
1. THE FOLLOWING GENERAL NOTES ARE APPLICABLE TO THE ENTIRE SET OF
PLANS, THE CONTRACTOR IS RESPONSIBLE FOR APPLYING THESE NOTES
THROUGHOUT THE ENTIRE PROJECT.
2. EXISTING KNOWN UNDERGROUND UTILITIES, KNOWN STRUCTURES, MANHOLES,
PAVEMENTS, FENCES, POLES, AND SIMILAR FEATURES ARE SHOWN ON THE
PLANS ACCORDING TO THE BEST AVAILABLE INFORMATION. FIELD CONDITIONS
MAY BE ENCOUNTERED DURING CONSTRUCTION WHICH MAY VARY FROM THOSE
DEPICTED HEREIN.
3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THE SERVICES OF AN
UNDERGROUND PENETRATING RADAR UTILITY LOCATOR TO LOCATE AND MARK
ALL UTILITIES BEFORE ANY EXCAVATION/CONSTRUCTION WORK BEGINS.
4. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN
THE FIELD PRIOR TO STARTING ANY WORK. IF FIELD CONDITIONS ARE FOUND TO
VARY FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY
THE FACILITY MANAGER AND ENGINEER.
5. THE CONTRACTOR SHALL LOCATE AND MARK ALL PROPERTY LINES,
RIGHT-OF-WAYS, AND EASEMENTS PRIOR TO THE START OF WORK.
6. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS
FOR WORK WITHIN PUBLIC RIGHT-OF-WAY.
7. CONTRACTOR VEHICLES, EQUIPMENT OR MATERIALS ARE NOT TO BE PARKED
OR STORED WITHIN PUBLIC RIGHT-OF-WAY. CONTRACTOR AND PERSONNEL
VEHICLES ARE NOT TO BE PARKED OR DRIVEN ON ADJACENT PROPERTIES.
8. COORDINATE MATERIAL STAGING AREA, IF REQUIRED, WITH THE FACILITY
MANAGER.
9. ALL WORK AND MATERIALS SHALL CONFORM TO NYSDOT
REQUIREMENTS/SPECIFICATIONS.
10. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING TRAFFIC FLOW AND
PROVIDING WORK ZONE TRAFFIC CONTROL WHEN NECESSARY, REFER TO
NYSDOT STANDARD SHEETS.
11. CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE OR DISTURB EXISTING
STRUCTURES, CONCRETE, PAVERS/BRICK, STAIRS, FOUNDATIONS OR UTILITIES
DURING CONSTRUCTION. DAMAGED FEATURES AS A RESULT OF THE
CONTRACTOR'S OPERATIONS SHALL BE IMMEDIATELY REPAIRED OR REPLACED
BY THE CONTRACTOR TO THE SATISFACTION OF THE FACILITY MANAGER AT NO
ADDITIONAL COST TO THE OWNER.
12. CONTRACTOR SHALL KEEP SITE CLEAN AND FREE OF HAZARDS TO PREVENT
INJURY TO STAFF AND RESIDENTS.
13. STORMWATER PIPES, ROADSIDE DRAINAGE, FOUNDATION/ROOF DRAINS, AND
SANITARY SEWER FLOWS MUST BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
14. DISTURBED AREA SHALL BE MINIMIZED TO THE EXTENT POSSIBLE, TOTAL
DISTURBED AREA SHALL REMAIN UNDER ONE (1) ACRE.
15. CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL SURFACES DISTURBED BY
DEMOLITION AND PROPOSED WORK.
GENERAL SPECIFICATIONS:
SECTION 310000 - EARTHWORK
PART 1 GENERAL
1.01 RELATED WORK SPECIFIED ELSEWHERE
A. SITE RESTORATION: SECTION 310101.
1.02 DEFINITIONS
A. THE FOLLOWING TERMS SHALL HAVE THE MEANINGS ASCRIBED TO THEM IN THIS
ARTICLE, WHEREVER THEY APPEAR IN THIS SECTION.
1. EARTH EXCAVATION: THE REMOVAL OF ALL SURFACE AND SUBSURFACE MATERIAL
NOT CLASSIFIED AS ROCK (AS DEFINED BELOW).
2. SUBGRADE SURFACE: SURFACE UPON WHICH SUBBASE OR TOPSOIL IS PLACED.
3. SUBBASE: SELECT GRANULAR MATERIAL OR SUBBASE COURSE TYPE 2 WHICH IS
PLACED IMMEDIATELY BENEATH PAVEMENT OR CONCRETE SLABS.
4. FOUNDATION BEARING GRADE: GRADE/ELEVATION AT WHICH THE
BOTTOM-OF-FOOTINGS ARE CONSTRUCTED.
5. MAXIMUM DENSITY: THE DRY UNIT WEIGHT IN POUNDS PER CUBIC FOOT OF THE SOIL
AT “OPTIMUM MOISTURE CONTENT” WHEN DETERMINED BY ASTM D 698 (STANDARD
PROCTOR).
6. STRUCTURES: BUILDINGS, FOOTINGS, FOUNDATIONS, RETAINING WALLS, SLABS,
TANKS, MECHANICAL AND ELECTRICAL APPURTENANCES, OR OTHER MAN-MADE
STATIONARY FEATURES CONSTRUCTED ABOVE OR BELOW THE GROUND SURFACE.
7. LANDSCAPED AREAS: AREAS NOT COVERED BY STRUCTURES, WALKS, ROADS,
PAVING, OR PARKING.
8. UNAUTHORIZED EXCAVATION: THE REMOVAL OF MATERIAL BELOW REQUIRED
ELEVATION INDICATED ON THE DRAWINGS OR BEYOND LATERAL DIMENSIONS
INDICATED OR SPECIFIED WITHOUT SPECIFIC WRITTEN DIRECTION BY THE
DIRECTOR'S REPRESENTATIVE.
1.03 PROJECT CONDITIONS
A. PROTECT EXISTING TREES AND PLANTS DURING PERFORMANCE OF THE WORK
UNLESS OTHERWISE INDICATED. PROTECT ROOT SYSTEMS FROM SMOTHERING. DO
NOT STORE EXCAVATED MATERIAL, OR ALLOW VEHICULAR TRAFFIC OR PARKING
WITHIN THE BRANCH DRIP LINE. RESTRICT FOOT TRAFFIC TO PREVENT EXCESSIVE
COMPACTION OF SOIL OVER ROOT SYSTEMS.
B. COLD WEATHER REQUIREMENTS: WHEN FREEZING TEMPERATURES ARE PREDICTED,
DO NOT EXCAVATE TO FINAL REQUIRED ELEVATIONS. COMPACTION OF SOIL DURING
COLD WEATHER IS DIFFICULT AND CAN BE IMPRACTICAL. EARTHWORK OPERATIONS
ARE NOT PERMITTED BETWEEN NOVEMBER 1ST AND APRIL 1ST.
PART 2 PRODUCTS
2.01 MATERIALS
A. SUBBASE COURSE TYPE 2: STOCKPILED, CRUSHED LEDGE ROCK OR APPROVED
BLAST FURNACE SLAG. COMPLY WITH THE GRADATION AND MATERIAL
REQUIREMENTS SPECIFIED BELOW:
1. MAGNESIUM SULFATE SOUNDNESS TEST: 20 PERCENT MAXIMUM LOSS BY WEIGHT
AFTER FOUR TEST CYCLES.
2. PLASTICITY INDEX: THE PLASTICITY INDEX OF THE MATERIAL PASSING THE NO. 40
MESH SIEVE SHALL NOT EXCEED 5.0.
3. ELONGATED PARTICLES: NOT MORE THAN 30 PERCENT, BY WEIGHT, OF THE
PARTICLES RETAINED ON A 1/2 INCH SIEVE SHALL CONSIST OF FLAT OR ELONGATED
PARTICLES. A FLAT OR ELONGATED PARTICLE IS DEFINED AS ONE WHICH HAS ITS
GREATEST DIMENSION MORE THAN THREE TIMES ITS LEAST DIMENSION.
PART 3 EXECUTION
3.01 UNDERGROUND UTILITIES
A. LOCATE EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCING EXCAVATION
WORK. DETERMINE EXACT UTILITY LOCATIONS BY HAND EXCAVATED TEST PITS.
SUPPORT AND PROTECT UTILITIES TO REMAIN IN PLACE.
B. DO NOT INTERRUPT EXISTING UTILITIES THAT ARE IN SERVICE UNTIL TEMPORARY OR
NEW UTILITIES ARE INSTALLED AND OPERATIONAL.
3.02 EXCAVATION
A. EXCAVATE EARTH AS REQUIRED FOR THE WORK.
B. INSTALL AND MAINTAIN ALL EROSION AND SEDIMENTATION CONTROLS DURING ALL
EARTHWORK OPERATIONS AS SPECIFIED ON THE CONTRACT DRAWINGS OR AS
DIRECTED BY LOCAL OFFICIALS. IF THE EROSION AND SEDIMENTATION CONTROLS
SPECIFIED BY THE LOCAL OFFICIALS ARE MORE STRINGENT THAN THOSE SPECIFIED
ON THE CONTRACT DRAWINGS CONTACT THE DIRECTOR'S REPRESENTATIVE.
C. MAINTAIN SIDES AND SLOPES OF EXCAVATIONS IN A SAFE CONDITION UNTIL
COMPLETION OF BACKFILLING. COMPLY WITH CODE OF FEDERAL REGULATIONS
TITLE 29 - LABOR, PART 1926 (OSHA).
D. STOCKPILE EXCAVATED MATERIALS CLASSIFIED AS SUITABLE MATERIAL WHERE
DIRECTED, UNTIL REQUIRED FOR FILL. PLACE, GRADE, AND SHAPE STOCKPILES FOR
PROPER DRAINAGE AS APPROVED BY THE DIRECTOR'S REPRESENTATIVE.
E. CONCRETE SLABS: EXCAVATE TO THE FOLLOWING DEPTHS BELOW BOTTOM OF
CONCRETE FOR ADDITION OF SELECT GRANULAR MATERIAL:
1. EXTERIOR SLABS AND STEPS: 12 INCHES UNLESS OTHERWISE INDICATED.
F. PAVEMENT: EXCAVATE TO SUBGRADE SURFACE ELEVATION.
G. UNAUTHORIZED EXCAVATIONS: UNLESS OTHERWISE DIRECTED, BACKFILL
UNAUTHORIZED EXCAVATION UNDER FOOTINGS, FOUNDATION BASES, AND
RETAINING WALLS WITH COMPACTED SELECT GRANULAR MATERIAL WITHOUT
ALTERING THE REQUIRED FOOTING ELEVATION. ELSEWHERE, BACKFILL AND
COMPACT UNAUTHORIZED EXCAVATION AS SPECIFIED FOR AUTHORIZED EXCAVATION
OF THE SAME CLASSIFICATION, UNLESS OTHERWISE DIRECTED BY THE DIRECTOR.
1. UNAUTHORIZED EXCAVATIONS UNDER STRUCTURAL WORK SUCH AS FOOTINGS,
FOUNDATION BASES, AND RETAINING WALLS SHALL BE REPORTED IMMEDIATELY TO
THE DIRECTOR BEFORE ANY CONCRETE OR BACKFILLING WORK COMMENCES.
H. NOTIFY THE DIRECTOR'S REPRESENTATIVE UPON COMPLETION OF EXCAVATION
OPERATIONS. DO NOT PROCEED WITH THE WORK UNTIL THE EXCAVATION IS
INSPECTED AND APPROVED. INSPECTION OF THE EXCAVATION BY THE DIRECTOR'S
REPRESENTATIVE WILL BE MADE ON 3 WORKING DAYS NOTICE.
3.03 DEWATERING
A. PREVENT SURFACE AND SUBSURFACE WATER FROM FLOWING INTO EXCAVATIONS
FROM FLOODING THE SITE AND SURROUNDING AREA.
B. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. REMOVE WATER FROM
ALL EXCAVATIONS IMMEDIATELY TO PREVENT SOFTENING OF FOUNDATION
BOTTOMS, UNDERCUTTING FOOTINGS, AND SOIL CHANGES DETRIMENTAL TO THE
STABILITY OF SUBGRADES AND FOUNDATIONS. FURNISH AND MAINTAIN PUMPS,
SUMPS, SUCTION AND DISCHARGE PIPING SYSTEMS, AND OTHER SYSTEM
COMPONENTS NECESSARY TO CONVEY THE WATER AWAY FROM THE SITE.
C. CONVEY WATER REMOVED FROM EXCAVATIONS, AND RAIN WATER, TO COLLECTING
OR RUN-OFF AREA. CUT AND MAINTAIN TEMPORARY DRAINAGE DITCHES AND
PROVIDE OTHER NECESSARY DIVERSIONS OUTSIDE EXCAVATION LIMITS FOR EACH
STRUCTURE. DO NOT USE TRENCH EXCAVATIONS AS TEMPORARY DRAINAGE
DITCHES.
D. PROVIDE TEMPORARY CONTROLS TO RESTRICT THE VELOCITY OF DISCHARGED
WATER AS NECESSARY TO PREVENT EROSION AND SILTATION OF RECEIVING AREAS.
3.04 PLACING FILL AND BACKFILL
A. SURFACE PREPARATION OF FILL AREAS: STRIP TOPSOIL, REMAINING VEGETATION,
AND OTHER DELETERIOUS MATERIALS PRIOR TO PLACEMENT OF FILL. REMOVE ALL
ASPHALT PAVEMENT IN ITS ENTIRETY FROM AREAS REQUIRING FILL PLACEMENT.
REUSE OF BROKEN OR MILLED ASPHALT AS FILL OR SUBBASE MATERIAL IS NOT
PERMITTED. PRIOR TO PLACEMENT OF FILL, SMOOTH OUT AND COMPACT AREAS
WHERE WHEEL RUTTING HAS OCCURRED DUE TO STRIPPING OR EARTHWORK
OPERATIONS.
B. EXCAVATIONS: BACKFILL AS PROMPTLY AS PRACTICABLE, BUT ONLY AFTER
APPROVAL BY THE DIRECTOR'S REPRESENTATIVE. DO NOT BACKFILL WITH
EXCAVATED MATERIAL UNLESS IT MEETS THE REQUIREMENTS OF THIS SECTION.
C. PLACE BACKFILL AND FILL MATERIALS IN LAYERS NOT MORE THAN 8 INCHES THICK IN
LOOSE DEPTH. BEFORE COMPACTION, MOISTEN OR AERATE EACH LAYER AS
NECESSARY TO FACILITATE COMPACTION TO THE REQUIRED DENSITY. DO NOT
PLACE BACKFILL OR FILL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR
COVERED WITH ICE.
D. UNDER EXTERIOR CONCRETE SLABS AND STEPS:
1. UP TO SUBGRADE SURFACE ELEVATION: PLACE SELECTED FILL WHEN FILL OR
BACKFILL IS REQUIRED.
2. SUBBASE MATERIAL: PLACE 12 INCHES OF SELECT GRANULAR MATERIAL (NYSDOT
TYPE 2 OR APPROVED EQUAL) OVER SUBGRADE SURFACE.
E. UNDER PAVEMENTS:
1. UP TO SUBGRADE SURFACE ELEVATION: PLACE SELECTED FILL WHEN FILL OR
BACKFILL IS REQUIRED.
2. SUBBASE MATERIAL: PLACE NYSDOT TYPE 2 SUBBASE MATERIAL AS INDICATED.
F. LANDSCAPED AREAS: PLACE SUITABLE MATERIAL WHEN REQUIRED TO COMPLETE
FILL OR BACKFILL AREAS UP TO SUBGRADE SURFACE ELEVATION. DO NOT USE
MATERIAL CONTAINING ROCKS OVER FOUR INCHES IN DIAMETER WITHIN THE TOP 12
INCHES OF SUITABLE MATERIAL.
3.05 COMPACTION
A. ALL MATERIALS WITH EXCEPTION OF OPEN GRADED STONE (NO. 2 COARSE
AGGREGATE, NO. 1 COARSE AGGREGATE, ITEM B-12, ETC.):
1. COMPACT EACH LAYER OF FILL AND BACKFILL FOR THE FOLLOWING AREA
CLASSIFICATIONS TO THE PERCENTAGE OF MAXIMUM DENSITY SPECIFIED BELOW
AND AT A MOISTURE CONTENT SUITABLE TO OBTAIN THE REQUIRED DENSITIES, BUT
AT NOT LESS THAN THREE PERCENT DRIER OR MORE THAN TWO PERCENT WETTER
THAN THE OPTIMUM CONTENT AS DETERMINED BY ASTM D 698 (STANDARD
PROCTOR).
A. CONCRETE SLABS AND STEPS: 95 PERCENT.
B. LANDSCAPED AREAS: 90 PERCENT.
C. PAVEMENT: 95 PERCENT.
IF A COMPACTED LAYER FAILS TO MEET THE SPECIFIED PERCENTAGE OF MAXIMUM
DENSITY, THE LAYER WILL BE RE-COMPACTED AND RETESTED. IF COMPACTION CANNOT
BE ACHIEVED THE MATERIAL/LAYER WILL BE REMOVED AND REPLACED. NO ADDITIONAL
MATERIAL MAY BE PLACED OVER A COMPACTED LAYER UNTIL THE SPECIFIED DENSITY IS
ACHIEVED. CONTRACTOR TO PROVIDE CERTIFIED TEST EVIDENCE OF ACHIEVED 95%
DRY-DENSITY.
3.06 GRADING
A. ROUGH GRADING: TRIM AND GRADE AREA TO A LEVEL OF FOUR INCHES BELOW THE
FINISH GRADES INDICATED. PROVIDE SMOOTH UNIFORM TRANSITION TO ADJACENT
AREAS.
B. FINISH GRADING: FINISH SURFACES FREE FROM IRREGULAR SURFACE CHANGES,
AND AS FOLLOWS:
1. GRASSED AREAS: FINISH AREAS TO RECEIVE TOPSOIL TO WITHIN 1 INCH ABOVE OR
BELOW THE REQUIRED SUBGRADE SURFACE ELEVATIONS.
2. PAVEMENTS: PLACE AND COMPACT SUBBASE MATERIAL AS SPECIFIED. SHAPE
SURFACE OF AREAS TO REQUIRED LINE, GRADE AND CROSS SECTION, WITH THE
FINISH SURFACE NOT MORE THAN 1/2 INCH ABOVE OR BELOW THE REQUIRED
SUBBASE ELEVATION.
C. SPREAD APPROVED TOPSOIL DIRECTLY UPON PREPARED SUBGRADE SURFACE TO A
DEPTH MEASURING 4 INCHES AFTER NATURAL SETTLEMENT OF THE TOPSOIL HAS
OCCURRED IN AREAS TO BE SEEDED. PLACE TO GREATER DEPTH WHEN NECESSARY
TO ADJUST GRADES TO REQUIRED ELEVATIONS.
1. APPROVED EXISTING TOPSOIL MAY BE USED. PROVIDE ADDITIONAL TOPSOIL FROM
OUTSIDE SOURCES AS REQUIRED.
D. FINISH TOPSOIL SURFACE FREE OF DEPRESSIONS WHICH WILL TRAP WATER, FREE
OF STONES OVER 1 INCH IN ANY DIMENSION, AND FREE OF DEBRIS.
3.07 RESTORATION
A. RESTORE PAVEMENTS, WALKS, CURBS, LAWNS, AND OTHER EXTERIOR SURFACES
DAMAGED DURING PERFORMANCE OF THE WORK TO MATCH THE APPEARANCE AND
PERFORMANCE OF EXISTING CORRESPONDING SURFACES AS CLOSELY AS
PRACTICABLE.
B. TOPSOIL AND SEED OR SOD DAMAGED LAWN AREAS OUTSIDE THE PROJECT AREA
AND NEW LAWN AREAS INSIDE. WATER AS REQUIRED UNTIL PHYSICAL COMPLETION
OF THE WORK.
3.8 DISPOSAL OF EXCESS AND UNSUITABLE MATERIALS
A. REMOVE FROM STATE PROPERTY AND DISPOSE OF EXCESS AND UNSUITABLE
MATERIALS, INCLUDING MATERIALS RESULTING FROM CLEARING AND GRUBBING AND
REMOVAL OF EXISTING IMPROVEMENTS.
3.9 FIELD QUALITY CONTROL
A. COMPACTION TESTING: NOTIFY THE DIRECTOR'S REPRESENTATIVE AT LEAST 3
WORKING DAYS IN ADVANCE OF ALL PHASES OF FILLING AND BACKFILLING
OPERATIONS. IF A COMPACTED LAYER FAILS TO MEET THE SPECIFIED PERCENTAGE
OF MAXIMUM DENSITY, THE LAYER SHALL BE RE-COMPACTED AND WILL BE
RETESTED. NO ADDITIONAL MATERIAL MAY BE PLACED OVER A COMPACTED LAYER
UNTIL THE SPECIFIED DENSITY IS ACHIEVED.
3.10 PROTECTION
A. PROTECT GRADED AREAS FROM TRAFFIC AND EROSION, AND KEEP THEM FREE OF
TRASH AND DEBRIS.
SECTION 310101 - SITE RESTORATION
PART 1 GENERAL
1.01 DESCRIPTION
A. COMPANY QUALIFICATIONS: THE COMPANY PERFORMING THE WORK OF THIS
SECTION SHALL BE INSURED AND HAVE A MINIMUM OF FIVE (5) YEARS OF
EXPERIENCE IN TREE REMOVAL AND TRIMMING. THE PERSON SUPERVISING THE
WORK SHALL ALSO HAVE A MINIMUM OF FIVE (5) YEARS OF EXPERIENCE IN TREE
REMOVAL AND TRIMMING.
B. THE WORK SHALL CONSIST OF THE REMOVAL AND DISPOSAL OF SELECTED TREES
INCLUDING STUMPS AND ROOTS.
1.02 COORDINATION AND SCHEDULING
A. COORDINATE WORK WITH THE DIRECTOR'S REPRESENTATIVE TO MINIMIZE
DISRUPTIONS AND FACILITY OPERATIONS. THE DIRECTOR'S REPRESENTATIVE SHALL
BE NOTIFIED AT LEAST THREE (3) WORKING DAYS PRIOR TO PERFORMING THE WORK,
AND SHOULD BE PROVIDED A SCHEDULE FOR THE WORKS PROGRESSION.
1.03 PROJECT CONDITIONS
A. PROTECT EXISTING TREES AND PLANTS DURING PERFORMANCE OF THE WORK
UNLESS OTHERWISE INDICATED. BOX TREES AND PLANTS INDICATED TO REMAIN
WITH TEMPORARY ORANGE CONSTRUCTION FENCING OR SOLIDLY CONSTRUCTED
WOOD BARRICADES AS REQUIRED. PROTECT ROOT SYSTEMS FROM SMOTHERING.
DO NOT STORE EXCAVATED MATERIAL, OR ALLOW VEHICULAR TRAFFIC OR PARKING
WITHIN THE CANOPY DRIP LINE. RESTRICT FOOT TRAFFIC TO PREVENT EXCESSIVE
COMPACTION OF SOIL OVER ROOT SYSTEMS.
B. REVIEW NYS DEC QUARANTINE ORDER FOR THE DISTRICTS AND THE REGULATIONS
OF THE MOVEMENT OF MATERIALS.
HTTP://WWW.DEC.NY.GOV/DOCS/LANDS_FORESTS_PDF/EAB2013QUARORDER.PDF
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.01 PREPARATION
A. PROTECTION:
1. PREVENT DAMAGE TO BUILDINGS, PAVEMENT, PIPES, CONDUITS, POLES AND OTHER
STRUCTURES ABOVE AND BELOW GROUND THAT ARE ADJOINING OR INCLUDED IN
THE CONTRACT AREA. REPAIR DAMAGE RESULTING FROM THE CONTRACTOR'S
NEGLIGENCE.
2. PROTECT EXISTING TREES AND SHRUBS NOT TO BE REMOVED. CUT BACK TO POINT
OF BRANCHING ALL BROKEN BRANCHES AND SKINNED AREAS.
3. STORE MATERIALS AND EQUIPMENT IN CLEARED AREAS AWAY FROM TREE ROOTS.
PREVENT EMPLOYEES AND EQUIPMENT FROM TRAMPLING OVER WOODLAND,
EXISTING PLANTING, AND ESTABLISHED LAWNS.
3.02 REMOVALS - TREES ENTIRELY
A. REMOVE TREES WHERE INDICATED.
B. TOP AND LIMB ALL TREES BEFORE FALLING, UNLESS OTHERWISE APPROVED BY THE
DIRECTOR'S REPRESENTATIVE.
C. CHIP OUT STUMPS TO A DEPTH OF NOT LESS THAN 6 INCHES BELOW FINISHED
GRADE. BACKFILL STUMP HOLES WITH TOPSOIL, AND SEED.
3.03 CLEAN UP - TREES TRIMMED AND REMOVED
A. REMOVE AND DISPOSE OF ALL LOGS, TREE TRIMMINGS, AND DEBRIS FROM STATE
PROPERTY. LEAVE WORK AREA IN A NEAT UNCLUTTERED CONDITION, WHERE
INDICATED OR SPECIFIED.
3.04 MAINTENANCE AND RESTORATION
A. RESTORE GRADES TO INDICATED LEVELS WHERE SETTLEMENT OR DAMAGE DUE TO
PERFORMANCE OF THE WORK HAS OCCURRED. CORRECT CONDITIONS
CONTRIBUTING TO SETTLEMENT OR DAMAGE.
B. RESTORE PAVEMENTS, WALKS, CURBS, LAWNS, AND OTHER EXTERIOR SURFACES
DAMAGED DURING PERFORMANCE OF THE WORK TO MATCH THE APPEARANCE AND
PERFORMANCE OF EXISTING CORRESPONDING SURFACES AS CLOSELY AS
PRACTICABLE.
3.05 WORK AREAS AND PERFORMANCE
A. THE DIRECTOR'S REPRESENTATIVE MAY LIMIT OR RESTRICT WORK AREAS AND
SCHEDULING OF THE TREE TRIMMING AND/OR REMOVAL BASED UPON PROJECT
PROGRESS.
VE
R
S H
EE
T
AP
PR
O
VE
D
CH
EC
KE
D
B Y:
D R
AW
N
B Y:
SC
AL
E:
PR
O
JE
CT
ID
EN
TI
FI
CA
TI
O N
N O
D
AT
E:
N
UM
BE
R
SH
EE
T
SH
EE
T
TI
TL
E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL
AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P T
R
IO
T S
T
IL
L S
E R
V
IN
G D
E
SI
G N
C
O N
SU
L
T
IN
G
C
AN
AL
V
IE
W
B
LV
D . S
U
IT
E
R
O C
H
ES
TE
R
, N Y
5.
8.
W
W W
.P
AT
R
IO
T- D
C .C
O M
AS
IN
D
IC
AT
ED
D R
IV
EW
AY
A
N D
P
AR
KI
N
G L
O T
D
ES
IG
N
P
IE
R
C E
ST
W
EB
ST
ER
, N
Y
G I-0
J U
N
C R
B
AW
M
FS
W
-4
R
EV
IS
IO
N
D
AT
E
BY
SP
EC
IF
IC
AT
IO
N S
GENERAL SPECIFICATIONS, CONTINUED:
SECTION 321216 - ASPHALT PAVING
PART 1 GENERAL
1.01 REFERENCES
A. NEW YORK STATE DEPARTMENT OF TRANSPORTATION (DOT) SPECIFICATION SECTION
400 DATED JANUARY 1, 2023.
1.02 RELATED WORK SPECIFIED ELSEWHERE
A. EARTHWORK: SECTION 310000.
1.03 PROJECT CONDITIONS
A. ENVIRONMENTAL REQUIREMENTS:
1. DISCONTINUE PAVING WHEN SURFACE TEMPERATURES FALL BELOW REQUIREMENTS
LISTED IN DOT TABLE 404-1 UNLESS OTHERWISE SPECIFIED IN THE GENERAL
CONDITIONS OF THIS CONTRACT OR AS DIRECTED BY THE DIRECTOR'S
REPRESENTATIVE.
2. DO NOT PLACE ASPHALT CONCRETE ON WET SURFACES, OR WHEN WEATHER
CONDITIONS OTHERWISE PREVENT THE PROPER HANDLING OR FINISHING OF
BITUMINOUS MIXTURES AS DETERMINED BY THE DIRECTOR'S REPRESENTATIVE.
3. PAVEMENT IS RESTRICTED BY DATES LISTED IN THE GENERAL CONDITIONS OR BY
TEMPERATURES.
PART 2 PRODUCTS
2.01 MATERIALS
A. ALL AGGREGATE USED IN DESIGN MIXES SHALL BE AS SPECIFIED IN DOT
SPECIFICATION SECTION 401-2.02 B.; COARSE AGGREGATE TYPE F2 CONDITIONS.
B. ASPHALT: USE AGGREGATE AND PG BINDER FROM SUPPLIERS LISTED IN THE NYS
DOT'S APPROVED LIST FOR FINE AND COARSE AGGREGATES AND PERFORMANCE
GRADED (PG) BINDERS FOR WARM MIX ASPHALT (WMA) TECHNOLOGY FOR PAVING
RESPECTIVELY. USE OF MINERAL FILLER OR ANY OTHER MATERIALS FOR THE
PRODUCTION OF ASPHALT WILL BE ACCEPTED IN ACCORDANCE WITH THE STATE'S
WRITTEN INSTRUCTIONS.
C. SUPPLY APPROVED ASPHALT MIXTURES THAT MEET THE REQUIREMENTS OF NYS
DOT MM 5.16 SUPERPAVE HOT MIX ASPHALT MIXTURE DESIGN AND MIXTURE
VERIFICATION PROCEDURES. EACH MIXTURE MUST BE OBTAINED FROM A SINGLE
PLANT FOR THE DURATION OF THE PROJECT. THE FOLLOWING NYS DOT ITEMS ONLY
SHALL BE UTILIZED FOR THIS PROJECT:
1. 9.5 TOP COURSE ASPHALT (DRIVEWAYS).
2. 25.0 BINDER COURSE ASPHALT.
3. TYPE 2 SUBBASE COURSE.
D. RECLAIMED ASPHALT PAVEMENT (RAP) WILL NOT BE ACCEPTED.
E. ASPHALT CEMENT TACK COAT.
PART 3 EXECUTION
3.01 ASPHALT PAVING PLACEMENT & COMPACTION
A. PREPARE EXISTING SURFACES IN ACCORDANCE WITH DOT SECTION 404-3.05,
CONDITIONING OF EXISTING SURFACE.
B. APPLY TACK COAT IN ACCORDANCE WITH DOT SECTION 407-3.02, APPLICATION OF
TACK COAT, SPECIFICALLY TABLE 407-1 - TACK COAT APPLICATION RATES.
C. SPREAD AND FINISH ASPHALT IN ACCORDANCE WITH DOT SECTION 404-3.06,
SPREADING AND FINISHING.
D. PROVIDE COMPACTION OF ASPHALT IN ACCORDANCE WITH DOT SECTION 404-3.07,
COMPACTION.
1. PARAGRAPH D. 80 SERIES COMPACTION METHODS, SPECIFICALLY MEETING THE
MINIMUM REQUIREMENTS AS SHOWN IN TABLE 404-3 NUMBER OF PASSES. THE
DIRECTOR'S REPRESENTATIVE MAY INCREASE OR DECREASE THE NUMBER OF
PASSES TO OBTAIN ADEQUATE DENSITY OF THE COMPACTED HMA.
2. THE DIRECTOR'S REPRESENTATIVE MAY ALSO APPROVE ALTERNATE COMPACTION
PROCEDURES WHERE THE SPECIFIED PROCEDURES ARE NOT APPLICABLE.
3. TESTING TO BE PERFORMED BY CONTRACTOR AT THE DIRECTION OF AND IN
LOCATIONS CHOSEN BY THE DIRECTOR'S REPRESENTATIVE. TARGET COMPACTION IS
95% (92% - 97% RANGE IS ACCEPTABLE).
4. CONTRACTOR TO PROVIDE CERTIFIED TEST EVIDENCE OF ACHIEVED 95%
DRY-DENSITY.
E. ASPHALT JOINTS SHALL BE IN ACCORDANCE WITH DOT SECTION 404-3.09, JOINTS.
F. CONSTRUCT EACH PAVEMENT COURSE TO A ¼” SURFACE TOLERANCE. THE
DIRECTOR'S REPRESENTATIVE MAY TEST THE SURFACE WITH A 16-FOOT STRAIGHT
EDGE OR STRING LINE PLACED PARALLEL TO THE CENTERLINE OF THE PAVEMENT
AND WITH A 10-FOOT STRAIGHT EDGE OR STRING LINE PLACED TRANSVERSELY TO
THE CENTERLINE OF THE PAVEMENT ON ANY PORTION OF THE PAVEMENT.
VARIATIONS EXCEEDING ¼ INCH WILL BE APPROPRIATELY CORRECTED OR THE
PAVEMENT BE REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE STATE.
G. THE ALLOWABLE THICKNESS TOLERANCE OF ALL ASPHALT MIXTURES SHALL BE:
1. 1/4 INCH OR LESS WHEN THE TOTAL NOMINAL THICKNESS INDICATED ON THE PLANS
IS 4 INCHES OR LESS.
2. 1/2 INCH OR LESS WHEN THE TOTAL NOMINAL THICKNESS IS OVER 4 INCHES BUT NOT
MORE THAN 8 INCHES.
3. WHEN THE ASPHALT MIXTURE IS PLACED ON NEWLY CONSTRUCTED SUBBASE
MATERIAL, AN ADDITIONAL TOLERANCE OF 1/4 INCH WILL BE ALLOWED BOTH IN THE
NOMINAL THICKNESS OF THE COURSE PLACED DIRECTLY ON THE SUBBASE AND THE
TOTAL PAVEMENT THICKNESS.
H. REMOVE AND RESTORE PAVED AREAS THAT ARE DEFECTIVE OR CONTAMINATED AS
DELINEATED BY THE DIRECTOR'S REPRESENTATIVE AT NO ADDITIONAL COST TO THE
STATE.
I. DO NOT CLEAN TOOLS AND EQUIPMENT USED FOR ASPHALT PLACEMENT ON THE
PAVEMENT SURFACE, OR NEAR STREAMS, PONDS, DRAINAGE STRUCTURES OR
OTHER AREAS THAT ARE TRIBUTARIES TO WATERWAYS. USE AN AREA APPROVED BY
THE DIRECTOR'S REPRESENTATIVE FOR CLEANING ALL PAVING EQUIPMENT AND
TOOLS.
J. ONCE PAVEMENT CURES FOR A MINIMUM OF 24 HOURS, APPLY PAVEMENT MARKINGS
WITH MECHANICAL EQUIPMENT TO A MINIMUM WET FILM THICKNESS OF 15 MILS (0.4
MM), OR AS SPECIFIED BY THE MANUFACTURER IF GREATER.
SECTION 329221 - SEEDING
PART 1 GENERAL
1.01 QUALITY ASSURANCE
A. PROVIDE PREPACKAGED SEED READILY AVAILABLE TO THE PUBLIC WITH QUALITY
AND PURITY EQUAL TO PRODUCT OF O.M. SCOTTS AND SON, MARYSVILLE, OH.
ON-THE-JOB OR MADE-TO-ORDER MIXES WILL NOT BE ACCEPTED.
1.02 DELIVERY STORAGE AND HANDLING
A. DELIVER FERTILIZER IN MANUFACTURER'S STANDARD SIZE BAGS OR CARTONS
SHOWING WEIGHT, ANALYSIS, AND THE NAME OF THE MANUFACTURER. STORE AS
APPROVED BY DIRECTOR'S REPRESENTATIVE.
B. STORE ALL SEED AT THE SITE IN A COOL DRY PLACE AS APPROVED BY THE
DIRECTOR'S REPRESENTATIVE. REPLACE ANY SEED DAMAGED DURING STORAGE.
1.03 SCHEDULING
A. TIME FOR SEEDING: OPTIMUM PERIOD TO SOW PERMANENT GRASS SEED IS
GENERALLY BETWEEN APRIL 1ST AND MAY 15TH OR BETWEEN AUGUST 15TH AND
OCTOBER 1ST. SCHEDULE APPLICATION FOR WHEN WEATHER CONDITIONS PERMIT OR
AS DIRECTED.
1. PROVIDE TEMPORARY SEED AND MULCH WHEN FINAL GRADING IS COMPLETE WHILE
WAITING FOR OPTIMAL SEEDING PERIOD.
2. PROVIDE TEMPORARY SEED AND MULCH FOR TEMPORARY COVER ON DISTURBED
GROUND NOT TO BE WORKED ON FOR MORE THAN 7 DAYS.
3. PROVIDE TEMPORARY SEED AND MULCH ON DISTURBED EARTH PRIOR TO
TEMPORARY SHUTDOWN OF CONSTRUCTION.
PART 2 PRODUCTS
2.01 FERTILIZER
A. FERTILIZER: MIXED COMMERCIAL FERTILIZERS SHALL CONTAIN TOTAL NITROGEN,
AVAILABLE PHOSPHORIC ACID AND SOLUBLE POTASH IN THE RATIO OF 10-6-4 (50%
N/UF). 50% OF TOTAL NITROGEN SHALL BE DERIVED FROM UREAFORM FURNISHING A
MINIMUM OF 3.5% WATER INSOLUBLE NITROGEN (3.5% WIN). THE BALANCE OF THE
NITROGEN SHALL BE PRESENT AS METHYLENE UREA, WATER SOLUBLE UREA,
NITRATE AND AMMONIACAL COMPOUNDS.
B. OTHER FERTILIZERS MEETING DOT SPECIFICATION SECTION 713-03 FERTILIZER CAN
BE USED.
2.02 SEED
A. FURNISH FRESH, CLEAN, NEW-CROP SEED MIXED IN THE PROPORTIONS SPECIFIED
FOR SPECIES AND VARIETY, AND CONFORMING TO FEDERAL AND STATE STANDARDS.
B. ACCEPTABLE MATERIAL IN A SEED MIXTURE OTHER THAN PURE LIVE SEED CONSISTS
OF NONVIABLE SEED, CHAFF, HULLS, LIVE SEED OF CROP PLANTS AND INERT
MATTER. THE PERCENTAGE OF WEED SEED SHALL NOT EXCEED 0.1 PERCENT BY
WEIGHT.
C. ALL SEED WILL BE REJECTED IF THE LABEL OR TEST ANALYSIS INDICATES ANY OF
THE FOLLOWING CONTAMINATES: TIMOTHY, ORCHARD GRASS, SHEEP FESCUE,
MEADOW FESCUE, CANADA BLUE GRASS, ALTA FESCUE, KENTUCKY 31 FESCUE, AND
BENT GRASS.
D. PROVIDE THE FOLLOWING SEED MIXTURE:
A = MIN. PERCENTAGE OF GERMINATION
B = MIN. PURITY PERCENTAGE
C = WEIGHT PURE LIVE SEED IN MIXTURE
SEED MIX “A”
NAME VARIETY A B C
CHEWINGS FESCUE (FESTUCA RUBRA COMMUTATA); BANNER, HIGHLIGHT, JAMESTOWN,
OR AN APPROVED EQUAL. 85, 97, 25
KENTUCKY BLUEGRASS (POA PRATENSIS); BARRON, FLYKING, GLADE, OR AN APPROVED
EQUAL. 80, 95, 55
PERENNIAL RYEGRASS (LOLIUM PERENNE); MANHATTEN II, PENNFINE, YORKTOWN II, OR
AN APPROVED EQUAL. 90, 98, 20
2.03 MULCH
A. DRY APPLICATION, STRAW: STALKS OF OATS, WHEAT, RYE OR OTHER APPROVED
CROPS WHICH ARE FREE OF NOXIOUS WEEDS. WEIGHT SHALL BE BASED ON A 15
PERCENT MOISTURE CONTENT.
B. HYDRO APPLICATION: COLORED WOOD CELLULOSE FIBER PRODUCT SPECIFICALLY
DESIGNED FOR USE AS A HYDRO-MECHANICAL APPLIED MULCH. ACCEPTABLE
PRODUCT: CONWED HYDRO MULCH, CONWED FIBERS, 231 4TH STREET SW, HICKORY,
NC.
PART 3 EXECUTION
3.01 PREPARATION
A. SEED BED: SCARIFY SOIL TO A DEPTH OF 3 INCHES IN COMPACTED AREAS. SMOOTH
OUT UNSIGHTLY VARIATIONS, BUMPS, RIDGES, AND DEPRESSIONS WHICH WILL HOLD
WATER. REMOVE STONES, LITTER, OR OTHER OBJECTIONABLE MATERIAL.
1. OBTAIN WRITTEN APPROVAL OF SEED BED FROM THE DIRECTOR'S REPRESENTATIVE
BEFORE COMMENCING SEEDING OPERATIONS.
3.02 FERTILIZING
A. APPLY 10-6-4 FERTILIZER EVENLY AT THE RATE OF 40 POUNDS PER 1000 SQ FT OR 2
POUNDS OF NITROGEN PER 1000 SQ FT.
3.03 SEEDING
A. ASSUME ALL RISKS WHEN SEED IS SOWED BEFORE APPROVAL OF SEED ANALYSIS.
B. DO NOT SEED WHEN THE WIND VELOCITY EXCEEDS 5 MILES PER HOUR.
C. APPLICATION RATE:
1. SEED MIX “A”: 5 POUNDS PER 1,000 SQ. FT.
D. DRY APPLICATION: SOW SEED EVENLY BY HAND OR SEED SPREADER ON DRY OR
MODERATELY DRY SOIL.
E. HYDROSEEDING:
1. APPLY SEEDING MATERIALS WITH AN APPROVED HYDROSEEDER.
2. FILL TANK WITH WATER AND AGITATE WHILE ADDING SEEDING MATERIALS. USE
SUFFICIENT FERTILIZER, MULCH, AND SEED TO OBTAIN THE SPECIFIED APPLICATION
RATE. ADD SEED TO THE TANK AFTER THE FERTILIZER AND MULCH HAVE BEEN ADDED.
MAINTAIN CONSTANT AGITATION TO KEEP CONTENTS IN HOMOGENEOUS SUSPENSION.
PROLONGED DELAYS IN APPLICATION OR AGITATION THAT MAY BE INJURIOUS TO THE
SEED WILL BE THE BASIS OF REJECTION OF MATERIAL REMAINING IN TANK.
3. DISTRIBUTE UNIFORMLY A SLURRY MIXTURE OF WATER, SEED, FERTILIZER, AND MULCH
AT A MINIMUM RATE OF 57 GALLONS PER 1000 SQ FT (2500 GALLONS PER ACRE). THE
DIRECTOR'S REPRESENTATIVE MAY ORDER THE AMOUNT OF WATER INCREASED IF
DISTRIBUTION OF SEEDING MATERIALS IS NOT UNIFORM.
3.04 MULCHING
A. DRY APPLICATION: WITHIN ONE DAY AFTER SEEDING, COVER THE SEEDED AREAS WITH A
UNIFORM BLANKET OF STRAW MULCH AT THE RATE OF 100 POUNDS PER 1000 SQ FT OF
SEEDED AREA.
B. HYDRO APPLICATION: APPLY APPROVED MULCH IN ACCORDANCE WITH THE
MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDED RATES OF APPLICATION.
3.06 LAWN ESTABLISHMENT
A. MAINTAIN THE GRASS AT HEIGHTS BETWEEN 3 INCHES AND 3-1/2 INCHES ON A WEEKLY
BASIS UNTIL THE FINAL ACCEPTANCE OF THE WORK.
B. WATER AND PROTECT ALL SEEDED AREAS UNTIL FINAL ACCEPTANCE OF THE LAWN.
3.07 FINAL ACCEPTANCE
A. FINAL ACCEPTANCE OF LAWN AREAS WILL BE GRANTED WHEN A UNIFORM STAND OF
ACCEPTABLE GRASS IS OBTAINED, WITH A MINIMUM OF 95 PERCENT COVERAGE.
PORTIONS OF THE LAWN AREAS MAY BE ACCEPTED AT VARIOUS TIMES AT THE
DISCRETION OF THE DIRECTOR'S REPRESENTATIVE.
B. AT THE PHYSICAL COMPLETION OF THE WORK, THE STATE WILL ASSUME MAINTENANCE
RESPONSIBILITIES OF THE LAWN AREAS.
SECTION 329303 - TREE REMOVAL
PART 1 GENERAL
1.01 DESCRIPTION
A. COMPANY QUALIFICATIONS: THE COMPANY PERFORMING THE WORK OF THIS SECTION
SHALL BE INSURED AND HAVE A MINIMUM OF FIVE (5) YEARS OF EXPERIENCE IN TREE
REMOVAL AND TRIMMING. THE PERSON SUPERVISING THE WORK SHALL ALSO HAVE A
MINIMUM OF FIVE (5) YEARS OF EXPERIENCE IN TREE REMOVAL AND TRIMMING.
B. THE WORK SHALL CONSIST OF THE REMOVAL AND DISPOSAL OF SELECTED TREES
INCLUDING STUMPS AND ROOTS.
1.02 COORDINATION AND SCHEDULING
A. COORDINATE WORK WITH THE DIRECTOR'S REPRESENTATIVE TO MINIMIZE DISRUPTIONS
AND FACILITY OPERATIONS. THE DIRECTOR'S REPRESENTATIVE SHALL BE NOTIFIED AT
LEAST THREE (3) WORKING DAYS PRIOR TO PERFORMING THE WORK, AND SHOULD BE
PROVIDED A SCHEDULE FOR THE WORKS PROGRESSION.
1.03 PROJECT CONDITIONS
A. PROTECT EXISTING TREES AND PLANTS DURING PERFORMANCE OF THE WORK UNLESS
OTHERWISE INDICATED. BOX TREES AND PLANTS INDICATED TO REMAIN WITH
TEMPORARY ORANGE CONSTRUCTION FENCING OR SOLIDLY CONSTRUCTED WOOD
BARRICADES AS REQUIRED. PROTECT ROOT SYSTEMS FROM SMOTHERING. DO NOT
STORE EXCAVATED MATERIAL, OR ALLOW VEHICULAR TRAFFIC OR PARKING WITHIN THE
CANOPY DRIP LINE. RESTRICT FOOT TRAFFIC TO PREVENT EXCESSIVE COMPACTION OF
SOIL OVER ROOT SYSTEMS.
B. REVIEW NYS DEC QUARANTINE ORDER FOR THE DISTRICTS AND THE REGULATIONS OF
THE MOVEMENT OF MATERIALS.
HTTP://WWW.DEC.NY.GOV/DOCS/LANDS_FORESTS_PDF/EAB2013QUARORDER.PDF
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.01 PREPARATION
A. PROTECTION:
1. PREVENT DAMAGE TO BUILDINGS, PAVEMENT, PIPES, CONDUITS, POLES AND OTHER
STRUCTURES ABOVE AND BELOW GROUND THAT ARE ADJOINING OR INCLUDED IN THE
CONTRACT AREA. REPAIR DAMAGE RESULTING FROM THE CONTRACTOR'S NEGLIGENCE.
2. PROTECT EXISTING TREES AND SHRUBS NOT TO BE REMOVED. CUT BACK TO POINT OF
BRANCHING ALL BROKEN BRANCHES AND SKINNED AREAS.
3. STORE MATERIALS AND EQUIPMENT IN CLEARED AREAS AWAY FROM TREE ROOTS.
PREVENT EMPLOYEES AND EQUIPMENT FROM TRAMPLING OVER WOODLAND, EXISTING
PLANTING, AND ESTABLISHED LAWNS.
3.03 REMOVALS - TREES ENTIRELY
A. REMOVE TREES WHERE INDICATED.
B. TOP AND LIMB ALL TREES BEFORE FALLING, UNLESS OTHERWISE APPROVED BY THE
DIRECTOR'S REPRESENTATIVE.
C. CHIP OUT STUMPS TO A DEPTH OF NOT LESS THAN 6 INCHES BELOW FINISHED GRADE.
BACKFILL STUMP HOLES WITH TOPSOIL, AND SEED.
3.05 CLEAN UP - TREES TRIMMED AND REMOVED
A. REMOVE AND DISPOSE OF ALL LOGS, TREE TRIMMINGS, AND DEBRIS FROM STATE
PROPERTY. LEAVE WORK AREA IN A NEAT UNCLUTTERED CONDITION, WHERE INDICATED
OR SPECIFIED.
3.06 MAINTENANCE AND RESTORATION
A. RESTORE GRADES TO INDICATED LEVELS WHERE SETTLEMENT OR DAMAGE DUE TO
PERFORMANCE OF THE WORK HAS OCCURRED. CORRECT CONDITIONS CONTRIBUTING
TO SETTLEMENT OR DAMAGE.
B. RESTORE PAVEMENTS, WALKS, CURBS, LAWNS, AND OTHER EXTERIOR SURFACES
DAMAGED DURING PERFORMANCE OF THE WORK TO MATCH THE APPEARANCE AND
PERFORMANCE OF EXISTING CORRESPONDING SURFACES AS CLOSELY AS PRACTICABLE.
3.07 WORK AREAS AND PERFORMANCE
A. THE DIRECTOR'S REPRESENTATIVE MAY LIMIT OR RESTRICT WORK AREAS AND
SCHEDULING OF THE TREE TRIMMING AND/OR REMOVAL BASED UPON PROJECT
PROGRESS.
VE
R
S H
EE
T
AP
PR
O
VE
D
CH
EC
KE
D
B Y:
D R
AW
N
B Y:
SC
AL
E:
PR
O
JE
CT
ID
EN
TI
FI
CA
TI
O N
N O
D
AT
E:
N
UM
BE
R
SH
EE
T
SH
EE
T
TI
TL
E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL
AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P T
R
IO
T S
T
IL
L S
E R
V
IN
G D
E
SI
G N
C
O N
SU
L
T
IN
G
C
AN
AL
V
IE
W
B
LV
D . S
U
IT
E
R
O C
H
ES
TE
R
, N Y
5.
8.
W
W W
.P
AT
R
IO
T- D
C .C
O M
AS
IN
D
IC
AT
ED
D R
IV
EW
AY
A
N D
P
AR
KI
N
G L
O T
D
ES
IG
N
P
IE
R
C E
ST
W
EB
ST
ER
, N
Y
C D
-1
J
U N
C R
B
AW
M
FS
W
-4
R
EV
IS
IO
N
D
AT
E
BY
D
EM
O
LI
TI
O
N P
LA
N
DEMOLITION PLAN KEYED NOTES:
1. SAW CUT ALONG EXISTING CONCRETE DRAINAGE GUTTER.
2. REMOVE ASPHALT PAVEMENT AND REMOVE MATERIAL TO
BOTTOM OF PROPOSED SUBBASE.
3. REMOVE GRAVEL AND/OR TOPSOIL AND EXCAVATE DOWN TO
BOTTOM OF PROPOSED SUBBASE.
4. PROTECT AND MAINTAIN EXISTING TREE(S). TAKE CARE NOT TO
DAMAGE MAJOR ROOTS DURING REMOVAL OF EXISTING
ASPHALT.
5. PROTECT AND MAINTAIN EXISTING WALKWAY.
6. PROTECT AND MAINTAIN EXISTING STAIRS.
7. PROTECT AND MAINTAIN EXISTING BASKETBALL HOOP.
8. REMOVE CONCRETE APRON AND REMOVE MATERIAL TO BOTTOM
OF PROPOSED SUBBASE.
N
GENERAL DEMOLITION NOTES:
1. BEFORE COMPLETING ANY WORK, THE CONTRACTOR SHALL
OBTAIN THE SERVICES OF AN INDEPENDENT UNDERGROUND
UTILITY LOCATOR TO FIELD LOCATE AND MARK EXISTING
UNDERGROUND UTILITIES.
2. REFER TO GI-002 FOR GENERAL NOTES.
3. ITEMS TO BE DEMOLISHED AND/OR REMOVED ARE DARK AND
DASHED ON THE DEMOLITION PLANS.
4. PROTECT ALL OVERHEAD, SURFACE AND SUBSURFACE UTILITIES
TO REMAIN DURING DEMOLITION WORK.
5. THE CONTRACTOR SHALL NOT REMOVE ANY LIGHT POSTS,
SIGNS, UTILITY MARKERS, TREES, SHRUBBERY, FENCES
MAILBOXES OR OTHER OBSTRUCTIONS THAT ARE NOT
INDICATED ON THE PLANS TO BE DEMOLISHED AND/OR
REMOVED WITHOUT THE PRIOR APPROVAL OF THE OWNER.
6. UNLESS OTHERWISE INDICATED, ALL ITEMS REMOVED SHALL
BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE
IMMEDIATELY DISPOSED OF IN A LEGAL MANNER.
7. CONTRACTOR SHALL USE SAWCUT TO CREATE UNIFORM JOINT
BETWEEN EXISTING ASPHALT TO BE REMOVED AND EXISTING
CONCRETE DRAINAGE GUTTER.
8. CONTRACTOR SHALL REMOVE ALL EXISTING ASPHALT UP TO
EXISTING CONCRETE DRAINAGE GUTTER.
UNDERGROUND UTILITIES TO BE LOCATED BEFORE
COMMENCING WORK, CONTACT: UNDERGROUND
UTILITY LOCATION SERVICE 811 OR 1-800-962-7962
DEMOLITION PLAN1 SCALE: 1" = 10'-0"
DEMOLITION LEGEND:
- ASPHALT TO BE DEMOLISHED AND REMOVED
- ITEMS TO BE DEMOLISHED AND REMOVED
- CONCRETE APRON TO BE DEMOLISHED AND REMOVED
X
457.90
457.70
458.32 458.23
458.06457.98
458.61
458.37
458.01 457.98
458.46
458.86 458.86
458.80
458.71
458.69
458.61 458.59
458.43
458.56
458.48
458.49
458.49
N 1171384.54 E 1454781.26
N 1171361.55 E 1454781.88
C O
VE
R
S H
EE
T
AP
PR
O
VE
D
CH
EC
KE
D
B Y:
D R
AW
N
B Y:
SC
AL
E:
PR
O
JE
CT
ID
EN
TI
FI
CA
TI
O N
N O
D
AT
E:
N
UM
BE
R
SH
EE
T
SH
EE
T
TI
TL
E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL
AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P T
R
IO
T S
T
IL
L S
E R
V
IN
G D
E
SI
G N
C
O N
SU
L
T
IN
G
C
AN
AL
V
IE
W
B
LV
D . S
U
IT
E
R
O C
H
ES
TE
R
, N Y
5.
8.
W
W W
.P
AT
R
IO
T- D
C .C
O M
AS
IN
D
IC
AT
ED
D R
IV
EW
AY
A
N D
P
AR
KI
N
G L
O T
D
ES
IG
N
P
IE
R
C E
ST
W
EB
ST
ER
, N
Y
C G
-1
J
U N
C R
B
AW
M
FS
W
-4
R
EV
IS
IO
N
D
AT
E
BY
G R
AD
IN
G , E
R O
SI
O
N
SE
D
IM
EN
T C
O N
TR
O
L
PL
AN
PLAN KEYED NOTES:
1. MATCH EXISTING GRADE OF EXISTING CONCRETE DRAINAGE GUTTER.
2. HOLD ASPHALT ELEVATIONS AS SHOWN TO CREATE POSITIVE SLOPE
TO SHED WATER AWAY FROM STRUCTURE, TYPICAL.
3. MATCH EXISTING GRADE OF CONCRETE SURFACE/WALKWAY.
4. MATCH EXISTING GRADE AT BOTTOM OF STAIR.
5. GRADE TO ELIMINATE PONDING, RESTORE TURF SURFACE.
6. TOPOGRAPHY ON ASPHALT SHOWN ENHANCED AT 1/10TH OF A FOOT
(0.1') INCREMENTS TO CLEARLY DEFINE DESIGN INTENT DUE TO
FLATNESS OF EXISTING GRADE.
7. INDICATES " HIGH POINT" AND CHANGE OF SLOPE DIRECTION.
8. PROVIDE 8" COMPOST FILTER SOCK, REFER TO DETAIL 2/CG-101.
9. EXISTING CONTOUR LINE, TYPICAL.
X
GENERAL GRADING NOTES:
1. CONTRACTOR SHALL MATCH GRADES OF EXISTING CONCRETE
AND ASPHALT SURFACES WITH NEW HMA PAVEMENT. PROVIDE
SMOOTH TRANSITION BETWEEN SURFACES.
2. IN GENERAL PAVEMENT SHOULD SLOPE AWAY FROM
STRUCTURES.
3. A CROSS SLOPE OF 1% MINIMUM AND 2% MAXIMUM SHOULD BE
ACHIEVED WHERE POSSIBLE TO PREVENT PONDING, UNLESS
SPECIFIED ON DRAWINGS.
4. CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL SURFACES
DISTURBED. REFER TO SITE RESTORATION AND SEEDING ON
GI-002.
UNDERGROUND UTILITIES TO BE LOCATED BEFORE
COMMENCING WORK, CONTACT: UNDERGROUND
UTILITY LOCATION SERVICE 811 OR 1-800-962-7962
N
GRADING PLAN1 SCALE: 1" = 10'-0"
EROSION AND SEDIMENT CONTROL NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING EROSION
AND SEDIMENT CONTROL MEASURES TO PREVENT SEDIMENT
FROM LEAVING SITE. EROSION AND SEDIMENT CONTROL
MEASURES SHALL CONFORM TO NEW YORK STATE STANDARDS
AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL
(BLUE BOOK).
2. EROSION AND SEDIMENT CONTROLS BMP'S MUST BE
CONSTRUCTED, STABILIZED AND FUNCTIONAL BEFORE SITE
DISTURBANCE BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE
BMP'S.
3. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED,
TEMPORARY EROSION AND SEDIMENT BMP'S MUST BE REMOVED.
AREAS DISTURBED DURING REMOVAL OF BMP'S MUST BE
STABILIZED IMMEDIATELY.
4. MINIMIZE THE AREAS DISTURBED AS MUCH AS PRACTICAL TO
RETAIN THE EXISTING VEGETATIVE COVER AND REDUCE THE
POTENTIAL FOR EROSION.
5. SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED
AND RETURNED TO THE CONSTRUCTION SITE. WASHING THE
ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY
DITCHES, SEWERS, CULVERTS, OR OTHER DRAINWAYS IS NOT
ALLOWED.
6. GARBAGE, LITTER, RUBBISH, OR OTHER SUCH MATERIAL SHALL BE
DISPOSED OF PROPERLY, AND SHALL NOT BE ALLOWED TO ENTER
THE WATERS OF THE STATE.
7. DURING CONSTRUCTION, NO WET OR FRESH CONCRETE OR
LEACHATE SHALL BE ALLOWED TO ESCAPE INTO THE WATERS OF
THE STATE. NOR SHALL WASHINGS FROM CONCRETE TRUCKS,
MIXERS OR ANY OTHER DEVICES BE ALLOWED TO ENTER ANY
WATERS.
30'
23'
MIN. 1
MAX. 2
MIN. 1%MAX. 2%
MIN. 1%
MAX. 2%
MIN. 1
MAX. 2
.3
3'
4.
5.
5' 7'
23'
25'
.9
6'
6'
R3'
.3
'9.
4'
34'
30'
.1
'18 .1
.1
7'
R3'
TYP
TYP
R50'
R50
OCCUPANCY & ACCESS NOTE:
1. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION
ACTIVITIES TO MAINTAIN SAFE AND CONTINUOUS ACCESS TO THE
FACILITY FOR RESIDENTS, STAFF, AND VISITORS AT ALL TIMES.
TEMPORARY WALKWAYS, SIGNAGE, AND PROTECTIVE BARRIERS
SHALL BE PROVIDED AS NEEDED TO ENSURE SAFETY. NOISE,
DUST, AND DISRUPTIONS SHALL BE MINIMIZED, AND ALL WORK
SHALL BE SCHEDULED IN COORDINATION WITH FACILITY
MANAGEMENT TO AVOID INTERFERENCE WITH DAILY OPERATIONS.
EMERGENCY EGRESS ROUTES SHALL REMAIN UNOBSTRUCTED AT
ALL TIMES.
E&S CONTROL LEGEND:
- COMPOST FILTER SOCK
COMPOST FILTER SOCK DETAIL2 NTS
12" MIN.
SECTION
UNDISTURBED AREADISTURBED AREA
FL
OW
FLOW
DISTURBED AREA
UNDISTURBED AREA
PLAN
2"x2" WOODEN STAKES
PLACED 10' O.C.
COMPOST FILTER SOCK
BLOWN/PLACED
FILTER MEDIA
CONTOURS
COMPOST FILTER SOCK
2"x2" WOODEN STAKES
PLACED 10' O.C.
Table 3
NOTES:
1. SOCK FABRIC SHALL MEET STANDARDS OF TABLE 1. COMPOST SHALL MEET THE
STANDARDS LISTED ON OF TABLE 2.
2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS
OF THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES
TO THE MAIN SOCK ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL
NOT EXCEED THAT SHOWN IN TABLE 3.
3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE
ABOVEGROUND HEIGHT OF THE SOCK.
5. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED
SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR
REPLACED WITHIN 24 HOURS OF INSPECTION.
6. BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS;
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE
REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCKS, STAKES AND SOCKS
SHALL BE REMOVED.
8. INSTALLATION AND MAINTENANCE SHALL CONFORM TO THE NYS STANDARDS AND
SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.
457.90
457.70
458.32 458.23
458.06457.98
458.61
458.37
458.01 457.98
458.46
458.86 458.86
458.80
458.71
458.69
458.61 458.59
458.43
458.56
458.48
458.49
458.49
N 1171384.54 E 1454781.26
N 1171361.55 E 1454781.88
C O
VE
R
S H
EE
T
AP
PR
O
VE
D
CH
EC
KE
D
B Y:
D R
AW
N
B Y:
SC
AL
E:
PR
O
JE
CT
ID
EN
TI
FI
CA
TI
O N
N O
D
AT
E:
N
UM
BE
R
SH
EE
T
SH
EE
T
TI
TL
E
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, EXCEPT A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR, TO ALTER THIS DRAWING IN ANY WAY. IF A LICENSED PROFESSIONAL ENGINEER OR LAND SURVEYOR ALTERS THIS DRAWING THEY MUST ATTACH THEIR SEAL
AND NOTATION "ALTERED BY" FOLLOWED BY A SIGNATURE AND THE DATE AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
P T
R
IO
T S
T
IL
L S
E R
V
IN
G D
E
SI
G N
C
O N
SU
L
T
IN
G
C
AN
AL
V
IE
W
B
LV
D . S
U
IT
E
R
O C
H
ES
TE
R
, N Y
5.
8.
W
W W
.P
AT
R
IO
T- D
C .C
O M
AS
IN
D
IC
AT
ED
D R
IV
EW
AY
A
N D
P
AR
KI
N
G L
O T
D
ES
IG
N
P
IE
R
C E
ST
W
EB
ST
ER
, N
Y
C S-
J
U N
C R
B
AW
M
FS
W
-4
R
EV
IS
IO
N
D
AT
E
BY
SI
TE
P
LA
N
PLAN KEYED NOTES:
1. PROVIDE NEW COMPACTED SUBBASE AND NEW HMA PAVEMENT,
REFER TO DETAIL 2/CS-101.
2. TOPOGRAPHY ON ASPHALT SHOWN ENHANCED AT 1/10TH OF A
FOOT (0.1') INCREMENTS TO CLEARLY DEFINE DESIGN INTENT
DUE TO FLATNESS OF EXISTING GRADE.
X
GENERAL PLAN NOTES:
1. BEFORE COMPLETING ANY WORK, THE CONTRACTOR SHALL
OBTAIN THE SERVICES OF AN INDEPENDENT UNDERGROUND
UTILITY LOCATOR TO FIELD LOCATE AND MARK EXISTING
UNDERGROUND UTILITIES.
2. REFER TO GI-002 FOR GENERAL NOTES.
3. PROTECT ALL OVERHEAD, SURFACE AND SUBSURFACE UTILITIES
TO REMAIN DURING PROPOSED WORK.
4. THE CONTRACTOR SHALL NOT REMOVE ANY LIGHT POSTS,
SIGNS, UTILITY MARKERS, TREES, SHRUBBERY, FENCES
MAILBOXES OR OTHER OBSTRUCTIONS THAT ARE NOT
INDICATED ON THE PLANS TO BE DEMOLISHED AND/OR REMOVED
WITHOUT THE PRIOR APPROVAL OF THE OWNER.
5. FOR GRADING AND SEDIMENT AND EROSION CONTROL, REFER
TO DRAWING CS-101.
6. CONTRACTOR VEHICLES, EQUIPMENT OR MATERIALS ARE NOT
TO BE PARKED OR STORED WITHIN PUBLIC RIGHT-OF-WAY.
UNDERGROUND UTILITIES TO BE LOCATED BEFORE
COMMENCING WORK, CONTACT: UNDERGROUND
UTILITY LOCATION SERVICE 811 OR 1-800-962-7962
N
SITE PLAN1 SCALE: 1" = 10'-0"
PROPOSED LEGEND:
- NEW HMA PAVEMENT
TYP
1 1/2" TOP COURSE,
2 1/2" BINDER AND 8" STONE FILL OVER
MIRAFI 180N STABILIZATION FABRIC
PARKING
ASPHALT PAVEMENT DETAIL2 NTS
COMPACTED SUBGRADE;
PROOF ROLLED TO 95%
DENSITY (STD PROCTOR)
COMPACTED 8"
SUBBASE COURSE,
NYSDOT TYPE 2
APPLY TACK COAT
BETWEEN LAYERS
| Sheets and Views |
| GI-001-GI-001 |
| GI-002-GI-002 |
| GI-003-GI-003 |
| CD-101-CD-101 |
| CG-101-CG-101 |
| CS-101-CS-101 |
File details come from the government source that posted it. Updated .