SOW_Gym Flooring.docx
DOCX document 18 KB Posted
- Attached to
- Z2JZ--NEW GYM RUBBER FLOORING AND MIRRORS
- Solicitation number
- 36C24223Q1102
About this file
This scope of work document outlines requirements for replacing gym flooring and installing mirrors at the James J. Peters VA Medical Center in Bronx, New York. The contractor shall remove the existing gym flooring; provide and install 14.5mm thick interlocking rubber floor tiles or larger; submit flooring samples for approval; install with seamless transitions and a transition at the entrance; reinstall the existing wall base molding; install full-length and full-height mirrors on one wall; provide and install new double swing entrance doors and signage indicating the room name, number, and location. The contractor has 90 business days to complete the work, which will be overseen by the VA project manager. The related federal contract opportunity is solicitation number 36C24223Q1102 to provide the new gym rubber flooring and mirrors for the Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_GYM FLOORING updated August 30 2023.docx | DOCX document | |
| GYM Floor Site Visit sign-in sheet.pdf | ||
| 36C24223Q1102 0001 Gym Floor Amendment 0001.pdf | ||
| 36C24223Q1102_2.docx | DOCX document | |
| Gym Flooring photos 8-30-2023.docx | DOCX document | |
| Gym Relocation Project-Floor Plan.pdf | ||
| Questions and Answers GYM FLOORING 8-30-2023.docx | DOCX document | |
| Wage Determination - Bronx.pdf | ||
| 36C24223Q1102 Gym Floor bronx.docx | DOCX document | |
| 36C24223Q1102_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW GYM RUBBER FLOORING AND MIRRORS
DEPARTMENT OF VETERANS AFFAIRS
JAMES J. PETERS VA MEDICAL CENTER
BRONX, NEW YORK
SCOPE OF WORK
INTRODUCTION
The existing gym flooring needs to be replaced to comply with the durability needs of the gym. The gym supervisory staff have requested wall length mirror on one of the existing gym walls. The new gym is located on the 3rd floor in room number 3D-22.
SERVICE AND MATERIALS
Contractor shall relocate the existing gym equipment to remove the existing gym flooring and install the new gym floor, coordinate with VA project manager.
Contractor shall remove and discard off site, the existing gym floor.
Contractor shall provide and install all the gym commercial grade rubber flooring that meet a 14.5mm in thickness. The rubber flooring shall be interlocking tiles at 2’-0” x 2”-0” or larger.
Contractor shall provide gym commercial grade rubber floor samples to be approved by the VA project manager before the purchase and installation of the new gym rubber floor.
Contractor shall install the new gym floor with seamless transitions where the materials connect.
Contractor shall install the new gym floor with a gym commercial grade rubber floor transition at the threshold of the gym entrance door and hallway floor.
Contractor shall remove the existing wall base board molding before the removal of the existing gym floor and reinstall the existing wall base board molding when the new commercial grade rubber gym floor has been installed.
Contractor shall install the new mirrors spanning the entire wall length of the wall to the left of the exterior window wall. The mirrors will be a minimum of 6 feet in height and spanning length of the entire wall.
Contractor shall provide and install new 7’-0” x 6’-0” glass and aluminum double swing doors with 2” metal frame for the gym entrance. The door specifications shall be approved by the VA project manager prior to purchase.
Contractor shall provide and install new VA gym signage at the gym entrance, gym doors and in the hallway adjacent to the main elevator bank that meets the requirements of the VA facility and the VA project manager. The requirements for the signable are as followed: Room Name, Room Number, Room Location/Direction Contractor shall remove all debris from the work area when the work is completed.
Contractor shall have a period of performance of 90 business days to complete the work. All completed work will have to be signed off by the VA project manager.