SOW_GYM FLOORING updated August 30 2023.docx

DOCX document 19 KB Posted

Attached to
Z2JZ--NEW GYM RUBBER FLOORING AND MIRRORS
Solicitation number
36C24223Q1102
Issued by

About this file

This scope of work document outlines requirements for a gym flooring replacement and mirror installation project at the James J. Peters VA Medical Center in Bronx, New York. The contractor will remove the existing gym flooring tiles and baseboards, discard all debris, and install new interlocking black rubber flooring tiles that are 14.5mm thick over the 1,850 square foot gym floor. Wall-length mirrors will also be installed on one wall spanning its entire 43-foot, 10-inch length. Additional requirements include installing new glass and aluminum entrance doors, signage, and floor transitions. The work must be completed on weekends between 6pm Friday and 6am Monday over a 60-day performance period to avoid disrupting normal gym operations. The contractor must ensure any floor transitions are safe if not fully replacing the floor in one weekend.

View the file

Other files

File Type Posted
GYM Floor Site Visit sign-in sheet.pdf PDF
36C24223Q1102 0001 Gym Floor Amendment 0001.pdf PDF
36C24223Q1102_2.docx DOCX document
Gym Flooring photos 8-30-2023.docx DOCX document
Gym Relocation Project-Floor Plan.pdf PDF
Questions and Answers GYM FLOORING 8-30-2023.docx DOCX document
Wage Determination - Bronx.pdf PDF
36C24223Q1102 Gym Floor bronx.docx DOCX document
SOW_Gym Flooring.docx DOCX document
36C24223Q1102_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW GYM RUBBER FLOORING AND MIRRORS

PROJECT NUMBER: 526-22-515

DEPARTMENT OF VETERANS AFFAIRS

JAMES J. PETERS VA MEDICAL CENTER

BRONX, NEW YORK

SCOPE OF WORK

INTRODUCTION

The existing gym flooring needs to be replaced to comply with the durability needs of the gym. The gym supervisory staff have requested wall length mirror on one of the existing gym walls. The new gym is located on the 3rd floor in room number 3D-22.

SERVICE AND MATERIALS

Contractor shall relocate the existing gym equipment to remove the existing gym flooring and install the new gym floor. Once machines have been put back in place, they shall be certified by a manufacturer’s representative that they have been installed properly. The contractor shall coordinate with the VA project manager.

Contractor shall remove and discard off site all of the existing gym mat flooring. Approximately 15 of the existing gym mat flooring tiles at the gym entrance have been installed with adhesive and are to be removed along with any existing debris and materials left because of the use of the adhesive. The Gym floor is 1,850 sqft.

Contractor shall provide and install all the gym commercial grade rubber flooring that meet a 14.5mm in thickness. The rubber flooring shall be interlocking tiles at 2’-0” x 2”-0” or larger and be solid black in color. Contractor shall provide solid black in color, commercial grade rubber gym floor samples to be approved by the VA project manager before the purchase and installation of the new gym rubber floor.

Contractor shall provide and install new floor transition at the gyms’ new entry doors threshold where the new rubber gym floor meets the hallway. (This is meant to reduce the trip hazard because of the rise in height of the gym rubber floor.)

Contractor shall install the new gym floor with seamless transitions where the materials connect.

Contractor shall remove the existing wall base board molding before the removal of the existing gym floor and reinstall the existing wall base board molding when the new commercial grade rubber gym floor has been installed.

Contractor shall install the new mirrors spanning the entire wall length of the wall to the left of the exterior window wall. The mirrors will be a minimum of 96 inch with no gaps between mirror panels and spanning length of the entire wall, approx. 43’-10”.

Contractor shall provide and install new 7’-0” x 6’-0” glass and aluminum double swing doors with 2” metal frame for the gym entrance. The door specifications shall be approved by the VA project manager prior to purchase.

Contractor shall provide and install new VA gym signage at the gym entrance, gym doors and in the hallway adjacent to the main elevator bank that meets the requirements of the VA facility and the VA project manager. The requirements for the signable are as followed: Room Name, Room Number, Room Location/Direction Contractor shall remove all debris from the work area when the work is completed.

Contractor shall have a period of performance of 60 calendar days and work only between 6 PM Friday and 6 AM Monday to complete the work. The gym must be fully operational between 6 AM Monday and 6 PM Friday. If the contractor does not complete all work in one weekend the contractor must assure any transitions between the old and new floor are safe and do not create a hazard. All completed work will have to be signed off by the VA project manager.