Scope of Work Summary
This is a Scope of Work document issued by the Finger Lakes DDSO (Developmental Disabilities Services Office), a division of the New York Office for People with Developmental Disabilities (OPWDD), for a driveway renovation project at the Pine City IRA facility located at 1503 Pennsylvania Ave, Pine City, NY 14871. The project involves the removal of an existing asphalt driveway, repair of the substructure, and installation of new pavement in accordance with blueprints and specifications prepared by Aubertine & Currier dated January 23, 2026. The work must be completed within 90 days of contract award, with work performed Monday through Friday during hours to be determined (TBD). A mandatory site visit is scheduled for Thursday, July 23, 2026, at 11:30 a.m., and prospective bidders must attend in their entirety and remain on-site for the duration; bids will not be accepted from vendors who do not attend the site visit, arrive late, or submitted bids before the site visit. The project point of contact is Jim Colon, Maintenance Supervisor, reachable at 585-335-4119.
As a New York State Public Works project, prevailing wages must be paid, and all bidders are required to provide a valid NYSDOL registration number and Certificate of Registration at the time of bid submission; failure to do so will result in automatic disqualification. The bid price must include all materials, labor, disposal fees, and site cleanup. The contractor is responsible for acquiring any required Highway Work Permit and Work Zone Traffic Control Plan from the NYS Department of Transportation prior to work commencement, as well as ensuring all underground utilities are marked before excavation begins. Additional requirements include conducting a pre-work meeting with FLDDSO Operations and Maintenance staff to discuss safety protocols, providing Safety Data Sheets to the Plant Superintendent prior to start of work, maintaining the occupied residence's safety and security, and coordinating all work with the House Director and Plant Superintendent. To request an invitation for bid, companies should submit a request on letterhead via fax to 585-461-8811 (Attention: Franchesca Sagen) or email to FL.Purchasing@opwdd.ny.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CP-FL-H600-2026026_Driveway_Replacement_PINE_CITY.pdf | ||
| Approved for Construction-20260206_Pine CityDriveway.pdf | ||
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
DESCRIPTION:
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Driveway Replacement, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.
SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Furnish materials and labor to complete the driveway renovation following the
Blueprints and Specifications as designed by: Aubertine & Currier Dated: 1/23/2026.
2. If a Highway Work Permit, and Work Zone Traffic Control Plan is needed for the project, it shall be acquired by the awarded contracted vendor from NYS Department of Transportation and provided to the Point of Contact listed above before work can begin.
3. It is the winning bidders’ responsibility to have all underground utilities marked, prior to any excavation work.
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
Facility:
Pine City IRA 263-FLA-600
Facility Address:
1503 Pennsylvania Ave Pine City, NY 14871
Point of Contact:
Jim Colon – Maintenance Supervisor 2
Contact Phone Number:
585-335-4119
Project Title:
Driveway Replacement
SCOPE: JC0100
Summary of Work:
Remove existing asphalt driveway, repair substructure, install new pavement.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
SITE VISIT
A site visit is mandatory. The site visit date is scheduled for Thursday, July 23, 2026 @ 11:30am at the project site. All prospective bidders are encouraged to attend.
A. Lawn Damage/Property Damage
• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
• Personal vehicles are not to be parked on the grass.
• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
• Once the job has begun, it is to be worked on continuously until completed.
• If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
• Work must be completed within 90 days of receiving the purchase order.
C. House Safety
• The residence will be occupied during the job.
• The contractor must take all reasonable care to safeguard the residents and the staff.
• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.
• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.
• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.
| SCOPE OF WORK includes, but is not necessarily limited to the following: |
| 1. Furnish materials and labor to complete the driveway renovation following the Blueprints and Specifications as designed by: Aubertine & Currier Dated: 1/23/2026. |
| 2. If a Highway Work Permit, and Work Zone Traffic Control Plan is needed for the project, it shall be acquired by the awarded contracted vendor from NYS Department of Transportation and provided to the Point of Contact listed above before work can be... |
| 3. It is the winning bidders’ responsibility to have all underground utilities marked, prior to any excavation work. |
| 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. |
| 2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times. |
| 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday. |
| 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. |
| 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. |
| 6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. |
| 7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. |
| 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. |
SITE VISIT