About this file

This is a construction site plan document for the New York State Office for People with Developmental Disabilities (OPWDD) and Chemung County, detailing a driveway replacement project at Hostel #600 (Pine City IRA) located at 1503 Pennsylvania Avenue, Pine City, New York. The project involves the complete renovation and reconstruction of the driveway serving the facility, including demolition of existing asphalt pavement, removal of unsuitable subsurface materials, and installation of new full-depth asphalt pavement with proper grading and drainage. The civil and site engineering work is being designed by Aubertine and Currier, PLLC, and the project was accepted for construction on February 6, 2026. A mandatory site visit is required on Thursday, July 23, 2026, at 11:30 a.m., which vendors must attend in their entirety to remain eligible for bid consideration; late arrivals may result in disqualification.

The project is classified as a New York State public works project requiring prevailing wage compliance. Bidders must provide a current New York State Department of Labor (NYSDOL) registration number and Certificate of Registration with their bid submission; failure to do so will result in automatic disqualification. The contractor is responsible for obtaining underground utility location requests through UDIG NY or by calling 811, retaining a licensed land surveyor for utility and field stakeout at contractor expense, and providing comprehensive as-built record drawings including utility information, manhole locations, and all field changes. The project requires erosion and dust control measures, tree protection, roadway connection work in accordance with NYSDOT specifications, and adherence to NYSDOT maintenance and protection of traffic regulations. Requests for bid invitations should be submitted on company letterhead via fax to 585-461-8811 (Attention: Franchesca Sagen) or by email to FL.Purchasing@opwdd.ny.gov, with the location and project title referenced. The onsite survey was conducted on September 17, 2025, using NAVD88 vertical datum and NAD83 (2011) horizontal datum.

View the file

Other files

File Type Posted
RFQ.pdf PDF
SOW.pdf PDF
CP-FL-H600-2026026_Driveway_Replacement_PINE_CITY.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHEMUNG COUNTY, STATE OF NEW YORK

INDEX OF DRAWINGS

1503 PENNSYLVANIA AVENUE

SITE PLANS: 01/23/2026

OWNER

PROJECT

LOCATION

HOSTEL #600

DRIVEWAY REPLACEMENT

NYS OFFICE FOR PEOPLE WITH

DEVELOPMENTAL DISABILITIES

44 HOLLAND AVENUE

ALBANY, NEW YORK 12208

TELE: (866) 946-9733

CIVIL/SITE ENGINEER

AUBERTINE and CURRIER, PLLC

522 BRADLEY STREET

WATERTOWN, NEW YORK 13601

TELE: (315) 782-2005

FAX: (315) 782-1472

www.aubertinecurrier.com

CD-100 EXISTING CONDITIONS AND DEMOLITION PLAN

CS-100 SITE AND GRADING PLAN

NYS OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES

CS-500 SITE DETAILS

CAPITAL SERVICES

ACCEPTED FOR CONSTRUCTION

By: stroudjj 02/06/2026Date:

Benchmark Spike in Utility Pole

Elev.=984.70'

HOSTEL 600

PINE CITY IRA

P E N N S Y L V A N I A A V E . (CO. RT. 69)

EXISTING

WELL

UTILITY POLE

LIGHT POLE

GAS METER

PROPOSEDLEGEND

5' CONTOUR

1' CONTOUR

PROPERTY LINE

RIGHT OF WAY

BUILDING

ASPHALT PAVEMENT

CURB

OVERHEAD UTILITIES

CHAIN LINK FENCE

HANDRAIL

EDGE OF CRUSHED STONE

CONCRETE

TREES

BUSH

MAILBOX

PORCH

PAVEMENT MARKING

ASPHALT AND STONE

REMOVAL

SAWCUT ASPHALT SHOULDER

REMOVAL

CONCRETE SIDEWALK

REMOVAL

STONE REMOVAL

GENERAL NOTES:

1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE

SURVEYS AND RECORDS, AND THEREFORE THEIR LOCATIONS MUST BE CONSIDERED

APPROXIMATE ONLY. THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS PRESENTLY NOT

KNOWN. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT AN UNDERGROUND UTILITY

LOCATION REQUEST ON THE UDIG NY WEBSITE OR CALL 811. CONTRACTOR IS RESPONSIBLE

FOR LOCATING AND WORKING WITH THE APPROPRIATE UTILITY COMPANIES PRIOR TO

CONSTRUCTION.

2. THE ONSITE TOPOGRAPHIC, UTILITY, AND PLANIMETRIC SURVEY FOR THE PROJECT AREA WAS CONDUCTED BY AUBERTINE AND CURRIER, PLLC ON SEPTEMBER 17, 2025. VERTICAL DATUM IS

BASED ON NAVD88 DATUM AND THE HORIZONTAL DATUM IS BASED ON NAD83 (2011).

3. ALL OUT-OF-SCOPE AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS WILL BE

RESTORED TO CONDITIONS EQUAL TO OR BETTER THAN THAT PRIOR TO CONSTRUCTION.

OUTSIDE OF PROPERTY BOUNDARIES AND EASEMENT AREAS THE CONTRACTOR IS REMINDED

THAT HE MUST OBTAIN WRITTEN AUTHORIZATION TO USE PRIVATE PROPERTY AND ASSUMES

ALL LIABILITY HIMSELF.

4. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CHARACTERISTICS AND EXTENT OF

SUBSURFACE SOILS, ROCK, WATER TABLE LEVELS, ETC., PRIOR TO BIDDING.

5. SITE CONTRACTOR TO PROVIDE EROSION AND DUST CONTROL AS REQUIRED.

6. A LICENSED LAND SURVEYOR SHALL BE RETAINED FOR ALL UTILITY AND FIELD STAKEOUT AT

THE CONTRACTORS EXPENSE.

7. PAVED AREAS WILL BE SAWCUT PRIOR TO EXCAVATION AND PAVING OPERATIONS. SAW CUT

AREAS WILL BE TACK COATED PRIOR TO PAVING. TACK COAT SHALL MEET THE REQUIREMENTS

OF ASPHALT OF ASPHALT EMULSION FOR TACK COAT, NYSDOT TABLE 702-9.

8. CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES THROUGHOUT

CONSTRUCTION UNTIL ESTABLISHMENT OF VEGETATIVE COVER. RUN-OFF CONTAINING

SEDIMENTS FROM DISTURBED AREAS OF THE SITE SHALL NOT BE ALLOWED DIRECTLY INTO

NATURAL STREAM CHANNELS.

9. ALL TREES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. CONSTRUCTION

ACTIVITIES ADJACENT TO TREES SHALL BE CONDUCTED TO REDUCE THE IMPACT TO TREES TO

THE MAXIMUM EXTENT PRACTICAL. ANY DAMAGE TO EXISTING TREES SHALL BE REPAIRED OR

THE TREE REPLACED, AS DIRECTED BY THE OWNER AT THE CONTRACTORS EXPENSE.

10. CONTRACTOR SHALL PERFORM ALL ROADWAY CONNECTION WORK IN ACCORDANCE WITH

NYSDOT SPECIFICATIONS. ALL ROADWAY WORK SHALL BE IN ACCORDANCE WITH NYSDOT

MAINTENANCE AND PROTECTION OF TRAFFIC REGULATIONS, INCLUDING FLAGMEN,

BARRICADES, WARNING SIGNS/LIGHTS, ETC., WHERE WARRANTED.

11. EXCAVATIONS SHALL BE TO DEPTHS SHOWN ON DRAWINGS. ALL UNSTABLE OR UNSUITABLE

MATERIAL SHALL BE EXCAVATED AND REMOVED TO SUCH DEPTH AS REQUIRED TO PROVIDE

SUFFICIENT BEARING CAPACITY. OVEREXCAVATED AREAS SHALL BE BACKFILLED WITH

SUITABLE MATERIAL.

12. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OF DIMENSIONS,

ELEVATIONS AND LOCATIONS DURING PRECONSTRUCTION FIELD VERIFICATION. SUCH

INFORMATION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR VERIFICATION OR

MODIFICATION OF THE PLANS.

13. THE CONTRACTOR SHALL PROVIDE AS-BUILT RECORD DRAWINGS INCLUDING, AS A MINIMUM, THE FOLLOWING INFORMATION AS WELL AS ALL REQUIREMENTS OF THE SPECIFICATION:

RECORD OF ALL UTILITIES ENCOUNTERED IN TRENCH EXCAVATION. INFORMATION SHALL

INCLUDE DIAMETER OF UTILITY, DEPTH OF BURIAL AND LOCATION WITH REFERENCE TO

NEAREST STRUCTURE SHOWN ON DRAWINGS. THIS INFORMATION SHALL BE KEPT

CURRENT ON A WEEKLY BASIS. FAILURE TO DO SO MAY RESULT IN WITHHOLDING OF

PAYMENTS.

DISTANCE TIES TO ALL MANHOLES, CLEANOUTS, BENDS AND CORPORATION STOPS.

UTILITY REPAIRS, SIDEWALK, AND DRIVEWAY REPLACEMENTS CENTERLINE.

STATIONS OF BENDS, CLEANOUTS, VALVES AND CORPORATION STOPS.

DENOTE BENCH MARK REFERENCE USED.

PERIODIC OFFSETS.

RECORD DETAILS NOT SHOWN ON THE ORIGINAL CONTRACT DOCUMENTS. ANY FIELD

CHANGES OF DIMENSIONS AND DETAILS AND ANY CHANGES MADE BY CHANGE ORDER

OR FIELD ORDER.

CERTIFICATE OF SUBSTANTIAL COMPLETION SHALL NOT BE ISSUED UNTIL AS-BUILT

INFORMATION IS ACCEPTABLE.

PROVIDE TWO (2) SETS OF FINAL COMPLETE RECORD DRAWINGS. CONTRACTOR SHALL

FURNISH AS-BUILT DATA ON PLAN SHEETS.

CAPITAL SERVICES

Benchmark Spike in Utility Pole

Elev.=984.70'

HOSTEL 600

PINE CITY IRA

P E N N S Y L V A N I A A V E . (CO. RT. 69)

GENERAL NOTES:

1. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE

SURVEYS AND RECORDS, AND THEREFORE THEIR LOCATIONS MUST BE CONSIDERED

APPROXIMATE ONLY. THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS PRESENTLY NOT

KNOWN. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL SUBMIT AN UNDERGROUND UTILITY

LOCATION REQUEST ON THE UDIG NY WEBSITE OR CALL 811. CONTRACTOR IS RESPONSIBLE

FOR LOCATING AND WORKING WITH THE APPROPRIATE UTILITY COMPANIES PRIOR TO

CONSTRUCTION.

2. THE ONSITE TOPOGRAPHIC, UTILITY, AND PLANIMETRIC SURVEY FOR THE PROJECT AREA WAS CONDUCTED BY AUBERTINE AND CURRIER, PLLC ON SEPTEMBER 17, 2025. VERTICAL DATUM IS

BASED ON NAVD88 DATUM AND THE HORIZONTAL DATUM IS BASED ON NAD83 (2011).

3. ALL OUT-OF-SCOPE AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS WILL BE

RESTORED TO CONDITIONS EQUAL TO OR BETTER THAN THAT PRIOR TO CONSTRUCTION.

OUTSIDE OF PROPERTY BOUNDARIES AND EASEMENT AREAS THE CONTRACTOR IS REMINDED

THAT HE MUST OBTAIN WRITTEN AUTHORIZATION TO USE PRIVATE PROPERTY AND ASSUMES

ALL LIABILITY HIMSELF.

4. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE CHARACTERISTICS AND EXTENT OF

SUBSURFACE SOILS, ROCK, WATER TABLE LEVELS, ETC., PRIOR TO BIDDING.

5. SITE CONTRACTOR TO PROVIDE EROSION AND DUST CONTROL AS REQUIRED.

6. A LICENSED LAND SURVEYOR SHALL BE RETAINED FOR ALL UTILITY AND FIELD STAKEOUT AT

THE CONTRACTORS EXPENSE.

7. PAVED AREAS WILL BE SAWCUT PRIOR TO EXCAVATION AND PAVING OPERATIONS. SAW CUT

AREAS WILL BE TACK COATED PRIOR TO PAVING. TACK COAT SHALL MEET THE REQUIREMENTS

OF ASPHALT OF ASPHALT EMULSION FOR TACK COAT, NYSDOT TABLE 702-9.

8. CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES THROUGHOUT

CONSTRUCTION UNTIL ESTABLISHMENT OF VEGETATIVE COVER. RUN-OFF CONTAINING

SEDIMENTS FROM DISTURBED AREAS OF THE SITE SHALL NOT BE ALLOWED DIRECTLY INTO

NATURAL STREAM CHANNELS.

9. ALL TREES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. CONSTRUCTION

ACTIVITIES ADJACENT TO TREES SHALL BE CONDUCTED TO REDUCE THE IMPACT TO TREES TO

THE MAXIMUM EXTENT PRACTICAL. ANY DAMAGE TO EXISTING TREES SHALL BE REPAIRED OR

THE TREE REPLACED, AS DIRECTED BY THE OWNER AT THE CONTRACTORS EXPENSE.

10. CONTRACTOR SHALL PERFORM ALL ROADWAY CONNECTION WORK IN ACCORDANCE WITH

NYSDOT SPECIFICATIONS. ALL ROADWAY WORK SHALL BE IN ACCORDANCE WITH NYSDOT

MAINTENANCE AND PROTECTION OF TRAFFIC REGULATIONS, INCLUDING FLAGMEN,

BARRICADES, WARNING SIGNS/LIGHTS, ETC., WHERE WARRANTED.

11. EXCAVATIONS SHALL BE TO DEPTHS SHOWN ON DRAWINGS. ALL UNSTABLE OR UNSUITABLE

MATERIAL SHALL BE EXCAVATED AND REMOVED TO SUCH DEPTH AS REQUIRED TO PROVIDE

SUFFICIENT BEARING CAPACITY. OVEREXCAVATED AREAS SHALL BE BACKFILLED WITH

SUITABLE MATERIAL.

12. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OF DIMENSIONS,

ELEVATIONS AND LOCATIONS DURING PRECONSTRUCTION FIELD VERIFICATION. SUCH

INFORMATION SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR VERIFICATION OR

MODIFICATION OF THE PLANS.

13. THE CONTRACTOR SHALL PROVIDE AS-BUILT RECORD DRAWINGS INCLUDING, AS A MINIMUM, THE FOLLOWING INFORMATION AS WELL AS ALL REQUIREMENTS OF THE SPECIFICATION:

RECORD OF ALL UTILITIES ENCOUNTERED IN TRENCH EXCAVATION. INFORMATION SHALL

INCLUDE DIAMETER OF UTILITY, DEPTH OF BURIAL AND LOCATION WITH REFERENCE TO

NEAREST STRUCTURE SHOWN ON DRAWINGS. THIS INFORMATION SHALL BE KEPT

CURRENT ON A WEEKLY BASIS. FAILURE TO DO SO MAY RESULT IN WITHHOLDING OF

PAYMENTS.

DISTANCE TIES TO ALL MANHOLES, CLEANOUTS, BENDS AND CORPORATION STOPS.

UTILITY REPAIRS, SIDEWALK, AND DRIVEWAY REPLACEMENTS CENTERLINE.

STATIONS OF BENDS, CLEANOUTS, VALVES AND CORPORATION STOPS.

DENOTE BENCH MARK REFERENCE USED.

PERIODIC OFFSETS.

RECORD DETAILS NOT SHOWN ON THE ORIGINAL CONTRACT DOCUMENTS. ANY FIELD

CHANGES OF DIMENSIONS AND DETAILS AND ANY CHANGES MADE BY CHANGE ORDER

OR FIELD ORDER.

CERTIFICATE OF SUBSTANTIAL COMPLETION SHALL NOT BE ISSUED UNTIL AS-BUILT

INFORMATION IS ACCEPTABLE.

PROVIDE TWO (2) SETS OF FINAL COMPLETE RECORD DRAWINGS. CONTRACTOR SHALL

FURNISH AS-BUILT DATA ON PLAN SHEETS.

EXISTING

WELL

UTILITY POLE

LIGHT POLE

GAS METER

PROPOSEDLEGEND

5' CONTOUR

1' CONTOUR

PROPERTY LINE

RIGHT OF WAY

BUILDING

ASPHALT PAVEMENT

CURB

OVERHEAD UTILITIES

CHAIN LINK FENCE

HANDRAIL

EDGE OF CRUSHED STONE

CONCRETE

TREES

BUSH

MAILBOX

PORCH

PAVEMENT MARKING

FULL DEPTH ASPHALT AND

STONE RECONSTRUCTION

CAPITAL SERVICES

TYPICAL TOPSOIL REPLACEMENT DETAIL4 NOT TO SCALE

TYPICAL ASPHALT PAVEMENT DETAIL

NOT TO SCALE1

TYPICAL ASPHALT PAVEMENT JOINT DETAIL

NOT TO SCALE2

REGRADE AND ASPHALT PAVEMENT RECONSTRUCTION DETAIL

NOT TO SCALE3

TYPICAL EXISTING ASPHALT PAVEMENT REMOVAL AND

PENNSYLVANIA AVE. SHOULDER TIE-IN

CAPITAL SERVICES

2025-111 Cover-COVER
2025-111 Site-CD-100
2025-111 Site-CS-100
2025-111 Site-CS-500

File details come from the government source that posted it. Updated .